ATTACHMENT_C_MSFC_Task_Order.pdf

PDF 101 KB Posted

Attached to
Regionalized Multiple Award Construction Contract Two (MACC-II) Federal contract opportunity
Solicitation number
NNS17612547R
Issued by
National Aeronautics and Space Administration Stennis Space Center

About this file

NNS17612547R Attachment C MSFC Task Order

View the file

Other files for this federal contract opportunity

Other files attached to Regionalized Multiple Award Construction Contract Two (MACC-II), newest first.
File Type Posted
NNS17612547R-0006.pdf PDF
ATTACHMENT_B_KSC_Task_Order_A-5.pdf PDF
NNS17612547R-0005.pdf PDF
NNS17612547R_Revised_SF1442.pdf PDF
ATTACHMENT_A_JSC_Task_Order_A-4.pdf PDF
ATTACHMENT_C_MSFC_Task_Order_A-4.pdf PDF
NNS17612547R_Amendment_0004.pdf PDF
Geotech_Report_KSC_Seed_Project.pdf PDF
79K39707_pictures_only.pdf PDF
JSC_J-3_Specifications_REV1.pdf PDF
79K39706_pictures_only.pdf PDF
NNS17612547R-0003.pdf PDF
12A_-_SWPPP_Details.pdf PDF
ATTACHMENT_D_SSC_A-3_Task_Order.pdf PDF
JSC_Site_Visit_Sign-in_Sheet_AM_Session.pdf PDF
JSC_Site_Visit_Sign-in_Sheet_PM_Session.pdf PDF
NNS17612547R-0002.pdf PDF
KSC_Site_Visit_AM_Attendance_Roster.pdf PDF
MSFC_SITE_VISIT_LIST_AM_Session.pdf PDF
MSFC_SITE_VISIT_LIST_PM_Session.pdf PDF
ATTACHMENT_B_KSC_A-1_Task_Order.pdf PDF
ATTACHMENT_D_SSC_A-1_Task_Order.pdf PDF
NNS17612547R-0001.pdf PDF
SSC_Site_Visit-Sign-In-Sheet_AM_Session.pdf PDF
SSC_Site_Visit-Sign-In-Sheet_PM_Session.pdf PDF
RFP_INSTRUCTIONS_TO_OFFERORS.pdf PDF
ATTACHMENT_B_KSC_Task_Order.pdf PDF
ATTACHMENT_D_SSC_Task_Order.pdf PDF
ATTACHMENT_A_JSC_Task_Order.pdf PDF
2nd_Response_to_Questions.docx DOCX document
Synopsis_Q_&_A_Response.docx DOCX document
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NNS17612547R

ATTACHMENT C

This attachment identifies local clauses and requirements specific to Marshall Space Flight Center (MSFC) and are applicable to task orders issued under the MACC-II by MSFC.

Other MSFC specific project requirements will be cited in full text in individual task order solicitations/orders. Necessary changes to the requirements in this attachment will also be cited in full text in individual task order solicitations/orders. Nothing contained in this Attachment shall relieve the Contractor from complying with other requirements of the MACC-II Solicitation / or Resultant Award.

“This attachment is the Model Request for Proposal for MSFC. It identifies local clauses and requirements specific to the task order for MSFC. All future projects issued by MSFC will include either this listing or a similar listing of local clauses and requirements.”

All work shall be performed in accordance with the specifications and drawings and use the General Wage Determinations, as identified in the List of Attachments located in Section J. of this document. In accordance with the above referenced contract the following contract clause information is applicable to this Task Order:

In accordance with the MACC-II contract the following contract clause information is applicable to this Task Order:

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS

B.1 SUPPLIES AND/OR SERVICES TO BE PROVIDED

The work to be performed under this project consists of providing the labor, equipment, and materials to perform the renovation of the offices, laboratories, and high bay areas HVAC systems in Building 4619 at the Marshall Space Flight Center in Huntsville, Alabama. The Contractor shall provide all resources (except as may be expressly stated in the contract as furnished by the Government) necessary to deliver and perform the work in accordance with the Description/Specifications/Statement of Work and Drawings provided for this Task Order; your basic contract terms and conditions, drawings, and special conditions provided with this task order.

B.2 BID SCHEDULE

CLIN 0001: “Revitalize Building 4619 Mechanical Systems” All work as described in Spec. No. FAC-M5064 and as shown on the contract drawings for Building 4619. The work to be performed under this task order shall consist of providing all labor, tools, equipment, and materials necessary to accomplish all work in accordance with Specification, Drawings, and Reports for Project FAC-M5064, Revitalize Building 4619 Mechanical Systems; Date: 10/27/16; See Section J of this document.

