J-4_CAT_I_ _II_NAVSEA_STANDARD_ITEM_INDEX.pdf
PDF 24 KB Posted
- Attached to
- USS GETTYSBURG (CG-64) SSRA
- Solicitation number
- N50054-16-R-0003
About this file
ATTACHMENT J-4
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHIP: USS GETTYSBURG (CG-64) TPPC-CG64-NSSA16-CN01
ITEM NO. TITLE
009-01 General Criteria; accomplish
009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide
009-03 Toxic and Hazardous Substances; control
009-04 Quality Management System; provide
009-05 Temporary Accesses; provide
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish
009-08 Fire Protection at Contractor's Facility; accomplish
009-10 Shipboard Asbestos-Containing Material (ACM); control
009-18 Magnetic Material; control
009-19 Provisioning Technical Documentation (PTD); provide
009-20 Government Property; control
009-21 Logistics and Technical Data; provide
009-23 Interferences; remove and install
009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish
009-28 Fire Prevention Requirements; accomplish
009-29 Asbestos-Free Pipe Hanger Liner Material; install
009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide
009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and
Housekeeping; accomplish
009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for
Commercial Equipment/ Component; provide
009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling
Equipment at Naval Facilities; accomplish
009-59 Organotin Antifouling Material; control
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage
009-61 Shipboard Use of Fluorocarbons; control
009-64 Synthetic Fire-Resistant Hydraulic Fluid; control
009-65 Polychlorinated Biphenyls (PCBs); control
009-67 Integrated Total Ship Testing; manage
009-69 Heavy Weather/Mooring Plan; provide
009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned
Vessels; accomplish
009-72 Physical Security at Private Contractor's Facility; accomplish
009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install
009-74 Occupational, Safety and Health Requirements; accomplish
009-77 Cofferdam Requirements; accomplish
009-79 Government Owned Material (GOM); status reporting
009-80 Ship's Facilities; provide
009-81 Compartment Closeout; accomplish
009-82 Data Requirements When Installing an Equal Component Vice Specified Component;
provide
009-83 Wire Rope Fitting Verfication; provide
009-84 Accountability of Temporary Fasteners; provide
INDEX
CATEGORY I. FY-16 CHANGE 2 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT
FURTHER REFERENCE.
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
SHIP: USS GETTYSBURG (CG-64) TPPC-CG64-NSSA16-CN01
009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H)
Materials; accomplish
009-87 Chemical disinfection Procedures; accomplish
009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including
Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify
009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes; accomplish
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention
Act (PPA) Information; provide
009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish
009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install
009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air
Pollutants (NESHAPS) for Surface Coating Information; provide
009-99 Ship Departure Report; provide
009-100 Ship's Stability Process Control Procedure (PCP); maintain
009-101 Requirements for Entry to and Departure from Contractor's Facility; accomplish
009-102 Alteration Verification; provide
009-103 Weight and Moment Change Data; provide
009-106 Work Authorization Form Coordinator (WAFCOR); provide
009-108 Aircraft Carrier Requirements for Entry to, Movement within, and Departure from
Contractor's Facility; accomplish
009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels; accomplish
009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage
009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish
009-118 CG Deck Loading; accomplish
009-120 Fact Finding and Critique of Unplanned Events; manage
009-121 Ship Assessment/Inspection Requirements; provide
ITEM NO. TITLE
009-11 Insulation and Lagging Requirements; accomplish
009-12 Welding, Fabrication and Inspection Requirements; accomplish
009-16 Electronic Equipment ; repair
009-17 Rotating Electrical Equipment; repair
009-22 Shipboard Electric Cable; test
009-25 Structural Boundary Test; accomplish
009-26 Deck Covering Requirements; accomplish
009-32 Cleanin and Painting Requirements; accomplish
009-33 Rotating Electrical Equipment; rewind
009-71 Testing Requirements for Piping Systems; accomplish
009-107 Piping System Cleanliness(Non-Nuclear); accomplish
CATEGORY II. FY-16 CHANGE 2 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK
ITEMS OF THIS JOB ORDER
File details come from the government source that posted it. Updated .