This is a pipe specification document related to Lakeland Electric's Unit 5 Fall 2026 Outage Contract Services in Florida. The specification details three valves and associated piping requirements for the boiler and HRSG (Heat Recovery Steam Generator) contractor work scheduled during the outage period from November 29 through December 19, 2026. The document provides technical specifications for the piping components that bidders must understand and comply with when submitting proposals. Contractors responding to this RFP must demonstrate experience with code welds on thin-wall HRSG tubes and heavy wall P91 piping, and this specification document serves as a technical reference for the materials and components that will be utilized during the outage work.
The specification establishes the precise technical requirements for the three valves that will be part of the overall scope of work. Bidders must review these specifications in conjunction with the broader RFP requirements to ensure their proposals include adequate technical qualifications and experience with the specific piping materials and valve configurations detailed. The specification is essential for cost estimation and demonstrating the bidder's capability to work with the exact equipment and materials that Lakeland Electric has designated for this project.