rfb 13291_for info only_FY20-21 Pothole Report_GROUP 3.pdf
PDF 16 MB Posted
- Attached to
- RFB - COUNTYWIDE CULVERT REPAIR AND REPLACEMENT
- Solicitation number
- BPM013291
- Issued by
- California
About this file
This is a Potholing Report prepared by AIRX Utility Surveyors, Inc. for the County of San Diego, documenting underground utility location and vacuum excavation services performed across multiple locations in the county including Ridge Gill Road, Blossom Valley Road, Flinn Spring Road in El Cajon, Denova Drive in Alpine, Sunrise Highway in Pine Valley, North Magnolia Avenue, and Denny Way in Santee, California. The report details fieldwork conducted between September 2 and September 16, 2022, during which a total of 14 potholes were excavated to identify utility conflicts and connection points. The work involved marking pothole locations, calling in Underground Service Alert (USA), obtaining permits, establishing traffic control, and performing vacuum excavation using high-pressure air and water to expose utilities to depths measured to the nearest inch. AIRX documented utility alignments, depths, and other data using pink paint markings and wood lath, with all excavations and discoveries completed without incident. Potholes were backfilled with compacted material and patched with Cold Mix asphalt.
The pothole survey identified various utilities at different depths and locations, including water lines (ranging from 8 to 33 inches in diameter), sanitary and storm sewers, gas lines, electric encasements, Cox fiber optic cables, and street light conduits. Utilities were located in clay, granite, and subgrade soils at depths ranging from 11 inches to 96 inches below the ground surface. The report includes comprehensive location maps with GPS coordinates, tabulation data for each pothole site, detailed data sheets with photographs showing downhole views of exposed utilities, and manhole dip measurements. Most target utilities were found directly on USA markout, with tracer wire detected at two locations. One sanitary sewer line was not found at the planned excavation depth of 66 inches. AIRX recommends that all pothole locations and active mark-outs be surveyed to assist in adjusting utilities on final construction plans and profiles.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PPOOTTHHOOLLIINNGG RREEPPOORRTT
U T I L I T Y S U R V E Y O R S , I N C .
PPRREEPPAARREEDD BBYY::
September 15, 2022
785 East Mission Road Ste. 100 I San Marcos, CA 92069 I P.760.480.2347 I F.760.739.8034 I airxus.com
Utility Locating and Potholing Area:
Ridge Gill Rd, intersection of Blossom Valley Rd and Flinn Spring Rd in El Cajon, Denova Dr in Alpine, Sunrise Hwy in Pine Valley, N Magnolia Ave, Denny Way in Santee, CA
AIRX Project #: X221205
Project Name: RFP_1023457_20-21 Annual Culverts_GROUP 3
TABLE OF CONTENTS
1. Description of Pothole Procedures and Site-Specific Details
2. Pothole Project Map (s)
3. Pothole Location Map (s)
4. Pothole Tabulation Report
5. Pothole Data Sheet (s)
6. Manhole Dip Data Sheet (s)
7. Permit (s)
A I R X U T I L I T Y S U R V E Y O R S , I N C .
Descriptionof
P otholeP roceduresand
S iteS pecificDetails
A IR X U T IL IT Y S U R V E Y O R S , IN C .
DESCRIPTION OF POTHOLE PROCEDURES
AIRX Utility Surveyors performs a full range of specialized engineering services including Underground Utility Location and Vacuum Excavation (to verify depth and alignment of underground utilities).
Underground Utility Location employs sophisticated electronic locating devices to trace the route of an underground utility; then the route is marked on the surface with marking paint in paved areas, or with 60 penny nails and feathers in unpaved areas.
Vacuum excavation employs a vacuum truck in conjunction with high-pressure air or water to excavate material and expose an underground utility. A 10 to 12-inch diameter hole is first cored or chiseled through the pavement so that the vacuum hose and high-pressure air or water hose can be inserted.
Utilities found during potholing are located on the surface by placing two reference points (typically 36” apart) on either side of the pothole along the centerline (or edge) of the utility, using paving nails or 60 penny nails as appropriate. Depth measurements (to the nearest ½ inch) are taken midway between the two reference points.
Utility alignment, depth, and other data is marked with pink paint (on pavement), or on wood lath (unpaved areas).
SITE SPECIFIC DETAILS
AIRX was contracted by County of San Diego to perform utility locating and potholing services on Ridge Gill Rd, intersection of Blossom Valley Rd and Flinn Spring Rd in El Cajon, Denova Dr in Alpine, Sunrise Hwy in Pine Valley, and N Magnolia Ave, Denny Way in Santee, California. A total of 14 potholes were excavated to establish conflicts and connection points on a variety of utilities. The results of the data are contained in the attached spreadsheet and data sheets.
In preparation of these excavations, AIRX marked out the dig locations and called in for USA (Underground Service Alert). All traffic control plans and permits were drawn and applied for by AIRX and all traffic control was set up by
AIRX.
All the excavations and discovery went without any incident. Any changes and adjustments are mentioned in the Pothole Tabulation Report and the Pothole Data Sheets. All the results were annotated on the ground and in this report. It is AIRX’s recommendation that all pothole locations and the active mark out should be surveyed to aid in the adjustment of utilities on the final plan and profile.
At each pothole location, the utility alignment was marked with pink paint, as well as paving nails or feathers. AIRX used potable water acquired offsite for excavation and all water and material vacuumed was disposed of off-site. No water was allowed to flow into storm drains or natural drainages. The potholes were covered with clean backfill material and compacted to 95% density in 3” lifts. The pavement was patched with Cold Mix. All field work was performed between September 2, 2022 and September 16, 2022.
P otholeP rojectM ap(s)
0 950475
US Feet
Coordinate System: GCS WGS 1984 Web Mercator Auxiliary Sphere
X221205
Gillespie Field
Broadway Channel
W Bradley Ave
Oconner St
N M a g n o lia
A v e
Airport Dr
G ra v e s A v e
W in g A v e
P io n e e r W a y
N J o h n s o n A v e
W Brad ley Ave
N M a g n o li a A v e
Denny Way
Floyd Smith Dr
J o e C ro s s o n D r
Cypress Ln
S a n V ic e n te
F w y
1D
P o in c ia n a D r
T e to n D r
V u lc a n S t
R o x a n n e D r
W e n a tc h e e A v e
Pepper Dr
Danny St
E Bradley Ave
P e p p e rw o o d D r
G r a v e s A v e
V u lc a n S t
Bluebird Ln
R o b in
L n
Magnolia Elementary
Pothole Project Map 1
Location Map 12
Location Map 11
RFP_1023457_20-21 Annual Culverts_GROUP 3
0 1,000500
Coordinate System: GCS WGS 1984 Web Mercator Auxiliary Sphere
X221205
Lake Jennings
Bass Dr
B as s D r
Bas s D r
P a lo m in o R id g e D r
P in ka rd
Ln
H arritt
R d
Shalyn Dr
Old e Hw y 8
Jen ni n g s
Vi sta
Dr
Q u a i l C anyo n R d
T elka if S t
Lake Jennings Park Rd
Kumeyaay Hwy
Lake Jennings Park
Johnstown
Los Coches Creek
High way
8 Bus ines s
Q uail V alley W ay
Olde Hwy 80
Ol de
Hw y 8
Sold in Ln
B o n d A ve
C h im n e y R o c k L n
B lo ss om
Va lle y Rd
O ak
Cr ee k R d
Ran ch
Tr ai l D r
Red Po ny Ln
Ku me yaa y Hwy
Kumeyaay Hwy
Flinn Springs Park
Rios Baseball Park
Pothole Project Map 2
Location Map 14
Location Map 13
0 119,23059,615
Coordinate System: GCS WGS 1984 Web Mercator Auxiliary Sphere
X221205
Banning
Murrieta
Rancho Santa Margarita
Hemet
Laguna Niguel
San Clemente
Perris
Oceanside
Corona
Santa Ana
Anaheim
Playas de Rosarito
El Cajon
Santee
Escondido
Chula Vista
San Diego
Tijuana
Ocotillo Wells State Vehicular Recreation Area
Salton Sea State
Recreation Area
Coyote Canyon Cultural Preserve
Joshua Tree National Park
Santa Rosa-San Jacinto
Mountains National Monument
Indio
Cathedral City
Palm Desert
Laguna Salada
Southern Overland Trail
Cultural Preserve
Anza-Borrego Desert State Wilderness
Cleveland National Forest
Tecate
Mexicali
Pothole Project Map 3
Location Map 15
P otholeL ocationM ap(s)
0 200100
Coordinate System: NAD 1983 UTM Zone 11N Web Mercator Auxiliary Sphere
X221205
RFP_1023457_20-21 Annual Culverts_GROUP 3
Pothole Location Map 1
271 Cox Pkg -116.962494 32.822821
281 Electric SL -116.964596 32.820467
282 Electric SL -116.964517 32.820469
Pothole Number Utility Type Longitude Latitude
0 2010
Coordinate System: NAD 1983 UTM Zone 11N Web Mercator Auxiliary Sphere
X221205
RFP_1023457_20-21 Annual Culverts_GROUP 3
263263
261261
Pothole Location Map 2
261 Sewer -116.962264 32.823229
261 Cox PVC -116.962266 32.823228
263 SD T Connection -116.962249 32.823217
263 SD T connection -116.962256 32.823217
264 Sewer (Not Found) -116.962251 32.82324
265 Manhole Dip 32.823105 -116.962268
0 5025
Coordinate System: NAD 1983 UTM Zone 11N Web Mercator Auxiliary Sphere
X221205
RFP_1023457_20-21 Annual Culverts_GROUP 3
Pothole Location Map 3
253 Water 8" -116.884969 32.842073
254 Water 16" -116.884959 32.842059
256 Manhole Dip 32.842277 -116.884781
0 10050
Coordinate System: NAD 1983 UTM Zone 11N Web Mercator Auxiliary Sphere
X221205
RFP_1023457_20-21 Annual Culverts_GROUP 3
Pothole Location Map 4
241 Gas -116.859991 32.859056
242 Water -116.859985 32.859158
243 Water -116.859948 32.859229
0 10,0005,000
Coordinate System: NAD 1983 UTM Zone 11N Web Mercator Auxiliary Sphere
X221205
RFP_1023457_20-21 Annual Culverts_GROUP 3
311A
Pothole Location Map 5
301 Water -116.793903 32.817814
311 Electric Enc -116.500302 32.824419
311A Electric Enc -116.49534 32.82787
P otholeT abulationR eport
POTHOLE TABULATION REPORT: RFP_1023457_20-21 Annual Culverts_GROUP 3
Pothole Number
Date Job Number/Street Pavement Thickness
Utility Type Utility Size & Material Soil Type Depth-Ground to Top of Utility
Depth-Ground to Top of Package/
Encasement
Depth-Ground to Bottom of Package/
Encasement
Total Depth
Excavated
Utility Orientation
Pothole Project Area
Map #
Pothole Location
Map # Description & Location Notes
241 09/06/2022
Intersection of Blossom Valley Rd and Flinn Springs Rd
Asphalt - 9.0″ Concrete - N/A
Base - N/A Total - 9.0″
Gas 3.0″ Polyethylene Clay 54.0″ T/P N/A N/A 54.0” NW/SE 2 4 Pothole 241 is located in the intersection of Blossom Valley Rd and Flinn Springs Rd. Please refer to Location Map 4 for the approximate location of Pothole 241.
242 09/06/2022
Intersection of Flinn Springs Rd and
Blossom Valley Rd
Asphalt - 7.0″ Concrete - N/A
Base - N/A Total - 7.0″
Water 33.0″ Concrete Clay 61.0″ T/P N/A N/A 90.0” NW/SE 2 4
Pothole 242 is located in the intersection of Flinn Springs Rd and Blossom Valley Rd. Please refer to Location Map 4 for the approximate location of Pothole 242.
243 09/06/2022
Intersection of Flinn Springs Rd & Blossom
Valley Rd
Asphalt - N/A Concrete - N/A
Base - N/A Total - N/A
Water 33.0″ Concrete Clay 57.0″ T/P N/A N/A 90.0” NE/SW 2 4
Pothole 243 is located in the intersection of Flinn Springs Rd and Blossom Valley Rd. Please refer to Location Map 4 for the approximate location of Pothole 243.
251 Cancelled
252 Cancelled
253 09/08/2022 Ridge Hill Rd
Asphalt - 7.0″ Concrete - N/A
Base - 3.0″ Total - 10.0″
Water 8.0″ ACP Subgrade 43.5″ T/P N/A N/A 50.0” NE/SW 2 3 Pothole 253 is located in the south-bound lane of Ridge Hill Rd. Please refer to Location Map 3 for the approximate location of Pothole 253.
254 09/07/2022 Ridge Hill Rd
Asphalt - 7.0″ Concrete - N/A
Base - 12.0″ Total - 19.0″
Water 16.0″ ACP Subgrade 96.0″ T/P N/A N/A 11.0” NE/SW 2 3 Pothole 254 is located in the north-bound lane of Ridge Hill Road. Please refer to Location Map 3 for the approximate location of Pothole 254.
Tracer wire was present.
255 Cancelled
256 Cancelled
261 09/02/2022 Magnolia Ave
Asphalt - 8.0″ Concrete - N/A
Base - N/A Total - 8.0″
Cox, Fiber Optic Sanitary Sewer
2.0″ PVC
6.0″ PVC
Clay 36.0″ T/P 61.0″ T/P
N/A N/A
N/A N/A
61.0” N/S N/S
1 2 Pothole 261 is located east of Magnolia Av. Please refer to Location Map 2 for the approximate location of Pothole 261.
262 &
09/02/2022 Magnolia Ave
Asphalt - 4.0″ Concrete - N/A
Base - N/A Total - 4.0″
Storm Drain T Connection
3.0″ Corrugated Steel Clay 11.0″ T/P N/A N/A 11.0” W & S 1 2 Pothole 262 & 263 is located east of Magnolia Av.
Please refer to Location Map 2 for the approximate location of Pothole 262 & 263.
Found connections.
09/02/2022
Magnolia Ave
Asphalt - 4.0″ Concrete - N/A
Base - N/A Total - 4.0″
Sanitary Sewer (Not Found)
N/A
Clay, Granite
N/A N/A N/A 66.0” N/A 1 2 Pothole 264 is located east of Magnolia Av. Please refer to Location Map 2 for the approximate location of Pothole 264.
Excavated 66 inches deep, 12 inches wide, hit decomposed granite. Sanitary sewer was not found.
265 Cancelled
271 09/07/2022 Magnolia Ave
Asphalt - N/A Concrete - N/A
Base - N/A Total - N/A
Cox (2) 2.0″ PVC Clay 16.0″ T/P N/A N/A 33.0” N/S 1 1 Pothole 271 is located east of Magnolia Ave. Please refer to Location Map 1 for the approximate location of Pothole 271.
272 Cancelled
POTHOLE TABULATION REPORT: RFP_1023457_20-21 Annual Culverts_GROUP 3
Pothole Number
Date Job Number/Street Pavement Thickness
Utility Type Utility Size & Material Soil Type Depth-Ground to Top of Utility
Depth-Ground to Top of Package/
Encasement
Depth-Ground to Bottom of Package/
Encasement
Total Depth
Excavated
Utility Orientation
Pothole Project Area
Map #
Pothole Location
Map # Description & Location Notes
09/02/2022
Denny Way
Asphalt - N/A Concrete - N/A
Base - N/A Total - N/A
Street Light
1.0″ PVC
Clay
39.5″ T/P
39.5” W/E 1 1
Pothole 281 is located south of Denny Way. Please refer to Location Map 1 for the approximate location of Pothole 281.
282 09/02/2022 Denny Way
Asphalt - N/A Concrete - N/A
Base - N/A Total - N/A
Street Light 1.0″ PVC Substrate 38.0″ T/P N/A N/A 38.0” W/E 1 1 Pothole 282 is located south of Denny Way. Please refer to Location Map 1 for the approximate location of Pothole 282.
283 Cancelled
301 09/07/2022 Denova Dr
Asphalt - 7.5″ Concrete - N/A
Base - N/A Total - 7.5″
Water 8.0″ Concrete Clay 59.0″ T/P N/A N/A 64.0” N/S 3 5 Pothole 301 is located in the north-bound lane of Denova Dr. Please refer to Location Map 5 for the approximate location of Pothole 301.
Tracer wire was present.
311 09/07/2022 Sunrise Hwy
Asphalt - 9.0″ Concrete - N/A
Base - N/A Total - 9.0″
Electric Concrete Encasement Rocks, Granite N/A 12.0″ T/Enc 50.0″ B/Enc 51.0” NW/SE 3 5
Pothole 311 is located in the south-bound lane of Sunrise Hwy. Please refer to Location Map 5 for the approximate location of Pothole 311.
311A 09/16/2022 Sunrise Hwy
Asphalt - 7.0″ Concrete - N/A
Base - N/A Total - 7.0″
Electric Concrete Encasement Rocks, Granite N/A 7.0″ T/Enc 50.0″ B/Enc 55.0” NNE/SSW 3 5
Pothole 311A is located in the south-bound lane of Sunrise Hwy. Please refer to Location Map 5 for the approximate location of Pothole 311A.
P otholeDataS heet(s)
RECORD OF TEST HOLE DATA
AIRX JOB NO: X221205
TEST HOLE NO: 241
DATE EXCAVATED: 09/06/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Gas 3.0″ Polyethylene 54.0″ T/P N/A N/A NW/SE
TOTAL DEPTH EXCAVATED: 54.0”
PAVEMENT THICKNESS: ASPHALT: 9.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Clay
COMMENT:
Pothole 241 is located in the intersection of Blossom Valley Rd and Flinn Springs Rd. Please refer to Location Map 4 for the approximate location of Pothole 241. The photo above was taken in front of Pothole 241 facing NE.
A downhole view of the 3.0 inch wide Polyethylene Gas utility found in Pothole 241, at the depth of 54.0 inches T/P. Utility runs in a NW/SE direction at the Pothole location and was found directly on markout.
AREA SHOT DOWNHOLE VIEW
PH 241
TEST HOLE NO: 242
DATE EXCAVATED: 09/06/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Water 33.0″ Concrete 61.0″ T/P N/A N/A NW/SE
TOTAL DEPTH EXCAVATED: 90.0”
PAVEMENT THICKNESS: ASPHALT: 7.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Clay
COMMENT:
Pothole 242 is located in the intersection of Blossom Valley Rd and Flinn Springs Rd. Please refer to Location Map 4 for the approximate location of Pothole 242. The photo above was taken in front of Pothole 242 facing NE.
A downhole view of the 33.0 inch wide Concrete Water utility found in Pothole 242, at the depth of 61.0 inches T/P. Utility runs in a NW/SE direction at the Pothole location and was found directly on markout.
PH 242
AIRX JOB NO: X2211205
TEST HOLE NO: 243
DATE EXCAVATED: 09/06/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Water 33.0″ Concrete 57.0″ T/P N/A N/A NE/SW
TOTAL DEPTH EXCAVATED: 90.0”
PAVEMENT THICKNESS: ASPHALT: N/A CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Class II Base
PERMANENT SURFACE REPAIR: Class II Base
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Clay
COMMENT:
Pothole 243 is located in the intersection of Flinn Springs Rd and Blossom Valley Rd. Please refer to Location Map 4 for the approximate location of Pothole 243. The photo above was taken in front of Pothole 243 facing NW.
A downhole view of the 33.0 inch wide Concrete Water utility found in Pothole 243, at the depth of 57.0 inches T/P. Utility runs in a NE/SW direction at the Pothole location and was found directly on markout.
PH 243
TEST HOLE NO: 253
DATE EXCAVATED: 09/08/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Water 8.0″ ACP 43.5″ T/P N/A N/A NE/SW
TOTAL DEPTH EXCAVATED: 50.0”
PAVEMENT THICKNESS: ASPHALT: 7.0″ CONCRETE: N/A BASE: 3.0″
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade
COMMENT:
Pothole 253 is located in the south-bound lane of Ridge Hill Rd.
Please refer to Location Map 3 for the approximate location of Pothole 253. The photo above was taken in front of Pothole 253 facing NW.
A downhole view of the 8.0 inch wide ACP Water utility found in Pothole 253, at the depth of 43.5 inches T/P. Utility runs in a NE/SW direction at the Pothole location and was found directly on markout.
PH 253
TEST HOLE NO: 254
DATE EXCAVATED: 09/07/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Water 16.0″ ACP 96.0″ T/P N/A N/A NE/SW
TOTAL DEPTH EXCAVATED: 11.0”
PAVEMENT THICKNESS: ASPHALT: 7.0″ CONCRETE: N/A BASE: 12.0″
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: Yes
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Subgrade
COMMENT:
Pothole 254 is located in the north-bound lane of Ridge Hill Road.
Please refer to Location Map 3 for the approximate location of Pothole 254. The photo above was taken in front of Pothole 254 facing SW.
A downhole view of the 16.0 inch wide ACP Water utility found in Pothole 254, at the depth of 96.0 inches T/P. Utility runs in a NE/SW direction at the Pothole location and was found directly on markout.
PH 254
TEST HOLE NO: 261
DATE EXCAVATED: 09/02/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Cox, Fiber Optic 2.0″ PVC 36.0″ T/P N/A N/A N/S
2 Sanitary Sewer 6.0″ PVC 61.0″ T/P N/A N/A N/S
TOTAL DEPTH EXCAVATED: 61.0”
PAVEMENT THICKNESS: ASPHALT: 8.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Clay
COMMENT:
Pothole 261 is located east of Magnolia Ave. Please refer to Location Map 2 for the approximate location of Pothole 261 & 263.
The photo above was taken in front of Pothole 261 & 263 facing east.
A downhole view of the utilities found in Pothole 261 and their orientation at the pothole location: 2.0 inch PVC Cox, Fiber Opticutility at the depth of 36.0 inches T/P and runs in a N/S direction; and 6.0 inch PVC Sanitary Sewer utility at the depth of 61.0 inches T/P and runs in a N/S direction. Utilities were found directly on markout.
PH 261 PH 263
TEST HOLE NO: 262 & 263
DATE EXCAVATED: 09/02/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
Storm Drain T
Connection 3.0″ Corrugated Steel 11.0″ T/P N/A N/A W & S
TOTAL DEPTH EXCAVATED: 11.0”
PAVEMENT THICKNESS: ASPHALT: 4.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Clay
COMMENT:
Found connections.
Pothole 262 & 263 is located east of Magnolia Ave. Please refer to Location Map 2 for the approximate location of Pothole 262 & 263.
The photo above was taken in front of Pothole 262 & 263 facing east.
A downhole view of the 3.0 inch wide corrugated Steel Storm Drain T Connection utility found in Pothole 262 & 263, at the depth of 11.0 inches T/P. Utility runs in a W & S direction at the Pothole location and was found directly on markout.
PH 262 & 263
TEST HOLE NO: 264
DATE EXCAVATED: 09/02/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
Sanitary Sewer (Not
Found) N/A N/A N/A N/A N/A
TOTAL DEPTH EXCAVATED: 66.0”
PAVEMENT THICKNESS: ASPHALT: 4.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: N/A
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Clay,Granite
COMMENT:
Excavated 66 inches deep, 12 inches wide, hit decomposed granite. Sanitary sewer was not found.
Pothole 264 is located east of Magnolia Ave. Please refer to Location Map 2 for the approximate location of potholes 261, 263 and 264. The photo above was taken in front of pothole 261, 263 and 264 facing east.
A downhole view of the excavation to 66.0 inches deep. Utilities were not found in the Pothole.
PH 264 PH 261 PH 263
TEST HOLE NO: 271
DATE EXCAVATED: 09/07/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Cox (2) 2.0″ PVC 16.0″ T/P N/A N/A N/S
TOTAL DEPTH EXCAVATED: 33.0”
PAVEMENT THICKNESS: ASPHALT: N/A CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Class II Base
PERMANENT SURFACE REPAIR: Class II Base
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Clay
COMMENT:
Pothole 271 is located east of Magnolia Ave. Please refer to Location Map 1 for the approximate location of Pothole 271. The photo above was taken in front of Pothole 271 facing east.
A downhole view of the (2) 2.0 inch wide PVC Cox utility found in Pothole 271, at the depth of 16.0 inches T/P. Utility runs in a N/S direction at the Pothole location and was found directly on markout.
PH 271
TEST HOLE NO: 281
DATE EXCAVATED: 09/02/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Street Light 1.0″ PVC 39.5″ T/P N/A N/A W/E
TOTAL DEPTH EXCAVATED: 39.5”
PAVEMENT THICKNESS: ASPHALT: N/A CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Class II Base
PERMANENT SURFACE REPAIR: Class II Base
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Clay
COMMENT:
Pothole 281 is located south of Denny Way. Please refer to Location Map 1 for the approximate location of Pothole 281. The photo above was taken in front of Pothole 281 facing north.
A downhole view of the 1.0 inch wide PVC Street Light utility found in Pothole 281, at the depth of 39.5 inches T/P. Utility runs in a W/E direction at the Pothole location and was found directly on markout.
PH 281
TEST HOLE NO: 282
DATE EXCAVATED: 09/02/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Street Light 1.0″ PVC 38.0″ T/P N/A N/A W/E
TOTAL DEPTH EXCAVATED: 38.0”
PAVEMENT THICKNESS: ASPHALT: N/A CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Class II Base
PERMANENT SURFACE REPAIR: Class II Base
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Substrate
COMMENT:
Pothole 282 is located south of Denny Way. Please refer to Location Map 1 for the approximate location of Pothole 282. The photo above was taken in front of Pothole 282 facing west.
A downhole view of the 1.0 inch wide PVC Street Light utility found in Pothole 282, at the depth of 38.0 inches T/P. Utility runs in a W/E direction at the Pothole location and was found directly on markout.
PH 282
TEST HOLE NO: 301
DATE EXCAVATED: 09/07/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Water 8.0″ Concrete 59.0″ T/P N/A N/A N/S
TOTAL DEPTH EXCAVATED: 64.0”
PAVEMENT THICKNESS: ASPHALT: 7.5″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: Yes
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Sand
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Clay
COMMENT:
Pothole 301 is located in the north-bound lane of Denova Dr. Please refer to Location Map 5 for the approximate location of Pothole 301.
The photo above was taken in front of Pothole 301 facing west.
A downhole view of the 8.0 inch wide Concrete Water utility found in Pothole 301, at the depth of 59.0 inches T/P. Utility runs in a N/S direction at the Pothole location and was found directly on markout.
PH 301
TEST HOLE NO: 311
DATE EXCAVATED: 09/07/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Electric Concrete Encasement N/A 12.0″ T/Enc 50.0″ B/Enc NW/SE
TOTAL DEPTH EXCAVATED: 51.0”
PAVEMENT THICKNESS: ASPHALT: 9.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: No TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Concrete
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Granite,Rocks
COMMENT:
Pothole 311 is located in the south-bound lane of Sunrise Hwy.
Please refer to Location Map 5 for the approximate location of Pothole 311. The photo above was taken in front of Pothole 311 facing SW.
A downhole view of the Concrete Encasement housing Electric utilities found in Pothole 311, at the depth of 12.0 inches T/Enc and
50.0 inches B/Enc. Utility runs in a NW/SE direction at the Pothole location and was found directly on markout.
PH 311
TEST HOLE NO: 311A
DATE EXCAVATED: 09/16/2022
UTILITY
TYPE
SIZE &
MATERIAL
UTILITY
DEPTH
ENCASEMENT/
PACKAGE TOP
ENCASEMENT/
PACKAGE BOTTOM
UTILITY
DIRECTION
1 Electric Concrete Encasement N/A 7.0″ T/Enc 50.0″ B/Enc NNE/SSW
TOTAL DEPTH EXCAVATED: 55”
PAVEMENT THICKNESS:
ASPHALT: 7.0″ CONCRETE: N/A BASE: N/A
STANDBY REQUIRED: N/A
IMMEDIATE SURFACE REPAIR: Aquaphalt
PERMANENT SURFACE REPAIR: Aquaphalt
TARGET UTILITY MARKED BY USA: Yes TRACER WIRE FOUND: No
MARKOUT LOCATION CORRECT: Yes PIPE COVER MATERIAL: Concrete
UTILITY SHOWN ON PLAN: Yes OVERBURDEN MATERIAL: Granite, Rocks
COMMENT:
Pothole 311A is located south-bound lane of Sunrise Hwy. Please refer to Location Map 1 for the approximate location of Pothole 311A. The photo above was taken in front of Pothole 311A facing west.
A downhole view of the Concrete Encasement housing Electric utilities found in Pothole 311A, at the depth of 7.0 inches T/Enc and
50.0 inches B/Enc. Utility runs in a NNE/SSW direction at the Pothole location and was found directly on markout.
PH 311A
Manhole Data Sheet(s)
A
B
C
D
F
G
DIP DATA SHEET
AIR X Job #: 221205
Crew Members: Rodrigo Rodriguez Date: 9/14/2022
Job Name: RFP_1023457_20-21 Annual Culverts_GROUP 3
DIP # 256
Location (Street Name): Ridge Hill Rd
Flagger: N/A
Service Type (Sanitary, Storm, Gas, Water, Electric, Etc): Sanitary Sewer
Barrel Type & Diameter: N/A
MEASURE DOWN
/ FLOWLINE
COMMENTS
84" T/P
DOWNHOLE VIEW
ORIENTATION AREA PHOTO
N
B
C
D
F
G
DOWNHOLE VIEW
ORIENTATION AREA PHOTO
MEASURE DOWN
/ FLOWLINE
COMMENTS
63" T/P
Flagger: N/A
Service Type (Sanitary, Storm, Gas, Water, Electric, Etc): Sanitary Sewer
Barrel Type & Diameter: N/A
Job Name: RFP_1023457_20-21 Annual Culverts_GROUP 3
DIP # 265
Location (Street Name): Magnolia Ave
DIP DATA SHEET
AIR X Job #: 221205
Crew Members: Rodrigo Rodriguez Date: 9/14/2022
Permit(s)
DPW2022-RWEXCP-75097
���������������������������� ��������� !!"#$%&'�(&)*+,%'#*&�-./012� � 4������4���5� ���6718 �//9:;018� �3
� ���<��=�����6718��>-17��?.@7A� �B���C������ �6718��.0:9��DDA7EE� �<��=����F�
����G����6718��0:9:16��DDA7EE��C�����
| ������:82� ���������� �8087� �� H:/��-D7����B��70E-1�I-A� | A0II:;��-18A-9� ����� | ��3���J��K�����KL�� |
| � | ||
| ������ | 4�����80A8��087��C |
�B ���� �80A8� :.7��C������M:1:E>��087���
| ���� �1D� | :.7��������������� | |||||||
| 4 �3������� | ||||||||
| � | <��������5� | <������M�5� | <������M�5� | <������M�5� | <��������5� | <������MB���� | ����N��� | >-.0E�<A-EG��0/��067�01D�=A:D�� ��� |
����J�6718OE�-A��//9:;018OE��:6108?A7L J�087LPQQ� ''%$RQS�T"%&�UVW�%&S�X+%))#$�Y*&'+*"�Z*'QVXR#V�+Q[\QV'�#V�%!!+*]QŜ_#+Q$'*+̀�_Q!%+',Q&'�*)�T\a"#$�b*+cV�de Uf*+�g*%S�Y*,,#VV#*&Q+W U_%'QW
| hijklm�in�opk�qrsti����� | ��� | ��M���<3 |
| �����u� | ��MM |
�����3
| ���M��� | ��MM | ||
| ����� | ��3����� | ||
| ���� ����� | �������3���J82/7�-I�8A0II:;�;-18A-9��I9065�E>:I85�78;GL�-?182�-I��01��:76-���� | ||
| � | A0II:;��16:177A:16�J�������L������v7A901D��v75��?:87�����01��:76-5�������������� 8797/>-17 | ||
| v-:;7�.0:9����JC�CL�B����CB�E7;A780A2����JC�CL�B����C��I0w����JC�CL�B������C7�.0:9����� | A0II:;�-18A-9G/7A.:8FED;-?182G;0G6-v���������� | �������� | |
| ('�#V�+Q[\QV'QS�'R%'�%�!Q+,#'�aQ�x+%&'QS�)*+�'+%))#$�$*&'+*"�*&�'RQ�)*""*y#&x�V'+QQ'zV'+QQ'V{� | ��� | �� ��� |
��������� MA-.��8A778 ���
�� - ���� ���M���3���
�����-1E8A?;8:-1�
1E/7;8:-1�7I���7;���G��G��-?182��-D7�-I��76?908-A2��AD:101;7E
08-11-2022
DPW2022-RWEXCP-75097
DPW2022-RWTCP-00913
PH 252
PH 251
PH 253
PH 254
PH 255
NTS
RIDGE HILL RD
G
AU
C
HO
LN
APN 3981108100
14009 Ridge Hill Rd
APN 3981002600
9117 Gaucho Ln
Caltrans County of San Diego
240'±
STOP BLOSSOM VALLEY RD
FLINN SPRINGS RD
PH 241
PH 243
APN 3930901100
9780 Blossom Valley Rd
APN 3960112000
9787 Flinn Springs Rd
APN 3960700700
9708 Flinn Springs Rd
PH 242
NTS
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
20-21 Annual Culverts (Group 3)
5/24/2022
James ZamoraVaries
County of San Diego
X221205
Potholing
Site Plan:
LEGEND
APPROXIMATE POTHOLE LOCATION
PH 265
PH 261PH 264
PH 262
PH 263 N
TSMAGNOLIA AVE
A
IR
PO
RT
D R
APN 3871500700
1730 Magnolia Ave
APN 3870900800
1717 Magnolia Ave
APN 3870900500
1681 Magnolia Ave
APN 3871500800
1702 Magnolia Ave
STOP
495'±
455'±
450'±
PH 272
PH 271
APN 3871601700
1666 Magnolia Ave
595'±
PH 283
PH 282PH 281
NTS
DENNY WAY
W
IN
G A
VE
APN 3871214302
1681 Denny Wy
APN 3871601600
1681 Denny Wy
STO
P
135'±
150'±
155'±
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
20-21 Annual Culverts (Group 3)
5/24/2022
James ZamoraVaries
County of San Diego
X221205
Potholing
Site Plan:
TS
S1 SUNRISE HWY
APN 4121400600
APN 4121400600
9,000'± to
OLD HWY 80
Intersection
PH 301
NTS
DENOVA DR
A
LP
IN
E
HE
IG
HT
S
RDAPN 4043500200
2336 Denova Dr
APN 4043501400
2337 Denova Dr
435'±
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
20-21 Annual Culverts (Group 3)
5/24/2022
James ZamoraVaries
County of San Diego
X221205
Potholing
Site Plan:
VARIOUS ROADS – VARIOUS COMMUNITIES
TRAFFIC CONTROL NOTES
Contractor shall make application to the Traffic Engineering Section of the Department of Public Works (Roads Division, 5510 Overland Ave, Suite 410, Rm 470, San Diego, CA, 92123-1239, Mail Station O332) for a traffic control permit, a minimum of three (3) weeks prior to commencement of work. For more complex projects, contractor shall allow for additional time for review. There is no fee for this permit.
All Traffic control plan(s) shall be in compliance with the 2014 Revision 6 California, Manual Uniform Traffic Control Devices (CAMUTCD), Chapter 6 Temporary Traffic Control, and Appendix A of the 2018 San Diego Regional Standard Drawings.
PROJECT SPECIFIC TRAFFIC CONTROL
Road name and work location radius/scope: VARIOUS ROADS – VARIOUS COMMUNITIES
Road traffic control operations: FLAGGING, LANE CLOSURE, LANE SHIFT AND
SHOULDER CLOSURE.
Type of work: 20 POTHOLES (12" X 12") WITHIN COUNTY ROW
Traffic control shall be in accordance with attached approved plans and/or 2018 San Diego Regional Standard Drawings TCP-04 and TCP-09. The Contractor shall maintain 12’ minimum travel lanes (14’ minimum travel lanes where bike lanes exist) at all times.
Work hours shall be from 8:30 AM to 4:00 PM, Monday thru Friday, when school is not in session. **PLEASE CONTACT COUNTY INSPECTOR TO MODIFY WORKING HOURS**
CONTRACTOR TO CONTACT SCHOOL(S) TO AVOID WORKING WHEN CHILDREN
ARE PRESENT. WORK TO START 30 MIN. AFTER ARRIVAL BELL AND WORK TO END
30 MIN. PRIOR TO DISMISSAL BELL.
Work hours shall be from 08:30 AM to 01:30 PM, Monday thru Friday, while school is in session (SEE BELL SCHEDULE). Contractor shall contact school Monday thru Friday during School hours, a minimum of 48 hours before work begins. To identify potential conflict hours within the approved work hours.
The Contractor shall anticipate shorter work hours where work zone is within a quarter mile radius from a school. Due to peak volumes of pedestrian and vehicular traffic associated with schools, the Contractor shall be required to delay the start of construction operations until a minimum 30 minutes after school is in session and complete construction operations a minimum 30 minutes before school is out of session, at the discretion of the County Engineer. Contractor shall contact school at least 2 working days before work begins to identify potential conflict hours within the approved work hours.
The Contractor will not be allowed to work during peak hours on roads that carry commuter traffic on the Mobility Element Roads per County of San Diego General Plan.
Work zone is confined to the road shoulder with minimal or no road encroachment, refer to Chapter 6H “Typical Applications” of the “California Manual on Uniform Traffic Control Devices” (CA MUTCD), latest edition.
ROAD CLOSURE
No full or partial Road Closure will be allowed.
NOTIFICATION
By agreeing to this Permit, permittee agrees that County of San Diego shall not be liable for, and permittee shall indemnify, hold harmless, and defend the County of San Diego and each of its officers and employees against any and all claims, demands, liability, judgments, awards, fines, mechanics' liens or other liens, labor disputes, losses, damages, expenses, charges or costs of any kind or character, including attorneys’ fees and court costs (hereinafter collectively referred to as “Claims”), related to this Permit or the work covered by this Permit and arising either directly or indirectly from any act, error, omission or negligence of permittee or its contractors, licensees, agents, servants or employees, including, without limitation, Claims caused by the sole passive negligent act or the concurrent negligent act, error or omission, whether active or passive, of County of San Diego Parties.
For work from 7PM to 7AM, Mon. thru Fri., the Contractor shall obtain a variance from the Noise Control Officer in accordance with Section 36.424, “VARIANCES,” of the County Code of Regulatory Ordinances. There is a fee for this variance. Please contact Souphie Sakdara at
(858) 495-5214.
Whenever construction activity will disrupt or impede access to any residence/business, the contractor shall inform each affected residence/business by written notice the nature and expected duration of the disruptive construction activity. Such written notice shall be delivered to each affected residence/business a minimum of five (5) business days prior to the start of the disruptive construction activity.
Contractor shall coordinate with County Traffic Signal Coordinator three (3) work days prior to start of work at (619) 701-1905 or (858) 935-5705 or (858) 694-3850 to identify location of signal detector loops and, if appropriate, to set the traffic signal on flashing red or modify signal timing prior to the start of work and to reset upon completion of work. Contractor shall provide signage for signal modification. For work requiring extended days of signal flash (more than three days in total for the length of the permit) or for night work the contractor will be required to obtain an electrical sub-contractor to place the signal on flash prior to start of work and to reset upon completion of work. The electrical sub-contractor must possess a State of California Contractor’s License, Classification C-10 Electrical Contractor.
SIGNING
All signs shall conform to the guidelines set forth in the latest edition of Part 2 “Signs” and Part 6, “Temporary Traffic Control” of the “California Manual on Uniform Traffic Control Devices for Streets and Highways” (CA MUTCD).
The Contractor shall place “Tow-Away/No Parking” signs along the street 24 hours prior to the impending work. “Tow-Away/No Parking” signs shall be furnished by the Contractor and shall contain the following information: the day(s) and time during which parking will be prohibited, the name of contractor, and the contractor’s/tow yard’s contact number. Contractor shall remove these signs immediately when they are no longer needed for use in the respective area of the project. If work is delayed or rescheduled for any reason after placement of “Tow-Away/No Parking” signs, sign(s) shall be removed and re-dated signs shall be installed two (2) days in advance of the impending work.
All signs shall be in place prior to start of construction.
All other signs shall be standard size unless otherwise noted. All advance warning signs shall be per MUTCD (CA) or 36” x 36” minimum, whichever is greater.
For work zone lasting more than four weeks, all W20-1 or C23, and curve warning signs shall be mounted on 4”x 4” wooden posts at standard height and equipped with type “B” high-intensity flashers, unless otherwise noted.
Temporary Traffic Control Signs shall be on a portable type installation.
Post-mounted signs shall remain in place at all times until construction is completed. Other signs required for traffic control shall be laid down or covered during non-working hours.
Temporary Traffic Control Devices shall comply with section 12-3 of Caltrans Standard Specifications unless otherwise noted.
All advance-warning signs for night closures shall be illuminated.
Placement of all signs shall not interfere with sight distance at driveways and intersections.
Position of post-mounted signs may be adjusted as necessary to optimize visibility or sign and/or obtain suitable placement area.
W20-1 signs and all other yellow or orange signs shall have a reflective background constructed of at least high-intensity (Type III) retroreflective sheeting.
All signs shall be equipped with orange flags and signs mounted on barricades shall have flashers on roads posted 50 MPH or higher.
PORTABLE CHANGEABLE MESSAGE SIGNS (PCMS)
PCMS shall comply with Section 6F.60 of the CA MUTCD.
Minimum of Two PCMS shall be considered when Road Closures (Partial or full) are necessary with detours.
STRIPING
No striping changes will be allowed to start on a Friday, unless otherwise noted and approved by the County Traffic Engineer.
Contractors shall layout and stripe all interim and final striping.
Contractor shall install all interim and final pavement markers, temporary tabs, and channelizers.
All striping changes shall be the responsibility of the Contractor. Striping modifications (due to construction), which exceed one (1) week in duration, require sandblasting. All sandblasting required by said striping changes shall be completed within 24 hours of that change.
All obliterated striping, raised pavement markers, pavement paint legends and markings, shall be reflectorized and replaced by the Contractor. Markings in thermoplastic shall be replaced in kind.
TRAFFIC SIGNAL LOOP DETECTORS
Signal equipment, such as loop detectors, damaged by the Contractor shall be replaced by the Contractor within 48 hours from time of damage.
DEVICES
Actual work area shall be protected with either orange reflectorized channelizing devices or by barricades equipped with type “A” flashers sufficient in number to prevent entry of both vehicles and pedestrians except as may be noted elsewhere. At no time shall a continuous row of flashers be used adjacent to a lane of traffic. Only steady-burn type “C” lamps shall be used under these circumstances.
All cones and/or post delineators shall be fitted with reflective sleeves of the appropriate color.
If used, all type “B” flashers shall operate 24 hours a day.
FLAGGING
Flagging operation shall use alternate one-way movement to pass traffic through the construction area.
Traffic shall be controlled at all times by flaggers. Flaggers shall be in constant communication with each other during the flagging operation. Advance flaggers shall be positioned upstream to warn traffic when queues develop. Additional flaggers may be required at intersections.
Where the one-lane section is short enough so that each end is visible from the other end, traffic will be controlled by means of a flagger at each end of the section. They should be able to communicate with each other verbally or by means of signals. These signals should not be such as to be mistaken for flagging signals. Where the end of one-way section is not visible from the other end, the flaggers shall maintain contact by means of radio or field telephones so that a flagger may know when to allow traffic to proceed into the section.
Flaggers shall be positioned near crest of hill allowing flaggers sufficient visibility of approaching traffic.
Flaggers shall be positioned so that they are easily visible to approaching traffic.
Flagger stations for work at night shall be illuminated as referenced in Part 6 of the “California Manual on Uniform Traffic Control Devices for Streets and Highways” (CA MUTCD), latest edition.
Where a one-lane temporary traffic control zone is short enough to allow visibility from one end to the other, traffic may be controlled by a single flagger. When a single flagger is used, the flagger shall be stationed on the shoulder opposite the obstruction or work space, or in a position where good visibility and traffic control can be maintained at all times.
If unable to utilize an alternate one-way flagging operation, Contractor shall contact Department of Public Works, Roads Division at (858) 694-3850 three (3) weeks prior to the proposed closure to determine its appropriateness. If a road closure is deemed appropriate, proper advanced notification (information signs, mailed and verbal notifications) is necessary to the emergency services, police services, businesses, residents and school districts.
ACCESS
Emergency vehicle access shall be maintained at all times.
Mail service, trash service, and school bus access shall be maintained at all times.
Motorist delay time shall not exceed 15 minutes unless otherwise approved by the County Traffic Engineer.
Contractor shall maintain access to all private driveways within the construction area at all times. If continuous access cannot be maintained, access must be provided as needed.
Adequate provisions shall be made for pedestrian traffic.
Adequate sight distance shall be maintained at all intersections in the vicinity of the work zone. If sight distance is affected by the traffic control, the contractor shall provide adequate distance per the County of San Diego Public Road Standards. Flaggers may be needed. The use of mirrors is not permitted as an alternative to providing adequate sight distance.
GENERAL
The Contractor shall be responsible for supplying, installing and maintaining all traffic control devices as shown on the plan along with additional traffic control devices that may be required to ensure safe movement of traffic and pedestrians through work area.
The Contractor shall be responsible for coordinating with any Special Events that will be affected in the area of the impending work and the Contractor shall be responsible for coordinating with other traffic control work zones, unless approved by County Inspector. The Contractor shall maintain 500 feet between beginning and end of work zone signage. Updated Special Event and Temporary Traffic Control information within the County may be found at the following link:
https://www.sandiegocounty.gov/content/sdc/dpw/roads/roadclose.html
The provisions of this section may be modified or altered if, in the opinion of the engineer, public traffic will be better served, and the work expedited. Said modifications or alterations shall not be adopted until approved in writing by the engineer.
The Contractor shall minimize the active construction zone to 250 feet to 500 feet unless approved by County Inspector.
The Contractor shall maintain maximum closure length based on work that can be completed at the end of the workday.
During non-working hours, the Contractor shall provide the full road width, which existed prior to the start of construction.
Bore shall offset 24” minimum from any streetlight and signal foundation and shall not occur beneath any streetlight and signal foundation.
All dirt and debris shall be removed from the roadway each day before completion of work. Street must be maintained in drivable condition at all times. Contractor shall not use the County right of way for storage of materials and equipment.
All Traffic Control devices, including advance warning signs, delineators, and barricades shall be removed from the roadway at the end of work each day (except W20-1 signs, if plate-bridging overnight.)
The Contractor is to restore roadway and all signing to prior conditions at the completion of work.
The Contractor shall coordinate their work with impacted agencies, San Diego Metropolitan Transit System (MTS), private road owners and/or Home-Owner Associations (HOA). Some agencies may require up to two weeks lead time.
Unless the work is specifically requested by the Engineer, or is Emergency in nature, no work will be performed on the following, County observed holidays:
New Year’s Day Independence Day Martin Luther King Jr. Day Labor Day President’s Day Veteran’s Day Cesar Chavez Day Thanksgiving Day Memorial Day Day after Thanksgiving Day Juneteenth Day Christmas Day http://www.sandiegocounty.gov/content/sdc/dpw/roads/roadclose.html
APPROACH
SPEED (MPH)
55+
MINIMUM DISTANCE (FEET)
BETWEEN SIGNS AND FROM LAST
SIGN TO TAPER
MINIMUM TAPER LENGTHS (L) (FEET) FOR
12-FOOT LANE
L 1/2L 1/3L
125 65 45
180 90 60
245 125 85
320 160 110
540 270 180
600 300 200
660 330 220
BUFFER
LENGTH
(FEET)
MAX CONE SPACING
TAPER TANGENT CONFLICT
25 50 12
30 60 15
35 70 17
40 80 20
45 90 22
50 100 25
50 110 27
STOP
RIGHT LANE
MUST
TURN RIGHT
KEEP
LEFT
SIDEWALK
CLOSED
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
AHEAD
CROSS HERE
SIDEWALK CLOSED
CROSS HERE
ROAD
CLOSED
ROAD CLOSED
TO
THRU TRAFFIC
BE
PREPARED
TO STOP
ROAD
WORK
AHEAD
DETOUR
AHEAD
ROAD
CLOSED
AHEAD
RIGHT LANE
CLOSED
AHEAD
BIKE LANE
CLOSED
AHEAD
NARROW
LANE
END
DETOUR
DETOUR
END
ROAD WORK
BIKE LANE
CLOSED
STEEL
PLATES
AHEAD
LANE
CLOSED
LEFT LANE
CLOSED
AHEAD
M4-10(R/L)
DETOUR
SHARE
THE
ROAD
SIGN LEGEND
ONE LANE
ROAD
AHEAD
RIGHT LANE
CLOSED
AHEAD
LEFT LANE
CLOSED
AHEAD
DETOUR
KEEP
RIGHT
M4-8AG20-2C30A(CA)C30(BK)C30(CA)C20(CA)RC20(CA)LC12(CA)C9A(CA)
SHOULDER
CLOSED
R1-1 R3-1 R3-2 R3-4
R3-5(R/L)
ONLY
OPEN
TRENCH
C27(CA)
W21-5
SHOULDER
WORK
RIGHT
SHOULDER
CLOSED
AHEAD
W21-5b(R/L)
R9-11a(R/L)R9-11(R/L)R9-10R9-9R9-3R4-8AR3-7(R/L)R3-6(R/L) R11-2 R11-4 SC3(CA) W1-4(R/L)R4-7A
W20-5(L)W20-4W20-3W20-2W20-1W16-1W8-24W4-2(R/L)W3-4 W20-5(R) W20-5(BK)W11-1
STOP
SLOW
Flagger Paddle
TRAFFIC CONTROL SIGN
APPROXIMATE POTHOLE LOCATION
TRAFFIC CONE / DELINEATOR
FLAGGER
FAS - FLASHING
ARROW SIGN
WORK ZONE
SIGNALIZED
INTERSECTION
TRAFFIC CONTROL BARRICADE
BUS STOP
TS
W1-6(R/L)
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
20-21 Annual Culverts (Group 3)
5/24/2022
James ZamoraVaries
County of San Diego
X221205
Potholing
AutoCAD SHX Text
BUS
STO
P
NTS
BLOSSOM VALLEY RD
(45 MPH)
FLINN SPRINGS RD
(25 MPH)
C9A(CA)
W3-4
G20-2
S i g n
S p a c i n g
W20-1
C9A(CA)
W3-4
G20-2
S i g n
S p a c i n g
W20-1
PH 241
12' min
FLAGGER WILL MAINTAIN DRIVEWAY
ACCESS AT ALL TIMES
COORDINATE WITH DRIVEWAY OWNER
48 HOURS PRIOR TO START OF WORK
FLAGGER(S) TO ASSIST
PEDESTRIAN ACTIVITY AS NEEDED
R4-7a
R4-7a
C 9A
(C A
W 3-
100' Sign Spacing
W
-4
W
-1 G
-2
100' min 100'
Work Zone 80'±
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
20-21 Annual Culverts (Group 3)
5/24/2022
James ZamoraVaries
County of San Diego
X221205
Potholing
PH 241:
1232-J3
STO
P
NTS
BLOSSOM VALLEY RD
(45 MPH)
FLINN SPRINGS RD
(25 MPH)
PH 242
C9A(CA)
W3-4
G20-2
S i g n
S p a c i n g
W20-1
Work Zone 80'±
R4-7a
R4-7a
W1-6(L)
C9A(CA)
W3-4
G20-2
S i g n
S p a c i n g W20-1
C 9A
(C A
W 3-
100' Sign Spacing
W
-4
W
-1 G
-2
Flagging Taper 100"
100'
12' min
Buffer Space 155'
C30(CA)
FLAGGER WILL MAINTAIN DRIVEWAY
ACCESS AT ALL TIMES
COORDINATE WITH DRIVEWAY OWNER
48 HOURS PRIOR TO START OF WORK
FLAGGER(S) TO ASSIST
PEDESTRIAN ACTIVITY AS NEEDED
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
20-21 Annual Culverts (Group 3)
5/24/2022
James ZamoraVaries
County of San Diego
X221205
Potholing
PH 242:
STOP
NTS
BLOSSOM VALLEY RD
(45 MPH)
FLINN SPRINGS RD(25 MPH)
PH 243
FLAGGER WILL MAINTAIN DRIVEWAY
ACCESS AT ALL TIMES
COORDINATE WITH DRIVEWAY OWNER
48 HOURS PRIOR TO START OF WORK
FLAGGER(S) TO ASSIST
PEDESTRIAN ACTIVITY AS NEEDED
16' min
Flagging Taper 100'
100'
Buffer Space 360'C 9A
(C A
W 3-
G
-2
500' Sign Spacing
W
-4
W
-1
16' min
Work Zone 80'±
R4-7a
R4-7a
W1-6(L)
C 9A
(C A
W 3-
G
-2
500' Sign Spacing
W
-4
W
-1
C9A(CA)
W3-4
G20-2
S i g n
S p a c i n g
W20-1
C30(CA)
C30(CA)
G20-2
S i g n
S p a c i n g W20-1
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
20-21 Annual Culverts (Group 3)
5/24/2022
James ZamoraVaries
County of San Diego
X221205
Potholing
PH 243:
PH 252
PH 251
NTS
RIDGE HILL RD
(25 MPH)
GAUCHO LN
(private road)
FLAGGER WILL MAINTAIN DRIVEWAY
ACCESS AT ALL TIMES
COORDINATE WITH DRIVEWAY OWNER
48 HOURS PRIOR TO START OF WORK
FLAGGER(S) TO ASSIST
PEDESTRIAN ACTIVITY AS NEEDED
Work Zone 80'±
R4-7a
R4-7a
Flagging Taper 100"
100'
12' min
Buffer Space 155'
C30(CA)
C 9A
(C A
S i g n p a c i n g
W
-4 W
-1
G
-2
C 9A
(C A
G
-2
S i a c i n g
W
-4
W
-1
W1-6(L)
R4-7aR4-7a
CaltransCounty of San Diego
Caltrans County of San Diego
W20-1 100'80'±
W3-4 W3-4
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
20-21 Annual Culverts (Group 3)
5/24/2022
James ZamoraVaries
County of San Diego
X221205
Potholing
PH 251-252, 256:
1232-F5
RIDGE HILL RD
(25 MPH)
GAUCHO LN
(private road)
FLAGGER WILL MAINTAIN DRIVEWAY
ACCESS AT ALL TIMES
COORDINATE WITH DRIVEWAY OWNER
48 HOURS PRIOR TO START OF WORK
FLAGGER(S) TO ASSIST
PEDESTRIAN ACTIVITY AS NEEDED
R4-7a R4-7a
100' min 100'
12' min
Buffer Space 155'
C30(CA) C
9A
(C A a c i n g
W
-4 W
-1
G
-2C 9A
(C A
G
-2
S i a c i n g
W
-4
W
-1
W1-6(L)
R4-7aR4-7a
CaltransCounty of San Diego
Caltrans County of San Diego
W20-1 Flagging Taper 100'
70'±
PH 253 PH 254
PH 255
Work Zone 80'±
W3-4
W3-4
PROJECT NAME:
DATE:
DESIGNED BY:
AIRX JOB#:
TYPE OF WORK:
NOTES:
OFSHEET
THOMAS GRID#:
DRAWN FOR:
20-21 Annual Culverts (Group 3)
5/24/2022
James ZamoraVaries
County of San Diego
X221205
Potholing
PH 253-255:
1232-F5
PH 265 PH 261
PH 264
PH 262
PH 263
N
TS
MAGNOLIA AVE
(40 MPH)
Work Zone 80'±
14' min
POST TEMPORARY "NO PARKING" SIGNS
No Pedestrian FacilitiesNo Pedestrian Facilities
350' Sign Spacing
R4-7a
C30(CA)
Shifting Taper
L/2 = 160'
AIRPORT DR
(30 MPH)
W
-1
C
(C A
S i g n
S p a c i n g
C
(C A
G
-2
W20-1 G20-2
NOTE: TEMPORARY NO PARKING SIGNS
WILL BE PLACED 72 HOURS IN ADVANCE
Buffer Space 305'
FLAGGER(S) TO ASSIST
PEDESTRIAN ACTIVITY AS NEEDED
FLAGGER WILL MAINTAIN DRIVEWAY
ACCESS AT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .