rfb 13291_for info only_FY20-21 Pothole Report_GROUP 2.pdf
PDF 6 MB Posted
- Attached to
- RFB - COUNTYWIDE CULVERT REPAIR AND REPLACEMENT
- Solicitation number
- BPM013291
- Issued by
- California
About this file
This is a pothole report document for Group 2 prepared by a California county for fiscal years 2020-2021, supporting a countywide culvert repair and replacement request for bids. The report provides informational data regarding pothole incidents and conditions across the county's roadway infrastructure during the specified fiscal period. The document serves as a reference resource for bidders evaluating the scope and nature of road maintenance work required under the culvert repair and replacement project, offering baseline data on existing pavement conditions and repair needs that inform project planning and cost estimation.
The pothole report contains historical incident data and road condition assessments intended to establish the operational environment and maintenance demands that bidders should consider when preparing proposals. This reference documentation enables prospective contractors to understand the scale of infrastructure challenges, frequency of required repairs, and geographic distribution of maintenance needs across the county's road network, thereby supporting informed bidding decisions and realistic project cost projections for the countywide culvert repair and replacement initiative.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PPOOTTHHOOLLIINNGG RREEPPOORRTT
U T I L I T Y S U R V E Y O R S , I N C .
PPRREEPPAARREEDD BBYY::
August 30, 2022
785 East Mission Road Ste. 100 I San Marcos, CA 92069 I P.760.480.2347 I F.760.739.8034 I airxus.com
Utility Locating and Potholing Area:
Elm St, Sargeant Rd, Leada Wy, Gunn Stage Rd & Mt Woodson Rd
Ramona, CA
AIRX Project #: X221204 Project Name: Annual Culverts Group 2- County of San Diego
TABLE OF CONTENTS
1. Description of Pothole Procedures and Site-Specific Details
2. Pothole Project Map(s)
3. Pothole Location Map(s)
4. Pothole Tabulation Report
5. Pothole Data Sheet(s)
6. Manhole Data Sheet(s)
7. Permit(s)
A I R X U T I L I T Y S U R V E Y O R S , I N C .
Description of
Pothole Procedures and
Site Specific Details
DESCRIPTION OF POTHOLE PROCEDURES
AIRX Utility Surveyors performs a full range of specialized engineering services including Underground Utility Location and Vacuum Excavation (to verify depth and alignment of underground utilities).
Underground Utility Location employs sophisticated electronic locating devices to trace the route of an underground utility; then the route is marked on the surface with marking paint in paved areas, or with 60 penny nails and feathers in unpaved areas.
Vacuum excavation employs a vacuum truck in conjunction with high-pressure air or water to excavate material and expose an underground utility. A 10 to 12-inch diameter hole is first cored or chiseled through the pavement so that the vacuum hose and high-pressure air or water hose can be inserted.
Utilities found during potholing are located on the surface by placing two reference points (typically 36” apart) on either side of the pothole along the centerline (or edge) of the utility, using paving nails or 60 penny nails as appropriate. Depth measurements (to the nearest ½ inch) are taken midway between the two reference points.
Utility alignment, depth, and other data is marked with pink paint (on pavement), or on wood lath (unpaved areas).
SITE SPECIFIC DETAILS
AIRX was contracted by the County of San Diego to perform utility locating and potholing services in Ramona, California. A total of 8 potholes were excavated to establish conflicts and connection points on a variety of utilities.
The results of the data are contained in the attached spreadsheet and data sheets.
In preparation of these excavations, AIRX marked out the dig locations and called in for USA (Underground Service Alert). All traffic control plans and permits were drawn and applied for by AIRX and all traffic control was set up by
AIRX.
All the excavations and discovery went without any incident except for pothole 111, where an additional pothole was added in order to locate the desired water utility. Any changes and adjustments are mentioned in the Pothole Tabulation Report and the Pothole Data Sheets. All the results were annotated on the ground and in this report.
All Pothole and utility geographical locations were collected using the Trimble Catalyst DA1. The Trimble Catalyst DA1 uses RTK GNSS precision when collecting points. GPS locations are collected for GIS Map packages and are not to be used for Final Design. It is AIRX’s recommendation that all pothole locations and the active mark out should be surveyed to aid in the adjustment of utilities on the final plan and profile.
At each pothole location, the utility alignment was marked with pink paint, as well as paving nails or feathers. AIRX used potable water acquired offsite for excavation and all water and material vacuumed was disposed of off-site. No water was allowed to flow into storm drains or natural drainages. The potholes were covered with clean backfill material and compacted to 95% density in 3” lifts. The pavement was patched with Aquaphalt. All field work was performed between August 18, 2022, and August 24, 2022.
Pothole Project Map(s)
Pothole Location Map(s)
Pothole Tabulation Report
POTHOLE TABULATION REPORT: Annual Culverts Group 2- County of San Diego
Pothole Number
Date Street
Coordinates Pavement Thickness
Utility Type Utility Size & Material Soil Type Depth-Ground to Top of Utility
Depth-Ground to Top of Package/
Encasement
Depth-Ground to Bottom of Package/
Encasement
Total Depth
Excavated
Utility Orientation
Pothole Project Area
Map #
Pothole Location
Map # Description & Location Notes
08/22/2022
Elm St (33.054796, -116.861244)
Asphalt - 5.0″ Concrete - N/A
Base - N/A Total - 5.0″
Water (Not Found)
N/A
Subgrade
64.0” N/A 1 1
Pothole 111 is located at (33.054796, -116.861244).
Please refer to Location Map 1 for the approximate location of Pothole 111.
Excavated 64 inches deep and 72 inches wide.
111A 08/22/2022
Elm St (33.054797, -116.861258)
Asphalt - 10.0″ Concrete - N/A
Base - N/A Total - 10.0″
Water Water
4.0″ Steel 2.0″ Copper
Subgrade 38.0″ T/P 39.0″ T/P
N/A N/A
N/A N/A
66.0”
NNE/SSW
West 1 1
Pothole 111A is located at (33.054797, -116.861258).
Please refer to Location Map 1 for the approximate location of Pothole 111A.
Pothole added to locate water from Pothole 111A. Found 4-inch steel with a 2-inch T copper connection.
08/18/2022
Sargeant Rd (33.025594, -116.80851)
Asphalt - 5.0″ Concrete - N/A
Base - N/A Total - 5.0″
Water
10.0″ ACP
50.0″ T/P
66.0” W/E 2 2
Pothole 172 is located at (33.025594, -116.80851).
Please refer to Location Map 3 for the approximate location of Pothole 172.
173 08/18/2022
(33.025577, -116.808853)
Asphalt - 4.0″ Concrete - N/A
Base - N/A Total - 4.0″
AT&T, Cox, Electric
Plastic Package Subgrade N/A 43.0″ T/Pkg 59.0″ B/Pkg 70.0” W/E 2 2 Pothole 173 is located at (33.025577, -116.808853).
Please refer to Location Map 3 for the approximate location of Pothole 173.
Electric from Pothole 174 was found in this pothole.
08/18/2022
(33.025573, -116.80854)
Asphalt - 4.0″
Base - N/A Total - 4.0″
Electric (Not Found)
63.0” N/A 2 2
Pothole 174 is located at (33.025573, -116.80854).
Please refer to Location Map 3 for the approximate location of Pothole 174.
Excavated 63 inches deep and 36 inches wide, a big rock prevented further excavation. Electric was found in Pothole 173.
08/19/2022
Leada Way (33.009337, -116.793816)
Asphalt - N/A Concrete - N/A
Base - N/A Total - N/A
AT&T, Cox, Electric
Unknown
26.0″Wide PVC Package
1.0″ PVC
9.5″ T/P
42.0″ T/Pkg
56.0″ B/Pkg
57.5”
NW/SE
NW/SE
3 3 Pothole 192 is located at (33.009337, -116.793816).
Please refer to Location Map 3 for the approximate location of Pothole 192.
08/19/2022
Gunn Stage Rd (33.007744, -116.816061)
Asphalt - N/A Concrete - N/A
Base - N/A Total - N/A
Cox
2.0″ Plastic
38.5″ T/P
41.0” WSW/ENE 4 4
Pothole 201 is located at (33.007744, -116.816061).
Please refer to Location Map 4 for the approximate location of Pothole 201.
211 08/22/2022
Mount Woodson Rd
(33.006066, -116.95711)
Asphalt - 12.0″
Base - N/A Total - 12.0″
Water Water Service
12.0″ PVC
1.0″ Copper
Subgrade 54.0″ T/P 28.0″ T/P
N/A N/A
N/A N/A
60.0”
WSW/ENE
SSE
5 5
Pothole 211 is located at (33.006066, -116.95711).
Please refer to Location Map 5 for the approximate location of Pothole 211.
The water service line T's off the 12-inch water main, but first it goes up and towards the house at 28 inches T/P. Tracer wire was present.
Pothole Data Sheet(s)
RECORD OF TEST HOLE DATA
AIRX JOB NO: X221204
TEST HOLE NO: 111
DATE EXCAVATED: 08/22/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Water (Not Found) N/A N/A N/A N/A N/A
TOTAL DEPTH EXCAVATED: 64.0”
PAVEMENT THICKNESS: ASPHALT: 5.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: N/A
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade
COMMENT:
Excavated 64 inches deep and 72 inches wide.
Pothole 111 is located at (33.054796, -116.861244). Please refer to Location Map 1 for the approximate location of Pothole 111. The photo above was taken in front of Pothole 111 and 111A facing west.
A downhole view of the excavation to 64.0 inches deep. Utilities were not found in the Pothole.
AREA SHOT DOWNHOLE VIEW
PH 111 PH 111A
TEST HOLE NO: 111A
DATE EXCAVATED: 08/22/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Water 4.0″ Steel 38.0″ T/P N/A N/A NNE/SSW
2 Water 2.0″ Copper 39.0″ T/P N/A N/A West
TOTAL DEPTH EXCAVATED: 66.0”
PAVEMENT THICKNESS: ASPHALT: 10.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade
COMMENT:
Pothole added to locate water from Pothole 111A. Found 4-inch steel with a 2-inch T copper connection.
Pothole 111A is located at (33.054797, -116.861258). Please refer to Location Map 1 for the approximate location of Pothole 111A.
The photo above was taken in front of Pothole 111 and 111A facing
SSW.
A downhole view of the utilities found in Pothole 111A and their orientation at the pothole location: 4.0 inch Steel, Water utility at the depth of 38.0 inches T/P and runs in a NNE/SSW direction; and 2.0 inch Copper Water utility at the depth of 39.0 inches T/P and runs in a west direction.
PH 111 PH 111A
TEST HOLE NO: 172
DATE EXCAVATED: 08/18/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Water 10.0″ ACP 50.0″ T/P N/A N/A W/E
TOTAL DEPTH EXCAVATED: 66.0”
PAVEMENT THICKNESS: ASPHALT: 5.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Subgrade
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade
COMMENT:
Pothole 172 is located at (33.025594, -116.80851). Please refer to Location Map 3 for the approximate location of Pothole 172. The photo above was taken in front of Pothole 172, 173, and 174 facing west.
A downhole view of the 10.0 inch wide ACP Water utility found in Pothole 172, at the depth of 50.0 inches T/P. Utility runs in a W/E direction at the Pothole location and was found directly on markout.
PH 174 PH 173 PH 172
AIRX JOB NO: X221104
TEST HOLE NO: 173
DATE EXCAVATED: 08/18/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 AT&T, Cox, Electric Plastic Package N/A 43.0″ T/Pkg 59.0″ B/Pkg W/E
TOTAL DEPTH EXCAVATED: 70.0”
PAVEMENT THICKNESS: ASPHALT: 4.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Subgrade
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade
COMMENT:
Electric from Pothole 174 was found in this pothole.
Pothole 173 is located at (33.025577, -116.808853). Please refer to Location Map 3 for the approximate location of Pothole 173. The photo above was taken in front of Pothole 172, 173, and 174 facing east.
A downhole view of the Plastic Package housing AT&T, Cox, Electric utilities found in Pothole 173, at the depth of 43.0 inches T/Pkg and
59.0 inches B/Pkg. Utility runs in a W/E direction at the Pothole location and was found directly on markout.
PH 172 PH 173 PH 174
TEST HOLE NO: 174
DATE EXCAVATED: 08/18/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Electric (Not Found) N/A N/A N/A N/A N/A
TOTAL DEPTH EXCAVATED: 63.0”
PAVEMENT THICKNESS: ASPHALT: 4.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: N/A
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade
COMMENT:
Excavated 63 inches deep and 36 inches wide, a big rock prevented further excavation. Electric was found in Pothole 173.
Pothole 174 is located at (33.025573, -116.80854). Please refer to Location Map 3 for the approximate location of Pothole 174. The photo above was taken in front of Pothole 172, 173 and 174 facing
NNW.
A downhole view of the excavation to 63.0 inches deep. Utilities were not found in the Pothole.
PH 174 PH 173 PH 172
TEST HOLE NO: 192
DATE EXCAVATED: 08/19/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 AT&T, Cox, Electric 26.0″Wide PVC Package
N/A 42.0″ T/Pkg 56.0″ B/Pkg NW/SE
2 Unknown 1.0″ PVC 9.5″ T/P N/A N/A NW/SE
TOTAL DEPTH EXCAVATED: 57.5”
PAVEMENT THICKNESS:
ASPHALT: N/A CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Class II Base
PERMANENT SURFACE REPAIR: Class II Base
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Subgrade
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade
COMMENT:
Pothole 192 is located at (33.009337, -116.793816). Please refer to Location Map 3 for the approximate location of Pothole 192. The photo above was taken in front of Pothole 192 facing ENE.
