rfb 13291_for info only_FY21-22 Pothole Report_Supplemental.pdf
PDF 4 MB Posted
- Attached to
- RFB - COUNTYWIDE CULVERT REPAIR AND REPLACEMENT
- Solicitation number
- BPM013291
- Issued by
- California
About this file
This document is a Potholing Report prepared by AIRX Utility Surveyors, Inc. for the County of San Diego's Department of Public Works, detailing utility location and vacuum excavation services conducted on Tralee Terrace in Spring Valley, California. The report documents the excavation of seven test holes (potholes 17.1 through 17.7) performed between December 8 and December 16, 2022, to establish utility conflicts and connection points for the County of San Diego's FY21-22 Annual Culvert Supplemental Potholing project (RFP 1025095). The excavations identified multiple utilities including sewer laterals, sanitary sewer lines, storm drains, and unknown utilities housed in concrete encasements, with depth measurements ranging from 14 inches to 94 inches below ground surface. All work was conducted in the south-bound lane of Tralee Terrace under County excavation permit DPW2022-RWEXCP-75286 and traffic control permit DPW2022-RWTCP-01310, with all pothole locations marked and documented for future utility adjustment and final plan preparation.
The potholing work was performed following standard County procedures, including pre-excavation USA (Underground Service Alert) markout notification, traffic control plan implementation, and proper environmental protocols such as off-site water disposal and 95% density backfill compaction. Permanent surface repairs were completed using Aquaphalt patching for pavement and concrete replacement for the damaged sidewalk panel. AIRX's report recommends that all pothole locations and active markout be surveyed to aid in utility adjustment on final plans. The project is part of a larger countywide culvert repair and replacement initiative, with the excavation permit valid from September 9, 2022, through April 7, 2023. No pricing information, contract terms, or award details are specified in this technical report.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PPOOTTHHOOLLIINNGG RREEPPOORRTT
U T I L I T Y S U R V E Y O R S , I N C .
PPRREEPPAARREEDD BBYY::
December 23, 2022
785 East Mission Road Ste. 100 I San Marcos, CA 92069 I P.760.480.2347 I F.760.739.8034 I airxus.com
Utility Locating and Potholing Area:
Tralee Terrace
Spring Valley, CA
AIRX Project #: X221475 Project Name: County of San Diego RFP_1025095_21-22 Annual Culvert
Supplemental Potholing -Tralee Additional Sewer Lateral
TABLE OF CONTENTS
1. Description of Pothole Procedures and Site-Specific Details
2. Pothole Project Map(s)
3. Pothole Location Map(s)
4. Pothole Tabulation Report
5. Pothole Data Sheet(s)
6. Permit(s)
A I R X U T I L I T Y S U R V E Y O R S , I N C .
Descriptionof
P otholeP roceduresand
S iteS pecificDetails
A IR X U T IL IT Y S U R V E Y O R S , IN C .
DESCRIPTION OF POTHOLE PROCEDURES
AIRX Utility Surveyors performs a full range of specialized engineering services including Underground Utility Location and Vacuum Excavation (to verify depth and alignment of underground utilities).
Underground Utility Location employs sophisticated electronic locating devices to trace the route of an underground utility; then the route is marked on the surface with marking paint in paved areas, or with 60 penny nails and feathers in unpaved areas.
Vacuum excavation employs a vacuum truck in conjunction with high-pressure air or water to excavate material and expose an underground utility. A 10 to 12-inch diameter hole is first cored or chiseled through the pavement so that the vacuum hose and high-pressure air or water hose can be inserted.
Utilities found during potholing are located on the surface by placing two reference points (typically 36” apart) on either side of the pothole along the centerline (or edge) of the utility, using paving nails or 60 penny nails as appropriate. Depth measurements (to the nearest ½ inch) are taken midway between the two reference points.
Utility alignment, depth, and other data is marked with pink paint (on pavement), or on wood lath (unpaved areas).
SITE SPECIFIC DETAILS
AIRX was contracted by County of San Diego to perform utility locating and potholing services on Tralee Terrace in Spring Valley, CA. A total of 7 potholes were excavated to establish conflicts and connection points on a variety of utilities. The results of the data are contained in the attached spreadsheet and data sheets.
In preparation of these excavations, AIRX marked out the dig locations and called in for USA (Underground Service Alert). All traffic control plans and permits were drawn and applied for by AIRX and all traffic control was set up by
AIRX.
All the excavations and discovery went without any incident. Any changes and adjustments are mentioned in the Pothole Tabulation Report and the Pothole Data Sheets. All the results were annotated on the ground and in this report. It is AIRX’s recommendation that all pothole locations and the active mark out should be surveyed to aid in the adjustment of utilities on the final plan and profile.
At each pothole location, the utility alignment was marked with pink paint, as well as paving nails or feathers. AIRX used potable water acquired offsite for excavation and all water and material vacuumed was disposed of off-site. No water was allowed to flow into storm drains or natural drainages. The potholes were backfilled with clean backfill material and compacted to 95% density in 3” lifts. The pavement was patched with Aquaphalt and the sidewalk panel was replaced with concrete. All field work was performed between December 8, 2022 and December 16, 2022.
P otholeP rojectM ap(s)
P otholeL ocationM ap(s)
P otholeT abulationR eport
POTHOLE TABULATION REPORT: County of San Diego RFP_1025095_21-22 Annual Culvert Potholing -Tralee Additional Sewer Lateral
Pothole Number
Date Street Pavement Thickness
Utility Type Utility Size & Material Soil Type Depth-Ground to Top of Utility
Depth-Ground to Top of Package/
Encasement
Depth-Ground to Bottom of Package/
Encasement
Total Depth
Excavated
Utility Orientation
Pothole Project Area
Map #
Pothole Location
Map # Description & Location Notes
17.1 12/15/2022 Tralee Terrace
Asphalt - 3.0″ Concrete - N/A
Base - N/A Total - 3.0″
Sewer Lateral 4.0″ VCP Subgrade 92.0″ T/P N/A N/A 94.0” W/E 1 1 Pothole 17.1 is located in the south bound lane of Tralee Terrace. Please refer to Location Map 1 for the approximate location of Pothole 17.1.
17.2 12/15/2022 Tralee Terrace
Asphalt - 3.0″ Concrete - N/A
Base - N/A Total - 3.0″
Sewer Lateral 4.0″ VCP Subgrade 78.0″ T/P N/A N/A 80.0” W/E 1 1 Pothole 17.2 is located in the south bound lane of Tralee Terrace. Please refer to Location Map 1 for the approximate location of Pothole 17.2.
17.3 12/16/2022 Tralee Terrace
Asphalt - 4.0″ Concrete - N/A
Base - N/A Total - 4.0″
Sanitary Sewer Storm Drain
4.0″ VCP
30.0″ Steel
Subgrade, Sand
75.0″ T/P 56.0″ T/P
N/A N/A
N/A N/A
80.0” W/E N/S
1 1 Pothole 17.3 is located in the south bound lane of Tralee Terrace. Please refer to Location Map 1 for the approximate location of Pothole 17.3.
17.4 12/09/2022 Tralee Terrace
Asphalt - 4.0″ Concrete - N/A
Base - N/A Total - 4.0″
Sewer Lateral 4.0″ VCP Subgrade 80.0″ T/P N/A N/A 84.0” W/E 1 1 Pothole 17.4 is located in the south bound lane of Tralee Terrace. Please refer to Location Map 1 for the approximate location of Pothole 17.4.
17.5 12/15/2022 Tralee Terrace
Asphalt - 4.0″ Concrete - N/A
Base - N/A Total - 4.0″
Sewer Lateral 4.0″ VCP Subgrade 77.0″ T/P N/A N/A 86.0” W/E 1 1 Pothole 17.5 is located in the south bound lane of Tralee Terrace. Please refer to Location Map 1 for the approximate location of Pothole 17.5.
17.6 12/08/2022 Tralee Terrace
Asphalt - 4.0″ Concrete - N/A
Base - N/A Total - 4.0″
Unknown Concrete Encasement Subgrade, Clay N/A 27.0″ T/Enc 43.0″ B/Enc 52.0” W/E 1 1
Pothole 17.6 is located in the south bound lane of Tralee Terrace. Please refer to Location Map 1 for the approximate location of Pothole 17.6.
17.7 12/08/2022 Tralee Terrace
Asphalt - 4.0″ Concrete - N/A
Base - N/A Total - 4.0″
Unknown Concrete Encasement Subgrade, Clay N/A 14.0″ T/Enc 34.0″ B/Enc 77.0” W/E 1 1
Pothole 17.7 is located in the south bound lane of Tralee Terrace. Please refer to Location Map 1 for the approximate location of Pothole 17.7.
Excavated 77.0 inches deep, and 24.0 inches wide to get bottom of encasement.
P otholeDataS heet(s)
RECORD OF TEST HOLE DATA
AIRX JOB NO: X221475
TEST HOLE NO: 17.1
DATE EXCAVATED: 12/15/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Sewer Lateral 4.0″ VCP 92.0″ T/P N/A N/A W/E
TOTAL DEPTH EXCAVATED: 94.0”
PAVEMENT THICKNESS: ASPHALT: 3.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade
COMMENT:
Pothole 17.1 is located in the south-bound lane of Tralee Terrace.
Please refer to Location Map 1 for the approximate location of Pothole 17.1. The photo above was taken in front of Pothole 17.1 facing east.
A downhole view of the 4.0 inch wide VCP Sewer Lateral utility found in Pothole 17.1, at the depth of 92.0 inches T/P. Utility runs in a W/E direction at the Pothole location and was found directly on markout.
AREA SHOT DOWNHOLE VIEW
PH 17.1
TEST HOLE NO: 17.2
DATE EXCAVATED: 12/15/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Sewer Lateral 4.0″ VCP 78.0″ T/P N/A N/A W/E
TOTAL DEPTH EXCAVATED: 80.0”
PAVEMENT THICKNESS: ASPHALT: 3.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade
COMMENT:
Pothole 17.2 is located in the south-bound lane of Tralee Terrace.
Please refer to Location Map 1 for the approximate location of Pothole 17.2. The photo above was taken in front of Pothole 17.2 facing east.
A downhole view of the 4.0 inch wide VCP Sewer Lateral utility found in Pothole 17.2, at the depth of 78.0 inches T/P. Utility runs in a W/E direction at the Pothole location and was found directly on markout.
PH 17.2
AIRX JOB NO: X221206
TEST HOLE NO: 17.3
DATE EXCAVATED: 12/16/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Sanitary Sewer 4.0″ VCP 75.0″ T/P N/A N/A W/E
2 Storm Drain 30.0″ Steel 56.0″ T/P N/A N/A N/S
TOTAL DEPTH EXCAVATED: 80.0”
PAVEMENT THICKNESS: ASPHALT: 4.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade, Sand
COMMENT:
Pothole 17.3 is located in the south-bound lane of Tralee Terrace.
Please refer to Location Map 1 for the approximate location of Pothole 17.3. The photo above was taken in front of Pothole 17.3 facing south.
A downhole view of the utilities found in Pothole 17.3 and their orientation at the pothole location: 4.0 inch VCP Sanitary Sewer utility at the depth of 75.0 inches T/P and runs in a W/E direction; and 30.0 inch Steel Storm Drain utility at the depth of 56.0 inches T/P and runs in a N/S direction. Utilities were found directly on markout.
PH 17.3
TEST HOLE NO: 17.4
DATE EXCAVATED: 12/09/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Sewer Lateral 4.0″ VCP 80.0″ T/P N/A N/A W/E
TOTAL DEPTH EXCAVATED: 84.0”
PAVEMENT THICKNESS: ASPHALT: 4.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/AA
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade
COMMENT:
Pothole 17.4 is located south-bound lane of Tralee Terrace. Please refer to Location Map 1 for the approximate location of Pothole 17.4.
The photo above was taken in front of Pothole 17.4 facing east.
A downhole view of the 4.0 inch wide VCP Sewer Lateral utility found in Pothole 17.4, at the depth of 80.0 inches T/P. Utility runs in a W/E direction at the Pothole location and was found directly on markout.
PH 17.4
TEST HOLE NO: 17.5
DATE EXCAVATED: 12/15/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Sewer Lateral 4.0″ VCP 77.0″ T/P N/A N/A W/E
TOTAL DEPTH EXCAVATED: 86.0”
PAVEMENT THICKNESS: ASPHALT: 4.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade
COMMENT:
Pothole 17.5 is located in the south-bound lane of Tralee Terrace.
Please refer to Location Map 1 for the approximate location of Pothole 17.5. The photo above was taken in front of Pothole 17.5 facing east.
A downhole view of the 4.0 inch wide VCP Sewer Lateral utility found in Pothole 17.5, at the depth of 77.0 inches T/P. Utility runs in a W/E direction at the Pothole location and was found directly on markout.
PH 17.5
TEST HOLE NO: 17.6
DATE EXCAVATED: 12/08/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Unknown Concrete Encasement N/A 27.0″ T/Enc 43.0″ B/Enc W/E
TOTAL DEPTH EXCAVATED: 52.0”
PAVEMENT THICKNESS: ASPHALT: 4.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Concrete
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade, Clay
COMMENT:
Pothole 17.6 is located in the south bound lane of Tralee Terrace.
Please refer to Location Map 1 for the approximate location of Pothole 17.6. The photo above was taken in front of Pothole 17.6 facing south.
A downhole view of the Concrete Encasement housing Unknown utilities found in Pothole 17.6, at the depth of 27.0 inches T/Enc and
43.0 inches B/Enc. Utility runs in a W/E direction at the Pothole location and was found directly on markout.
PH 17.6
TEST HOLE NO: 17.7
DATE EXCAVATED: 12/08/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Unknown Concrete Encasement N/A 14.0″ T/Enc 34.0″ B/Enc W/S
TOTAL DEPTH EXCAVATED: 77.0”
PAVEMENT THICKNESS: ASPHALT: 4.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Concrete
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade, Clay
COMMENT:
Excavated 77.0 inches deep, and 24.0 inches wide to get bottom of encasement.
Pothole 17.7 is located in the south bound lane of Tralee Terrace.
Please refer to Location Map 1 for the approximate location of Pothole 17.7. The photo above was taken in front of Pothole 17.7 facing south.
A downhole view of the Concrete Encasement housing Unknown utilities found in Pothole 17.7, at the depth of 14.0 inches T/Enc and
34.0 inches B/Enc. Utility runs in a W/E direction at the Pothole location and was found directly on markout.
PH 17.7
Permit(s)
COUNTY OF SAN DIEGO
DEPARTMENT OF PUBLIC WORKS
PRIVATE DEVELOPMENT CONST.
INSPECTION
5510 OVERLAND AVE, SUITE 210
SAN DIEGO, CALIFORNIA 92123-1239
(858) 694-3165 FAX: (858) 694-2354
EXCAVATION PERMIT
DATE ISSUED:
EXPIRATION DATE:
09/09/2022 04/07/2023
TRUST ACCOUNT NO.: PERMIT NO.: DPW2022-RWEXCP-75286
Financial Source: CIP Number PWR-01303
APPLICANT:
AIRX UTILITY SURVEYORS, INC.
CLINTON BOOGAARD
760-480-2347
CBOOGAARD@AIRXUS.COM
CONTRACTOR: PERMIT OWNER:
AIRX UTILITY SURVEYORS, INC.
785 EAST MISSION ROAD #100
SAN MARCOS, CA 92069
760-480-2347
SITE ADDRESS / JOB LOCATION:
VARIOUS ROADS / SPRING VALLEY / TB 1271-C6 , 1291-A2
NEAREST X-STREET / INTERSECTION:
APN: Agency Job No.: 1025095 GPS COORD.:
DETAILED DESCRIPTION:
Scope of Work: 15 POTHOLES (12" X 12") WITHIN COUNTY ROW
Related Permits: DPW2022-RWTCP-01310
Any work performed by a subcontractor under this permit shall be disclosed, in accordance with County Code section 71.120. Submit completed form PDS-294 to grading.lueg@sdcounty.ca.gov prior to commencement of work by the subcontractor.
Notes:
A) A Pre-construction conference is required prior to the start of any work in the County ROW. Contact your assigned Private Development Construction Inspection (PDCI) Inspector directly to schedule.
B) Stormwater Best Management Practices (BMPs) are required at all times and shall be planned and installed in accordance with the County's Watershed Protection Ordinance, Municipal Separate Storm Sewer System Permit (MS4), and, if applicable, the State Construction General Permit regulations.
C) Traffic Control Permit(s) are required and must be obtained prior to start of any work in the County's Road ROW.
D) Compaction of backfill material shall be achieved by "Mechanical Compaction" methods and geotechnical compaction reports are required for all compacted sections. Exceptions to compaction testing requirements may be allowed at the discretion of DPW.
E) Existing culverts and other road facilities shall be protected in place against any damage. Any culvert or road facility damaged during construction shall be reported to DPW immediately through your assigned Inspector.
F) All existing paved and unpaved areas damaged, disturbed, or removed by the permitted work shall be repaired to the County Standards and as approved by DPW PDCI inspector. The trench resurfacing shall be done in accordance with San Diego Regional Standard Drawings G-24 A&B, Type D for asphalt surfacing, G-25 for concrete surfacing. In addition, the final surface treatment shall match the existing surface type.
G) Deviations from the standard trench restoration requirements must be reviewed and approved by DPW prior to start of work.
H) Trenches and excavation that exceeds five (5) feet in vertical depth shall be done in accordance with CAL-OSHA Safety Standards. Contact CAL-OSHA at (619) 767-2280 for permit requirements.
I) Gate Well Cap and Can installations shall meet San Diego Regional Standard Drawing WV-02.
J) Bollards are not allowed in the Right-of-Way to protect equipment per Highway Design Standards Section 2.2 No. 14. No less than an 8ft minimum clear recovery zone (CRZ) shall be maintained for roadways without curbs.
K) Subject to Streets and Highways Code Sections 732.5, 1492.5 and 1810.5; Survey monuments shall be preserved, referenced, and/or replaced pursuant to Section 8771 of the Business and Professions Code.
L) No greater than 50 Linear Feet of trench shall be opened and plated at any one time. Exceptions to the plated length may be
EXCAVATION PERMIT Page 1 of 2Permit No. DPW2022-RWEXCP-75286 allowed at the discretion of DPW.
M) Hours of work may be determined by the Traffic Control Permit. No traffic controls will be allowed during students drop off and pickup periods in the vicinity of schools and peak commute hours at some locations.
N) To document pavement condition in Condition No. F above, all permits that utilize heavy equipment and/or trucks weighing over 7-tons loaded weight, the applicant shall submit acceptable photo-documentation of the existing road surfacing including any visible cracks in the pavement for all work locations and intended haul routes to assigned PDCI inspector prior to start of construction.
LENGTH(FEET): 1 WIDTH(FEET): 1 DEPTH(FEET):
PIPE SIZE: MATERIAL:
This permit is granted under provision of Title 7 of the San Diego County Code of Regulatory Ordinances, and is subject to the following terms:
Permit Owner agrees to indemnify, hold harmless and defend the County and each of its officers and employees from any liability or responsibility for accident, loss or damage to persons or property arising in any way from the work authorized by this permit, including the design or performance of work by Permit Owner, or Permit Owner's agents, employees or representatives.
Only the contractor identified in this permit and contractor’s agents, employees, or representatives may perform work under this permit.
Substitution of the contractor shall require a modification of this permit or new permit, in accordance with County Code section 71.102.1.
Issuance of this permit does not grant Permit Owner any property rights. Permit Owner is solely responsible for obtaining any property rights that may be necessary to conduct work under this permit.
This permit does not authorize interference with the public use and maintenance of the public highway, including without limitation, any traveled way, shoulder, parking lane, sidepath, sidewalk, landscaped areas, drainage structure or watercourse. Upon receipt of reasonable notice from the Director, Department of Public Works, Permit Owner shall relocate, change the grade, or remove the improvement in a manner and to a location acceptable to Director.
Permit Owner shall notify the Department of Public Works, Construction Inspection at (858) 694-3165 at least 24 hours prior to (1) beginning any portion of work, (2) completing any portion of work, and (3) otherwise as required by the Director of Public Works.
Before you dig, call UNDERGROUND SERVICE ALERT at 1-800-422-4133. Enter UNDERGROUND SERVICE ALERT Inquiry Identification No. here__________. This permit is not valid until an inquiry number is obtained.
This permit, including any attachments, must be kept at the work site and made available to any authorized agent of the County of San Diego upon request.
County of San Diego, Director of Public Works by: Date:
EXCAVATION PERMIT Page 2 of 2Permit No. DPW2022-RWEXCP-75286
09/09/2022
FOR COUNTY USE ONLY APPLICATION FOR EXCAVATION PERMIT Date _ _ ______ _
RECORD ID:
DPW20 ______ _
RWEXCP-_____ _
Permit owner AirX Utility Surveyor s, Inc.
Last Name
Mailing Address 785 East Mission Road #100 Street
COUNTY OF SAN DIEGO
DEPARTMENT OF PUBLIC WORKS
5510 OVERLAND AVENUE, SUITE 110
SAN DIEGO, CA 92123
PHONE (858) 694-2055 • FAX (858) 279-7020
E-mail LDPERMITCOUNTER@SDCOUNTY. CA. GOV
THOMAS GUIDE
YEAR/ PAGE
EDITION
33 1028
Telephone# (760) 480-2347 First
San Marcos City
CA 92069
State lip Code
COORD
C6
Hereby makes application for permit to excavate and/or construct the following on the public roads, subject to provisions of Title 7, Div. 1 of San Diego County Code of Regulatory Ordinances. Permit revocable at option of Director, Department of Public Works when necessary.
Application Contact Name Clinton Boogaard Email Address cboogaard@airxus.com Telephone 11 (760) 480-2347
Contractor ____________________ Telephone # _____________ License# _______ __ _ Name Ins. Exp. Date
Email Address-- ------------ -- ----------- -- ---------- ---------
Utility Owner (if applicable) _N_I_A _________________ Agency Job Number: _X_2_2_1_4_7_5 __ _______ _
Is the work part of a larger project or program requiring multiple permits, or currently under review for permit? YES □ NO Iii
If yes provide: Related Permits Traffic Control Permit Assessor Parcel# __ ___________ __
Is this a utility relocation in connection with a County Capital Improvement Project? YES Iii NO D
If yes provide: Name of Project 21-22 Annual Culverts (GIP Project 1025095) - Spring Valley Location of work Tralee Terrace & Bray Ave, Sweetwater Ln & Harness St
Street Nome and Number and nearest cross street
Standard Drawing: □ G-24A Type D or DS-22 □ G-25 0 SP-02 0 WP-02 0 Other: _____ _
Excavation Length _1_2_"_(T_y_p_ic_a_l_) _ _______ Width 12" (Typical) Depth to be determined
If pipe is to be placed, state size _N_I_A _ ___________ _ ___ and kind _N_I_A ___ _ ___________ __
Detailed Description of Work 15 Potholes ( 12" x 12") within County ROW
Requested Permit Duration (ex: 90 days) _6_0_d_a_y_s_ _____ A general liability insurance certificate is required for this time period.
Surface to be cut: Iii Asphalt D Concrete □ Dirt
Sample Application (link here) Attachments/Requirements at Application (links to samples provided):
w/t>.. D Financially Responsible Party Agreement -8- Environmental Review Questionnaire (CEQA) iJ/,-:; D Inspection Deposits and Permit Fee --S-- Contractor's License and Proof of Liability Insurance
-9-Traffic Control Permit Application D Signed Engineering Plans (excavation over 1,000 LF) .-0- Traffic Control Plan or Regional Standard Drawing D Utility Company Connection Approval (if applicable)
D Location Map (link to tool LAYER NEEDS TO BE D Linear Underground/Overhead Project form (RWQCB Exemption) (for DEVELOPED) and Construction Drawing projects greater than or equal to 1500 LF)
I hereby agree as a condition of the granting of this permit to provide defense and indemnification in accordance with Section 71.103 of the San Diego County Code of Regulatory Ordinances as follows: Permit Owner agrees to indemnify, hold harmless and defend the County and each of its officers and employees from any liability of responsibility for accident, loss or damage to persons or property arising by reason of the work done by Permit Owner, or Permit Owner's agents, employees or representatives.
Permit Owner agrees that all work within the County right-of-way will be accomplished in accordance with Approved Plans, the Standard Specifications of the Department of Public Work, "Special Provisions for Work Done Under Excavation Permit", "Special Provisions and Specifications for Improvement of New Streets", or Regional Standard Drawings and as stated on the Permit, and shall be subject to inspection and approval of the Director, Department of Public Works. If any tank, pipe, conduit, duct, tunnel or other facility (collectively "facilities") placed in the right-of-way interferes with the operation, improvement, grading or realignment of the highway by the County, the above signed will at their own expense completely remove the facilities and restore the right-of-way, or relocate the facilities to a location designated by the Director, Department of Public Works, and restore the right-of-way. All work shall be completed to the satisfaction of the Director, Department of Public Works. The Permit Owner further agrees to pay any damages resulting to County of San Diego from the negligent or improper design, construction or installation of the facilities or performance of permitted work and will restore the right-of-way, as near as may be possible to its former state and so as not to have impaired unnecessarily its usefulness or will repay to County of San Diego its cost of such restoration. Notwithstanding the foregoing, this permit is not to be interpreted to supersede prior rights or franchise rights in the right-of-way that are owned by a Permit Owner, but should be interpreted to supplement or explain those rights whenever practical to do so without contradicting an express term of a title document or grant f franchise.
I declare under p�l�perjury_.u�9er/Y,e J,�� of California that the statements made herein are true and orrect.
S.igned, __ -"�'----------L--"______ _ _________ eJ 2, 2,J>Z--2- Permit Owner
DPW Form #1 (2/2016) ISSUANCE FEE AND DEPOSITS ARE PAYABLE IN ADVANCE
DPW2022-RWEXCP-75286
ENCROACHMENT/EXCAVATION/CONSTRUCTION PERMIT #
CIP PROJECT 1025095
DPW2022-RWEXCP-75286
Applicant Information
Company: AIRX UTILITY SURVEYORS, INC.
Agent/Applicant: CLINTON BOOGAARD Agent Phone Number: 760-480-2347 Agent Email Address: CBOOGAARD@AIRXUS.COM Agent Mailing Address: 785 E MISSION ROAD #100
City: SAN MARCOS State: CA Zip Code: 92069 Reason for Traffic Control: POTHOLING TO LOCATE POTENTIAL UTILITY CONFLICTS
Start Date: 09/19/2022 Start Time: 08:00 AM
Finish Date: 04/07/2023 End Time: 04:00 PM
COMMUNITY
SPRING VALLEY / TB 1271-C6 , TB
1291-A2 / STA:15 Thomas Bros. Map Page and Grid #
08/24/2022 (Agent's or Applicant's Signature) (Date)
See Attached Plan (s) and Traffic Control Notes
This request is approved.
Director, Department of Public Works
By (For Road Commissioner) (Date)
County of San Diego
DEPARTMENT OF PUBLIC WORKS
TRAFFIC ENGINEERING SECTION
APPLICATION FOR TRAFFIC CONTROL PERMIT -- SEE ATTACHED PLANS
(type of traffic control: flag, shift, etc.)
County of San Diego DPW / Traffic Engineering (MS 0332) 5510 Overland Ave, Suite 410 San Diego, CA 92123-1239 telephone/voice mail: (858) 694-3863 secretary: (858) 694-3850 fax: (858) 694-3928 e-mail:
DPWTrafficControl.permit@sdcounty.ca.gov
DPW2022-RWTCP-01310
It is requested that a permit be granted for traffic control on the following street/streets:
STREET 1 TRALEE TR
From Street QUAILCREEK LN To BRAY AV
STREET 2 BRAY AV
From Street TRALEE TR To CUL DE SAC
STREET 3 SWEETWATER LN
From Street BIRCH ST To HARNESS ST
CC: Construction Inspection Ref: Sec 72.75. County Code of Regulatory Ordinances
9/9/2022 elott Typewritten Text
SIGNATURE ON APPLICATION
COUNTY OF SAN DIEGO
DEPARTMENT OF PUBLIC WORKS
TRAFFIC ENGINEERING SECTION
APPLICATION FOR TRAFFIC CONTROL PERMIT Lane Shift
Type of traffic control: flag, shift, etc.
County of San Diego DPW Traffic Engineering Section Room 470, MS 0334 5510 Overland Ave, Suite 410 San Diego, CA 92123-1239
Telephone/voice mail:(858) 694-3863 Secretary (858) 694-3850
Fax (858) 694-3928
DPWTRAFFICCONTROL. PERMIT@SDCOUNTY. CA. GOV
Encroachment/ excavation/ construction permit# _________ _ ______ _
Applicant Information company Ai rX Utility Surveyors, Inc.
Agent/applican.� ___ B_o_o_g_a_a_ r _d ________ C_lin_t _o_n ________ _________ _ 1..a5t Name First
Agent Telephone .If (760) 480-2347 AgentFax/f. ________________ _
Agent Mailing Address: 785 E Mi ssi on Road #100 Street Name and Number
Agent E-mail Address cboogaard@airxus.com
Reason for Traffic Control: Potholing
San Ma rcos City
CA 92069
State Zip Code
St art Date: 9/19/2022
Finish Date: 11/18/2022 Start Time: 8:30 AM
End Time: 3:30 PM a.m. / p.m.
a.m. / p.m.
It is requested that a permit be granted for traffic control on the fallowing street/streets:
STREET 1 Tralee Terrace From Street Bray Ave
From Street Harness St
To Qua ilcreek Ln
To Bi rch StSTREET 2 Sweetwater Ln
COMMUNITY Spring Va lley Thomas Brothers Map Page and Grid# 1271-C6, 1291-A2
Signed_� ___ C>_�-�------------ !3 I?� I a z 'L
Agent or Applicant
See Attached Plan (s) and Traffic Control Notes
This request is:
APPROVED 0 DENIED 0
Director, Department of Public Works
By ____________________________ _ For Road Commissioner
Ref: Section 72.75 County Code of Regulatory Ordinances DPW Form #6(1/2014)
DPW2022-RWEXCP-75286
DPW2022-RWTCP-01310
ENVIRONMENTAL REVIEW QUESTIONNAIRE FOR WORK
WITHIN THE COUNTY OF SAN DIEGO ROAD RIGHT OF WAY
(TO BE FILLED OUT BY APPLICANT)
PERMIT owNER: AirX Utility Surveyors, Inc.
PROJECT LOCATION: 21-22 Annual Culverts (CIP Project 1025095) - Spring Valley
Please Check YES or NO
YES NO (FURTHER INVIRONMENTAL REVIEW MAY BE REQUIRED FOR A "YES" ANSWER)
The work is part of a larger project or program requiring multiple permits, or currently under review for perm it
The project proposes grading or fill within a creek or wetland area
The project will remove vegetation adjacent to a creek or wetland area
The project will harm or remove healthy, mature or scenic trees
The project is on a hazardous waste site per Section 65962.5 of Gov. Code
The project will have significant impact to aesthetics
The project is located on a dedicated trail, or pathway
The project will have impacts to historic or prehistoric resources
The project will result in significant noise impacts
This language shall be placed on the face of the plans and will become a permit condition:
"If during the course of any ground disturbing activities any historic or pre-historic resources are identified, work will be ceased immediately in that area and the Director of DPW notified. Work will commence once authorized by the Director of DPW".
"To avoid harm to any mature oak trees, the applicant will not place any concrete, fill, or grade within the canopy of any mature oak tree unless an arborist provides direction and certification that such construction would not cause harm to the tree".
"The applicant will avoid construction impacts to mature trees by only allowing hand digging within the canopy of any existing mature tree. Any tree with a diameter of 3 inches or greater will be considered mature."
"If existing landscaping is to be removed, the applicant will replace it in kind".
I hereby certify the above answers are true and correct to the best of my knowledge:
PERMIT SIGNATURE: __ cb ___ _ &-# _ _ _ ✓-_�- -� _ _ _ __ DATE:
February 2014
COUNTY OF SAN DIEGO
DEPARTMENT OF PUBLIC WORKS
TRAFFIC CONTROL PERMIT APPLICATION SUBMITTAL CHECKLIST
Application package must include the following requirements at a minimum. Application is subject to rejection if any of the following information is not completed.
D Description/type of work being done (Ex. access manhole, replace overhead lines on existing poles, replace water service line, etc.) Potholing to locate potential utility conflicts
D Roadway Characteristics:
□ County Maintained Road (Yes/No) _Y_e_s _________________ Information on County maintained roadways can be found at the link below:
https://www.sandiegocounty.gov/content/sdc/dpw/roads/maintroad.html
□ Work affecting other jurisdictions (Yes/No) If yes, please list. _N_o ___ _ _ _ _ _ _
□ Road Classification on Mobility Element Map Local Public Roads
(Ex. 2.2E Light Collector, 4.1A Major Road, Not on Mobility Element Map, etc.)
https://www.sandiegocounty.gov/pds/generalplan.html
□ Speed Limit_ 2_S_M_P_H _ _ _____________ _ _ __ http://library.amlegal.com/nxt/gateway.dll?f=templates&fn=default.htm&vid=amlegal:sandiego co ca me
□ # fl One each Direction o anes _____________ _ _ _ __________ _
0 Roadway Width Tralee Ter: 36', Sweetwater Ln: 28'
□ Centerline Striping (Yes/No) _N_o ___________________
□ Bike Lanes (Yes/No) _N_o _ _ _____________ __ _ _ __
□ Sidewalk (Yes/No) _l _n _te_r _m_it_te_n_t ____________ _
□ Traffic Signal in County Right of Way (Yes/No) No
□ Traffic Signal in other jurisdiction (Yes/No) _N_o _ _ _ _ __
No
□ School zone within½ mile of work zone (Yes/No) If yes, list school hours. _____ _
No
□ Bus route or bus stops within work zone (Yes/No) ___________ _ _ _ _ https://www .sdmts.com/ http://www.gonctd.com/
□ Identify Community (Ex. Alpine, Valley Center, Spring Valley, etc.) Spring Valley
D Overview map. Show location and limits of work area (length, width), including road name and distance to cross streets. See Example #1.
D Work site specific traffic control plans (See Example #3), appropriate Manual on Uniform
Traffic Control Devices (MUTCD) Chapter 6 Temporary Traffic Control, or appropriate San
Diego Regional Standard Drawing (SDRSD) Appendix "A" Traffic Control Plans. If submitting an SDRSD, please denote roadway width and work area dimensions on TCP. Include offsets of work area to points of interest (edge of pavement, adjacent lanes, etc.). See Example #2.
D Traffic Control Permit Application signed and dated.
I hereby certify the above information and attachments are true and correct to the best of my knowledge.
Clinton Boogaard Applicant Printed Name Applicant Signature
TRALEE TR, BRAY AV, AND SWEETWATER LN
TRAFFIC CONTROL NOTES
Contractor shall make application to the Traffic Engineering Section of the Department of Public Works (Roads Division, 5510 Overland Ave, Suite 410, Rm 470, San Diego, CA, 92123-1239, Mail Station O332) for a traffic control permit, a minimum of three (3) weeks prior to commencement of work. For more complex projects, contractor shall allow for additional time for review. There is no fee for this permit.
All Traffic control plan(s) shall be in compliance with the 2014 Revision 6 California, Manual Uniform Traffic Control Devices (CAMUTCD), Chapter 6 Temporary Traffic Control, and Appendix A of the 2018 San Diego Regional Standard Drawings.
PROJECT SPECIFIC TRAFFIC CONTROL
Road name and work location radius/scope: TRALEE TR (FROM QUAILCREEK LN TO
BRAY AV), BRAY AV (FROM TRALEE TR TO CUL DE SAC), AND SWEETWATER LN
(FROM BIRCH ST TO HARNESS ST)
Road traffic control operations: FLAGGING, LANE CLOSURE, LANE SHIFT, AND
SHOULDER CLOSURE
Type of work: POTHOLING TO LOCATE POTENTIAL UTILITY CONFLICTS
Traffic control shall be in accordance with the attached approved plans. The Contractor shall maintain 12’ minimum travel lanes (14’ minimum travel lanes where bike lanes exist) at all times.
Work hours shall be from 8:00 AM to 4:00 PM, Monday thru Friday.
**PLEASE CONTACT COUNTY INSPECTOR TO MODIFY WORKING HOURS**
The Contractor will not be allowed to work during peak hours on roads that carry commuter traffic on the Mobility Element Roads per County of San Diego General Plan.
When the work zone is confined to the road shoulder with minimal or no road encroachment, refer to Chapter 6H “Typical Applications” of the “California Manual on Uniform Traffic Control Devices” (CA MUTCD), latest edition.
ROAD CLOSURE
No full or partial Road Closure will be allowed.
NOTIFICATION
By agreeing to this Permit, permittee agrees that County of San Diego shall not be liable for, and permittee shall indemnify, hold harmless, and defend the County of San Diego and each of its officers and employees against any and all claims, demands, liability, judgments, awards, fines, mechanics' liens or other liens, labor disputes, losses, damages, expenses, charges or costs of any kind or character, including attorneys’ fees and court costs (hereinafter collectively referred to as “Claims”), related to this Permit or the work covered by this Permit and arising either directly or indirectly from any act, error, omission or negligence of permittee or its contractors, licensees, agents, servants or employees, including, without limitation, Claims caused by the sole passive negligent act or the concurrent negligent act, error or omission, whether active or passive, of County of San Diego Parties.
For work from 7PM to 7AM, Mon. thru Fri., the Contractor shall obtain a variance from the Noise Control Officer in accordance with Section 36.424, “VARIANCES,” of the County Code of Regulatory Ordinances. There is a fee for this variance. Please contact Souphie Sakdara at (858) 495-5214.
Whenever construction activity will disrupt or impede access to any residence/business, the contractor shall inform each affected residence/business by written notice the nature and expected duration of the disruptive construction activity. Such written notice shall be delivered to each affected residence/business a minimum of five (5) business days prior to the start of the disruptive construction activity.
Contractor shall coordinate with County Traffic Signal Coordinator three (3) work days prior to start of work at (619) 701-1905 or (858) 935-5705 or (858) 694-3850 to identify location of signal detector loops and, if appropriate, to set the traffic signal on flashing red or modify signal timing prior to the start of work and to reset upon completion of work. Contractor shall provide signage for signal modification. For work requiring extended days of signal flash (more than three days in total for the length of the permit) or for night work the contractor will be required to obtain an electrical sub-contractor to place the signal on flash prior to start of work and to reset upon completion of work. The electrical sub-contractor must possess a State of California Contractor’s License, Classification C-10 Electrical Contractor.
SIGNING
All signs shall conform to the guidelines set forth in the latest edition of Part 2 “Signs” and Part 6, “Temporary Traffic Control” of the “California Manual on Uniform Traffic Control Devices for Streets and Highways” (CA MUTCD).
The Contractor shall place “Tow-Away/No Parking” signs along the street 24 hours prior to the impending work. “Tow-Away/No Parking” signs shall be furnished by the Contractor and shall contain the following information: the day(s) and time during which parking will be prohibited, the name of contractor, and the contractor’s/tow yard’s contact number.
Contractor shall remove these signs immediately when they are no longer needed for use in the respective area of the project. If work is delayed or rescheduled for any reason after placement of “Tow-Away/No Parking” signs, sign(s) shall be removed and re-dated signs shall be installed two (2) days in advance of the impending work.
All signs shall be in place prior to start of construction.
All other signs shall be standard size unless otherwise noted. All advance warning signs shall be per MUTCD (CA) or 36” x 36” minimum, whichever is greater.
For work zone lasting more than four weeks, all W20-1 or C23, and curve warning signs shall be mounted on 4”x 4” wooden posts at standard height and equipped with type “B” high-intensity flashers, unless otherwise noted.
Temporary Traffic Control Signs shall be on a portable type installation.
Post-mounted signs shall remain in place at all times until construction is completed. Other signs required for traffic control shall be laid down or covered during non-working hours.
Temporary Traffic Control Devices shall comply with section 12-3 of Caltrans Standard Specifications unless otherwise noted.
All advance-warning signs for night closures shall be illuminated.
Placement of all signs shall not interfere with sight distance at driveways and intersections.
Position of post-mounted signs may be adjusted as necessary to optimize visibility or sign and/or obtain suitable placement area.
W20-1 signs and all other yellow or orange signs shall have a reflective background constructed of at least high-intensity (Type III) retroreflective sheeting.
All signs shall be equipped with orange flags and signs mounted on barricades shall have flashers on roads posted 50 MPH or higher.
PORTABLE CHANGEABLE MESSAGE SIGNS (PCMS)
PCMS shall comply with Section 6F.60 of the CA MUTCD.
Minimum of Two PCMS shall be considered when Road Closures (Partial or full) are necessary with detours.
STRIPING
No striping changes will be allowed to start on a Friday, unless otherwise noted and approved by the County Traffic Engineer.
Contractors shall layout and stripe all interim and final striping.
Contractor shall install all interim and final pavement markers, temporary tabs, and channelizers.
All striping changes shall be the responsibility of the Contractor. Striping modifications (due to construction), which exceed one (1) week in duration, require sandblasting. All sandblasting required by said striping changes shall be completed within 24 hours of that change.
All obliterated striping, raised pavement markers, pavement paint legends and markings, shall be reflectorized and replaced by the Contractor. Markings in thermoplastic shall be replaced in kind.
TRAFFIC SIGNAL LOOP DETECTORS
Signal equipment, such as loop detectors, damaged by the Contractor shall be replaced by the Contractor within 48 hours from time of damage.
DEVICES
Actual work area shall be protected with either orange reflectorized channelizing devices or by barricades equipped with type “A” flashers sufficient in number to prevent entry of both vehicles and pedestrians except as may be noted elsewhere. At no time shall a continuous row of flashers be used adjacent to a lane of traffic. Only steady-burn type “C” lamps shall be used under these circumstances.
All cones and/or post delineators shall be fitted with reflective sleeves of the appropriate color.
If used, all type “B” flashers shall operate 24 hours a day.
FLAGGING
Flagging operation shall use alternate one-way movement to pass traffic through the construction area.
Traffic shall be controlled at all times by flaggers. Flaggers shall be in constant communication with each other during the flagging operation. Advance flaggers shall be positioned upstream to warn traffic when queues develop. Additional flaggers may be required at intersections.
Where the one-lane section is short enough so that each end is visible from the other end, traffic will be controlled by means of a flagger at each end of the section. They should be able to communicate with each other verbally or by means of signals. These signals should not be such as to be mistaken for flagging signals. Where the end of one-way section is not visible from the other end, the flaggers shall maintain contact by means of radio or field telephones so that a flagger may know when to allow traffic to proceed into the section.
Flaggers shall be positioned near crest of hill allowing flaggers sufficient visibility of approaching traffic.
Flaggers shall be positioned so that they are easily visible to approaching traffic.
Flagger stations for work at night shall be illuminated as referenced in Part 6 of the “California Manual on Uniform Traffic Control Devices for Streets and Highways” (CA MUTCD), latest edition.
Where a one-lane temporary traffic control zone is short enough to allow visibility from one end to the other, traffic may be controlled by a single flagger. When a single flagger is used, the flagger shall be stationed on the shoulder opposite the obstruction or work space, or in a position where good visibility and traffic control can be maintained at all times.
If unable to utilize an alternate one-way flagging operation, Contractor shall contact Department of Public Works, Roads Division at (858) 694-3850 three (3) weeks prior to the proposed closure to determine its appropriateness. If a road closure is deemed appropriate, proper advanced notification (information signs, mailed and verbal notifications) is necessary to the emergency services, police services, businesses, residents, and school districts.
ACCESS
Emergency vehicle access shall be maintained at all times.
Mail service, trash service, and school bus access shall be maintained at all times.
Motorist delay time shall not exceed 15 minutes unless otherwise approved by the County Traffic Engineer.
Contractor shall maintain access to all private driveways within the construction area at all times. If continuous access cannot be maintained, access must be provided as needed.
Adequate provisions shall be made for pedestrian traffic.
Adequate sight distance shall be maintained at all intersections in the vicinity of the work zone. If sight distance is affected by the traffic control, the contractor shall provide adequate distance per the County of San Diego Public Road Standards. Flaggers may be needed. The use of mirrors is not permitted as an alternative to providing adequate sight distance.
GENERAL
The Contractor shall be responsible for supplying, installing, and maintaining all traffic control devices as shown on the plan along with additional traffic control devices that may be required to ensure safe movement of traffic and pedestrians through work area.
