About this file

This is a Potholing Report prepared by AIRX Utility Surveyors, Inc. for the County of San Diego, Department of Public Works, documenting utility location and vacuum excavation services conducted under project RFP_1023457_20-21 Annual Culverts_GROUP 4. The project involved the excavation of 30 potholes (12 inches by 12 inches) and dipping of 4 manholes across seven roads in San Diego County: Japatul Road, Fuerte Drive, Campo Road, Conard Drive, Elmdale Drive, Jamacha Road, and Alta Drive. Field work was performed between November 16, 2022, and February 9, 2023. The potholing operations identified various underground utilities including water lines, gas mains, sanitary and storm sewers, electric lines, telecommunications cables, and fiber optic lines at depths ranging from 26 inches to 109 inches below ground surface. All excavations were conducted in accordance with County standards, with traffic control plans and excavation permits (DPW2022-RWEXCP-75144) obtained prior to work commencement. Backfill material was compacted to 95 percent density in 3-inch lifts, and pavement was repaired with Aquaphalt or Class II base material as appropriate.

The report includes detailed pothole tabulation data sheets specifying utility type, size, material composition, depth measurements, soil conditions, and utility orientation for each excavation location. Utilities were located using Underground Service Alert (USA) markouts, with reference points placed using paving nails or 60-penny nails on either side of each pothole. Several utilities were not found during excavation at designated locations, including gas lines at potholes 373 and 375, sanitary sewer at potholes 377 and 383, and AT&T-D telecommunications at pothole 376A. The report recommends that all pothole locations and active markouts be surveyed to support final plan and profile adjustments. Potable water was used for excavation with all water and material disposed of off-site, and no water was allowed to flow into storm drains or natural drainages. A traffic control permit (DPW2022-RWTCP-01020) governed work zone operations, with work hours generally restricted to 8:00 AM to 4:00 PM Monday through Friday, and coordination required with schools to avoid dismissal and arrival times.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PPOOTTHHOOLLIINNGG RREEPPOORRTT

U T I L I T Y S U R V E Y O R S , I N C .

PPRREEPPAARREEDD BBYY::

April 7, 2023

785 East Mission Road Ste. 100 I San Marcos, CA 92069 I P.760.480.2347 I F.760.739.8034 I airxus.com

Utility Locating and Potholing Area:

Japatul Road, Fuerte Drive, Campo Road, Conard Drive, Elmdale Drive, Jamacha Road, and Alta Drive in San Diego County, CA

AIRX Project #: X221206

Project Name: RFP_1023457_20-21 Annual Culverts_GROUP 4

TABLE OF CONTENTS

1. Description of Pothole Procedures and Site-Specific Details

2. Pothole Project Map(s)

3. Pothole Location Map(s)

4. Pothole Tabulation Report

5. Pothole Data Sheet(s)

6. Manhole Dip Data Sheet(s)

7. Permit(s)

A I R X U T I L I T Y S U R V E Y O R S , I N C .

Descriptionof

P otholeP roceduresand

S iteS pecificDetails

A IR X U T IL IT Y S U R V E Y O R S , IN C .

DESCRIPTION OF POTHOLE PROCEDURES

AIRX Utility Surveyors performs a full range of specialized engineering services including Underground Utility Location and Vacuum Excavation (to verify depth and alignment of underground utilities).

Underground Utility Location employs sophisticated electronic locating devices to trace the route of an underground utility; then the route is marked on the surface with marking paint in paved areas, or with 60 penny nails and feathers in unpaved areas.

Vacuum excavation employs a vacuum truck in conjunction with high-pressure air or water to excavate material and expose an underground utility. A 10 to 12-inch diameter hole is first cored or chiseled through the pavement so that the vacuum hose and high-pressure air or water hose can be inserted.

Utilities found during potholing are located on the surface by placing two reference points (typically 36” apart) on either side of the pothole along the centerline (or edge) of the utility, using paving nails or 60 penny nails as appropriate. Depth measurements (to the nearest ½ inch) are taken midway between the two reference points.

Utility alignment, depth, and other data is marked with pink paint (on pavement), or on wood lath (unpaved areas).

SITE SPECIFIC DETAILS

AIRX was contracted by County of San Diego to perform utility locating and potholing services on Japatul Road, Fuerte Drive, Campo Road, Conard Drive, Elmdale Drive, Jamacha Road, and Alta Drive in San Diego County. A total of 30 potholes were excavated, and 4 manholes were dipped to establish conflicts and connection points on a variety of utilities. The results of the data are contained in the attached spreadsheet and data sheets.

In preparation of these excavations, AIRX marked out the dig locations and called in for USA (Underground Service Alert). All traffic control plans and permits were drawn and applied for by AIRX and all traffic control was set up by

AIRX.

All the excavations and discovery went without any incident. Any changes and adjustments are mentioned in the Pothole Tabulation Report and the Pothole Data Sheets. All the results were annotated on the ground and in this report. It is AIRX’s recommendation that all pothole locations and the active mark out should be surveyed to aid in the adjustment of utilities on the final plan and profile.

At each pothole location, the utility alignment was marked with pink paint, as well as paving nails or feathers. AIRX used potable water acquired offsite for excavation and all water and material vacuumed was disposed of off-site. No water was allowed to flow into storm drains or natural drainages. The potholes were covered with clean backfill material and compacted to 95% density in 3” lifts. The pavement was patched with Aquaphalt All field work was performed between November 16, 2022, and February 9, 2023.

P otholeP rojectM ap(s)

0 530265

US Feet

Coordinate System: NAD 1983 UTM Zone 11N

X221206

RFP_1023457_20-21 Annual Culverts_GROUP 4

Pothole Project Map 1

Location Map 1 1

0 3,0001,500

Coordinate System: NAD 1983 UTM Zone 11N

X221206

RFP_1023457_20-21 Annual Culverts_GROUP 4

Pothole Project Map 2

Location Map 1 2

Location Map 1 3 Location Map 1 4

Location Map 1 5

Location Map 1 6

0 550275

Coordinate System: NAD 1983 UTM Zone 11N

X221206

RFP_1023457_20-21 Annual Culverts_GROUP 4

Pothole Project Map 3

Location Map 1 7

P otholeL ocationM ap(s)

P otholeT abulationR eport

POTHOLE TABULATION REPORT: RFP_1023457_20-21 Annual Culverts_ GROUP 4

Pothole Number

Date Street Pavement Thickness

Utility Type Utility Size & Material Soil Type Depth-Ground to Top of Utility

Depth-Ground to Top of Package/

Encasement

Depth-Ground to Bottom of Package/

Encasement

Total Depth

Excavated

Utility Orientation

Pothole Project Area

Map #

Pothole Location

Map # Description & Location Notes

251 01/31/2023 Japatul Rd

Asphalt - 5.0″ Concrete - N/A

Base - N/A Total - 5.0″

Telecom 2.0″ PVC Subgrade 26.0″ T/P N/A N/A 73.0” NE/SW 1 1 Pothole 251 is located west of Japatul Rd. Please refer to Location Map 1 for the location of Pothole 251.