A downhole view of the utilities found in Pothole 192 and their orientation at the pothole location: 26.0 inch wide PVC Package housing AT&T, Cox, Electric utilities at the depth of 42.0 inches T/Pkg and 56.0 inches B/Pkg running in a NW/SE direction; and 1.0 inch
PVC Unknown utility at the depth of 9.5 inches T/P and runs in a
NW/SE direction. Utilities were found directly on markout.
PH 192
TEST HOLE NO: 201
DATE EXCAVATED: 08/19/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Cox 2.0″ Plastic 38.5″ T/P N/A N/A WSW/ENE
TOTAL DEPTH EXCAVATED: 41.0”
PAVEMENT THICKNESS: ASPHALT: N/A CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Class II Base
PERMANENT SURFACE REPAIR: Class II Base
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Subgrade
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade
COMMENT:
Pothole 201 is located at (33.007744, -116.816061). Please refer to Location Map 4 for the approximate location of Pothole 201. The photo above was taken in front of Pothole 201 facing NE.
A downhole view of the 2.0 inch wide Plastic Cox utility found in Pothole 201, at the depth of 38.5 inches T/P. Utility runs in a WSW/ENE direction at the Pothole location and was found directly on markout.
PH 201
TEST HOLE NO: 211
DATE EXCAVATED: 08/22/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Water 12.0″ PVC 54.0″ T/P N/A N/A WSW/ENE
2 Water Service 1.0″ Copper 28.0″ T/P N/A N/A SSE
TOTAL DEPTH EXCAVATED: 60.0”
PAVEMENT THICKNESS: ASPHALT: 12.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: Yes
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade
COMMENT:
The water service line T's off the 12-inch water main, but first it goes up and towards the house at 28 inches T/P.
Pothole 211 is located at (33.006066, -116.95711). Please refer to Location Map 5 for the approximate location of Pothole 211. The photo above was taken in front of Pothole 211 facing SSE.
A downhole view of the utilities found in Pothole 211 and their orientation at the pothole location: 12.0 inch PVC Water utility at the depth of 54.0 inches T/P and runs in a WSW/ENE direction; and 1.0 inch Copper Water Service utility at the depth of 28.0 inches T/P and runs in a SSE direction. Utilities were found directly on markout.
PH 211
Manhole Data Sheet(s)
A MH 1
B
C
D
F
G
DIP DATA SHEET
AIR X Job #:
X221204
Crew Members: Rodrigo Rodriguez Date:
8/24/2022
Job Name: Annual Culverts Group 2- County of San Diego
DIP #
PH 171
Location (Street Name): Sargeant Road and Abrigo Way
Flagger: N/A
Service Type (Sanitary, Storm, Gas, Water, Electric, Etc): Sewer
Barrel Type & Diameter:
MEASURE DOWN
/ FLOWLINE
COMMENTS
103" T/P
DOWNHOLE VIEW
ORIENTATION AREA PHOTO
N
Permit(s)
DPW2022-RWEXCP-74999
1������1���2� ��3�45-6 �++789,-6/ �0
| � | ���:��;�����45-6��<)-5��=*>5?/ �45-6��*,87��@@?5AA/ �:��;����B� |
| ���3����45-6��,878-4��@@?5AA/������� | �� |
| �����������86./ ���������� �6,65/ �� C8+��)@5/�5,A)-�D)?� | ?,DD89��)-6?)7/ E��� | ��0���F��G���GH�� |
| � | ||
| ������ | 1����3�6,?6��,65/�� |
���� �6,?6� 8*5/��/I����J8-8A<��,65/��
| ���I �-@� | 8*5/�K/����������� | |
| 1 ������� | ||
| � | :�������� | <)*,A�:?)A3��,+��,45�,-@�;?8@�� ��� |
����F�45-6LA�)?��++789,-6LA��84-,6=?5H F�,65HMNN��##! ONP�Q�!"�RST�!"P�U'!%%� �V&"#'&��W&#NSUO�S�'NXYNS#��S�!��'&ZNP[\�'N #&']�\N�!'#(N"#�&%�QŶ�� �_&'̀S�ab Rc&'�d&!P�V&((�SS�&"N'T R\!#NT
| efghij�fk�lmh�nopqf����� | ��� | ��J���:0 |
| �����r� | ��JJ |
�����0
| ���J��� | ��JJ | ||
| ����� | ��0����� | ||
| ���� ����� | �������0���F6.+5�)D�6?,DD89�9)-6?)7/�D7,42�A<8D62�5693H�)=-6.�)D��,-��854)���� | ||
| � | ?,DD89��-48-55?8-4�F����II�H������s5?7,-@��s52��=865�K���,-��854)2����E���I���IE 6575+<)-5 | ||
| s)895�*,87/���F���H�tEK�I�tIA59?56,?./���F���H�tEK�I���D,u/���F���H�tEK�IE��5�*,87/���� | ?,DD89�)-6?)73+5?*86BA@9)=-6.39,34)s���������� | �������t | |
| $#��S�'NXYNS#NP�#O!#�!��N'(�#�̂N�v'!"#NP�%&'�#'!%%� � &"#'&��&"�#ON�%&��&w�"v�S#'NN#xS#'NN#Sy� | ��� | �� J?)*��6?556 | ) |
��/��)-A6?=968)-� -A+5968)-�5D/��59���3��3��)=-6.��)@5�)D��54=7,6)?.��?@8-,-95A 07-19-2022
DPW2022-RWEXCP-75002
DPW2022-RWTCP-00726
VARIOUS ROADS – RAMONA COMMUNITY
TRAFFIC CONTROL NOTES
Contractor shall make application to the Traffic Engineering Section of the Department of Public Works (Roads Division, 5510 Overland Ave, Suite 410, Rm 470, San Diego, CA, 92123-1239, Mail Station O332) for a traffic control permit, a minimum of three (3) weeks prior to commencement of work. For more complex projects, contractor shall allow for additional time for review. There is no fee for this permit.
All Traffic control plan(s) shall be in compliance with the 2014 Revision 6 California, Manual Uniform Traffic Control Devices (CAMUTCD), Chapter 6 Temporary Traffic Control, and Appendix A of the 2018 San Diego Regional Standard Drawings.
PROJECT SPECIFIC TRAFFIC CONTROL
Road name and work location radius/scope: VARIOUS ROADS – RAMONA COMMUNITY
Road traffic control operations: FLAGGING, LANE CLOSURE, LANE SHIFT, AND
PEDESTRIAN CONTROLS.
Type of work: 9 POTHOLES (12"X12") WITHIN COUNTY ROW.
Traffic control shall be in accordance with attached approved plans and/or 2018 San Diego Regional Standard Drawings TCP-04, TCP-10B and TCP55. The Contractor shall maintain 12’ minimum travel lanes (14’ minimum travel lanes where bike lanes exist) at all times.
Work hours shall be from 7:30 AM to 4:00 PM, Monday thru Friday, when school is not in session. **PLEASE CONTACT COUNTY INSPECTOR TO MODIFY WORKING HOURS**
CONTRACTOR TO CONTACT SCHOOL(S) TO AVOID WORKING WHEN CHILDREN
ARE PRESENT. WORK TO START 30 MIN. AFTER ARRIVAL BELL AND WORK TO END
30 MIN. PRIOR TO DISMISSAL BELL.
Work hours shall be from 09:00 AM to 01:30 PM, Monday thru Friday, while school is in session (SEE BELL SCHEDULE). Contractor shall contact school Monday thru Friday during School hours, a minimum of 48 hours before work begins. To identify potential conflict hours within the approved work hours.
The Contractor shall anticipate shorter work hours where work zone is within a quarter mile radius from a school. Due to peak volumes of pedestrian and vehicular traffic associated with schools, the Contractor shall be required to delay the start of construction operations until a minimum 30 minutes after school is in session and complete construction operations a minimum 30 minutes before school is out of session, at the discretion of the County Engineer. Contractor shall contact school at least 2 working days before work begins to identify potential conflict hours within the approved work hours.
The Contractor will not be allowed to work during peak hours on roads that carry commuter traffic on the Mobility Element Roads per County of San Diego General Plan.
When the work zone is confined to the road shoulder with minimal or no road encroachment, refer to Chapter 6H “Typical Applications” of the “California Manual on Uniform Traffic Control Devices” (CA MUTCD), latest edition.
ROAD CLOSURE
No full or partial Road Closure will be allowed.
NOTIFICATION
By agreeing to this Permit, permittee agrees that County of San Diego shall not be liable for, and permittee shall indemnify, hold harmless, and defend the County of San Diego and each of its officers and employees against any and all claims, demands, liability, judgments, awards, fines, mechanics' liens or other liens, labor disputes, losses, damages, expenses, charges or costs of any kind or character, including attorneys’ fees and court costs (hereinafter collectively referred to as “Claims”), related to this Permit or the work covered by this Permit and arising either directly or indirectly from any act, error, omission or negligence of permittee or its contractors, licensees, agents, servants or employees, including, without limitation, Claims caused by the sole passive negligent act or the concurrent negligent act, error or omission, whether active or passive, of County of San Diego Parties.
For work from 7PM to 7AM, Mon. thru Fri., the Contractor shall obtain a variance from the Noise Control Officer in accordance with Section 36.424, “VARIANCES,” of the County Code of Regulatory Ordinances. There is a fee for this variance. Please contact Souphie Sakdara at
(858) 495-5214.
Whenever construction activity will disrupt or impede access to any residence/business, the contractor shall inform each affected residence/business by written notice the nature and expected duration of the disruptive construction activity. Such written notice shall be delivered to each affected residence/business a minimum of five (5) business days prior to the start of the disruptive construction activity.
Contractor shall coordinate with County Traffic Signal Coordinator three (3) work days prior to start of work at (619) 701-1905 or (858) 935-5705 or (858) 694-3850 to identify location of signal detector loops and, if appropriate, to set the traffic signal on flashing red or modify signal timing prior to the start of work and to reset upon completion of work. Contractor shall provide signage for signal modification. For work requiring extended days of signal flash (more than three days in total for the length of the permit) or for night work the contractor will be required to obtain an electrical sub-contractor to place the signal on flash prior to start of work and to reset upon completion of work. The electrical sub-contractor must possess a State of California Contractor’s License, Classification C-10 Electrical Contractor.
SIGNING
All signs shall conform to the guidelines set forth in the latest edition of Part 2 “Signs” and Part 6, “Temporary Traffic Control” of the “California Manual on Uniform Traffic Control Devices for Streets and Highways” (CA MUTCD).
The Contractor shall place “Tow-Away/No Parking” signs along the street 24 hours prior to the impending work. “Tow-Away/No Parking” signs shall be furnished by the Contractor and shall contain the following information: the day(s) and time during which parking will be prohibited, the name of contractor, and the contractor’s/tow yard’s contact number. Contractor shall remove these signs immediately when they are no longer needed for use in the respective area of the project. If work is delayed or rescheduled for any reason after placement of “Tow-Away/No Parking” signs, sign(s) shall be removed and re-dated signs shall be installed two (2) days in advance of the impending work.
All signs shall be in place prior to start of construction.
All other signs shall be standard size unless otherwise noted. All advance warning signs shall be per MUTCD (CA) or 36” x 36” minimum, whichever is greater.
For work zone lasting more than four weeks, all W20-1 or C23, and curve warning signs shall be mounted on 4”x 4” wooden posts at standard height and equipped with type “B” high-intensity flashers, unless otherwise noted.
Temporary Traffic Control Signs shall be on a portable type installation.
Post-mounted signs shall remain in place at all times until construction is completed. Other signs required for traffic control shall be laid down or covered during non-working hours.
Temporary Traffic Control Devices shall comply with section 12-3 of Caltrans Standard Specifications unless otherwise noted.
All advance-warning signs for night closures shall be illuminated.
Placement of all signs shall not interfere with sight distance at driveways and intersections.
Position of post-mounted signs may be adjusted as necessary to optimize visibility or sign and/or obtain suitable placement area.
W20-1 signs and all other yellow or orange signs shall have a reflective background constructed of at least high-intensity (Type III) retroreflective sheeting.
All signs shall be equipped with orange flags and signs mounted on barricades shall have flashers on roads posted 50 MPH or higher.
PORTABLE CHANGEABLE MESSAGE SIGNS (PCMS)
PCMS shall comply with Section 6F.60 of the CA MUTCD.
Minimum of Two PCMS shall be considered when Road Closures (Partial or full) are necessary with detours.
STRIPING
No striping changes will be allowed to start on a Friday, unless otherwise noted and approved by the County Traffic Engineer.
Contractors shall layout and stripe all interim and final striping.
Contractor shall install all interim and final pavement markers, temporary tabs, and channelizers.
All striping changes shall be the responsibility of the Contractor. Striping modifications (due to construction), which exceed one (1) week in duration, require sandblasting. All sandblasting required by said striping changes shall be completed within 24 hours of that change.
All obliterated striping, raised pavement markers, pavement paint legends and markings, shall be reflectorized and replaced by the Contractor. Markings in thermoplastic shall be replaced in kind.
TRAFFIC SIGNAL LOOP DETECTORS
Signal equipment, such as loop detectors, damaged by the Contractor shall be replaced by the Contractor within 48 hours from time of damage.
DEVICES
Actual work area shall be protected with either orange reflectorized channelizing devices or by barricades equipped with type “A” flashers sufficient in number to prevent entry of both vehicles and pedestrians except as may be noted elsewhere. At no time shall a continuous row of flashers be used adjacent to a lane of traffic. Only steady-burn type “C” lamps shall be used under these circumstances.
All cones and/or post delineators shall be fitted with reflective sleeves of the appropriate color.
If used, all type “B” flashers shall operate 24 hours a day.
FLAGGING
Flagging operation shall use alternate one-way movement to pass traffic through the construction area.
Traffic shall be controlled at all times by flaggers. Flaggers shall be in constant communication with each other during the flagging operation. Advance flaggers shall be positioned upstream to warn traffic when queues develop. Additional flaggers may be required at intersections.
Where the one-lane section is short enough so that each end is visible from the other end, traffic will be controlled by means of a flagger at each end of the section. They should be able to communicate with each other verbally or by means of signals. These signals should not be such as to be mistaken for flagging signals. Where the end of one-way section is not visible from the other end, the flaggers shall maintain contact by means of radio or field telephones so that a flagger may know when to allow traffic to proceed into the section.
Flaggers shall be positioned near crest of hill allowing flaggers sufficient visibility of approaching traffic.
Flaggers shall be positioned so that they are easily visible to approaching traffic.
Flagger stations for work at night shall be illuminated as referenced in Part 6 of the “California Manual on Uniform Traffic Control Devices for Streets and Highways” (CA MUTCD), latest edition.
Where a one-lane temporary traffic control zone is short enough to allow visibility from one end to the other, traffic may be controlled by a single flagger. When a single flagger is used, the flagger shall be stationed on the shoulder opposite the obstruction or work space, or in a position where good visibility and traffic control can be maintained at all times.
If unable to utilize an alternate one-way flagging operation, Contractor shall contact Department of Public Works, Roads Division at (858) 694-3850 three (3) weeks prior to the proposed closure to determine its appropriateness. If a road closure is deemed appropriate, proper advanced notification (information signs, mailed and verbal notifications) is necessary to the emergency services, police services, businesses, residents and school districts.
ACCESS
Emergency vehicle access shall be maintained at all times.
Mail service, trash service, and school bus access shall be maintained at all times.
Motorist delay time shall not exceed 15 minutes unless otherwise approved by the County Traffic Engineer.
Contractor shall maintain access to all private driveways within the construction area at all times. If continuous access cannot be maintained, access must be provided as needed.
Adequate provisions shall be made for pedestrian traffic.
Adequate sight distance shall be maintained at all intersections in the vicinity of the work zone. If sight distance is affected by the traffic control, the contractor shall provide adequate distance per the County of San Diego Public Road Standards. Flaggers may be needed. The use of mirrors is not permitted as an alternative to providing adequate sight distance.
GENERAL
The Contractor shall be responsible for supplying, installing and maintaining all traffic control devices as shown on the plan along with additional traffic control devices that may be required to ensure safe movement of traffic and pedestrians through work area.
The Contractor shall be responsible for coordinating with any Special Events that will be affected in the area of the impending work and the Contractor shall be responsible for coordinating with other traffic control work zones, unless approved by County Inspector. The Contractor shall maintain 500 feet between beginning and end of work zone signage. Updated Special Event and Temporary Traffic Control information within the County may be found at the following link:
https://www.sandiegocounty.gov/content/sdc/dpw/roads/roadclose.html http://www.sandiegocounty.gov/content/sdc/dpw/roads/roadclose.html
The provisions of this section may be modified or altered if, in the opinion of the engineer, public traffic will be better served, and the work expedited. Said modifications or alterations shall not be adopted until approved in writing by the engineer.
The Contractor shall minimize the active construction zone to 250 feet to 500 feet unless approved by County Inspector.
The Contractor shall maintain maximum closure length based on work that can be completed at the end of the workday.
During non-working hours, the Contractor shall provide the full road width, which existed prior to the start of construction.
Bore shall offset 24” minimum from any streetlight and signal foundation and shall not occur beneath any streetlight and signal foundation.
All dirt and debris shall be removed from the roadway each day before completion of work. Street must be maintained in drivable condition at all times. Contractor shall not use the County right of way for storage of materials and equipment.