CLIN 0002: Additive Bid Item NO. 1:

All work as described in Spec. No. FAC-M5064 and as shown on the contract drawings for Building 4619, Additive Alternate No. 1 $________________________

CLIN 0003: Additive Bid Item NO. 2:

All work as described in Spec. No. FAC-M5064

Additive Alternate No. 2 $________________________

CLIN 0004: Additive Bid Item NO. 3:

and as shown on the contract drawings for Building 4619, Additive Alternate No. 3 $________________________

CLIN 0005: Additive Bid Item NO. 4:

All work as described in Spec. No. FAC-M5064

Additive Alternate No. 4 $________________________

CLIN 0006: Additive Bid Item NO. 5:

Additive Alternate No. 5 $________________________

Total for All CLIN Items 0001 - 0006: $________________________

B.2 Firm Fixed Price (NFS) (1852.216-78) (DEC 1988)

The total firm fixed price of this Task Order is:

To be completed by the Government.

Note: In accordance with NFS 1852.236-71 Additive or Deductive Bid Items, All bids shall be evaluated on the basis of the same additive bid items.

[END OF SECTION]

C.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(FAR) (52.211-10) (APR 1984)

The Contractor shall be required to (a) commence work under this task order within ten

(10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later within 730 calendar days after receipt of the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

SECTION D LISTING OF CLAUSES INCORPORATED BY REFERENCE

Liquidated Damages-Construction (Sep 2000) FAR 52.211-12: Not applicable

SECTION E – SPECIAL CONTRACT REQUIREMENTS

Identification of Government Furnished Property (GFP): Pursuant to the “Government Property” clause herein, the Government will furnish the item(s) of the property listed below as Government Furnished Property to the contractor, FOB Destination, for use in performance of this contract:

E.1 52.246-11 Higher-Level Contract Quality Requirements (DEC 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

Title Number Date Tailoring Contractor Quality Assurance/Quality Control

MSFC Specification FAC-M5064, Section 014000

Oct 27, 2016

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

LIST OF GOVERNMENT FURNISHED PROPERTY (GFP)

Item Description Qty

Expected Delivery Date Location of Item Item Value

N/A

(2) When the technical requirements of a subcontract require-

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E.2 1852.246-71 Government Contract Quality Assurance Functions (OCT 1988)

In accordance with the inspection clause of this contract, the Government intends to perform the following functions at the locations indicated:

Item Quality Assurance Location Function

1. Project Site, MSFC In-Process Inspection

2. Project Site, MSFC Final Inspection

F.1 MSFC 52.237-91 Place of Performance (FEB 2001)

The Contractor shall perform the work under this contract at Marshall Space Flight Center (MSFC), Alabama, and at such other locations as may be approved in writing by the Contracting Officer.

G.1 MSFC 52.204-91 Security and Badging Requirements (NOV 2016)

Performance of this contract will require access to facilities, information technology systems, and other resources at the Marshall Space Flight Center and/or the Michoud Assembly Facility. To obtain and maintain access, the Contractor shall comply with the applicable requirements from the latest revision of (1) NASA Procedural Requirements (NPR) 1600.1, “NASA Security Program Procedural Requirements,” (2) NPR 1600.4, “Identity and Credential Management,” (3) Marshall Procedural Requirements (MPR) 1600.1, “MSFC Security Program Procedural Requirements,” (4) MPR 1600.4, “MSFC Identity, Credential, and Access Management,” and (5) NASA Advisory Implementing Instruction (NAII) 1600.4, “Foreign National Access Management.”

(End of Clause)

H.1 1852.225-70 Export Licenses (FEB 2000)

Insert in Paragraph (b): Marshall Space Flight Center

H.2 1852.243-72 Equitable Adjustments (APR 1998)

(a) The provisions of all other clauses contained in this contract which provide for an equitable adjustment, including those clauses incorporated by reference with the exception of the “Suspension of Work” clause (FAR 52.242-14), are supplemented as follows:

Upon written request, the Contractor shall submit a proposal for review by the Government. The proposal shall be submitted to the contracting officer within the time limit indicated in the request or any extension thereto subsequently granted. The proposal shall provide an itemized breakdown of all increases and decreases in the contract for the Contractor and each subcontractor in at least the following detail: material quantities and costs;

direct labor hours and rates for each trade; the associated FICA, FUTA, SUTA, and Workmen’s Compensation Insurance; and equipment hours and rates.

(b) The overhead percentage cited below shall be considered to include all indirect costs including, but not limited to, field and office supervisors and assistants, incidental job burdens, small tools, and general overhead allocations. “Commission” is defined as profit on work performed by others.

The percentages for overhead, profit, and commission are negotiable according to the nature, extent, and complexity of the work involved, but in no case shall they exceed the following ceilings:

Overhead

(Percent) Profit

(Percent) Commission

To Contractor on work performed by other than its own forces

0 percent 0 percent 10 percent

To first tier subcontractor on work performed by its subcontractors

0 percent percent To Contractor and/or subcontractors on work performed with their own forces

10 percent

10 percent

(c) Not more than four percentages for overhead, profit, and commission shall be allowed regardless of the number of subcontractor tiers.

(d) The Contractor or subcontractor shall not be allowed overhead or commission on the overhead, profit, and/or commission received by its subcontractors.

(e) Equitable adjustments for deleted work shall include credits, limited to the same percentages for overhead, profit, and commission in paragraph (b) of this clause.

(f) On proposals covering both increases and decreases in the amount of the contract, the application of the overhead, profit, and commission shall be on the net change in direct costs for the Contractor or the subcontractor performing the work.

(g) After receipt of the Contractor’s proposal, the contracting officer shall act within a reasonable period, provided that when the necessity to proceed with a change does not permit time to properly check the proposal, or in the event of a failure to reach an agreement on a proposal, the contracting officer may order the Contractor to proceed on the basis of the price being determined at the earliest practicable date. In such a case, the price shall not be more than the increase or less than the decrease proposed.

H.3 MSFC 52.223-90 Asbestos Material (AUG 2015)

During performance of this contract, Contractor personnel performing work in MSFC buildings may come in contact with materials containing asbestos. MSFC Buildings 4200, 4201, and 4663 are of special concern since they are known to contain a sprayed on fire insulation on or above the ceiling, usually located on the metal or concrete structure of the buildings. Examples of asbestos-containing material are floor tile, pipe and lagging insulation, exterior siding, roofing felt, and many other building materials. To facilitate communication, MSFC has established a website where the inventory of asbestos-containing material, their condition and approximate location are provided. The URL for this website is http://ais.ndc.nasa.gov/default.aspx. If the Contractor is unable to access this URL, they may contact the Contracting Officer or MSFC’s Environmental Engineering and Occupational Health (EEOH) Office (organization code AS10) for assistance. Prior to performing tasks which may disturb building material containing asbestos or suspected asbestos, the Contractor shall notify MSFC’s EEOH Office for assistance. The Contractor shall also be responsible for ensuring that all Contractor personnel working onsite are made aware of and comply with the requirements of this clause.

H.4 MSFC 52.223-91 Hazardous Material Reporting (FEB 2016)

(a) If during the performance of this contract, the Contractor transports or accepts delivery of any hazardous materials (hazardous as defined under the latest version of http://ais.ndc.nasa.gov/default.aspx

Federal Standard No. 313, including revisions adopted during the term of the contract) on-site to Marshall Space Flight Center, the hazardous material shall be processed through MSFC Central Receiving to be bar-coded for inventory. Alternative receiving points may be designated if approval is granted in accordance with MWI 8550.5, “Hazardous Material Management.” Chemical containers shall be managed in accordance with the provisions of MWI 8550.5. The Contractor shall be responsible for ensuring that all Contractor/subcontractor personnel are made aware of and comply with this clause.

(b) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material; or with clauses regarding hazardous materials, which may be contained in the contract and/or order.

H.5 MSFC 52.223-92 Environmental General Clause (AUG 2010)

Contractors performing on-site shall comply with all applicable Environmental policies and procedures including, but not limited to, MPD 8500.1, “MSFC Environmental Management Policy” and MPR 8500.1, “MSFC Environmental Engineering and Occupational Health Program.” MSFC contractors performing on-site activities that could potentially impact the environment shall be responsible for following all established NASA/MSFC environmental procedures. These procedures and other applicable policies and procedures are available by contacting the NASA/MSFC Environmental Engineering & Occupational Health Office. Failure to comply with environmental policies and procedures, may result in damage to the environment, and could potentially result in regulatory penalties against NASA and/or the Contractor, and Contractor loss of access to NASA/MSFC facilities.

H.6 MSFC 52.223-95 Prevention of and Response to Threatening Behavior in the

Workplace (AUG 2010)

The Contractor shall comply with all applicable Contractor responsibilities set forth in Marshall Procedural Requirements (MPR) 1600.2, “Prevention of and Response to Threatening Behavior in the Workplace.”

H.7 MSFC 52.236-90 Review of Cost Proposals (FEB 2001)

During the performance of this contract it may become necessary for a Government designated Contractor to review estimates for time and materials in change order proposals submitted for evaluation. If this is necessary, no proprietary data contained in proposals (such as Overhead, G&A, Profit, and Total Cost) will be made available to any Government designated Contractor for review.

H.8 Submission of Invoices

Invoices are to be prepared by the Contractor in accordance with contract clauses 52.232- 5 entitled “Payments under Fixed-Price Construction Contracts” and 52.232-27 entitled “Prompt Payment for Construction Contracts,” and submitted in two (2) copies to the cognizant Contracting Officer’s Representative (COR), address as follows:

Marshall Space Flight Center AS22, Facilities Engineering Office Marshall Space Flight Center, AL 35812

H.9 Subcontracting

(a) In the event the Contractor desires to have subcontractors perform any portion of the work covered by this contract, the Contractor is hereby required to comply with the requirements of FAR Clause 52.222-11, entitled “Subcontracts (Labor Standards).”

(b) The Contractor shall also submit, prior to the start of any field work by a subcontractor, evidence of the subcontractor’s compliance with the insurance requirements as set forth in this contract.

(c) Failure of the Contractor to comply with these requirements shall be cause for the Government to bar the subcontractors, singly or collectively, from access to the site of the work, or stop the work from being performed by such subcontractors, singly or collectively, until the requirements of this clause have been complied with. Such stoppage of work shall not be considered cause for equitable adjustment for time or money under the applicable clauses of the contract.

H.10 Notification for Onsite Work

The Contractor shall notify the Government Contracting Officer’s Representative (COR) or his designated construction representative when performing any onsite work. Further, the Contractor shall notify the Government COR when any subcontractor is onsite. If the work involves multiple work locations, the Contractor shall notify the COR or his representative when a change in work site is required.

H.11 Applicable MSFC Regulations, Other Laws and Regulations

The Contractor and all its employees engaged in the performance of work under this contract shall observe and comply with all rules and regulations prescribed by the authorities at Marshall Space Flight Center and shall strictly comply with fire, safety, sanitation and security regulations. In addition, the Contractor shall obey and abide by and comply with Social Security, Workmen’s Compensation and Unemployment Laws of the State as shall be applicable to the work hereunder and the Contractor shall obey and comply with all other Legislation, State and Federal Laws.

H.12 Hours of Work

Normal duty hours during which work may be performed are from 7:00 a.m. to 5:00 p.m., Monday through Friday. If the Contractor desires to work outside of the normal duty hours or on Saturdays, Sundays, or holidays, it shall request approval from the Contracting Officer Representative (COR), and allow ample time to enable satisfactory arrangements to be made by the Government for inspecting the work in progress.

H.13 Submittals and Samples

Reference Section I, FAR Clause 52.236-21, Specifications and Drawings for Construction

(a) Submittals shall be made for all materials where required under various sections of the specifications and for all materials being proposed as substitutes for materials specified on the drawings or in the specifications.

(b) Submittals shall consist of shop drawings, samples, and maintenance data as required in each technical section of the specifications.

(c) Submit a list of all equipment to be furnished including the name of the manufacturer, the model number and other identifying data and information related to performance, capacity, nature and rating.

(d) Samples of all materials proposed for use in this project shall be submitted to the Contracting Officer for approval. Contractor shall not deliver to the job site, nor shall he incorporate any materials into the job which have not been approved by the Contracting Officer or Contracting Officer’s Representative.

(e) Submittals and samples shall be furnished to the Contracting Officer’s Representative at the following address:

Marshall Space Flight Center AS22, Facilities Engineering Office

Marshall Space Flight Center, AL 35812

END OF SECTION

I.1 52.204-14 Service Contract Reporting Requirements (OCT 2016)

(a) ) Definition.

“First-tier subcontract” means a subcontract awarded directly by the Contractor for the purpose of acquiring supplies or services (including construction) for performance of a prime contract. It does not include the Contractor’s supplier agreements with vendors, such as long-term arrangements for materials or supplies that benefit multiple contracts and/or the costs of which are normally applied to a Contractor’s general and administrative expenses or indirect costs.

(b) The Contractor shall report, in accordance with paragraphs (c) and (d) of this clause, annually by October 31, for services performed under this contract during the preceding Government fiscal year (October 1-September 30).

(c) The Contractor shall report the following information:

(1) Contract number and, as applicable, order number.

(2) The total dollar amount invoiced for services performed during the previous Government fiscal year under the contract.

(3) The number of Contractor direct labor hours expended on the services performed during the previous Government fiscal year.

(4) Data reported by subcontractors under paragraph (f) of this clause.

(d) The information required in paragraph (c) of this clause shall be submitted via the internet at www.sam.gov. (See SAM User Guide). If the Contractor fails to submit the report in a timely manner, the contracting officer will exercise appropriate contractual remedies. In addition, the Contracting Officer will make the Contractor’s failure to comply with the reporting requirements a part of the Contractor’s performance information under FAR subpart 42.15.

(e) ) Agencies will review Contractor reported information for reasonableness and consistency with available contract information. In the event the agency believes that revisions to the Contractor reported information are warranted, the agency will notify the Contractor no later than November 15. By November 30, the Contractor shall revise the report, or document its rationale for the agency.

(f)(1) The Contractor shall require each first-tier subcontractor providing services under this contract, with subcontract(s) each valued at or above the thresholds set forth in 4.1703(a)(2), to provide the following detailed information to the Contractor in sufficient time to submit the report:

(i) Subcontract number (including subcontractor name and unique entity identifier); and http://www.sam.gov/

(ii) The number of first-tier subcontractor direct-labor hours expended on the services performed during the previous Government fiscal year.

(2) The Contractor shall advise the subcontractor that the information will be made available to the public as required by section 743 of Division C of the Consolidated Appropriations Act, 2010.

I.2 52.236-1 Performance of Work by the Contractor (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least 20 percent of the total amount of work to be performed under the contract.

This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

I.12 MSFC 52.246-90 Warranted Items (FEB 2001)

(a) All items delivered under this contract/purchase order shall be warranted by the manufacturer’s standard warranty.

(b) A copy of the manufacturer’s standard warranty shall be enclosed in the package or included with shipping documents, as appropriate, for each warranted item delivered under this contract/purchase order.

(c) Items warranted by the manufacturer’s standard warranty shall be marked or stamped “Warranted.” If space on the item is not available, the packing slip should state, as a minimum, the following:

1.Brief statement that a warranty exists.

2.Substance of the warranty.

3.Duration of the warranty.

4.Person to notify if the items are defective.

( End of clause)

END OF SECTION

SECTION J LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

Attachment

Title “Revitalize Building 4619 Mechanical Systems”

Date

Pages

MSFC J-1

Drawings, Revitalize Building 4619 Mechanical Systems.

PART 1

10/27/16

MSFC J-2

Drawings, Revitalize Building 4619 Mechanical Systems.

PART 2

MSFC J-3 Drawings, Revitalize Building 4619 Mechanical Systems.

PART 3

MSFC J-4 Drawings, Revitalize Building 4619 Mechanical Systems.

PART 4

MSFC J-5 Drawings, Revitalize Building 4619 Mechanical Systems.

PART 5

MSFC J-6

SPECIFICATION: Revitalize Building Mechanical Systems (4619) Specification, GMC-11: FAC-M5064

07/15/2016

MSFC J-7

General Asbestos Survey for Asbestos-Containing Materials.

Building 4619

10/31/2008

MSFC J-8

U.S. Department of Labor General Wage Determination issued Under the Davis- Bacon and Related Acts: General Wage Decision No. AL160056 01/06/2017 AL56 Building Construction; Madison County in Alabama; Modification 0.

01/06/2017

MSFC J-9

Safety, Health, and Environmental (SHE) Plan (incorporated into the contract upon approval – prior to Notice to Proceed)

MSFC J-10

Quality Assurance Plan (incorporated into the contract upon approval – prior to Notice to Proceed)

ATTACHMENT MSFC J-1 Through MSFC J-7

These referenced documents in this solicitation attachment MSFC J-1 through MSFC J-7 (as amended) will be maintained in its entirety on the compact disk (CD) and placed in the contract file.

(End of Attachment)

ATTACHMENT MSFC J-8

General Decision Number: AL170056 01/06/2017 AL56

Superseded General Decision Number: AL20160056

State: Alabama

Construction Type: Building

County: Madison County in Alabama.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.

If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2017

CARP0109-001 01/01/2016

Rates Fringes

CARPENTER, Includes Drywall Hanging, and Form Work...........$ 21.63 11.17

ENGI0320-003 01/01/2010

Rates Fringes

Power equipment operators:

Boom and Crane (Hydraulic & Conventional Cranes-100 Ton and over)...............$ 22.08 8.31 Cherry Picker (Hydraulic Crane Uner 100 Ton), Forklift, and Front End Loader......................$ 21.08 8.31 Oiler.......................$ 18.42 8.31

* IRON0477-001 05/01/2016

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 24.06 13.68

SHEE0048-004 06/01/2013

Rates Fringes

Sheet Metal Worker (including HVAC Duct Work)..................$ 23.14 13.69

SUAL2007-048 10/02/2007

Rates Fringes

BRICKLAYER.......................$ 17.00 0.00

CEMENT MASON/CONCRETE FINISHER...$ 16.50 0.00

DRYWALL FINISHER/TAPER...........$ 13.24 0.00

ELECTRICIAN......................$ 17.52 4.06

HVAC MECHANIC (HVAC Pipe Installation)....................$ 15.33 0.67

IRONWORKER, REINFORCING..........$ 10.87 0.00

LABORER: Common/General, Including Landscaping............$ 10.24 0.00

LABORER: Pipelayer..............$ 9.15 1.18

OPERATOR: Backhoe...............$ 11.50 3.24

OPERATOR: Bulldozer.............$ 12.94 2.47

OPERATOR: Excavator.............$ 16.00 0.00

OPERATOR: Grader/Blade..........$ 11.00 0.00

PAINTER: Brush and Roller.......$ 10.25 0.00

PIPEFITTER, Excludes HVAC Pipe Installation................$ 15.06 2.19

PLUMBER, Excludes HVAC Pipe Installation.....................$ 13.87 0.00

ROOFER, Includes Built Up, Polyurethane Foam, Metal, Shake & Shingle, and Single Ply Roofs........................$ 9.75 0.00

TILE SETTER......................$ 16.80 3.90

TRUCK DRIVER.....................$ 10.42 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Attachment)

ATTACHMENT MSFC J-9

Safety, Health, and Environmental (SHE) Plan

Notice To Offerors: The Successful Offeror shall submit a Project Specific Safety, Health and Environmental Plan for review and approval by the Contracting Officer. (A Site Specific Plan will be requested from the successful offeror which shall be incorporated as part of the resultant task order award upon approval and prior to Notice to Proceed)

ATTACHMENT MSFC J-10

Quality Assurance Plan

Notice To Offerors: The Successful Offeror shall submit a Quality Assurance Plan for review and approval by the Contracting Officer. The Successful Offeror shall submit a Project Specific Quality Assurance Plan for review and approval by the Contracting Officer for review and approval by the Contracting Officer. (The Plan will be requested from the successful offeror which shall be incorporated as part of the resultant task order award upon approval and prior to Notice to Proceed)

L.6 MAGNITUDE OF REQUIREMENT (NFS 1852.236-74) (DEC 1988)

The Government estimated price range of this task order is between $5,000,000 and $10,000,000.

PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 SUPPLIES AND/OR SERVICES TO BE PROVIDED
B.2 BID SCHEDULE
SECTION D LISTING OF CLAUSES INCORPORATED BY REFERENCE
F.1 MSFC 52.237-91 Place of Performance (FEB 2001)
H.2 1852.243-72 Equitable Adjustments (APR 1998)
H.3 MSFC 52.223-90 Asbestos Material (AUG 2015)
H.4 MSFC 52.223-91 Hazardous Material Reporting (FEB 2016)
H.5 MSFC 52.223-92 Environmental General Clause (AUG 2010)
H.6 MSFC 52.223-95 Prevention of and Response to Threatening Behavior in the Workplace (AUG 2010)
H.7 MSFC 52.236-90 Review of Cost Proposals (FEB 2001)
H.8 Submission of Invoices
H.9 Subcontracting
H.10 Notification for Onsite Work
H.11 Applicable MSFC Regulations, Other Laws and Regulations
H.12 Hours of Work
H.13 Submittals and Samples
END OF SECTION
I.1 52.204-14 Service Contract Reporting Requirements (OCT 2016)
I.2 52.236-1 Performance of Work by the Contractor (APR 1984)
I.12 MSFC 52.246-90 Warranted Items (FEB 2001)
ATTACHMENT MSFC J-1 Through MSFC J-7
ATTACHMENT MSFC J-8
ATTACHMENT MSFC J-9