253 01/31/2023 Japatul Rd

Asphalt - 2.0″ Concrete - N/A

Base - N/A Total - 2.0″

Telecom 2.0″ PVC Subgrade 26.0″ T/P N/A N/A 34.0” NE/SW 1 1 Pothole 253 is located west of Japatul Rd. Please refer to Location Map 1 for the location of Pothole 253.

361 11/16/2022 Fuerte Dr

Asphalt - 9.0″ Concrete - N/A

Base - N/A Total - 9.0″

Gas 4.0″ PVC Granite 38.0″ T/P N/A N/A 38.0” W/E 2 2 Pothole 361 is located north of Fuerte Dr. Please refer to Location Map 2 for the location of Pothole 361.

364 11/16/2022 Fuerte Dr

Asphalt - 7.0″ Concrete - N/A

Base - N/A Total - 7.0″

AT&T/Cox Electric Water

PVC Package

2.0″ PVC

8.0” PVC

Granite N/A

65.5″ T/P 39.0” T/P

35.0″ T/Pkg N/A N/A

44.0″ B/Pkg N/A N/A

76.0” N/S N/S W/E

2 2 Pothole 364 is located in the east-bound lane of Fuerte Dr. Please refer to Location Map 2 for the location of Pothole 364.

Water markout was off by 3 feet. Fanned out 3 feet wide to north of the pothole.

365 02/09/2023 Fuerte Dr

Asphalt - 11.0″ Concrete - N/A

Base - 8.0″ Total - 19.0″

AT&T/Cox/Electric Electric

12.0″ PVC

2.0″ PVC

Subgrade 33.0″ T/P 50.0″ T/P

N/A N/A

N/A N/A

57.0” N/S N/S

2 2 Pothole 365 is located in the east-bound lane of Fuerte Dr. Please refer to Location Map 2 for the location of Pothole 365.

371 11/16/2022 Campo Rd

Asphalt - 5.0″ Concrete - N/A

Base - N/A Total - 5.0″

Fiber Optic 2.0″ PVC Granite 53.0″ T/P N/A N/A 53.0” WNW/ESE 2 3 Pothole 371 is located in the intersection of Campo Rd and Rogers Rd. Please refer to Location Map 3 for the location of Pothole 371.

372 11/16/2022 Campo Rd

Asphalt - 7.0″ Concrete - N/A

Base - N/A Total - 7.0″

AT&T-D

Storm Drain

PVC Package 24.0″ Steel

Granite N/A

46.0″ T/P 90.0″ T/Pkg

N/A N/A N/A

90.0”

WNW/ESE

NW/SE

2 3

Pothole 372 is located in the intersection of Campo Rd and Rogers Rd. Please refer to Location Map 3 for the location of Pothole 372.

373 11/16/2022 Campo Rd

Asphalt - 8.0″ Concrete - N/A

Base - N/A Total - 8.0″

Storm Drain Gas (Not Found)

24.0″ Steel N/A

Subgrade, Granite

52.0″ T/P N/A

N/A N/A

N/A N/A

79.0”

NNW/SSE

N/A 2 3

Pothole 373 is located in the intersection of Campo Rd and Rogers Rd. Please refer to Location Map 3 for the location of Pothole 373.

Excavated 79 inches deep and fanned out 24 inches wide 3 ways. Unable to find gas utility.

374 02/08/2023 Intersection of Campo Rd and

Rogers Rd

Asphalt - 9.0″ Concrete - N/A

Base - 9.0″ Total - 18.0″

Water 18.0″ ACP Subgrade 86.0″ T/P N/A N/A

89.0” W/E 2 3 Pothole 374 is located in the intersection of Campo Rd and Rogers Rd. Please refer to Location Map 3 for the location of Pothole 374.

375 02/08/2023 Intersection of Campo Rd and

Rogers Rd

Asphalt - 6.0″ Concrete - N/A

Base - 5.0″ Total - 11.0″

Unknown Gas (Not Found)

Concrete Cap N/A

Subgrade N/A N/A

57.0″ T/Cap N/A

N/A N/A

57.0” N/A N/A

2 3 Pothole 375 is located in the intersection of Campo Rd and Rogers Rd. Please refer to Location Map 3 for the location of Pothole 375.

Excavated 57 inches deep and 48 inches deep, fanned out 24 inches.

376 12/13/2022 Campo Rd

Asphalt - 12.0″ Concrete - N/A

Base - 32.0″ Total - 44.0″

Gas Storm Drain

36.0″ Steel 24.0″ Steel

Sand 109.0″ T/P 71.0″ T/P

N/A N/A

N/A N/A

109.0” W/E

NNW/SSE

2 3

Pothole 376 is located in the intersection of Campo Rd and Rogers Rd. Please refer to Location Map 3 for the location of Pothole 376.

Yellow caution tape found above the utilities. SDG&E was on Standby.

376A 02/03/2023 Intersection of Campo Rd and

Rogers Rd

Asphalt - 10.0″ Concrete - N/A

Base - 12.0″ Total - 22.0″

AT&T-D (Not Found) N/A Subgrade N/A N/A N/A 109.0” N/A 2 3 Pothole 376-A is located in the intersection of Campo Rd and Rogers Rd. Please refer to Location Map 3 for the location of Pothole 376-A.

Excavated 109 inches deep, fanned out 48 inches wide to south and to north. SDG&E was on Standby.

377 02/03/2023 Campo Rd

Asphalt - N/A Concrete - N/A

Base - N/A Total - N/A

Sanitary Sewer (Not Found) N/A Subgrade N/A N/A N/A 108.0” N/A 2 3 Pothole 377 is located south of Campo Rd. Please refer to Location Map 3 for the location of Pothole 377.

Excavated 108 inches deep, and 24 inches wide, fanned out to north and south.

381 12/02/2022 Conrad Dr

Asphalt - 4.5″ Concrete - N/A

Base - N/A Total - 4.5″

AT&T-D Slurry Encasement Subgrade N/A 4.5″ T/Enc 56.0″ B/Enc 64.0” N/S 2 4 Pothole 381 is located in the south-bound lane of Conrad Dr. Please refer to Location Map 4 for the location of Pothole 381.

Pothole 381 connects to pothole 382.

382 12/02/2022 Conrad Dr

Asphalt - 6.0″ Concrete - N/A

Base - N/A Total - 6.0″

AT&T-D

Storm Drain

Slurry Encasement 18.0″ Cast Iron

Subgrade N/A

21.0″ T/P 6.0″ T/Enc

N/A 60.0″ B/Enc

N/A 62.0”

N/S N/S

2 4 Pothole 382 is located in the south-bound lane of Conrad Dr. Please refer to Location Map 4 for the location of Pothole 382.

AT&T-D encasement connects to pothole

381. Found both edges of encasement.

POTHOLE TABULATION REPORT: RFP_1023457_20-21 Annual Culverts_ GROUP 4

Pothole Number

Date Street Pavement Thickness

Utility Type Utility Size & Material Soil Type Depth-Ground to Top of Utility

Depth-Ground to Top of Package/

Encasement

Depth-Ground to Bottom of Package/

Encasement

Total Depth

Excavated

Utility Orientation

Pothole Project Area

Map #

Pothole Location

Map # Description & Location Notes

383 11/30/2022 Conrad Dr

Asphalt - 7.0″ Concrete - N/A

Base - N/A Total - 7.0″

Sanitary Sewer (Not Found) N/A Subgrade N/A N/A N/A 45.0” N/S 2 4 Pothole 383 is located in the south-bound lane of Conrad Dr. Please refer to Location Map 4 for the location of Pothole 383.

Found unknown concrete at 45 inches deep.

One edge is exposed. Another pothole needs to be done in order to find the bottom.

384 11/30/2022 Conrad Dr

Asphalt - 7.0″ Concrete - N/A

Base - N/A Total - 7.0″

Water 8.0″ ACP Subgrade 65.0″ T/P N/A N/A 70.0” N/S 2 4 Pothole 384 is located in the north-bound lane of Conrad Dr. Please refer to Location Map 4 for the location of Pothole 384.

385 11/30/2022 Conrad Dr

Asphalt - 6.0″ Concrete - N/A

Base - N/A Total - 6.0″

Gas 4.0″ Steel Subgrade 55.0″ T/P N/A N/A 56.0” N/S 2 4 Pothole 385 is located in the north-bound lane of Conrad Dr. Please refer to Location Map 4 for the location of Pothole 385.

386 12/02/2022 Conrad Dr

Asphalt - 6.0″ Concrete - N/A

Base - N/A Total - 6.0″

Electric Concrete Encasement Subgrade N/A 20.0″ T/Enc 35.0″ B/Enc 50.0” N/S 2 4 Pothole 386 is located in the north-bound lane of Conrad Dr. Please refer to Location Map 4 for the location of Pothole 386.

391 12/15/2022 Elmdale Dr

Asphalt - 5.0″ Concrete - N/A

Base - N/A Total - 5.0″

Gas 2.0″ Steel Subgrade 44.0″ T/P N/A N/A 44.0” NE/SW 2 5 Pothole 391 is located in the SW-bound lane of Elmdale Dr. Please refer to Location Map 5 for the location of Pothole 391.

392 12/15/2022 Elmdale Dr

Asphalt - 5.0″ Concrete - N/A

Base - N/A Total - 5.0″

Storm Drain Sanitary Sewer (Not Found)

30.0″ Steel N/A

Subgrade, Sand, Rocks

44.0″ T/P N/A

N/A N/A

N/A N/A

50.0” N/S N/A

2 5 Pothole 392 is located in the SW-bound lane of Elmdale Dr. Please refer to Location Map 5 for the location of Pothole 392.

393 12/15/2022 Elmdale Dr

Asphalt - 5.0″ Concrete - N/A

Base - N/A Total - 5.0″

Gas Water Service

3.4″ Steel 1.0″ Copper

Subgrade, Sand, Granite

44.0″ T/P 38.0″ T/P

N/A N/A

N/A N/A

54.0”

NW/SE

NW/SE

2 5 Pothole 393 is located in the SW-bound lane of Elmdale Dr. Please refer to Location Map 5 for the location of Pothole 393.

394 12/15/2022 Elmdale Dr

Asphalt - 5.0″ Concrete - N/A

Base - N/A Total - 5.0″

Water 6.0″ ACP Subgrade, Sand

64.0″ T/P N/A N/A 64.0” NE/SW 2 5

Pothole 394 is located in the NE-bound lane of Elmdale Dr. Please refer to Location Map 5 for the location of Pothole 394.

403 02/02/2023 Jamacha Rd

Asphalt - 10.0″ Concrete - N/A

Base - 20.0″ Total - 30.0″

Gas 8.0″ Steel Subgrade 41.0″ T/P N/A N/A 45.0” W/E 2 6 Pothole 403 is located in the west-bound lane of Jamacha Rd. Please refer to Location Map 6 for the location of Pothole 403.

405 02/02/2023 Jamacha Rd

Asphalt - 8.0″ Concrete - N/A

Base - 4.0″ Total - 12.0″

Water 12.0″ ACP Subgrade 53.0″ T/P N/A N/A 57.0” W/E 2 6 Pothole 405 is located in the east-bound lane of Jamacha Rd. Please refer to Location Map 6 for the location of Pothole 405.

406 02/02/2023 Jamacha Rd

Asphalt - 6.0″ Concrete - N/A

Base - N/A Total - 6.0″

Fiber Optic 2.0″ PVC Subgrade 46.0″ T/P N/A N/A 48.0” W/E 2 6 Pothole 406 is located in the east-bound lane of Jamacha Rd. Please refer to Location Map 6 for the location of Pothole 406.

407 02/02/2023 Jamacha Rd

Asphalt - N/A Concrete - N/A

Base - N/A Total - N/A

Telecom Concrete Encasement Subgrade N/A 42.0″ T/Enc 52.0″ B/Enc 55.0” W/E 2 6 Pothole 407 is located south of Jamacha Rd. Please refer to Location Map 6 for the location of Pothole 407.

412 02/01/2023 Alta Dr

Asphalt - 3.0″ Concrete - N/A

Base - 16.0″ Total - 19.0″

Gas Main Gas Service

2.0″ Steel 1/2″ Plastic

Subgrade 55.0″ T/P

N/A N/A N/A

N/A N/A

72.0” N/S N/A

3 7 Pothole 412 is located in the south-bound lane of Alta Dr. Please refer to Location Map 7 for the location of Pothole 412.

413 02/01/2023 Alta Dr

Asphalt - 3.0″ Concrete - N/A

Base - 16.0″ Total - 19.0″

Sanitary Sewer 8.0″ VCP Subgrade 55.0″ T/P

N/A N/A 65.0” N/S 3 7 Pothole 413 is located in the south-bound lane of Alta Dr. Please refer to Location Map 7 for the location of Pothole 413.

414 02/01/2023 Alta Dr

Asphalt - 5.0″ Concrete - N/A

Base - 16.0″ Total - 21.0″

Water 8.0″ Plastic Subgrade 51.0″ T/P N/A N/A 60.0” N/S 3 7 Pothole 414 is located in the north-bound lane of Alta Dr. Please refer to Location Map 7 for the location of Pothole 414.

Tracer wire was present.

P otholeDataS heet(s)

RECORD OF TEST HOLE DATA

AIRX JOB NO: X221206

TEST HOLE NO: 251

DATE EXCAVATED: 01/31/2023

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Telecom 2.0″ PVC 26.0″ T/P N/A N/A NW/SE

TOTAL DEPTH EXCAVATED: 73.0”

PAVEMENT THICKNESS: ASPHALT: 5.0″ CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Subgrade

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Pothole 251 is located west of Japatul Rd. Please refer to Location Map 1 for the location of Pothole 251. The photo above was taken in front of Pothole 251 and Pothole 253 facing SE

A downhole view of the 2.0 inch wide PVC Telecom utility found in Pothole 251, at the depth of 26.0 inches T/P. Utility runs in a NW/SE direction at the Pothole location and was found directly on markout.

AREA SHOT DOWNHOLE VIEW

PH 253 PH 251

TEST HOLE NO: 253

DATE EXCAVATED: 01/31/2023

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Telecom 2.0″ PVC 26.0″ T/P N/A N/A NW/SE

TOTAL DEPTH EXCAVATED: 34.0”

PAVEMENT THICKNESS: ASPHALT: 2.0″ CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Subgrade

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Pothole 253 is located west of Japatul Rd. Please refer to Location Map 1 for the location of Pothole 253. The photo above was taken in front of Pothole 253 and Pothole 251 facing north WNW.

A downhole view of the 2.0 inch wide PVC Telecom utility found in Pothole 253, at the depth of 26.0 inches T/P. Utility runs in a NW/SE direction at the Pothole location and was found directly on markout.

PH 253 PH 251

TEST HOLE NO: 361

DATE EXCAVATED: 11/16/2022

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Gas 4.0” Steel 38.0″ T/P N/A N/A W/E

TOTAL DEPTH EXCAVATED: 38.0”

PAVEMENT THICKNESS: ASPHALT: 9.0” CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Cold Mix

PERMANENT SURFACE REPAIR: Cold Mix

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Slurry

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Slurry

COMMENT:

Pothole 361 is located north of Fuerte Dr. Please refer to Location Map 2 for the location of Pothole 361. The photo above was taken in front of Pothole 361 facing east.

A downhole view of the 4.0 inch wide steel Gas utility found in Pothole 361, at the depth of 38.0 inches T/P. Utility runs in a W/E direction at the Pothole location and was found directly on markout

PH 361

TEST HOLE NO: 364

DATE EXCAVATED: 11/16/2022

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 AT&T-D/Cox PVC Package N/A 35.0″ T/Pkg 44.0″ B/Pkg N/S

2 Electric 2.0” PVC 65.5″ T/P N/A N/A N/S

3 Water 8.0” ACP 39.0″ T/P N/A N/A W/E

TOTAL DEPTH EXCAVATED: 76.0”

PAVEMENT THICKNESS: ASPHALT: 7.0” CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Cold Mix

PERMANENT SURFACE REPAIR: Cold Mix

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Sand

COMMENT:

Water markout was off by 3 feet. Fanned out 3 feet wide to north of the pothole.

Pothole 364 is located in the east-bound lane of Fuerte Dr. Please refer to Location Map 2 for the location of Pothole 364. The photo above was taken in front of Pothole 364 facing north.

A downhole view of the utilities found in Pothole 365 and their orientation at the pothole location: a PVC package housing AT&T-D /Cox at the depth of 35.0 inches T/Pkg and 45.0 inches B/Pkg running in a N/S direction; 2.0 inch PVC Electric utility at the depth of 65.5 inches T/P and runs in a N/S direction; and 8.0 inch ACP water utility at the depth of 39.0 inches T/P and runs in a W/E direction.

PH 364

TEST HOLE NO: 365

DATE EXCAVATED: 02/09/2023

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 AT&T/Cox PVC Package N/A 33.0″ T/Pkg N/A N/S

2 Electric 2.0″ Plastic 50.0″ T/P N/A N/A NNE/SSW

TOTAL DEPTH EXCAVATED: 57.0”

PAVEMENT THICKNESS: ASPHALT: 11.0″ CONCRETE: N/A BASE: 8.0″

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Pothole 365 is located in the east-bound lane of Fuerte Dr. Please refer to Location Map 2 for the location of Pothole 365. The photo above was taken in front of Pothole 365 facing north.

A downhole view of the utilities found in Pothole 365 and their orientation at the pothole location: PVC Package housing AT&T/Cox utilities at the depth of 33.0 inches T/Pkg and runs in a N/S direction and 2.0 inch PVC Electric utility at the depth of 50.0 inches T/P running in a NNE/SSW direction. Utilities were found directly on markout.

PH 365

TEST HOLE NO: 371

DATE EXCAVATED: 11/16/2022

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Fiber Optic 2.0″ PVC 53.0″ T/P N/A N/A WNW/ESE

TOTAL DEPTH EXCAVATED: 53.0”

PAVEMENT THICKNESS: ASPHALT: 5.0″ CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Cold Mix

PERMANENT SURFACE REPAIR: Cold Mix

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Granite

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Granite

COMMENT:

Pothole 371 is located in the intersection of Campo Rd and Rogers Rd. Please refer to Location Map 3 for the approximate location of Pothole 371. The photo above was taken in front of Pothole 371 facing ESE.

A downhole view of the 2.0 inch wide PVC Fiber Optic utility found in Pothole 371, at the depth of 53.0 inches T/P. Utility runs in a WNW/ESE direction at the Pothole location and was found directly on markout.

PH 371

TEST HOLE NO: 372

DATE EXCAVATED: 11/16/2022

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 AT&T-D PVC Package N/A 90.0″ T/Pkg N/A WNW/ESE

2 Storm Drain 24.0″ Steel 46.0″ T/P N/A N/A NW/SE

TOTAL DEPTH EXCAVATED: 90.0”

PAVEMENT THICKNESS: ASPHALT: 7.0″ CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Subgrade

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Granite

COMMENT:

Pothole 372 is located in the intersection of Campo Rd and Rogers Rd. Please refer to Location Map 3 for the location of Pothole 372.

The photo above was taken in front of Pothole 372 facing ESE.

A downhole view of the utilities found in Pothole 372 and their orientation at the pothole location: PVC Package housing AT&T-D, Telecom utilities at the depth of 90.0 inches T/Pkg running in a WNW/ESE direction; and 24.0 inch Steel Storm Drain utility at the depth of 46.0 inches T/P and runs in a NW/SE direction. Utilities were found directly on markout.

PH 372

TEST HOLE NO: 373

DATE EXCAVATED: 11/16/2022

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Storm Drain 24.0″ Steel 52.0″ T/P N/A N/A NNW/SSE

2 Gas (Not Found) N/A N/A N/A N/A N/A

TOTAL DEPTH EXCAVATED: 79.0”

PAVEMENT THICKNESS: ASPHALT: 8.0″ CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Subgrade

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade, Granite

COMMENT:

Excavated 79 inches deep and fanned out 24 inches wide 3 ways to find gas.

Pothole 373 is located in the intersection of Campo Rd and Rogers Rd. Please refer to Location Map 3 for the approximate location of Pothole 373. The photo above was taken in front of Pothole 372 and 373 facing SE.

A downhole view of the 24.0 inch wide Steel Storm Drain utility found in Pothole 373, at the depth of 52.0 inches T/P. Utility runs in a NNW/SSE direction at the Pothole location and was found directly on markout.

PH 372 PH 373

TEST HOLE NO: 374

DATE EXCAVATED: 02/08/2023

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Water 18.0″ ACP 86.0″ T/P N/A N/A W/E

TOTAL DEPTH EXCAVATED: 89.0”

PAVEMENT THICKNESS: ASPHALT: 9.0″ CONCRETE: N/A BASE: 9.0″

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Pothole 374 is located in the intersection of Campo Rd and Rogers Rd. Please refer to Location Map 3 for the location of Pothole 374.

The photo above was taken in front of Potholes 373, 374 and 375 facing west.

A downhole view of the 18.0 inch wide ACP Water utility found in Pothole 374, at the depth of 86.0 inches T/P. Utility runs in a W/E direction at the Pothole location and was found directly on markout.

PH 374 PH 373 PH 375

TEST HOLE NO: 375

DATE EXCAVATED: 02/08/2023

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Unknown Concrete Cap N/A 57.0″ T/Cap N/A N/A

2 Gas (Not Found) N/A N/A N/A N/A N/A

TOTAL DEPTH EXCAVATED: 57.0”

PAVEMENT THICKNESS: ASPHALT: 6.0″ CONCRETE: N/A BASE: 5.0″

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Excavated 57 inches deep and 48 inches deep, fanned out 24 inches.

Pothole 375 is located in the intersection of Campo Rd and Rogers Rd. Please refer to Location Map 3 for the location of Pothole 375.

The photo above was taken in front of Potholes 373, 374, and 375 facing west.

A downhole view of the Concrete Cap housing Unknown utilities found in Pothole 375, at the depth of 57.0 inches T/Cap. Utility was found at the Pothole location and was found directly on markout.

PH 374 PH 375 PH 373

TEST HOLE NO: 376

DATE EXCAVATED: 12/13/2022

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Gas 36.0″ Steel 109.0″ T/P N/A N/A W/E

2 Storm Drain 24.0″ Steel 71.0″ T/P N/A N/A NNW/SSE

TOTAL DEPTH EXCAVATED: 109”

PAVEMENT THICKNESS: ASPHALT: 12.0″ CONCRETE: N/A BASE: 32.0″

STANDBY REQUIRED: SDG&E

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Sand

COMMENT:

Yellow caution tape found above the utilities.

Pothole 376 is located in the intersection of Campo Rd and Rogers Rd. Please refer to Location Map 1 for the location of Pothole 376.

The photo above was taken in front of Pothole 376 facing north.

A downhole view of the utilities found in Pothole 376 and their orientation at the pothole location: 36.0 inch Steel Gas utility at the depth of 109.0 inches T/P and runs in a W/E direction; and 24.0 inch Steel Storm Drain utility at the depth of 71.0 inches T/P and runs in a NNW/SSE direction. Utilities were found directly on markout.

PH 376

TEST HOLE NO: 376A

DATE EXCAVATED: 02/03/2023

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 AT&T-D (Not Found) N/A N/A N/A N/A N/A

TOTAL DEPTH EXCAVATED: 109.0”

PAVEMENT THICKNESS: ASPHALT: 10.0″ CONCRETE: N/A BASE: 12.0″

STANDBY REQUIRED: SDG&E

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: N/A

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Excavated 109 inches deep, fanned out 48 inches wide to south and to north.

Pothole 376A is located in the intersection of Campo Rd and Rogers Rd. Please refer to Location Map 3 for the location of Pothole 376A. The photo above was taken in front of Pothole 376A facing north.

A downhole view of the excavation to 109.0 inches deep. Utilities were not found in the Pothole.

PH 376A

TEST HOLE NO: 377

DATE EXCAVATED: 02/03/2023

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

Sanitary Sewer (Not

Found) N/A N/A N/A N/A N/A

TOTAL DEPTH EXCAVATED: 108.0”

PAVEMENT THICKNESS: ASPHALT: N/A CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Class II Base

PERMANENT SURFACE REPAIR: Class II Base

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: No PIPE COVER MATERIAL: N/A

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Excavated 108 inches deep, and 24 inches wide, fanned out to north and south.

Pothole 377 is south of Campo Rd. Please refer to Location Map 3 for the approximate location of Pothole 377. The photo above was taken in front of Pothole 377 facing north.

A downhole view of the excavation to 108.0 inches deep. Utilities were not found in the Pothole.

PH 377

TEST HOLE NO: 381

DATE EXCAVATED: 12/02/2022

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 AT&T-D Slurry Encasement N/A 4.5″ T/Enc 56.0″ B/Enc N/S

TOTAL DEPTH EXCAVATED: 64.0”

PAVEMENT THICKNESS: ASPHALT: 4.5″ CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Slurry

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Pothole 381 connects to pothole 382.

Pothole 381 is located in the south-bound lane of Conrad Dr. Please refer to Location Map 4 for the approximate location of Pothole 381.

The photo above was taken in front of Pothole 381 and Pothole 382 facing east.

A downhole view of the Slurry Encasement housing AT&T-D utilities found in Pothole 381, at the depth of 4.5 inches T/Enc and 56.0 inches B/Enc. Utility runs in a N/S direction at the Pothole location and was found directly on markout.

PH 381 PH 382

TEST HOLE NO: 382

DATE EXCAVATED: 12/02/2022

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 AT&T-D Slurry Encasement N/A 6.0″ T/Enc 60.0″ B/Enc N/S

2 Storm Drain 18.0″ Cast Iron 21.0″ T/P N/A N/A W/E

TOTAL DEPTH EXCAVATED: 62.0”

PAVEMENT THICKNESS: ASPHALT: 6.0″ CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Slurry

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

AT&T-D encasement connects to pothole 381. Found both edges of encasement.

Pothole 382 is located in the south-bound lane of Conrad Dr. Please refer to Location Map 4 for the approximate location of Pothole 382.

The photo above was taken in front of Pothole 382 and Pothole 381 facing east.

A downhole view of the utilities found in Pothole 382 and their orientation at the pothole location: inch wide Slurry Encasement housing AT&T-D utilities at the depth of 6.0 inches T/Enc and 60.0 inches B/Enc running in a N/S direction; and 18.0 inch Cast Iron Storm Drain utility at the depth of 21.0 inches T/P and runs in a N/S direction. Utilities were found directly on markout.

PH 381 PH 382

TEST HOLE NO: 383

DATE EXCAVATED: 11/30/2022

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

Sanitary Sewer (Not

Found) N/A N/A N/A N/A N/A

TOTAL DEPTH EXCAVATED: 45.0”

PAVEMENT THICKNESS: ASPHALT: 7.0″ CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: N/A

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Found unknown concrete at 45 inches deep. One edge is exposed. Another pothole needs to be done in order to find the bottom.

Pothole 383 is located in the north-bound lane of Conrad Dr. Please refer to Location Map 4 for the location of Pothole 383. The photo above was taken in front of Pothole 383 facing west.

A downhole view of the excavation to 45.0 inches deep. Utilities were not found in the Pothole.

PH 383

TEST HOLE NO: 384

DATE EXCAVATED: 11/30/2022

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Water 8.0″ ACP 65.0″ T/P N/A N/A N/S

TOTAL DEPTH EXCAVATED: 70.0”

PAVEMENT THICKNESS: ASPHALT: 7.0″ CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Pothole 384 is located in the north-bound lane of Conrad Dr. Please refer to Location Map 4 for the location of Pothole 384. The photo above was taken in front of Pothole 384 facing west.

A downhole view of the 8.0 inch wide ACP Water utility found in Pothole 384, at the depth of 65.0 inches T/P. Utility runs in a N/S direction at the Pothole location and was found directly on markout.

PH 384 PH 383

TEST HOLE NO: 385

DATE EXCAVATED: 11/30/2022

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Gas 4.0″ Steel 55.0″ T/P N/A N/A N/S

TOTAL DEPTH EXCAVATED: 56.0”

PAVEMENT THICKNESS: ASPHALT: 6.0″ CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Black Wrap

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Pothole 385 is located in the north-bound lane of Conrad Dr. Please refer to Location Map 4 for the approximate location of Pothole 385.

The photo above was taken in front of Pothole 385 facing west.

A downhole view of the 4.0 inch wide Steel Gas utility found in Pothole 385, at the depth of 55.0 inches T/P. Utility runs in a N/S direction at the Pothole location and was found directly on markout.

PH 385 PH 384 PH 383

TEST HOLE NO: 386

DATE EXCAVATED: 12/02/2022

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Electric Concrete Encasement N/A 20.0″ T/Enc 35.0″ B/Enc N/S

TOTAL DEPTH EXCAVATED: 50.0”

PAVEMENT THICKNESS: ASPHALT: 6.0″ CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Concrete

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Pothole 386 is located in the north-bound lane of Conrad Dr. Please refer to Location Map 4 for the location of Pothole 386. The photo above was taken in front of Pothole 386, Pothole 385, and Pothole 384 facing west.

A downhole view of the Concrete Encasement housing Electric utilities found in Pothole 386, at the depth of 20.0 inches T/Enc and

35.0 inches B/Enc. Utility runs in a N/S direction at the Pothole location and was found directly on markout.

PH 386 PH 385 PH 384

TEST HOLE NO: 391

DATE EXCAVATED: 12/15/2022

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Gas 2.0″ Steel 44.0″ T/P N/A N/A NE/SW

TOTAL DEPTH EXCAVATED: 44.0”

PAVEMENT THICKNESS: ASPHALT: 5.0″ CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Pothole 391 is located in the SW-bound lane of Elmdale Dr. Please refer to Location Map 5 for the approximate location of Pothole 391.

The photo above was taken in front of Pothole 391, Pothole 392, and Pothole 393 facing SE.

A downhole view of the 2.0 inch wide Steel Gas utility found in Pothole 391, at the depth of 44.0 inches T/P. Utility runs in a NE/SW direction at the Pothole location and was found directly on markout.

PH 392 PH 393 PH 391

TEST HOLE NO: 392

DATE EXCAVATED: 12/15/2022

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Storm Drain 30.0″ Steel 44.0″ T/P N/A N/A NNW/SSE

2 Sanitary Sewer (Not Found) N/A N/A N/A N/A N/A

TOTAL DEPTH EXCAVATED: 50.0”

PAVEMENT THICKNESS: ASPHALT: 5.0″ CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: No TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: No PIPE COVER MATERIAL: Subgrade

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade, Sand, Rocks

COMMENT:

Pothole 392 is located in the SW-bound lane of Elmdale Dr. Please refer to Location Map 5 for the approximate location of Pothole 392.

The photo above was taken in front of Pothole 392 facing SE.

A downhole view of the 30.0 inch wide Steel Storm Drain utility found in Pothole 392, at the depth of 44.0 inches T/P. Utility runs in a N/S direction at the Pothole location and was found directly on markout.

PH 392

TEST HOLE NO: 393

DATE EXCAVATED: 12/15/2022

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Gas 3.4″ Steel 44.0″ T/P N/A N/A NW/SE

2 Water Service 1.0″ Copper 38.0″ T/P N/A N/A NW/SE

TOTAL DEPTH EXCAVATED: 54.0”

PAVEMENT THICKNESS: ASPHALT: 5.0″ CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Subgrade

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Granite, Subgrade, Sand

COMMENT:

Pothole 393 is located in the SW-bound lane of Elmdale Dr. Please refer to Location Map 5 for the approximate location of Pothole 393.

The photo above was taken in front of Pothole 393 facing NW.

A downhole view of the utilities found in Pothole 393 and their orientation at the pothole location: 3.4 inch Steel Gas utility at the depth of 44.0 inches T/P and runs in a NW/SE direction; and 1.0 inch Copper Water Service utility at the depth of 38.0 inches T/P and runs in a NW/SE direction. Utilities were found directly on markout.

PH 393

TEST HOLE NO: 394

DATE EXCAVATED: 12/15/2022

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Water 6.0″ ACP 64.0″ T/P N/A N/A NNE/SSW

TOTAL DEPTH EXCAVATED: 64.0”

PAVEMENT THICKNESS: ASPHALT: 5.0″ CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade, Sand

COMMENT:

Pothole 394 is located in the NE-bound lane of Elmdale Dr. Please refer to Location Map 5 for the approximate location of Pothole 394.

The photo above was taken in front of Pothole 394 facing NNE.

A downhole view of the 6.0 inch wide ACP Water utility found in Pothole 394, at the depth of 64.0 inches T/P. Utility runs in a NNE/SSW direction at the Pothole location and was found directly on markout.

PH 394

TEST HOLE NO: 403

DATE EXCAVATED: 02/02/2023

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Gas 8.0″ Steel 41.0″ T/P N/A N/A W/E

TOTAL DEPTH EXCAVATED: 45.0”

PAVEMENT THICKNESS: ASPHALT: 10.0″ CONCRETE: N/A BASE: 20.0″

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Pothole 403 is located in the west-bound lane of Jamacha Rd.

Please refer to Location Map 6 for the location of Pothole 403. The photo above was taken in front of Pothole 403 facing north.

A downhole view of the 8.0 inch wide Steel Gas utility found in Pothole 403, at the depth of 41.0 inches T/P. Utility runs in a W/E direction at the Pothole location and was found directly on markout.

PH 403

TEST HOLE NO: 405

DATE EXCAVATED: 02/02/2023

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Water 12.0″ ACP 53.0″ T/P N/A N/A W/E

TOTAL DEPTH EXCAVATED: 57.0”

PAVEMENT THICKNESS: ASPHALT: 8.0″ CONCRETE: N/A BASE: 4.0″

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Pothole 405 is located in the east-bound lane of Jamacha Rd.

Please refer to Location Map 6 for the location of Pothole 405. The photo above was taken in front of Pothole 405 facing north.

A downhole view of the 12.0 inch wide ACP Water utility found in Pothole 405, at the depth of 53.0 inches T/P. Utility runs in a W/E direction at the Pothole location and was found directly on markout.

PH 405

TEST HOLE NO: 406

DATE EXCAVATED: 02/02/2023

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Fiber Optic 2.0″ PVC 46.0″ T/P N/A N/A W/E

TOTAL DEPTH EXCAVATED: 48.0”

PAVEMENT THICKNESS: ASPHALT: 6.0″ CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Subgrade

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Pothole 406 is located in the east-bound lane of Jamacha Rd.

Please refer to Location Map 6 for the location of Pothole 406. The photo above was taken in front of Pothole 406 and Pothole 403 facing north.

A downhole view of the 2.0 inch wide PVC Fiber Optic utility found in Pothole 406, at the depth of 46.0 inches T/P. Utility runs in a W/E direction at the Pothole location and was found directly on markout.

PH 406 PH 403

TEST HOLE NO: 407

DATE EXCAVATED: 02/02/2023

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Telecom Concrete Encasement N/A 42.0″ T/Enc 52.0″ B/Enc W/E

TOTAL DEPTH EXCAVATED: 55.0”

PAVEMENT THICKNESS: ASPHALT: N/A CONCRETE: N/A BASE: N/A

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Class II Base

PERMANENT SURFACE REPAIR: Class II Base

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Pothole 407 is located south of Jamacha Rd. Please refer to Location Map 6 for the location of Pothole 407. The photo above was taken in front of Pothole 407 facing east.

A downhole view of the Concrete Encasement housing Telecom utilities found in Pothole 407, at the depth of 42.0 inches T/Enc and

52.0 inches B/Enc. Utility runs in a W/E direction at the Pothole location and was found directly on markout.

PH 407

TEST HOLE NO: 412

DATE EXCAVATED: 02/01/2023

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Gas Main 2.0″ Steel 55.0″ T/P N/A N/A N/S

Gas Service (Not

Found) N/A N/A N/A N/A N/A

TOTAL DEPTH EXCAVATED: 72.0”

PAVEMENT THICKNESS: ASPHALT: 3.0″ CONCRETE: N/A BASE: 16.0″

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Subgrade

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Pothole 412 is located in the south-bound lane of Alta Dr. Please refer to Location Map 7 for the approximate location of Pothole 412.

The photo above was taken in front of Pothole 412 facing north.

A downhole view of the 2.0 inch wide Steel Gas Main utility found in Pothole 412, at the depth of 55.0 inches T/P. Utility runs in a N/S direction at the Pothole location and was found directly on markout.

PH 412

TEST HOLE NO: 413

DATE EXCAVATED: 02/01/2023

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Sanitary Sewer 8.0″ VCP 55.0″ T/P N/A N/A N/S

TOTAL DEPTH EXCAVATED: 65.0”

PAVEMENT THICKNESS: ASPHALT: 3.0″ CONCRETE: N/A BASE: 16.0″

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: No TRACER WIRE FOUND: No

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Subgrade

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Pothole 413 is located in the south-bound lane of Alta Dr. Please refer to Location Map 7 for the approximate location of Pothole 413.

The photo above was taken in front of Pothole 413 facing north.

A downhole view of the 8.0 inch wide VCP Sanitary Sewer utility found in Pothole 413, at the depth of 55.0 inches T/P. Utility runs in a N/S direction at the Pothole location and was found directly on markout.

PH 413

TEST HOLE NO: 414

DATE EXCAVATED: 02/01/2023

UTILITY

TYPE

SIZE &

MATERIAL

UTILITY

DEPTH

ENCASEMENT/

PACKAGE TOP

ENCASEMENT/

PACKAGE BOTTOM

UTILITY

DIRECTION

1 Water 8.0″ Plastic 51.0″ T/P N/A N/A N/S

TOTAL DEPTH EXCAVATED: 60.0”

PAVEMENT THICKNESS: ASPHALT: 5.0″ CONCRETE: N/A BASE: 16.0″

STANDBY REQUIRED: N/A

IMMEDIATE SURFACE REPAIR: Aquaphalt

PERMANENT SURFACE REPAIR: Aquaphalt

UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: Yes

MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sanda

UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade

COMMENT:

Pothole 414 is located in the north-bound lane of Alta Dr. Please refer to Location Map 7 for the approximate location of Pothole 414.

The photo above was taken in front of Pothole 414 facing east.

A downhole view of the 8.0 inch wide Plastic Water utility found in Pothole 414, at the depth of 51.0 inches T/P. Utility runs in a N/S direction at the Pothole location and was found directly on markout.

PH 414

Manhole Dip Data Sheet(s)

A MH 1

B

C

D

F

G

DOWNHOLE VIEW

ORIENTATION AREA PHOTO

MEASURE DOWN

/ FLOWLINE

COMMENTS

120" T/P WNW→ ESE and N→ S

Flagger: N/A

Service Type (Sanitary, Storm, Gas, Water, Electric, Etc): Sanitary Sewer

Barrel Type & Diameter: 6.0" ACP

Job Name: RFP_1023457_20-21 Annual Culverts_GROUP 4

DIP #

Dip 378

Location (Street Name): Campo Road

DIP DATA SHEET

AIR X Job #:

X221206

Crew Members: Steve Santos, Alex Sanchez Date:

2/3/2023

N

C

D

F

G

DOWNHOLE VIEW

ORIENTATION AREA PHOTO

MEASURE DOWN

/ FLOWLINE

COMMENTS

180" T/P WNW→ESE

Flagger: N/A

Service Type (Sanitary, Storm, Gas, Water, Electric, Etc): Sanitary Sewer

Barrel Type & Diameter: 6.0" ACP

Job Name: RFP_1023457_20-21 Annual Culverts_GROUP 4

DIP #

Dip 378A

Location (Street Name): Campo Road

DIP DATA SHEET

AIR X Job #:

X221206

Crew Members: Steve Santos, Alex Sanchez Date:

2/3/2023

Sanitary Sewer

C

D

F

G

DOWNHOLE VIEW

ORIENTATION AREA PHOTO

MEASURE DOWN

/ FLOWLINE

COMMENTS

N → S88.0" T/P

Flagger: N/A

Service Type (Sanitary, Storm, Gas, Water, Electric, Etc): Sanitary Sewer

Barrel Type & Diameter: 8.0" VCP

Job Name: RFP_1023457_20-21 Annual Culverts_GROUP 4

DIP #

Dip 383

Location (Street Name): Conrad Drive

DIP DATA SHEET

AIR X Job #:

X221206

Crew Members: Roger Silva, Jesús Delgado Date:

11/30/2022

C

D

F

G

DOWNHOLE VIEW

ORIENTATION AREA PHOTO

MEASURE DOWN

/ FLOWLINE

COMMENTS

64" T/P N→ S

Flagger: N/A

Service Type (Sanitary, Storm, Gas, Water, Electric, Etc): Sanitary Sewer

Barrel Type & Diameter: VCP

Job Name: RFP_1023457_20-21 Annual Culverts_GROUP 4

DIP #

Dip 415

Location (Street Name): Alta Drive

DIP DATA SHEET

AIR X Job #:

X221206

Crew Members: Gabe Mercado Date:

4/7/2023

P erm it(s)

COUNTY OF SAN DIEGO

DEPARTMENT OF PUBLIC WORKS

PRIVATE DEVELOPMENT CONST.

INSPECTION

5510 OVERLAND AVE, SUITE 210

SAN DIEGO, CALIFORNIA 92123-1239

(858) 694-3165 FAX: (858) 694-2354

EXCAVATION PERMIT

DATE ISSUED:

EXPIRATION DATE:

09/28/2022 03/17/2023

TRUST ACCOUNT NO.: PERMIT NO.: DPW2022-RWEXCP-75144

Financial Source: Internal Agreement Number PWR-01288

APPLICANT:

CLINTON BOOGAARD

760-480-2347

CBOOGAARD@AIRXUS.COM

CONTRACTOR: PERMIT OWNER:

AIRX UTILITY SURVEYORS, INC.

785 EAST MISSION ROAD #100

SAN MARCOS, CA 92069

760-480-2347

SITE ADDRESS / JOB LOCATION:

VARIOUS ROADS WITHIN LA PRESA / LA PRESA / TB 1271 - C5, 1291 - E2, 1291 B-2, 1310 - C3, NEAREST X-STREET / INTERSECTION: VARIOUS CROSS STREETS

APN: Agency Job No.: 1023457 GPS COORD.:

DETAILED DESCRIPTION:

Scope of Work: 35 POTHOLES (12" X 12") & 1 SLOT TRENCH (1' X 4') WITHIN COUNTY ROW

Related Permits: DPW2022-RWTCP-01020

Notes:

A) A Pre-construction conference is required prior to the start of any work in the County ROW. Contact your assigned Private Development Construction Inspection (PDCI) Inspector directly to schedule.

B) Stormwater Best Management Practices (BMPs) are required at all times and shall be planned and installed in accordance with the County's Watershed Protection Ordinance, Municipal Separate Storm Sewer System Permit (MS4), and, if applicable, the State Construction General Permit regulations.

C) Traffic Control Permit(s) are required and must be obtained prior to start of any work in the County's Road ROW.

D) Compaction of backfill material shall be achieved by "Mechanical Compaction" methods and geotechnical compaction reports are required for all compacted sections. Exceptions to compaction testing requirements may be allowed at the discretion of DPW.

E) Existing culverts and other road facilities shall be protected in place against any damage. Any culvert or road facility damaged during construction shall be reported to DPW immediately through your assigned Inspector.

F) All existing paved and unpaved areas damaged, disturbed, or removed by the permitted work shall be repaired to the County Standards and as approved by DPW PDCI inspector. The trench resurfacing shall be done in accordance with San Diego Regional Standard Drawings G-24 A&B, Type D for asphalt surfacing, G-25 for concrete surfacing. In addition, the final surface treatment shall match the existing surface type.

G) Deviations from the standard trench restoration requirements must be reviewed and approved by DPW prior to start of work.

H) Trenches and excavation that exceeds five (5) feet in vertical depth shall be done in accordance with CAL-OSHA Safety Standards. Contact CAL-OSHA at (619) 767-2280 for permit requirements.

I) Gate Well Cap and Can installations shall meet San Diego Regional Standard Drawing WV-02.

J) Bollards are not allowed in the Right-of-Way to protect equipment per Highway Design Standards Section 2.2 No. 14. No less than an 8ft minimum clear recovery zone (CRZ) shall be maintained for roadways without curbs.

K) Subject to Streets and Highways Code Sections 732.5, 1492.5 and 1810.5; Survey monuments shall be preserved, referenced, and/or replaced pursuant to Section 8771 of the Business and Professions Code.

L) No greater than 50 Linear Feet of trench shall be opened and plated at any one time. Exceptions to the plated length may be allowed at the discretion of DPW.

M) Hours of work may be determined by the Traffic Control Permit. No traffic controls will be allowed during students drop off and pickup periods in the vicinity of schools and peak commute hours at some locations.

EXCAVATION PERMIT Page 1 of 2Permit No. DPW2022-RWEXCP-75144

N) To document pavement condition in Condition No. F above, all permits that utilize heavy equipment and/or trucks weighing over 7-tons loaded weight, the applicant shall submit acceptable photo-documentation of the existing road surfacing including any visible cracks in the pavement for all work locations and intended haul routes to assigned PDCI inspector prior to…