All Traffic Control devices, including advance warning signs, delineators, and barricades shall be removed from the roadway at the end of work each day (except W20-1 signs, if plate-bridging overnight.)
The Contractor is to restore roadway and all signing to prior conditions at the completion of work.
The Contractor shall coordinate their work with impacted agencies, San Diego Metropolitan Transit System (MTS), private road owners and/or Home-Owner Associations (HOA). Some agencies may require up to two weeks lead time.
Unless the work is specifically requested by the Engineer, or is Emergency in nature, no work will be performed on the following, County observed holidays:
New Year’s Day Independence Day Martin Luther King Jr. Day Labor Day President’s Day Veteran’s Day Cesar Chavez Day Thanksgiving Day Memorial Day Day after Thanksgiving Day Juneteenth Day Christmas Day
STOP
PH 111
ELM STN
TS
CEDAR ST
APN 2800880400
636 ELM ST
APN 2801250900
26'±
PH 172
PH 173
PH 174
PH 171
ABRIGO WAY
SARGEANT RD
NTS
APN 2885611100
17312 ABRIGO WAY
APN 2885611200
24121 SARGEANT RD
54'±
30'±
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
X221204 20-21 Annual Culverts (Group 2)
4/26/2022
Michele Becerra1234-X5
County of San Diego
X221204
Potholing
Site Plan:
LEGEND
APPROXIMATE POTHOLE LOCATION
VARIES
APN 2885922900
16202 DARTOLO RD
PH 192
PH 191
LEADA WAY
DARTOLO RD
NTS
APN 2885921600
16154 DARTOLO RD
72'±
STOP
PH 201
NTS
GUNN STAGE RD
GUNN STAGE PL
250'±
40'±
A P
N
A P
N
A
R E
A
D
R
A P
N
A
R E
D
APN 2883300400
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
X221204 20-21 Annual Culverts (Group 2)
4/26/2022
Michele Becerra1234-X5
County of San Diego
X221204
Potholing
Site Plan:
LEGEND
PH 211
MT WOODSON RD
SR-67
NTS
425'±
APN 2782603800
17175 MT WOODSON RD
APN 2782602400
17165 MT WOODSON RD
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
X221204 20-21 Annual Culverts (Group 2)
4/26/2022
Michele Becerra1234-X5
County of San Diego
X221204
Potholing
Site Plan:
LEGEND
LEGEND
APPROACH
SPEED (MPH)
55+
MINIMUM TAPER LENGTHS (L) (FEET) FOR
12-FOOT LANE
L 1/2L 1/3L
125 65 45
180 90 60
245 125 85
320 160 110
540 270 180
600 300 200
660 330 220
BUFFER
LENGTH
(FEET)
MAX CONE SPACING
TAPER TANGENT CONFLICT
25 50 12
30 60 15
35 70 17
40 80 20
45 90 22
50 100 25
50 110 27
STOP
RIGHT LANE
MUST
TURN RIGHT
KEEP
LEFT
SIDEWALK
CLOSED
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
AHEAD
CROSS HERE
SIDEWALK CLOSED
CROSS HERE
ROAD
CLOSED
ROAD CLOSED
TO
THRU TRAFFIC
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
DETOUR
AHEAD
ROAD
CLOSED
AHEAD
RIGHT LANE
CLOSED
AHEAD
BIKE LANE
CLOSED
AHEAD
NARROW
LANE
END
DETOUR
DETOUR
END
ROAD WORK
BIKE LANE
CLOSED
STEEL
PLATES
AHEAD
LANE
CLOSED
LEFT LANE
CLOSED
AHEAD
M4-10(R/L)
DETOUR
SHARE
THE
ROAD
SIGN LEGEND
ONE LANE
ROAD
AHEAD
RIGHT LANE
CLOSED
AHEAD
LEFT LANE
CLOSED
AHEAD
DETOUR
KEEP
RIGHT
M4-8AG20-2C30A(CA)C30(BK)C30(CA)C20(CA)RC20(CA)LC12(CA)C9A(CA)
SHOULDER
CLOSED
R1-1 R3-1 R3-2 R3-4
R3-5(R/L)
ONLY
OPEN
TRENCH
C27(CA)
W21-5
SHOULDER
WORK
RIGHT
SHOULDER
CLOSED
AHEAD
W21-5b(R/L)
R9-11a(R/L)R9-11(R/L)R9-10R9-9R9-3R4-8AR3-7(R/L)R3-6(R/L) R11-2 R11-4 SC3(CA) W1-4(R/L)R4-7A
W20-5(L)W20-4W20-3W20-2W20-1W16-1W8-24W4-2(R)W4-2(L)
W3-4
W20-5(R) W20-5(BK)W11-1
STOP
SLOW
Flagger Paddle
TRAFFIC CONTROL SIGN
APPROXIMATE POTHOLE LOCATION
TRAFFIC CONE / DELINEATOR
FLAGGER
FAS - FLASHING
ARROW SIGN
WORK ZONE
SIGNALIZED
INTERSECTION
TRAFFIC CONTROL BARRICADE
BUS STOP
TS
MINIMUM DISTANCE (FEET)
BETWEEN SIGNS AND FROM LAST
SIGN TO TAPER
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
X221204 20-21 Annual Culverts (Group 2)
4/26/2022
Michele Becerra1234-X5
County of San Diego
X221204
Potholing
VARIES
AutoCAD SHX Text
BUS
PH 111
WORK ZONE
80'±
SHOULDER TAPER
1/3 L = 180'
C30A(CA)
C27(CA)
12' min
ELM ST
(45 MPH)
CEDAR ST
(25 MPH)
500' Sign Spacing
500' Sign Spacing
W
-1 G
-2
W20-1
G20-2
W20-1
G20-2
100' Sign
Spacing
W
-5
POST TEMPORARY NO PARKING SIGNS
Note: NO PEDESTRIAN FACILITIES
ON EITHER SIDE OF ELM ST
N
TS
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
X221204 20-21 Annual Culverts (Group 2)
4/26/2022
Michele Becerra1234-X5
County of San Diego
X221204
Potholing
PH 111:
FLAGGER WILL MAINTAIN DRIVEWAY
ACCESS AT ALL TIMES
COORDINATE WITH DRIVEWAY OWNER
72 HOURS PRIOR TO START OF WORK
FLAGGERS TO ASSIST
PEDESTRIAN ACTIVITY AS
NEEDED
TEMPORARY NO PARKING SIGNS WILL
BE PLACED 72 HOURS IN ADVANCE
1152-H4
STOPYIELD
BUFFER
250'
WORK ZONE
80'±
PH 171
W20-1
G20-2
W
-1
G20 -2
W20-1 G20-2
C27(CA)
S i g n
S p a c i n g
R4-7a g n p a c i n g
ABRIGO WAY
(25 MPH)
SARGEANT RD
(35 MPH)
VIST
A RA
MONA RD
(35 M
PH
NTS
POST TEMPORARY NO PARKING SIGNS
(BOTH SIDES)
WORK ZONE
80'±
S
H
I F
T
I
G
T
P
E
R
L
R4-7a R4-7a
12' min
12' min
C12(CA)
C12(CA)
100' Sign
Spacing
C27(CA)
W20-1 G20-2
100' Sign
Spacing
ACANTO DR
(25 MPH)
12' min
BUFFER
250'
SHIFTING TAPER
1/2 L = 123'
12' min
W
-1
G
-2
W20-1 G20-2
100' Sign
Spacing
C
(C A
C
(C A
S ig n S p a c in g
R4-7a R4-7a
R4-7a
ST HELENA DR
(25 MPH)
POST TEMPORARY
NO PARKING SIGNS
(BOTH SIDES)
SARGEANT RD
(35 MPH)NTS
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
X221204 20-21 Annual Culverts (Group 2)
4/26/2022
Michele Becerra1234-X5
County of San Diego
X221204
Potholing
PH 171:
FLAGGER WILL MAINTAIN DRIVEWAY
ACCESS AT ALL TIMES
COORDINATE WITH DRIVEWAY OWNER
72 HOURS PRIOR TO START OF WORK
FLAGGERS TO ASSIST
PEDESTRIAN ACTIVITY AS
NEEDED
TEMPORARY NO PARKING SIGNS WILL
BE PLACED 72 HOURS IN ADVANCE
1173-F1
M A
T C
H L
I N
E
A
A
M A
T C
H L
I N
E
A
STOPYIELD
BUFFER
250'
WORK ZONE
80'±
PH 172
PH 173
PH 174
W
-1
G20 -2
C30A(CA)
C27(CA)
g n
S p a c i n g
SARGEANT RD
(35 MPH)
VIST
A RA
MONA RD
(35 M
PH
NTS
12' min
POST TEMPORARY NO PARKING SIGNS
(BOTH SIDES)
12' min
SHIFTING TAPER
1/2 L = 123'
W
-1
G20 -2
W20-1 G20-2 g n
S p a c i n g
ABRIGO WAY
(25 MPH)
VIST
A RA
MONA RD
(35 M
PH
100' Sign
Spacing
SHIFTING TAPER
1/2 L = 123'
C30A(CA)
R4-7a
R4-7a
R4-7a
12' min
12' min
W20-1
G20-2 g n p a c i n g
C12(CA)
C12(CA)
Note: NO PEDESTRIAN FACILITIES
ON EITHER SIDE OF SARGEANT RD
W20-1 G20-2
ACANTO DR
(25 MPH)
100' Sign
Spacing
R4-7a
W
-1
G
-2
W20-1 G20-2
100' Sign
Spacing
C
(C A
250'
C12(CA)
ST HELENA DR
(25 MPH)
S ig n S p a c in g
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
X221204 20-21 Annual Culverts (Group 2)
4/26/2022
Michele Becerra1234-X5
County of San Diego
X221204
Potholing
PH 172 - 174:
1173-F1
M A
T C
H L
I N
E
B
B
M A
T C
H L
I N
E
B
B
FLAGGER WILL MAINTAIN DRIVEWAY
ACCESS AT ALL TIMES
COORDINATE WITH DRIVEWAY OWNER
72 HOURS PRIOR TO START OF WORK
FLAGGERS TO ASSIST
PEDESTRIAN ACTIVITY AS
NEEDED
TEMPORARY NO PARKING SIGNS WILL
PH 192
SHIFTING TAPER
1/2 L = 63'
PH 191
W20-1G20-2
R4-7a R4-7a
12' min
12' min
30'±
C30A(CA)
C27(CA)
90'90'
W20-1
G20-2
LEADA WAY
(25 MPH)
DARTOLO RD
(25 MPH)
DAZA DR
(25 MPH)
NTS
C12(CA)
W20-1 G20-2
C12(CA)
POST TEMPORARY NO PARKING SIGNS
(BOTH SIDES)
W20-1G20-2
Note: NO PEDESTRIAN FACILITIES
ON EITHER SIDE OF LEADA WAY
WORK ZONE
80'±
100' Sign
Spacing
100' Sign
Spacing
100' Sign
Spacing
100' Sign
Spacing
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
X221204 20-21 Annual Culverts (Group 2)
4/26/2022
Michele Becerra1234-X5
County of San Diego
X221204
Potholing
PH 191 - 192:
FLAGGER WILL MAINTAIN DRIVEWAY
ACCESS AT ALL TIMES
COORDINATE WITH DRIVEWAY OWNER
72 HOURS PRIOR TO START OF WORK
FLAGGERS TO ASSIST
PEDESTRIAN ACTIVITY AS
NEEDED
TEMPORARY NO PARKING SIGNS WILL
1173-G3
PH 201
WORK ZONE
80'±
B
U
F
F
E
R
NTS
GUNN STAGE RD
(45 MPH)
GUNN STAGE PL
(25 MPH)
W20-1 G20-2
W20-1
G20-2
500' Sign
Spacing
100' Sign
Spacing
12' min
Note: NO PEDESTRIAN FACILITIES ON
EITHER SIDE OF GUNN STAGE RD
RAISED MEDIAN C27(CA)
P O
S T
T E
M P
O R
A R
Y
N O
P A
R K
IN
G
S
IG
N S
B
U
F
F
E
R
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
X221204 20-21 Annual Culverts (Group 2)
4/26/2022
Michele Becerra1234-X5
County of San Diego
X221204
Potholing
PH 201:
FLAGGER WILL MAINTAIN DRIVEWAY
ACCESS AT ALL TIMES
COORDINATE WITH DRIVEWAY OWNER
72 HOURS PRIOR TO START OF WORK
FLAGGERS TO ASSIST
PEDESTRIAN ACTIVITY AS
NEEDED
TEMPORARY NO PARKING SIGNS WILL
BE PLACED 72 HOURS IN ADVANCE
1173-D3
M
A
T
C
H
L
I
E
C
C
S
H
E
W
O
K
Z
N
E
MERGING TAPER
L = 540'
B
U
F
F
E
R
TS
N
TS GUNN STAGE RD
SA
N
VIC
EN
TE RD
(45 M
PH)
W20-1
G20-2
W20-1
G20-2 g n
S p a c i n g
S i g n
S p a c i n g m n
RAISED MEDIAN
C27(CA)
C30(CA)
P
O
M
P
O
R
A
Y
P
R
K
I
I
G
N
S
N
TS
GUNN STAGE RD(45 MPH)
P
O
M
P
O
R
A
R
Y
P
R
K
I
I
G
N
S
B
U
F
F
E
R
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
X221204 20-21 Annual Culverts (Group 2)
4/26/2022
Michele Becerra1234-X5
County of San Diego
X221204
Potholing
PH 201:
FLAGGER WILL MAINTAIN DRIVEWAY
ACCESS AT ALL TIMES
COORDINATE WITH DRIVEWAY OWNER
72 HOURS PRIOR TO START OF WORK
FLAGGERS TO ASSIST
PEDESTRIAN ACTIVITY AS
NEEDED
TEMPORARY NO PARKING SIGNS WILL
BE PLACED 72 HOURS IN ADVANCE
1173-D3
M
A
T
C
H
L
I
C
C
S
H
E
PH 21112' min
R4-7a R4-7a
R4-7a R4-7a
STOP
STOP
50'
W
-1 G
-2
W
-4
C9A(CA) W3-4 W1-6(L) C30(CA) C27(CA)
W20-4
C9A(CA)W3-4
W20-1
G20-2
WORK ZONE
80'±
BUFFER
155'
FLAGGING TAPER = 100'
POST TEMPORARY NO PARKING SIGNS
(BOTH SIDES)
MT WOODSON RD
(25 MPH)
S ig n S p a c in g
SR-67
(55 M
PH)
NTS
50'
50'50'
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
X221204 20-21 Annual Culverts (Group 2)
4/26/2022
Michele Becerra1234-X5
County of San Diego
X221204
Potholing
PH 211:
1171-F4
FLAGGER WILL MAINTAIN DRIVEWAY
ACCESS AT ALL TIMES
COORDINATE WITH DRIVEWAY OWNER
72 HOURS PRIOR TO START OF WORK
FLAGGERS TO ASSIST
PEDESTRIAN ACTIVITY AS
NEEDED
TEMPORARY NO PARKING SIGNS WILL
BE PLACED 72 HOURS IN ADVANCE
EYE CONTACT MUST BE MAINTAINED BETWEEN
FLAGGERS OR USE 2-WAY COMMUNICATION
FLAGGER WILL ASSIST WITH BIKE/VEHICLE TRAFFIC
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
INSURER(S) AFFORDING COVERAGE
INSURER F :
INSURER E :
INSURER D :
INSURER C :
INSURER B :
INSURER A :
NAIC #
NAME:
CONTACT
(A/C, No):
FAX
ADDRESS:
PRODUCER
(A/C, No, Ext):
PHONE
INSURED
REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
OTHER:
(Per accident)
(Ea accident)
N / A
SUBR
WVD
ADDL
INSD
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
$PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)
COMBINED SINGLE LIMIT
AUTOS ONLY
AUTOSAUTOS ONLY
NON-OWNED
SCHEDULEDOWNED
ANY AUTO
AUTOMOBILE LIABILITY
Y / N
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below If yes, describe under
ANYP ROPRIETOR/PARTNER/EXECUTIVE
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-
STATUTE
PER
LIMITS(MM/DD/YYYY)
POLICY EXP
(MM/DD/YYYY)
POLICY EFF
POLICY NUMBERTYPE OF INSURANCELTR
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
EXCESS LIAB
UMBRELLA LIAB $EACH OCCURRENCE
$AGGREGATE
OCCUR
CLAIMS-MADE
DED RETENTION $
$PRODUCTS - COMP/OP AGG
$GENERAL AGGREGATE
$PERSONAL & ADV INJURY
$MED EXP (Any one person)
$EACH OCCURRENCE
DAMAGE TO RENTED
$PREMISES (Ea occurrence)
COMMERCIAL GENERAL LIABILITY
CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY
PRO-
JECT LOC
CERTIFICATE OF LIABILITY INSURANCE
DATE (MM/DD/YYYY)
CANCELLATION
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.
CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED
AUTOS ONLY
10/20/2021
Bolton & Company 3475 E. Foothill Blvd., Suite 100 Pasadena, CA 91107
(626) 799-7000 (626) 583-2117 www.boltonco.com 0008309
David Kuo
AirX Utility Surveyors, Inc.
785 E. Mission Road Suite 100 San Marcos CA 92069
64632374
Re: All operations of the Named Insured in San Diego County, San Diego, CA. Additional Insured(s): County of San Diego.
All Operations of the Named Insured
County of San Diego Department of Public Works 5510 Overland Avenue, Suite 110 San Diego CA 92123
GL & Auto Additional Insureds apply per CG20120413 & CA76010615 attached, only if required by written contract/agreement.
A 1,000,000A0137704005 10/24/2021 10/24/2022
500,000
10,000
1,000,000
BI/PD Ded: $5,000
3,000,000
2,000,000
A A0137704001 10/24/2021 10/24/2022 $1,000,000
A A0137704006 10/24/2021 10/24/2022 5,000,000
5,000,000
A A0137704007 9/1/2021 9/1/2022
1,000,000 Y
1,000,000
1,000,000
B Pollution / Professional Liability MKLV5ENV103283 10/24/2021 10/24/2022 Pollution $2,000,000 / $4,000,000 Aggr Professional $2,000,000 / $4,000,000 Aggr SIR: $25,000 Each Condition / Claim
Middlesex Insurance Company 23434
Evanston Insurance Company 35378
64632374 | 21-22 Poll, Prof, GL, WC 21-22,Auto, Umbrella | Emily Parks | 10/20/2021 9:23:42 AM (PDT) | Page 1 of 3
POLICY NUMBER:
SCHEDULE
COMMERCIAL AUTO
CA 76 01 06 15
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
DESIGNATED INSURED - PRIMARY AND
NONCONTRIBUTORY - COVERED AUTOS
LIABILITY COVERAGE
This endorsement modifies insurance provided under the following:
BUSINESS AUTO COVERAGE FORM
MOTOR CARRIER COVERAGE FORM
AUTO DEALERS COVERAGE FORM
With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by this endorsement.
This endorsement identifies person(s) or organization(s) who are "insureds" for Covered Autos Liability Coverage under the Who Is An Insured provision of the Coverage Form.
This endorsement changes the policy effective on the inception date of the policy unless another date is indicated.
Named Insured:
Endorsement Effective Date:
Name Of Person(s) Or Organization(s):
Any person or organization you are required to add as an additional insured under a written contract or agreement in effect prior to any accident, injury, loss or damage
Information required to complete this Schedule, if not shown above, will be shown in the Declarations.
A. Each person or organization shown in the Schedule is an "insured" for Covered Autos Liability Coverage, but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured provision contained in:
(1) Paragraph A.1. of Section II - Covered Autos Liability Coverage in the Business Auto and Motor Carrier Coverage Forms; or
(2) Paragraph D.2. of Section I - Covered Autos Coverages of the Auto Dealers Coverage Form.
B. Primary And Noncontributory Insurance
This insurance is primary to and will not seek contribution from any other auto insurance issued to the person or organization in the schedule under your policy provided that:
(1) The person or organization is a Named Insured under such other insurance; and
(2) Prior to the “accident” you have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to the person or organization.
Includes copyrighted material of Insurance Services Office, Inc., with its permission.
Page 1 of 1CA 76 01 06 15
Middlesex Insurance Company
AirX Utility Surveyors, Inc.
A0137704001
10/24/2021
64632374 | 21-22 Poll, Prof, GL, WC 21-22,Auto, Umbrella | Emily Parks | 10/20/2021 9:23:42 AM (PDT) | Page 2 of 3
Change effective Page 1 of 1CG 20 12 04 13 iddlesex Insurance Company
POLICY NUMBER:
SCHEDULE
State Or Governmental Agency Or Subdivision Or Political Subdivision:
Information required to complete this Schedule, if not shown above, will be shown in the Declarations.
COMMERCIAL GENERAL LIABILITY
CG 20 12 04 13
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL INSURED - STATE OR GOVERNMENTAL
AGENCY OR SUBDIVISION OR POLITICAL
SUBDIVISION - PERMITS OR AUTHORIZATIONS
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
A. Section II - Who Is An Insured is amended to include as an additional insured any state or governmental agency or subdivision or political subdivision shown in the Schedule, subject to the following provisions:
1. This insurance applies only with respect to operations performed by you or on your behalf for which the state or governmental agency or subdivision or political subdivision has issued a permit or authorization.
However:
a. The insurance afforded to such additional insured only applies to the extent permitted by law; and
b. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured.
2. This insurance does not apply to:
a. "Bodily injury", "property damage" or "personal and advertising injury" arising out of operations performed for the federal government, state or municipality; or
b. "Bodily injury" or "property damage" included within the "products-completed operations hazard".
B. With respect to the insurance afforded to these additional insureds, the following is added to Section III - Limits Of Insurance:
If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance:
1. Required by the contract or agreement; or
2. Available under the applicable Limits of Insurance shown in the Declarations;
whichever is less.
This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations.
© Insurance Services Office, Inc., 2012
A0137704005
County of San Diego its agents,officers, and employees Department of Public Works
6/25/2021
64632374 | 21-22 Poll, Prof, GL, WC 21-22,Auto, Umbrella | Emily Parks | 10/20/2021 9:23:42 AM (PDT) | Page 3 of 3
| DPW2022-RWEXCP-74999 DPW2022-RWTCP-00726 CIP.pdf |
| Insert from: "X221204 20-21 Annual Culverts (Group 2).pdf" |
| Sheets and Views |
| X221204 20-21 Annual Culverts (Group 2)-sheet (1) |
| X221204 20-21 Annual Culverts (Group 2)-sheet (2) |
| X221204 20-21 Annual Culverts (Group 2)-sheet (3) |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .