N50054-16-R-0003-0009.pdf
PDF 85 KB Posted
- Attached to
- USS GETTYSBURG (CG-64) SSRA Federal contract opportunity
- Solicitation number
- N50054-16-R-0003
About this file
N50054-16-R-0003-0009 SEE AMENDMENT ATTACHED
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N50054GETTYSBURG
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The subject amendment is hereby issued to reflect the follow ing changes:
1. Update Section H to include the Fire Drill requirement.
2. Incorporate Attachment J-3, Rev 3.
3. Incorporate Attachment J-5, Rev 1.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Mar-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N50054-16-R-0003
X 9B. DATED (SEE ITEM 11)
29-Jan-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Mar-2016
CODE
MID-ATLANTIC REGIONAL MAINTENANCE CENTER
CODE 411,
9727 AVIONICS LOOP
NORFOLK VA 23511-2124
N50054 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N50054-16-R-0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION H - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
LIABILITY, AUTOMOBILE AND WORKMEN'S COMPENSATION INSURANCE
The following types of insurance are required in accordance with the clause entitled "INSURANCE - WORK ON A
GOVERNMENT INSTALLATION" (FAR 52.228-5) and shall be maintained in the minimum amounts shown:
a. Comprehensive General Liability: $200,000 per person and $500,000 per accident for bodily injury.
b. Automobile Insurance: $200,000 per person and $500,000 per accident for bodily injury and $20,000 per accident for property damage.
c. Standard Workmen's Compensation and Employer's Liability Insurance (or, where maritime employment is involved, Longshoremen's and Harbor Workers Compensation Insurance) in the minimum amount of $100,000.
FIRE DRILL
The Contractor shall coordinate the execution of a full scale fire drill with MARMC within the first 30 days after the ship's arrival at the contractor's facility. The drill will include at a minimum the requirements of the drill specified in NAVSEA Standard Items 009-08 (Fire Protection at Contractor's Facility; Accomplish) and 009-28 (Fire Prevention Requirements). In order to minimize impact to production, the drill has been scheduled in Attachment J-3. Listing for a specific date; however, once the full production schedule is integrated, this date can be shifted by MARMC prior to availability start as long as it meets the criteria of being conducted in the first 30 days onsite at the contractor's facility. For the contractor, this drill will require all production work to stop for a minimum of 4 hours during day shift on the preselected day. As part of the drill, the contractor is required to evacuate the ship, provide a muster report of all personnel safely off ship, support the drill with any firefighting personnel/company emergency procedures, and support the disconnection of temporary services at the drill site. Temporary services at the drill site will be disconnected in the process of the drill, and the contractor will be responsible for restoring them after the drill. This drill will require involvement with the local fire department. For awareness, the government will be conducting the drill and using the evaluation criteria found in CH-12, 13, and Appendix A of S0570-AC-
CCM-010/8010.
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
PART III
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
(a) Any job order awarded as a result of this solicitation shall consist of the following sections of this solicitation, and the documents, exhibits, and attachments described below:
I. Part I - The Schedule (Sections A through H)
II. Part II - Contract Clauses (Section I)
III. Part III - List of Documents, Exhibits and other Attachments (Section J)
IV. Part IV - Representations and Instructions
(b) Part IV of the solicitation will not be physically incorporated into the resulting contract. However, Section K, "Representations, Certifications and Other Statements of Offerors or Quoters" will be retained in the contract file, and acceptance of a proposal under this solicitation incorporates Section K by reference into the resultant contract. (FAR 15.204-1(b)).
(c) Documents, exhibits, and other attachments that will form part of this contract are as follows:
Exhibit "A" Contract Data Requirements List (CDRL) (DD Form 1423)
Exhibit "B" Contract Data Requirements List (CDRL) (DD Form 1423)
Exhibit "C" Contract Data Requirements List (CDRL) (DD Form 1423)
J-1 Specification Package No. SSP TPPC-CG64-NSSA16-CN01
ERRATA Package #1 – issued 02 February 2016
(Offeror's must request to receive Errata Packages at
MARMC_NRFK_411_PROCUREMENT@navy.mil)
ERRATA Package #2 – issued 11 February 2016
ERRATA Package #3 – issued 11 February 2016
ERRATA Package #4 – issued 18 February 2016
ERRATA Package #5 – issued 19 February 2016
ERRATA Package #6 – issued 23 February 2016
ERRATA Package #7 – issued 23 February 2016
ERRATA Package #8 – issued 10 March 2016
J-2 Work Item Plans, Drawings, and Other References
J-3 Commencement & Completion Dates and Milestones mailto:MARMC_NRFK_411_PROCUREMENT@navy.mil mailto:MARMC_NRFK_411_PROCUREMENT@navy.mil mailto:MARMC_NRFK_411_PROCUREMENT@navy.mil mailto:MARMC_NRFK_411_PROCUREMENT@navy.mil mailto:MARMC_NRFK_411_PROCUREMENT@navy.mil
Revision 1 issued 18 February 2016
(Offeror's must request to receive Attachment J-3 at
Revision 2 issued 10 March 2016
Revision 3 issued 16 March 2016
J-4 CAT I & II NAVSEA STANDARD ITEM INDEX
J-5 ADDITIONAL REQUIREMENTS/INFORMATION
Revision 1 issued 16 March 2016
(Offeror's must request to receive Attachment J-5 at
In addition to the documents listed above, the Successful Offeror’s accepted/approved Small Business sub-contracting plan will be incorporated at contract award.
The following documents are included as part of the solicitation:
J-6A Ship Access Procedures
J-6B Ship Access Form
J-7 Labor & Material Burden Rate Worksheet
J-8 Request for Specification Clarification
J-9 Past Performance Information Form
(End of Summary of Changes)
File details come from the government source that posted it. Updated .