This is a technical specification document related to a packing gland component for a 10-inch nozzle, submitted in support of Lakeland Electric's Unit 5 Fall 2026 Outage Contract Services solicitation in Florida. The document provides detailed specifications and technical requirements for the packing gland assembly that contractors may need to procure or install as part of the broader boiler and HRSG (Heat Recovery Steam Generator) maintenance work scheduled for November 29 through December 19, 2026. The packing gland specification ensures that qualified bidders understand the exact technical parameters and quality standards required for this critical component, which must integrate with the 10-inch nozzle system within the steam generation equipment being serviced during the planned outage.
The specification document establishes performance and material standards necessary for contractors to bid accurately on the Unit 5 outage project. By providing this detailed technical specification upfront, Lakeland Electric enables prospective bidders—particularly those with experience in industrial boiler and HRSG work involving code welds, thin-wall tubes, and heavy-wall P91 piping—to develop comprehensive and competitive proposals. This document serves as a reference standard to ensure consistency in equipment sourcing and installation quality across all bid submissions and subsequent contract performance during the two-week outage window.