Packing_Gland_for_6"_Nozzle.pdf

PDF 137 KB Posted

Attached to
Lakeland Electric - Unit 5 - 2026 Fall Outage Contract Services
Solicitation number
2026-RFP-114
Issued by
Polk County, Florida

About this file

This is a technical specification document for a packing gland component designed for a 6-inch nozzle, related to Lakeland Electric's Unit 5 Fall 2026 Outage Contract Services in Florida. The document provides detailed engineering specifications and technical requirements for the packing gland assembly, which represents a critical component for the boiler and HRSG (Heat Recovery Steam Generator) contractor work scheduled to commence November 29, 2026, and conclude December 19, 2026. The packing gland specifications outline dimensional tolerances, material requirements, and performance standards necessary to ensure compatibility with the nozzle assembly and compliance with applicable industrial codes and standards for thin-wall HRSG tubes and heavy-wall P91 piping work.

The specification document establishes precise manufacturing and quality control parameters essential for contractors bidding on the Lakeland Electric outage project. These technical requirements ensure that any packing gland component supplied or installed during the scheduled fall outage meets the structural integrity and operational standards required for the HRSG system. Qualified boiler and HRSG contractors must demonstrate their ability to source, install, or fabricate components meeting these specifications as part of their comprehensive bid proposals. The detailed technical standards contained in this specification are integral to the overall project scope and serve as measurable and verifiable criteria for contractor evaluation and performance during the designated outage period.

View the file

Other files

File Type Posted
26NEA0277LBP-GA101.pdf PDF
Lakeland_Electric_-_Unit_5_-_2026_Fall_Outage_Contract_Services_(Addendum_#2_Revision).pdf PDF
Sample_Standard_Contract_Form.pdf PDF
25-1300-4002_-_HRSG_General_Arrangement_Right_side.pdf PDF
COL_Purchase_Order_Ts&Cs.pdf PDF
25-1301-4004.pdf PDF
Packing_Gland_for_8"_Nozzle.pdf PDF
25-1301-4001.pdf PDF
Bundle_Layout_Elevation_View_Color.pdf PDF
25-1301-4006.pdf PDF
25-1300-4003_-_HRSG_General_Arrangement_Left_Side.pdf PDF
25-1301-4014.pdf PDF
25-1317-5021_Interconnecting_Piping_RP-03_Reheater_#1_to_Reheater_#2.pdf PDF
25-1301-4011.pdf PDF
25-1301-4012.pdf PDF
New_Map_of_HRSG_-_Doors.pdf PDF
25-1301-4017.pdf PDF
25-1317-5022_Interconnecting_Piping_RP-03_Reheater_#1_to_Reheater_#2.pdf PDF
Pipe_Spec_T3_Drain.pdf PDF
Final_2026_City_of_Lakeland_Standard_Contract_Form.pdf PDF
25-1301-4002.pdf PDF
Pipe_Spec_EG11S_-_All_3_Valves.pdf PDF
Pipe_Spec_T1_Drain_Valve.pdf PDF
Pipe_Spec_T2_Drain_Valve.pdf PDF
25-1300-4064_NE_Plan_View.pdf PDF
HP_SH_Desuperheater_Spool_GA.pdf PDF
25-1300-4006_NE_HRSG_Plan_View.pdf PDF
Packing_Gland_for_10"_Nozzle.pdf PDF
Reheater_Interconnecting_Piping.pdf PDF
25-1300-4005_NE_HRSG_Elevation_View_Right_Side.pdf PDF
PSM_-_Contractor_Audit_Form.pdf PDF
Indemnification_2026_Contractor_-_FDOT.docx DOCX document
Indemnification_2026_Vendor.doc DOC document
Indemnification_2026_Consultant_-_FDOT.docx DOCX document
Human_Trafficking_Affidavit.docx DOCX document
Indemnification_2026_Consultant.doc DOC document
Indemnification_2026_Contractor.doc DOC document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .