RFP 80GSFC22R0004 Enclosure 2 - QASP Fixed Price Contract Template.pdf
PDF 176 KB Posted
- Attached to
- PROTECTIVE SERVICES – EASTERN REGION Federal contract opportunity
- Solicitation number
- 80GSFC22R0004
About this file
This document contains a Quality Assurance Surveillance Plan (QASP) for a contract to provide protective services to multiple NASA centers. The contract will be awarded as a single-award indefinite-delivery, indefinite-quantity contract with firm-fixed-price task orders. The contractor will provide services including communications security, security operations, information security, program security, resource protection, physical security, credentialing, emergency call center management, and training. The QASP defines the government's approach for monitoring contractor performance through oversight and insight. It outlines performance metrics and criteria for evaluation, methods for communication and reporting, and roles for government personnel in contract administration and record keeping.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 80GSFC22R0004, ENCLOSURE 2
GOVERNMENT QUALITY ASSURANCE SURVEILLANCE
PLAN
NASA PROTECTIVE SERVICES – EASTERN REGION
(NPS-ER)
CONTRACT NUMBER: TBD
OCTOBER 2021
FOR INFORMATION PURPOSES ONLY (10/2015)
NASA PROTECTIVE SERVICES – EASTERN REGION (NPS-ER)
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
1.0 INTRODUCTION
1.1 Purpose
The purpose of this Government Quality Assurance Surveillance Plan (QASP) is to define the overall approach the NASA Goddard Space Flight Center (GSFC) intends to use to monitor and survey Contractor performance under the NASA Protective Services – Eastern Region (NPS-ER), Contract No. TBD. This Single-Award Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract with Firm-Fixed-Price Task Orders provides for acquire regional protective services for NASA Glenn Research Center (GRC), Goddard Space Flight Center (GSFC), Headquarters (HQ), and Langley Research Center (LaRC).
These protective services include, but are not limited to; Communications Security (COMSEC), Security Operations (SECOPS), Information Security (INFOSEC), Program Security (SAP and SCI), Resource Protection, Physical Security (PHYSEC), Credentialing, 911 Phone Center and Protective Services Communications Center (PSCC), Emergency Management (EM), and NASA Protective Services Training.
The QASP is a Government-developed surveillance tool prepared in accordance with FAR 46.601 and NFS 1846.401. It is not part of the contract, per NFS 1846.401(a)(iii), but provided to the Contractor for informational purposes only.
1.2 Scope
This QASP has been developed to evaluate Contractor actions while implementing the Attachment A, Statement of Work (SOW). It is designed to provide an effective surveillance method of monitoring Contractor performance, services, processes, and products provided under this NPS-ER contract. This QASP defines the process the Government expects to follow to obtain data, evaluate the Contractor, and determine if contract performance conforms to contract requirements. The Contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract.
The role of the Government is quality assurance to ensure contract standards are achieved. In this contract the quality control program is the driver for product quality.
The Contractor is required to develop a comprehensive program of inspections and monitoring actions. The first major step to ensuring a “self-correcting” contract is to ensure that the quality control program approved at the beginning of the contract provides the measures needed to lead the Contractor to success. Once the quality control program is approved, careful application of the process and standards presented in the remainder of this document will ensure a robust quality assurance program.
This plan is applicable to all services performed or products provided by the NPS-ER Contractor(s). Throughout this QASP, the term “Contractor” is used. In terms of this plan, it should be known that unless explicitly stated, the term “Contractor” is applicable to both the NPS-ER Contractor and any and all of its subcontractors.
2.0 FORMS OF SURVEILLANCE
There exists a wide-ranging spectrum associated with surveillance, ranging from oversight to insight. The strategy and approach to surveillance by GSFC for the NPS-ER contract, as detailed in this plan, is one that concentrates primarily on insight as opposed to oversight. However, NASA reserves the right to initiate additional surveillance activities (insight or oversight) on an ‘as-needed’ basis, based upon circumstances and data collected (adverse trends, negative data points, lack of corrective action, etc.) via the surveillance activities defined in this plan.
2.1 Surveillance Strategies
Insight
Insight is an assurance process that uses performance requirements and if definable, performance metrics to ensure process capability, product quality and end-item effectiveness. Insight relies on gathering a minimum set of product or process data that provides adequate visibility into the integrity of the product or process. The data may be acquired from Contractor records, usually in a non-intrusive parallel method.
Insight as applied to this contract will result in lower levels of Government surveillance and allow the Contractor to assume increased responsibility and accountability for the integrity of processes. Insight will rely heavily on evaluating planned contract deliverables, performance standards, and existing Contractor procedures and working documents, if available.
Oversight
Oversight as applied to this contract will result in higher levels of Government surveillance. The Government will gather information pertaining to the Contractor's process through involvement and/or inspection in the process and will monitor the process itself. The Government's involvement in the Contractor's performance, through oversight, will be determined necessary by the Contracting Officer's Representative
(COR).
The Government may use a variety of surveillance methods to evaluate the Contractor's performance. Government surveillance will be conducted on a non-interference basis and in a manner that will not unduly delay work being performed by the Contractor.
2.2 Surveillance Team
All surveillance activities will be implemented using NASA and NASA support-contractor personnel, a delegated agency (e.g., Defense Contract Management Agency (DCMA)), and/or a surveillance support). The surveillance team may be composed of:
• GSFC Procurement Personnel (i.e., Contracting Officer (CO), Contract Specialist)
• GSFC’s Program Personnel (i.e., COR and GRC, GSFC, HQ, and LaRC Task
Monitor(s))
• GRC/GSFC/HQ/LaRC Safety, Health and Security Personnel (both physical and
Information Technology (IT) Security)
• GRC/GSFC/HQ/LaRC Property Administrator Personnel
The NPS-ER CO is responsible for ensuring performance of all necessary actions for effective contracting, ensuring compliance with the terms of the contract, issuing task orders, and safeguarding the interests of the United States in its contractual relationships.
The CO will also assure that the Contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
The NPS-ER COR is designated in writing by the CO to act as his/her authorized technical representative to assist in administering the contract. The COR monitors the technical work performed under the contract, evaluates Contractor performance, serves as the primary interface for the Contractor and the CO for all technical matters, reports on contract status to Program/Project Management, and recommends corrective action when necessary. The COR is not empowered to make any contractual commitments, authorize any contractual changes on the Government’s behalf, or in any way direct the Contractor to operate in conflict with the contract terms and conditions. Any changes that the Contractor deems may affect the contract or task order price, terms, or conditions shall be referred to the CO for action. The COR’s limitations of authority are contained in the NASA Form 1634, COR Delegation.
2.3 Communications
• Monthly Performance reviews
• Electronic mail
• Informal Discussions
• Other communication methods, as required
2.4 Evaluation and Reporting
• Monthly Reports
• Monthly Contractor performance metrics
• Inspection of deliverable items
2.5 Work Review and Performance Monitoring
The Government will evaluate the Contractor's accomplishment of the technical objectives through the following:
• Monthly meetings with the Contractor to review progress and identify problems.
• Preparation and submission of Contractor Performance Annual Reporting System
(CPARS) reports.
• Conduct inspection and acceptance of the Contractor's deliverable items.
• Review Contractor's safety procedures and performance.
• Validate that Contractor is performing according to the required contractual plans (e.g. testing, integration, quality assurance, etc.) by physical inspection, review of submitted reports, and meetings with the contract manager.
• The surveillance team will make a physical inspection of the Contractor's onsite work area semi-annually. In addition, the COR may make informal inspections, as required. These inspections are made to assure compliance with NASA and GSFC onsite regulations and procedures.
• All onsite Contractor employees have a GRC/GSFC/HQ/LaRC Personal Identity Verification (PIV) card (badge).
• The names and locations (buildings/room numbers) of the Contractor employees match their monthly onsite Personnel Identity Verification (PIV) Report.
• The Contractor employees are aware that the use of Government telephones is for official business only.
• The Contractor employees are following the proper Checkout Procedures when GRC/GSFC/HQ/LaRC e.g., returning PIV card (badges)). The PIV data forms will be checked against the monthly Onsite Reports to identify exiting employees.
• The Contractor employees are aware of the NASA and GRC/GSFC/HQ/LaRC IT
Security compliance requirements.
• Validate that all Installation-Accountable Government Property (IAGP) is being properly utilized and maintained.
2.6 Record Keeping and Documentation
The COR is responsible for maintaining accurate and complete records of the Contractor’s performance. The COR is responsible for collecting the performance evaluation documentation and maintaining any other material that reflects the quality of the Contractor performance. Even though the Contractor is responsible for ensuring performance compliance under their quality control requirements, the Government will give the Contractor prompt notice of defects observed by the COR and GRC/GSFC/HA/LaRC Task Monitor(s). This does not imply that the Government is obligated to carry out quality control inspections for the Contractor, but that on discovering a problem, the Government will inform the Contractor in detail of the incident. COR will keep CO informed of any issues brought to the attention of the Contractor by the COR.
If performance issues arise, they will be discussed immediately between the CO, COR, and Contractor. Action plans will be developed and resolutions tracked for closure by the Contractor and Government.
During the course of the contract, the COR shall retain a copy of all surveillance documentation. At the end of the surveillance period, these records shall be forwarded to the Contracting Officer for inclusion in the contract file. However, when a specific service or deliverable item becomes unsatisfactory during a surveillance period, a copy of the documentation supporting the unsatisfactory performance shall be forwarded to the Contracting Officer for action between the Government (CO and COR) and Contractor.
2.7 Contract Administration
Contractor maintains effective communication within its own organization, including subcontractors. Problems, technical issues, and programmatic changes are promptly communicated to all concerned. Prime Contractor communication with subcontractors is seamless and transparent to the customer.
3.0 CRITERIA FOR EVALUATING PERFORMANCE
The Contractor's performance in all of the areas listed above will be monitored to assure that ineffective or wasteful methods are not being used. As required by FAR 42.1502 and GPR 5100.2, Supplier Performance Evaluations, the CO, in collaboration with the COR, will annually complete a Contractor Performance Assessment Reporting System (CPARS) evaluation, which will also be reviewed by the Contractor, and become a part of the Past Performance Information Retrieval System (PPIRS). In the event of a finding that will require immediate attention, the COR will notify the CO of the situation for necessary action. The Contractor will be required to submit a written response and any corrective action steps needed.
4.0 SUMMARY
This Government Quality Assurance Surveillance Plan describes the approach GRC/GSFC/HQ/LaRC intends to use to monitor the NPS-ER contract and assure that the Contractor performs in accordance with the terms and conditions of the contract.
GRC/GSFC/HQ/LaRC using an insight surveillance approach. The goal is to balance the level of Government surveillance with the perceived impacts and risks of mission failure.
Contracting Officer’s Representative Signature
Contracting Officer Signature
File details come from the government source that posted it. Updated .