PM-1413_CSP Part 3 00 45 17.pdf
PDF 181 KB Posted
- Attached to
- PM-1413 JBK, CC & Cornette Lib. Roof Replacement
- Solicitation number
- PM-1413
- Issued by
- Ochiltree County, Texas
About this file
This is a Safety, Risk Assessment, Accident Prevention, and Quality Control proposal form for West Texas A&M University's roof replacement project, administered through SSC Services for Education Facilities Services. The project encompasses roof replacement services for three campus facilities—the Jack B. Kelly Student Center, Classroom Center, and Cornette Library—located in Canyon, Texas. The scope of work includes polyisocyanurate and modified bitumen roof replacement, shingle roof replacement, polycarbonate panel replacement, and roof coating applications. A pre-proposal meeting was held on February 12, 2026, at 10:00 AM, with proposals due by February 26, 2026, at 2:00 PM. The project was awarded to CS Advantage with a base bid of $3,580,000.00 and a proposed construction schedule of 150 days. All contractors must comply with NRCA, SMACNA, and ANSI/SPRI standards and manufacturer guidelines, with gas lines tested and certified by master or licensed plumbers. Warranty provisions include a twenty-year non-delegable limited manufacturer's warranty and two-year contractor's warranty for most roofing systems, with five-year warranties required for acrylic coating applications.
This proposal form requires contractors to submit detailed safety and quality control documentation as mandatory compliance elements upon contract award. Contractors must provide Workers Compensation Experience Modification Rates for the previous three years with supporting documentation from their insurance agent, OSHA recordable incident rates with supporting logs or documentation, and evidence of regular project safety meetings and inspections. A written safety program must be provided along with a complete site-specific risk assessment program and quality control program addressing surveillance, acceptance, rejection, documentation, deficiency resolution, trend analysis, and corrective action procedures. A Historically Underutilized Business Subcontracting Plan is required, with monthly HUB Progress Assessment Reports mandated with each pay application. Technical inquiries should be directed to A/E Contact Greg Carroll at Armko Industries, Inc., and HUB-related questions to Bryon McCafferty at WTAMU, while submission process questions should be directed to SSC Project Manager Stephanie Young.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SSC Services for Education Facilities Services Revised 01/2025
CSP Part 3 - Safety, Risk Assessment & Accident Prevention, & Quality Control Projects over $100,000
Page - 1 of 2
SSC SERVICES FOR EDUCATION
COMPETITIVE SEALED PROPOSAL
Part 3
SAFETY, RISK ASSESSMENT & QUALITY CONTROL
SECTION 00 45 17
West Texas A&M University – Canyon, TX Project No.: PM-1413 Project Title: Pkg A - JBK, CC, & Cornette Lib. Roof Replacement
NOTE: Contractor must complete each item pertaining to this form or bid may be disqualified for being incomplete.
FALSIFICATION OF ANY INFORMATION ON THIS PROPOSAL MAY RESULT IN DISQUALIFICATION.
General Contractor's Name:
Address:
City, State, Zip:
Telephone No.: E-Mail:
State Comptroller Vendor Identification Number:
1.0 SAFETY PROGRAM
1.1 List your organization's Workers Compensation Experience Modification Rate (EMR) for the last three years, as obtained from your insurance agent. Provide proof in the form of a letter from your Insurance Agent. If you do not have an EMR rating provide name and contact information for your Insurance Agent.
2024 Average (3 years)
Insurance Company Name:
Agent Name:
Agent Phone #:
Agent Email:
1.2 OSHA Recordable Incident Rate. Attach your OSHA 300A log or similar documentation of company’s injuries if the OSHA 300A log is not required due to the size of your company:
The OSHA Recordable Incident Rate (or Incident Rate) is calculated by multiplying the number of recordable cases by 200,000, and then dividing that number by the number of labor hours at the company.
Number of OSHA Recordable Cases X 200,000
IR = -------------------------------------------------------------------
Number of Employee labor hours worked
IR = _________________________________________
Facilities Services Revised 01/2025
CSP Part 3 - Safety, Risk Assessment & Accident Prevention, & Quality Control Projects over $100,000
Page - 2 of 2
1.3 Are regular project safety meetings held? Yes No
If yes, frequency: Weekly Bi-monthly Monthly As Needed
1.4 Are project safety inspections conducted? Yes No
If yes, who performs inspection?
How often?
Who is required to attend?
1.5 Does organization have a written safety program? Yes No
If yes, provide a copy. It will become a compliance document upon contract award.
2.0 SITE SPECIFIC RISK ASSESSMENT
2.1 Submit a complete Risk Assessment Program for this specific project at the end of this section.
3.0 QUALITY CONTROL PROGRAM
3.1 Submit a complete quality control program for this project which will become a compliance document upon contract award.
3.2 This plan should address all aspects of quality control including responsibility for surveillance work, acceptance, rejection, documentation and resolution of deficiencies, trend analysis and corrective action and interface with Owner's inspectors.
3.3 Contractor to maintain documentation log of project progress including photos from beginning to end of project.
END OF SECTION