Pipe_Spec_T1_Drain_Valve.pdf

PDF 159 KB Posted

Attached to
Lakeland Electric - Unit 5 - 2026 Fall Outage Contract Services
Solicitation number
2026-RFP-114
Issued by
Polk County, Florida

About this file

This is a technical specification document for a drain valve component related to Lakeland Electric's Unit 5 Fall Outage project scheduled for November 29 through December 19, 2026, in Florida. The specification document outlines detailed requirements for pipe and drain valve materials, dimensions, and performance standards necessary for the boiler and HRSG (Heat Recovery Steam Generator) work that will be performed during the outage period. The document establishes technical criteria for components used in the industrial boiler contractor work, specifically addressing the piping systems and drainage mechanisms required for code-compliant installation on thin-wall HRSG tubes and heavy-wall P91 piping.

The specification provides engineering requirements and material standards that bidders must meet when supplying or installing drain valve components as part of their overall scope of work for the Unit 5 outage project. This technical documentation serves as a binding reference standard for all contractors participating in the RFP process, ensuring that all submitted work proposals and material selections conform to Lakeland Electric's operational and safety specifications. The drain valve specification is one component within the larger project scope, which requires contractors to demonstrate measurable and verifiable qualifications in industrial boiler work, code welding capabilities, and experience with similar high-pressure piping systems.

View the file

Other files

File Type Posted
26NEA0277LBP-GA101.pdf PDF
Lakeland_Electric_-_Unit_5_-_2026_Fall_Outage_Contract_Services_(Addendum_#2_Revision).pdf PDF
Sample_Standard_Contract_Form.pdf PDF
25-1300-4002_-_HRSG_General_Arrangement_Right_side.pdf PDF
COL_Purchase_Order_Ts&Cs.pdf PDF
25-1301-4004.pdf PDF
Packing_Gland_for_8"_Nozzle.pdf PDF
25-1301-4001.pdf PDF
Bundle_Layout_Elevation_View_Color.pdf PDF
25-1301-4006.pdf PDF
Packing_Gland_for_6"_Nozzle.pdf PDF
25-1300-4003_-_HRSG_General_Arrangement_Left_Side.pdf PDF
25-1301-4014.pdf PDF
25-1317-5021_Interconnecting_Piping_RP-03_Reheater_#1_to_Reheater_#2.pdf PDF
25-1301-4011.pdf PDF
25-1301-4012.pdf PDF
New_Map_of_HRSG_-_Doors.pdf PDF
25-1301-4017.pdf PDF
25-1317-5022_Interconnecting_Piping_RP-03_Reheater_#1_to_Reheater_#2.pdf PDF
Pipe_Spec_T3_Drain.pdf PDF
Final_2026_City_of_Lakeland_Standard_Contract_Form.pdf PDF
25-1301-4002.pdf PDF
Pipe_Spec_EG11S_-_All_3_Valves.pdf PDF
Pipe_Spec_T2_Drain_Valve.pdf PDF
25-1300-4064_NE_Plan_View.pdf PDF
HP_SH_Desuperheater_Spool_GA.pdf PDF
25-1300-4006_NE_HRSG_Plan_View.pdf PDF
Packing_Gland_for_10"_Nozzle.pdf PDF
Reheater_Interconnecting_Piping.pdf PDF
25-1300-4005_NE_HRSG_Elevation_View_Right_Side.pdf PDF
PSM_-_Contractor_Audit_Form.pdf PDF
Indemnification_2026_Contractor_-_FDOT.docx DOCX document
Indemnification_2026_Vendor.doc DOC document
Indemnification_2026_Consultant_-_FDOT.docx DOCX document
Human_Trafficking_Affidavit.docx DOCX document
Indemnification_2026_Consultant.doc DOC document
Indemnification_2026_Contractor.doc DOC document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .