ITEM NO: Solicitation

TITLE: Section M - Evaluation Factors; Factor 1: Past Performance PARA. NO:a. Relevance PAGE NO: 155 of 157

ITEM NO: 262-80-001

TITLE: SHIPALTDDG51-76501D

PARA. NO: 2.9 & 5.3

PAGE NO: 2

ITEM NO: 980-11-001 thru 980-11-011

TITLE: AIT Support PARA. NO: Various

PAGE NO:

ITEM NO: 522-80-001

TITLE: ShipAltDDG51-82474D

PARA. NO: 2.6 & 5.3

PAGE NO: 2

ITEM NO: 524-80-001

TITLE: SHIPALTDDG51-00271D

PARA. NO: 2.14 & 5.3

PAGE NO: 3

ITEM NO: 150-11-002

TITLE: 02 Level Deck; repair and preserve

PARA. NO: 3.2.1; 3.2.2

PAGE NO: 1 of 2

CONTRACTOR QUESTION 6:

The work item directs to replace in way of and replace under the Nulka and SRBOC FDNs. Will the NULKA and SRBOC equipment have to be moved by the contractor? Also, this may necessitate the need to shoot and resurface the FDNs for alignment. Does the Customer desire this function to be accomplished?

GOVERNMENT RESPONSE:

The Contractor is only required to move SRBOC equipment if defects are discovered underneath it. NULKA launchers will be removed by other activity. Contractor will not need to shoot and resurface the FDNs for alignment.

REQUEST FOR SPECIFICATION CLARIFICATION

DATE: 15 June 2015 [Set 3] SOLICITATION NO: N50054-15-R-0007

TITLE: USS OSCAR AUSTIN (DDG-79) Selected Restricted Availability (SRA) MARMC POC: Christian R. Smith

MARMC PHONE: 757-396-5041 x423

GOVERNMENT RESPONSE:

The Contracting Officer considers "Surface Combatant Class Ships" to include: DDGs, CGs and FFGs.

CONTRACTOR QUESTION 1:

Regarding offerors’ past experience at accomplishing "CNO scheduled availability contracts for Surface Combatant Class Ships where the offeror performed as the Prime Contractor", based on recent contract precedent this Offeror considers "Surface Combatant Class Ships" to include CGs, DDGs, CVNs, LSDs, LPDs, LHAs, and LHDs. Does the Contracting Officer concur with this interpretation of the Factor 1 evaluation criterion?

If not, please clarify.

CONTRACTOR QUESTION 2:

Kitted material is listed in paragraph 5.3, but no material for this ShipAlt is listed in the Ship Alteration Material Summary 4720 listed in reference 2.9. Please provide listing of GFM.

GOVERNMENT RESPONSE:

The individual GFM materials are listed in the SID drawings. The completed 4720 Reference is issued closer to the availability.

CONTRACTOR QUESTION 3:

9 of the 11 AIT support items request laydown areas on the pier totaling in excess of 3600 square feet with an additional 8 conex boxes to be provided by the KTR for the AIT's use. Each item requires they be located in close proximity to the ship many require they be closer than 500 feet of the ship.

Meeting all of these requirements is a physical impossibility.

The sum total of these requirements would mean blocking access for cranes JLG's or services along the majority of the length of the vessel which creates inefficiency's for the prime KTR and raises safety concerns. Revise the location requirements for the Conex boxes so that only those which must be located on the pier for connection to the ships sytems in support of the item are required to be located on the pier.

Reduce or eliminate the pierside laydown requirements to the minimum necesary to accomplish the work vice for convienance of rht AIT at the inconvienance to the Prime KTR.

GOVERNMENT RESPONSE:

Work items have been changed via Errata 3 to deconflict the connex box and laydown area.

CONTRACTOR QUESTION 5:

Kitted material is listed in paragraph 5.3, but no material for this ShipAlt is listed in the Ship Alteration Material Summary 4720 listed in reference 2.14. Please provide listing of GFM.

GOVERNMENT RESPONSE:

The individual GFM materials are listed in the SID drawings. The completed 4720 Reference is issued closer to the availability.

CONTRACTOR QUESTION 4:

Kitted material is listed in paragraph 5.3, but no material for this ShipAlt is listed in the Ship Alteration Material Summary 4720 listed in reference 2.6. Please provide listing of GFM.

GOVERNMENT RESPONSE:

The individual GFM materials are listed in the SID drawings. The completed 4720 Reference is issued closer to the availability.

ITEM NO: Solicitation

TITLE: Subcontractor Data Requirements

PARA. NO: III. Pre-Award Information

PAGE NO: 136-137 of 157

ITEM NO: 634-11-001

TITLE: Cosmetic Polymeric Deck Covering System; install

PARA. NO:

PAGE NO: 1 of 1

ITEM NO: 262-80-001

TITLE: SHIPALT DDG51-76501D

PARA. NO: 5.3

PAGE NO: 2 OF 2

ITEM NO: Solicitation Package

TITLE:

PARA. NO:

PAGE NO:

ITEM NO: 120-80-001

TITLE: SA 73445D Ammo Trunk Stiffening

PARA. NO: 3.1, 2.5

PAGE NO: 1

ITEM NO: 264-90-001

TITLE: SA 85973K LO Purifier Heat Exchanger

PARA. NO: 3.2.2, 2.4

PAGE NO: 1

ITEM NO: 167-80-001

TITLE: SA 72424D MAFO Holtkamp Doors

PARA. NO: 3.1 , 2.2

PAGE NO: 1

ITEM NO: 581-11-001

TITLE: Anchor Hawse Pipe

PARA. NO: 3.1, 3.5

PAGE NO:

ITEM NO: 634-11-001

TITLE: Cosmetic Poly deck covering

PARA. NO: 3.1, 3.3,

PAGE NO:

ITEM NO: 167-80-002

TITLE: ShipAlt DDG-72424, MAFO-Holtkamp Door Installation

PARA. NO: 2.2

PAGE NO: 1

ITEM NO: 167-80-003

TITLE: ShipAlt DDG51-76258D, MAFO- Holtkamp Door Installation

PARA. NO: 2.2

PAGE NO: 1

ITEM NO: 262-80-001

TITLE: ShipAlt DDG51-76501D, Main Reduction Gear Lube Oil Flexible Hoses

PARA. NO: 2.2

PAGE NO: 1

CONTRACTOR QUESTION 18:

Drawing listed in Reference 2.2 indentifies material as GFM. However, there is no material listed in the 4720 for this Alt. Please confrim the material identified in 2.2 is GFM.

GOVERNMENT RESPONSE:

The individual GFM materials are listed in the SIDs. The completed 4720 Reference is issued closer to the avail.

CONTRACTOR QUESTION 10:

An Item index or the index of Standard Items invoked to include the index of CAT I was not provided with the package. Please provide these indexes.

GOVERNMENT RESPONSE:

NAVSEA Standard Item (NSI) Index has been provided as an attachment.

GOVERNMENT RESPONSE:

LAR is in error. If required, Stuffing Tube will be Steel, Size B, MIL-S-24235/18-062, Dwg 8100-3504-0039, P/N EST-SS-RB011. A LAR to correct is forthcoming.

CONTRACTOR QUESTION 11:

The material for the stuffing tube identified in Ref 2.5 indicates its type B aluminum, 1.33 LF Long. BIW catalog number indicates this material is 5/8" steel round bar.

CONTRACTOR QUESTION 12:

Para 3.2.2 states to accomplish the requirements of Chapter 5 of 2.4. This is a troubleshooting chapter. Should chapter 8 be invoked vice Chapter 5?

GOVERNMENT RESPONSE:

Work item revised to Chapter 8 vice Chapter 5. See Errata Package #3.

CONTRACTOR QUESTION 13:

Ref. 2.2, item no. 40 calls for a metric tool kit. Will this tool kit be provided with the GFM Doors.

CONTRACTOR QUESTION 9:

Para. 5.3 states kitted material for ShipAlt DDG51-76501D is listed in reference 2.9 (4720-DDG79-FY16) Ship Alteration Material Summary 4720/3. Will the flexible hoses that are supposed to be GFM be coming already tested and tagged with label plates?

GOVERNMENT RESPONSE:

Materials will be provided as GFM. The contractor must fit, assemble, test and label the hoses.

CONTRACTOR QUESTION 7:

The solicitation states that "Information outlined in (a) through (b) is also to be provided for each sub-contractor ." Common in cost reimbursable procurements, to collect data from potential subcontractors in a 30-day firm fixed price procurement is impractical and unreasonable. There are no teaming agreements. The supplier list, highly price-dependent, is not 100% known until very late in the proposal process. The Government is requested to re-assess and delete its requirements relative to subcontractors for (a)(5), (a)(6), (b)(1), (b)(2), (b)(3), (b)(4), (b)(5) and (b)(6). If the Government will not eliminate these requirements, then it is recommended that the delivery schedule for the Pre-Award Information package be changed to some number of days after award (which is really the only time that subcontractors will be 100% known and motivated to provide such information).

GOVERNMENT RESPONSE:

The requirement requiring that "Information outlined in (a) through (b) is also to be provided for each sub-contractor" has been removed from the solicitation via Solicitation Amendment 0003.

CONTRACTOR QUESTION 8:

In order to install new deck covering, the deck drains need to have a pre-operational flow test, then blanked. There will be a post-operational test on the deck drains with same strainers and hardware. Please provide a drawing or other information that tells how many drains are in this area.

GOVERNMENT RESPONSE:

Applicable drawings can be found in NSEDR: 505-7027451, Rev H, is the IP drawing for Zone 2240; or 528-6567447, Rev M, is the KP diagram.

CONTRACTOR QUESTION 16:

Drawing listed in Reference 2.2 indentifies materiall as GFM. However, there is no material listed in the 4720 for this Alt. Please confrim the material identified in 2.2 is GFM.

GOVERNMENT RESPONSE:

The individual GFM materials are listed in the SIDs. The completed 4720 Reference is issued closer to the avail.

CONTRACTOR QUESTION 17:

Drawing listed in Reference 2.2 indentifies material as GFM. However, there is no material listed in the 4720 for this Alt. Please confrim the material identified in 2.2 is GFM.

GOVERNMENT RESPONSE:

No. Tooling is the responsibility of the MSR.

GOVERNMENT RESPONSE:

Although the hawsepipe runs into the ship, it is external to the weather.

CONTRACTOR QUESTION 15:

Para 3.1 & 3.3 both invoke a different type of floor covering. Please identify the desired coating to install.

GOVERNMENT RESPONSE:

Work Item reads correctly.

CONTRACTOR QUESTION 14:

Para 3.1 calls for surface prep for the working surface of the Anchor Hawse Pipe. But then in para 3.5 it states to paint the exterior surfaces that was prepared in 3.1. The working surfaces is assumed to be in interior of the hawse pipe, not the exterior. Please clarify

GOVERNMENT RESPONSE:

The individual GFM materials are listed in the SIDs. The completed 4720 Reference is issued closer to the avail.

ITEM NO: 441-90-002

TITLE: ShipAlt DDG51-81322K, Automated Digital Network System (ADNS) AN/USQ-144

(V) 2 W-SP 1/2

PARA. NO: 2.2

PAGE NO: 1

ITEM NO: 522-80-001

TITLE: ShipAlt DDG51-82474D, Relocation of CIWS, Torpedo and DLS Magazine Gauges

PARA. NO: 2.3

PAGE NO: 1

ITEM NO: 524-80-001

TITLE: ShipAlt DDG51-00271D Hellan Strainers

PARA. NO: 2.2 - 2.8

PAGE NO: 1-2

ITEM NO: 711-90-001

TITLE: ShipAlt DDG51-75601K, MK 38 MOD 2 Chain Gun Installation

PARA. NO: 2.2, 2.3

PAGE NO: 1-2

ITEM NO: 150-11-003

TITLE: Antenna Platform Decks

PARA. NO: 1.2.2, 1.2.3, 3.4

PAGE NO: 1 & 2

ITEM NO: 167-80-002

TITLE: SA 72424 MAFO Holtkamp Door

PARA. NO: 2.6

PAGE NO:1

ITEM NO: 320-11-001

TITLE: MCT Device

PARA. NO: 2.2 , 2.3

PAGE NO:

GOVERNMENT RESPONSE:

The individual GFM materials are listed in the SIDs. The completed 4720 Reference is issued closer to the avail.

CONTRACTOR QUESTION 21:

Drawing listed in Reference 2.2-2.8 indentifies material as GFM. However, there is no material listed in the 4720 for this Alt. Please confrim the material identified in 2.2 - 2.8 is GFM.

GOVERNMENT RESPONSE:

The individual GFM materials are listed in the SIDs. The completed 4720 Reference is issued closer to the avail.

CONTRACTOR QUESTION 23:

Para 3.2 removes 2 of the 3 antennas listed. ( 1.2.2 & 1.2.3) Para 3.4 directs to accomplish inspections to all platforms listed in Ref. 1.2. Is the Inmarsat Antenna ( Ref. 1.2.1) not to be disconnected and removed or is it to be accomplished by others. If not removed, is the contractor to only inspect visible areas of the Platform? Is the material to be replaced in para

3.5 accessible with the antenna in place.

GOVERNMENT RESPONSE:

Yes; 1.3.1 is not disconnected. Yes, inspect coaming/waterway bar and replace 2 (min) to 4 (max) linear feet of corroded/deteriorated material. INMARSAT will not be removed, does not need to be removed, as it's on a pedestal on that platform. All areas of the platform and waterway bar will be accessible without removal of that antenna.

CONTRACTOR QUESTION 19:

Drawing listed in Reference 2.2 indentifies material as GFM. However, there is no material listed in the 4720 for this Alt. Please confrim the material identified in 2.2 is GFM.

GOVERNMENT RESPONSE:

The individual GFM materials are listed in the SIDs. The completed 4720 Reference is issued closer to the avail.

CONTRACTOR QUESTION 20:

Drawing listed in Reference 2.3 indentifies material as GFM. However, there is no material listed in the 4720 for this Alt. Please confrim the material identified in 2.3 is GFM.

GOVERNMENT RESPONSE:

The individual GFM materials are listed in the SIDs. The completed 4720 Reference is issued closer to the avail.

CONTRACTOR QUESTION 25:

Ref. 2.2 & 2.3 are missing from the package provided. Please provide these references.

GOVERNMENT RESPONSE:

Dwgs 320-7028460 and 321-7027311 can be found in NSEDR.

CONTRACTOR QUESTION 24:

Ref. 2.6 RLAR 72424/DDG53/1105931 was not provided on the CD received. Please provide

GOVERNMENT RESPONSE:

RLAR 72424/DDG53/1105931 has been provided as an attachment to Errata Package #3.

CONTRACTOR QUESTION 22:

Drawing listed in Reference 2.2-2.3 and 2.5-2.6 indentifies material as GFM. However, there is no material listed in the 4720 for this Alt. Please confrim the material identified in 2.2 , 2.3 is GFM.

ITEM NO: 625-11-001

TITLE: Pilot House Windows; repl

PARA. NO: 3.2.2

PAGE NO:2

ITEM NO: 631-21-001 & 991-11-001

TITLE: Mn Mast Pres & Mn Mast Staging

PARA. NO:

PAGE NO:

ITEM NO: Specifications TITLE: WAF Item

PARA. NO:

PAGE NO:

ITEM NO: Solicitation

TITLE: Pre Award

PARA. NO:

PAGE NO: 136 - 137

ITEM NO: Solicitation - Preaward Data Section F

TITLE:

PARA. NO:

PAGE NO:

ITEM NO: 634-21-001 * 588-21-002

TITLE: Flight Dk Nonskid

PARA. NO:

PAGE NO:

ITEM NO: 495-90-001

TITLE: SA 77279K CANES

PARA. NO: 2.3

PAGE NO:

ITEM NO: 495-90-001

TITLE: SA 77279K CANES

PARA. NO: 5.3

PAGE NO:

ITEM NO: 992-11-012

TITLE: Barge Services

PARA. NO: 3.2

PAGE NO: 1

ITEM NO: GENERAL

TITLE:

PARA. NO:

PAGE NO:

ITEM NO: Attachment J-3 Revised

TITLE:

PARA. NO:

PAGE NO:

ITEM NO: 992-11-011

TITLE: Ships Force Security Support

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 36:

Contractor received the revised J-3 Milestone chart. Production Complete Date (PCD) has been set for 1/12/15. As this is some seventy three (73) days prior to availability completion it seems somewhat skewed to the short side for completion of production work. Recommend that PCD be set at a more normal 5-6 weeks prior to completion or 2/9/16.

GOVERNMENT RESPONSE:

Execution milestones will not be changed.

CONTRACTOR QUESTION 37:

Errata No. 1 deleted all the para in this item. Is the contractor to assume this item is cancelled?

GOVERNMENT RESPONSE:

Yes, this work item is cancelled.

CONTRACTOR QUESTION 33:

Para 5.3 shows kitted material is provided by the Government, however there is no material listed on the 4720 provided for this alt. Please proivde a list of government provided material.

GOVERNMENT RESPONSE:

Paragraph 5.3.1 has been deleted from the work item. See Errata Package #3.

CONTRACTOR QUESTION 31:

634-21-001 directs contractor to accomplish 009-32 table 2 line 5 for the Flight Deck non-skid. Item 588-21-002 already covers this requirement.

Recommend deleting para 634-21-001

GOVERNMENT RESPONSE:

588-21-002 is not a WSI for OSA 6C1, no conflict.

CONTRACTOR QUESTION 32:

Para 3.3 states to perform op test IAW T5 of 2.3. There is no T5 on 2.3.

Please Clarify

GOVERNMENT RESPONSE:

Work Item has been revised via Errata Package #3 to reflect T1 vice T5.

CONTRACTOR QUESTION 35:

Government response to question 11 [Set 1] states "NAVSEA Standard items (NSI) FY-15 Edition applies to this solicitation. Please confirm that Change 1 Revisions are not included and do not apply to this solicitation.

Additionally, the contractor DOES NOT have acces to NMD as it pertains to OSCAR AUSTIN Solicitation package. While we have NMD access we CANNOT access this job in NMD. Please furnish information requested.

GOVERNMENT RESPONSE:

Section C of the solicitation has been revised to reflect FY-16 NAVSEA Standard Items (NSI) vice FY-15. NAVSEA Standard Item (NSI) Index has been provided as an attachment.

CONTRACTOR QUESTION 29:

Solicitation directs Prime contractors to submit Pre Award information.

Information outlined in (a) and (b) is to be provided for each subcontractor also. Pre-Award information is not part of the evaluation, and subcontractor selection may not be complete to the degree required to support this requirement in a timely manner. Additionally, as written, this requirement could hamper small business participation and reduce competition. Please confirm that this information is not required for subcontractors.

GOVERNMENT RESPONSE:

The requirement requiring that "Information outlined in (a) through (b) is also to be provided for each sub-contractor" has been removed from the solicitation via Solicitation Amendment 0003.

CONTRACTOR QUESTION 28:

There is no WAF item provided in this package. Please provide this item.

GOVERNMENT RESPONSE:

Covered in STD item 009-106.

CONTRACTOR QUESTION 34:

Para 3.2 tell contractor to provide a barge to allow the ships anchor be laid out for inspection. For estimating purposes, how long will the barge be required.

GOVERNMENT RESPONSE:

Government Response is forthcoming

CONTRACTOR QUESTION 26:

Para 3.2.2 states to accomlish 009-32 table 2 line 8. This requires blasting or water jetting. Contractor recomments this requirement be changed to a power tooling SP-11.

GOVERNMENT RESPONSE:

Do not deviate from work item. Contractor shall comply with work item as is.

CONTRACTOR QUESTION 27:

631-21-001 directs contractor to accomplish preservation of the Mn Mast.

Then 991-11-001 directs contractor to stage mast for the Ships force to accomplish preservation. Contractor recommends deleting one of the items.

GOVERNMENT RESPONSE:

631-21-001 directs the preservation of the INTERIOR of the mast, as stated in the title. 991-11-001 is not a WSI for OSA 6C1, additionally the mast will not be staged for S/F. No conflict.

CONTRACTOR QUESTION 30:

Preaward Data Section F has a requirement to acknowledge the requirements of Contract Data Requirements (DD Form 1423). We have not received the CDRLs in this package. Please provide.

GOVERNMENT RESPONSE:

CDRLs [Exhibit A, B, and C] have been provided as solicitation attachments via FedBizOpps (www.fbo.gov).

ITEM NO: 980-22-001

TITLE: IPDSLR Filter Replacement

PARA. NO: 3.1

PAGE NO:

ITEM NO: 980-22-001

TITLE: IPDSLR Filter Replacement

PARA. NO: 3.2 - 3.4

PAGE NO:

ITEM NO: 113-11-001

TITLE: Bilge Drain Well Preserve

PARA. NO: 3.11

PAGE NO:

ITEM NO: 150-11-009

TITLE: fan room structure repair and preserve

PARA. NO: 3.1, 3.10, & 3.20

PAGE NO:

ITEM NO: 251-31-001

TITLE: Intake & exhaust Louver clean and preserve

PARA. NO: 3.2

PAGE NO:

ITEM NO: 251-31-001

TITLE: Intake & exhaust Louver clean and preserve

PARA. NO: 3.12

PAGE NO:

ITEM NO: 243-80-001

TITLE: BHD seals

PARA. NO: 3.2.4

PAGE NO:

ITEM NO: 583-11-001

TITLE: Boat Handling System; Repair

PARA. NO: 3.2

PAGE NO: 1

ITEM NO: 495-90-001

TITLE: SA 77279K CANES

PARA. NO: 2.2 & 2.3

PAGE NO:

ITEM NO: 643-11-002

TITLE: Crew Sanitary Space Habitability Projects (HENL-S5314) Installation;

accomplish

PARA. NO: 3.10

PAGE NO: 2 of 3

ITEM NO: General

TITLE:

PARA. NO:

PAGE NO:

CONTRACTOR QUESTION 39:

Each of these paragraphs require the contractor to execute work based on a procedure or directions that are not referenced or provided. Please provide the appropriate procedures and or tech manual to enable the KTR to evaluate and estimate the Scope as written the job can't be accurately estimated.

GOVERNMENT RESPONSE:

OEM will be accomplishing all repairs and testing, therefore OEM will provide all necessary tech manuals and test procedures.

CONTRACTOR QUESTION 40:

Para 3.11 direct the contractor to fabricate and install new drain well box strainers "as designated by the supervisor" Please provide the QTY of new strainers the government will want manufactured.

GOVERNMENT RESPONSE:

Government Response is forthcoming

CONTRACTOR QUESTION 44:

Para 3.2.4 says to use the vendor provided test rig. The Oem has reported they do not provide a test rig for this work the DDG 51 Planning yard has the test fixture and the material should be GFM. Please revise para

3.2.4 and provide the required test fixture as GFM.

GOVERNMENT RESPONSE:

The test rig will be provided as GFM. See Errata Package #3. and RLAR attachment provided.

CONTRACTOR QUESTION 38:

PARA 3.1 invokes 009-90 which applicable for requesting OEM authorized representativess not for procuring services from a government agency such as the ISEA. The KTR cannot be responsible for providing another NAVY entity. Para 3.1.1 states to provide the ISEA 009-90 requires that the representative provided be authorized by the OEM. Does the government wish for us to provide an OEM rep?

GOVERNMENT RESPONSE:

Yes, the Contractor shall provide an OEM rep.

CONTRACTOR QUESTION 48:

Should offerors assume that NAVSEA Standard Items (NSI) FY-15 edition applies to this solicitation? Also, please provide the standard Work Item Index and NSI index out of NMD for so that offerors will understand which NSIs are invoked.

GOVERNMENT RESPONSE:

CORRECTION: FY-15 FY-16 NAVSEA Standard Items (NSI) apply to this solicitation. NAVSEA Standard Item (NSI) Index has been provided as an attachment.

CONTRACTOR QUESTION 45:

3.2 requires to submit a “DFS to change surface preparation for MIL-PRF- 23236 coating”. What surface preparation will be required in the DFS?

GOVERNMENT RESPONSE:

Para 3.2 does not address this question. Para 3.2 reads the following: 3.2 Accomplish a pre-repair test and inspection of the boat handling equipment listed in 1.3, located in 1.2, using Paragraph 8.7 of 2.2 for guidance. Inspect for wear, damage, defects, leaks, and system operational condition.

CONTRACTOR QUESTION 41:

The subject para. do not provide a total square footage to be "prepped" as directed by the supervisor for each location. Please provide the total square footage to be "prepped" IAW 009-32 for each para.

GOVERNMENT RESPONSE:

Work item clearly specifies the square footages to be bid. This work item was shipped checked by planning yeard and PE. Contractor shall comply with work item as written.

CONTRACTOR QUESTION 42:

STD Items require the LMA to provide back up emergency power in the event shore power is lost. With that backup power available it should negate the requirement that a SSGTG be kept available and delete the requirement of para 3.3

GOVERNMENT RESPONSE:

No, paragraph 3.3 will not be deleted. Contractor shall comply with work item as written.

CONTRACTOR QUESTION 43:

This para requires a near white metal blast. Based on the area and location this work is typically done using power tools to a SP 11 standard vice SP 10 blasting in the intakes and relatively small areas around the hull cuts is not practical. Request to revise spec to an SP 11 requirement.

GOVERNMENT RESPONSE:

Contractor shall comply with work item as written for the use of SP- 10.

CONTRACTOR QUESTION 46:

Is the Government going to provide the foundations on reference 2.2 and the ventilation assemblies on reference 2.3?

GOVERNMENT RESPONSE:

No, Foundations and Vent assemblies shall be provided by contractor. The contractor is responsible for the requirements of reference 2.2 and 2.3 as stated in para. 3.1. Paragraph 2.2 covers foundation fabrication requirements. Paragraph 2.3 covers ventilation fabrication requirements.

GOVERNMENT RESPONSE:

Paragraph's 3.10 and 3.10.1 have been revised via Errata Package #3.

CONTRACTOR QUESTION 47:

The spec calls out for cosmetic polymeric deck covering (009-26 Attachment C) color to be medium blue with white flakes. Ceramic tile is typically used in wet spaces. Should the specification be changed to ceramic tile vice cosmetic polymeric deck covering?

File details come from the government source that posted it. Updated .