The Contractor shall be responsible for coordinating with any Special Events that will be affected in the area of the impending work and the Contractor shall be responsible for coordinating with other traffic control work zones, unless approved by County Inspector. The Contractor shall maintain 500 feet between beginning and end of work zone signage. Updated Special Event and Temporary Traffic Control information within the County may be found at the following link: https://www.sandiegocounty.gov/content/sdc/dpw/roads/roadclose.html
The provisions of this section may be modified or altered if, in the opinion of the engineer, public traffic will be better served, and the work expedited. Said modifications or alterations shall not be adopted until approved in writing by the engineer.
The Contractor shall minimize the active construction zone to 250 feet to 500 feet unless approved by County Inspector.
https://www.sandiegocounty.gov/content/sdc/dpw/roads/roadclose.html
The Contractor shall maintain maximum closure length based on work that can be completed at the end of the workday.
During non-working hours, the Contractor shall provide the full road width, which existed prior to the start of construction.
Bore shall offset 24” minimum from any streetlight and signal foundation and shall not occur beneath any streetlight and signal foundation.
Any open trenches within the construction area shall be adequately protected with barricades, k-rails, and/or spoil piles to prevent entry of vehicles and pedestrians.
All trenches shall be back-filled and paved or plate-bridged overnight. All temporary steel plate bridging shall have non-skid surfaces. Non-skid surfaces on the temporary steel plate bridging as well as the method of installing the temporary steel plate bridging and shoring shall be as specified in Section 602.1, “Temporary Steel Plate Bridging -- With a Non-Skid Surface” of the most current Caltrans Encroachment Manual. Unless approved by the County Inspector, use of steel plate bridging shall not exceed 24 hours. At the end of every workday, steel plate bridging shall not exceed 50 feet in length, unless approved by the County Inspector. Open trenches are not allowed during non- working hours.
All dirt and debris shall be removed from the roadway each day before completion of work.
Street must be maintained in drivable condition at all times. Contractor shall not use the County right of way for storage of materials and equipment.
All Traffic Control devices, including advance warning signs, delineators, and barricades shall be removed from the roadway at the end of work each day (except W20-1 signs, if plate-bridging overnight.)
The Contractor is to restore roadway and all signing to prior conditions at the completion of work.
The Contractor shall coordinate their work with impacted agencies, San Diego Metropolitan Transit System (MTS), private road owners and/or Home-Owner Associations (HOA). Some agencies may require up to two weeks lead time.
Unless the work is specifically requested by the Engineer, or is Emergency in nature, no work will be performed on the following, County observed holidays:
New Year’s Day Martin Luther King Jr. Day President’s Day Cesar Chavez Day Memorial Day Juneteenth Day
Independence Day Labor Day Veteran’s Day Thanksgiving Day Day after Thanksgiving Day Christmas Day
LEGEND
APPROACH
SPEED (MPH)
55+
MINIMUM DISTANCE (FEET)
BETWEEN SIGNS AND FROM LAST
SIGN TO TAPER
MINIMUM TAPER LENGTHS (L) (FEET) FOR
12-FOOT LANE
L 1/2L 1/3L
125 65 45
180 90 60
245 125 85
320 160 110
540 270 180
600 300 200
660 330 220
BUFFER
LENGTH
(FEET)
MAX CONE SPACING
TAPER TANGENT CONFLICT
25 50 12
30 60 15
35 70 17
40 80 20
45 90 22
50 100 25
50 110 27
TRAFFIC CONTROL SIGN
APPROXIMATE POTHOLE LOCATION
TRAFFIC CONE / DELINEATOR
FLAGGER
FAS - FLASHING
ARROW SIGN
WORK ZONE
SIGNALIZED
INTERSECTION
TRAFFIC CONTROL BARRICADE
BUS STOP
TS
STOP
RIGHT LANE
MUST
TURN RIGHT SIDEWALK
CLOSED
SIDEWALK CLOSED
AHEAD
CROSS HERE
ROAD
CLOSED
ROAD CLOSED
TO
THRU TRAFFIC
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
DETOUR
AHEAD
ROAD
CLOSED
AHEAD
RIGHT LANE
CLOSED
AHEAD
BIKE LANE
CLOSED
AHEAD
NARROW
LANE
END
DETOUR
DETOUR
END
ROAD WORK
BIKE LANE
CLOSED
STEEL
PLATES
AHEAD
LANE
CLOSED
LEFT LANE
CLOSED
AHEAD
M4-10(R/L)
DETOUR
SHARE
THE
ROAD
SIGN LEGEND
ONE LANE
ROAD
AHEAD
RIGHT LANE
CLOSED
AHEAD
LEFT LANE
CLOSED
AHEAD
DETOUR
KEEP
RIGHT
M4-8AG20-2C30A(CA)C30(BK)C30(CA)C20(CA)RC20(CA)LC12(CA)C9A(CA)
SHOULDER
CLOSED
R1-1 R3-1 R3-2 R3-4
R3-5(R/L)
ONLY
OPEN
TRENCH
C27(CA)
W21-5
SHOULDER
WORK
RIGHT
SHOULDER
CLOSED
AHEAD
W21-5b(R/L)
R9-11(R/L)R9-9R9-3R3-7(R/L)R3-6(R/L) R11-2 R11-4 SC3(CA) W1-4(R/L)R4-7A
W20-5(L)W20-4W20-3W20-2W20-1W16-1W8-24W4-2(R)W4-2(L)
W3-4
W20-5(R) W20-5(BK)W11-1
STOP
SLOW
Flagger Paddle
R4-11
MAY USE
FULL LANE
WRONG
WAY
R5-1aR5-1
DO NOT
ENTER
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
21-22 ANNUAL CULVERTS – TO #23 SPRING VALLEY
08/22/2022
EDOARDO CRUZ
COUNTY OF SAN DIEGO
X221475
POTHOLING
AutoCAD SHX Text
BUS
175'± WORK ZONE
BUFFER SPACE
200'±
S
H
I
F
T
A
P
E
R
L
G
A
P
SHIFT TAPER
L=65'
POST TEMPORARY "NO PARKING" SIGNS
(Both Sides of Street)
PH 7PH 8PH 9PH 10
12' min
12' min
12' min
12' min m in m in m i n m i n
R4-7A
C27(CA) C27(CA)
R4-7A R4-7A R4-7A R4-7A
C30(CA)
C30(CA)
C30(CA)
R4-7A
R4-7A
G 20-2
W 20-1
C 12(C
A) C
12(C A)
R4-7A
C
(C A
C
(C A
W
-1 G
-2
100' Sign
Spacing
W20-1G20-2100' Sign
Spacing
100' Sign
Spacing
W20-1
G20-2
S i g n
S p a c i n g
NOTE: WORK WILL BE COORDINATED
WITH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .