About this file

This is a technical engineering drawing for a desuperheater spool replacement component related to the City of Lakeland's McIntosh #5 Combined Cycle power plant unit. The drawing, prepared by Nooter/Eriksen Inc., specifies the detailed design and material requirements for a desuperheater spool assembly that will be utilized during the Unit No. 5 Fall Outage scheduled to begin November 29, 2026, and conclude December 19, 2026. The component is designed to operate under demanding conditions with a design temperature of 1090°F and design pressure of 2165 PSIG, conforming to ASME BPVC 1-2025 code standards. The spool assembly features overall dimensions of 9 feet by 6 feet, with a desuperheater liner measuring 1 foot 7 inches in length, and includes multiple pipe connections, flanges, couplets, and sockolets of varying sizes (ranging from 1 inch to 3 inches in diameter). The assembly incorporates high-specification materials including SA-182 F91 Type 1 forgings, SA-335 P91 Type 1 pipe, and SA-387-22 CL2 liner material to withstand the high-temperature steam service application designated as HP-03.

The drawing establishes critical welding specifications, including continuous joint penetration (CJP) welds per AWS A2.4 standards, and provides detailed section views and orientation requirements for proper installation. All components are designed with materials compatible with the high-pressure, high-temperature service conditions, with specific attention to rod materials, spacer configurations, and spray water nozzle positioning. This technical documentation serves as the engineering specification for contractors bidding on the Lakeland Electric Unit 5 Fall Outage contract services, which seeks qualified boiler and HRSG contractors capable of performing code welds on thin-wall HRSG tubes and heavy wall P91 piping installations.

View the file

Other files

File Type Posted
26NEA0277LBP-GA101.pdf PDF
Lakeland_Electric_-_Unit_5_-_2026_Fall_Outage_Contract_Services_(Addendum_#2_Revision).pdf PDF
Sample_Standard_Contract_Form.pdf PDF
25-1300-4002_-_HRSG_General_Arrangement_Right_side.pdf PDF
COL_Purchase_Order_Ts&Cs.pdf PDF
25-1301-4004.pdf PDF
Packing_Gland_for_8"_Nozzle.pdf PDF
25-1301-4001.pdf PDF
Bundle_Layout_Elevation_View_Color.pdf PDF
25-1301-4006.pdf PDF
Packing_Gland_for_6"_Nozzle.pdf PDF
25-1300-4003_-_HRSG_General_Arrangement_Left_Side.pdf PDF
25-1301-4014.pdf PDF
25-1317-5021_Interconnecting_Piping_RP-03_Reheater_#1_to_Reheater_#2.pdf PDF
25-1301-4011.pdf PDF
25-1301-4012.pdf PDF
New_Map_of_HRSG_-_Doors.pdf PDF
25-1301-4017.pdf PDF
25-1317-5022_Interconnecting_Piping_RP-03_Reheater_#1_to_Reheater_#2.pdf PDF
Pipe_Spec_T3_Drain.pdf PDF
Final_2026_City_of_Lakeland_Standard_Contract_Form.pdf PDF
25-1301-4002.pdf PDF
Pipe_Spec_EG11S_-_All_3_Valves.pdf PDF
Pipe_Spec_T1_Drain_Valve.pdf PDF
Pipe_Spec_T2_Drain_Valve.pdf PDF
25-1300-4064_NE_Plan_View.pdf PDF
25-1300-4006_NE_HRSG_Plan_View.pdf PDF
Packing_Gland_for_10"_Nozzle.pdf PDF
Reheater_Interconnecting_Piping.pdf PDF
25-1300-4005_NE_HRSG_Elevation_View_Right_Side.pdf PDF
PSM_-_Contractor_Audit_Form.pdf PDF
Indemnification_2026_Contractor_-_FDOT.docx DOCX document
Indemnification_2026_Vendor.doc DOC document
Indemnification_2026_Consultant_-_FDOT.docx DOCX document
Human_Trafficking_Affidavit.docx DOCX document
Indemnification_2026_Consultant.doc DOC document
Indemnification_2026_Contractor.doc DOC document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1/8

1/8

TO LINER

TYP ROD

CORR. ALLOW.:

INSUL THK:

DESIGN TEMP:

DESIGN PRESS:

CODE:

SERVICE:

LINE NO. :

DESIGN CONDITIONS

FLOW

GENERAL ARRANGEMENT

DESUPERHEATER SPOOL REPLACEMENTJMD

RJL

25NEA0468LBP-GA101

0 JMD RJLINITIAL RELEASE

0 X

21-JAN-2026

TYP

CJP

3/8

3/8

3/8

TO PIPE

TYP AT PIN

SEAM

LINER LONG

O"

6"

1090°F

2165 PSIG

ASME BPVC 1-2025

STEAM

HP-03

WELD SYMBOLS ARE PER AWS A2.4 LATEST EDITION

PROJECT:

JOB NO SHEET REV FE-RELEASE DATE:

CODE

COMP

CODE

DOC

REVISIONREV CHKDWN

DWN

PM

SE

CHK

PE

TE

ORIG. JOB NO:

1 2 3 4 5 6 7 8 9 10 11 12

B

C

D

E

F

G

A

WAY APPLIES TO DESIGN AND FEATURES WHICH ARE OUR CUSTOMER'S PROPERTY.

AND MUST NOT BE COPIED OR REPRODUCED WITHOUT PERMISSION. THE FOREGOING IN NO

HOW, AND ALL NEW OR PATENTABLE FEATURES ARE THE PROPERTY OF NOOTER/ERIKSEN INC.

THIS DRAWING HAS BEEN FURNISHED BY NOOTER/ERIKSEN INC.: THE INFORMATION KNOW

997000LAKELAND

LOCATION: LAKELAND, FL

PROJECT: MCINTOSH #5 COMBINED CYCLE

PURCHASER: CITY OF LAKELAND

9'-0" DESUPERHEATER SPOOL OVERALL

6'-0" DESUPERHEATER LINER1'-7"

2'-7"

1'-7"1'-0"

6"

8"

AND 1ˆ" DIA. HOLE IN LINER (TYP)

DRILL 1•" DIA. HOLE IN PIPE

SAME, OR COMPATIBLE, MATERIAL AS PIPE

1" DIA. x 2‡" LG. ROD

(SA-182 F91 TYPE 1, OR BETTER)

3" CL2500 (RFLWN)

(TYP UNLESS NOTED)

(SA-182 F91 TYPE 1, OR BETTER)

2" CL2500 (RFLWN)

(SA-335 P91 TYPE 1, OR BETTER)

10.75" O.D. x 1.25" NOM.THK. PIPE

3" 3" 3'-0" 3"

(SA-387-22 CL2)

‰" THK. x 8" O.D. LINER

4"6"4"

R E

F

R E

F

3" DIA. HOLE (PIPE)

3•" DIA. HOLE (LINER)

2" DIA. HOLE

(2) PLACES

(SA-182 F91 TYPE 1, OR BETTER)

1" CL6000 COUPLET

1…" DIA. HOLE

(SA-182 F91 TYPE 1, OR BETTER)

1" CL6000 SOCKOLET (SWF)

A

A

B

B

SEE SECTION VIEWS FOR ACTUAL CONNECTION ORIENTATION

WELD TO LINER ONLY

(SA-387-22 CL2)

(3) EQUALLY SPACED AT (3) PLACES

„" SQ. x 3" LG. SPACER

(TYP)

STRADDLE CENTERLINE

BOLT HOLES TO

TO BE IN DIRECTION OF FLOW

DESUPERHEATER SPRAYWATER NOZZLE

ˆ

L A

N D ƒ

T H

K

10°

TYPICAL PIPE END PREP

MATCH 10" SCH.160

3:1 TAPER END TO

SECTION A-A

1" COUPLET

1" SOCKOLET

0°

90° 270°

180°

2" CL2500 LWN

FLANGE

EXISTING BLIND

DESUPERHEATER

EXISTING

AT (3) PLACES

EQUALLY SPACED

(3) ROD SPACERS

SECTION B-B

180°

90° 270°

0°

ON CENTERLINE

PINS TO BE

File details come from the government source that posted it. Updated .