N4523A-18-R-0550_Amendment_0005.pdf

PDF 110 KB Posted

Attached to
USS SAMPSON 8C1 DSRA Federal contract opportunity
Solicitation number
N4523A-18-R-0550
Issued by
Department of the Navy Naval Sea Systems Command

About this file

N4523A-18-R-0550 Amendment 0005

View the file

Other files for this federal contract opportunity

Other files attached to USS SAMPSON 8C1 DSRA, newest first.
File Type Posted
N4523A-18-R-0550_Amendment_0018.pdf PDF
DDG-102_SA_288K_HAZMINCEN_POAM.PDF PDF
BQ_028_PPT_HED_Informational_Brief_for_DDG_102.pptx PPTX presentation
551-8749120_Rev_A,_HYBRID_ELEC_DRIVE_PIPING_-AIR_SYS_MODS_&_ML.pdf PDF
N4523A-18-R-0550_Amendment_0009.pdf PDF
J-1_Work_Package_ERRATA_6.pdf PDF
BQ_026_Missing_Refs-Answered_Redacted.pdf PDF
BQ_025_Missing_Refs-Answered_Redacted.pdf PDF
644-8718346-ARR03_REV-A_SANITARY_ARR_MODS.pdf PDF
BQ_020_077-10-001_-_Answered_1-16-18_Redacted.pdf PDF
J-14_Pricing_Workbook_111517_rev001_(ECN).xlsx XLSX spreadsheet
BQ_010_077-10-001_vs_solicitation_-_Answered_1-11-18_Redacted.pdf PDF
BQ_013_53711-5808784M.PDF PDF
BQ_006_437-012-001_Possible_Source_-_Answered_1-5-18_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_009_-_Answered_09JAN18_Redacted.pdf PDF
BQ_004_Bearing_Staves_-_Answered_1-5-18_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_003_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_001_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_014_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_005_Redacted.pdf PDF
BQ_001_Extension_Request.pdf PDF
J-11_8010_Manual_19April2016_REV_00_ACN_1A.PDF PDF
J-16_CDRL_A006_Request_for_Technical_Deviation.pdf PDF
J-16_CDRL_A031_Demand_Only_Transactions.pdf PDF
J-17_Integrated_Schedule_&_Testing_-_Rev_1.docx DOCX document
MIL_STD_777F.pdf PDF
J-16_CDRL_B002_Logistics_Mgmt_-_EDFP.pdf PDF
MIL-STD-2191.pdf PDF
J-16_CDRL_A018_Critically_Coated_Surfaces_Rprt.pdf PDF
N4523A-18-R-0550_Solicitation.pdf PDF
J-16_CDRL_A013_Process_Control_Procedure.pdf PDF
J-16_CDRL_A019_Incident_Report.pdf PDF
J-16_CDRL_A010_Tank_Report.pdf PDF
J-12_Pre-Proposal_Information_(PPI)_Form.doc DOC document
J-16_CDRL_A035_Progress,_Status_and_Mgmt_Rprt.pdf PDF
J-16_CDRL_A030_Weight_and_Stability_Rprt.pdf PDF
J-16_CDRL_A026_Comp_Closeout_Insp_Rprt.pdf PDF
J-3_Key_Events_and_Milestone_Listing.pdf PDF
MIL-STD-3026.pdf PDF
J-20_Open_and_Inspect_Reports.xlsx XLSX spreadsheet
29_CFR_1915_Occupational_Safety_and_Health_Admin.,_Labor.pdf PDF
J-16_CDRL_A037_Contractor's_Training_Plan.pdf PDF
J-16_CDRL_A005_Purchase_Order.pdf PDF
J-16_CDRL_A025_Compt_Closeout_Sched_Rprt.pdf PDF
Resource_Conservation_and_Recovery_Act,_(RCRA).pdf PDF
NFPA_30,_Flammable_and_Combustible_Liquids_Code.pdf PDF
J-15_PPQ.doc DOC document
J-16_CDRL_A007_Quality_System_Plan.pdf PDF
NFPA_701_Rev_15,_Fire_Tests_for_Flame_Propagation_of_Textiles_and_Films.pdf PDF
J-16_CDRL_A002_Condition_Found_Report.pdf PDF
Show all 50

USS SAMPSON 8C1 DSRA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation No. N4523A-18-R-0550 Amendment No. 0005 This amendment provides for repsonse to PPI questions and edits generated in response to PPIs. Revised J-14 and Errata 5 are provided.

Closing is extended.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 17

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Jan-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4523A18R0550

X 9B. DATED (SEE ITEM 11)

06-Dec-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jan-2018

CODE

PUGET SOUND NAVAL SHIPYARD CODE 400

2000 WEST MARINE VIEW DR CODE 440

EVERETT WA 98207-2400

N4523A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4523A18R0550

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 30-Jan-2018 10:00 AM to 06-Feb-2018 10:00 AM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

NOTES

NOTES A, B AND C

NOTE A: FIXED SHIP REPAIR LABOR AND MATERIAL BURDEN RATES FOR GROWTH AND NEW

WORK

SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)

1. The Contractor’s fully burdened man-hour rate as proposed in Attachment J-14 and as defined in paragraph 3 below will be used for negotiating all growth and new work to be performed under this contract. The contractor agrees that the number of man hours included in its price proposal for contract modifications shall include only direct production man hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production including the following functions:

Abrasive cleaning/blasting Fire Watch Welding Burning Brazing Carpentry Machinists (inside and outside) Electrical Work Electronic Work Engineering Design Support Lagging Ship-fitting Boiler-making Painting Sheet-metal Work Pipefitting Pipe Welding Rigging General Labor Staging/Scaffolding Diesel Mechanics

2. The fully burdened man-hour rate proposed by the contractor in Attachment J-14 shall include those support functions (whether charged directly or indirectly by the offeror’s accounting systems) which are herein defined as support for production functions. Support functions shall be considered to be included in the offeror’s fully burdened ship repair labor rate for direct production man hours. Labor hours for the below support functions shall not be separately proposed. Support functions include those listed below and other non-production labor:

Testing Provisioning and Logistics Quality Assurance Quality Control Execution Planning Scheduling Cleaning (except tank cleaning) Supervision Security Surveying Administration Transportation Purchasing Staff Lofting Other indirect support Material handling & Warehousing Safety/Environmental

3. The fully burdened ship repair labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM) and profit. The fully burdened ship repair labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.

4. Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that are consumed/used in the process of repair and do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor’s fully burdened man-hour rate and not separately priced.

5. Physical materials are goods that become an integral part of the repaired vessel in the course of the repair, such as equipment, replacement steel, pipes, paint, and fasteners. The material burden rates apply to physical materials but not to consumable materials. The material burden rate will be applied to the actual cost of the physical material.

Actual cost does not include handling charges, general and administrative cost, overhead, profit, or any other indirect cost.

6. For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate shown in paragraph (7) below. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a Request for Contract Change (RCC) issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor. The proposed total pricing restriction addressed in the preceding sentence does not apply in any case where the work is required to be performed by Original Equipment Manufacturers (OEMs) and Government directed subcontractors.

7. The Contactor’s fully burdened man-hour rate and material burden rate shall be shown on Attachment J-14, Pricing Workbook. Those fixed rates shall be used for negotiating growth and new work during the entire availability regardless of how many labor hours and material dollars are procured and negotiated.

8. If the Contracting Officer determines an overall schedule delay has occurred as a result of Government caused delay, the Government shall pay the Contractor a standard rate per day for maintaining overall project management for the availability as outlined in applicable NAVSEA Standard Items (NSI) and contract requirements. This rate shall be used by the Contractor to retain the resources needed to meet critical program support functions. Those functions include but are not limited to the following program support functions: project management, scheduling, testing, logistics, quality assurance, purchasing, material procurement, and safety. Contactor’s fully burdened daily rate shall be shown on Attachment J-14, Pricing Workbook. Those rates shall be used for negotiating during the entire availability regardless of how many days are procured and negotiated.

NOTE B – GROWTH RESERVATION

The growth reservation manhours and material dollar requirements listed in the individual Work Items are a part of this contract under the original solicitation and award. The manhour reservation shall include both prime contractor and subcontractor efforts. The balance of hours and material remaining in the reservation items after negotiations have concluded, and when it is evident that no additional work will be tasked, is subject to a decrease change order.

Only actual production manhours negotiated will be considered towards the contractor’s obligation to provide the defined reservation manhour effort. While supervision, quality assurance, and other nonproductive labor should be included in the pricing for reservation items in the original bid, they shall not count towards satisfying the contractor’s obligation to provide reserved manhours. The production manhour reservation shall not include any allowance for technical representatives or for any other Government directed source unless specifically addressed in the individual Work Item. Material dollars shall be based on estimated costs to the Contractor of acquiring the materials provided. Material dollars may include freight or duties which would be reflected on the invoice for the material. The Contractor shall not be allowed to add material handling charges, overhead (including G&A), or profit into the actual cost of materials expended toward the reservation. The information received in the consolidated final report required by Work Item 042-11-001 paragraph 3.6 will be used by the Contracting Officer in the issuance of a contract modification, which will be a final settlement for reservation Work Items. The reservations listed in the individual Work Items are not to be considered Time and Material or a Level of Effort. Once the scope of work for a task has been identified and a mutually agreeable number of manhours or materials has been agreed to, neither party will be entitled to an adjustment based on actual manhours or material dollars required. Each task shall receive approval by the Navy Project Manager and the Administrative Contracting Officer (ACO).

NOTE C – FRONT LOAD WORK ITEMS

The work package (Attachment J-1) contains individual Work Items that may contain “Front Loaded” repair work.

Front Loaded repair work is defined as an individual Work Item that contains a maximized scope of work that may not be required to the extent/quantity noted in the individual Work Item and will be identified in paragraph 3 of the individual Work Item. Such unaccomplished work would therefore be subject to descope and recoupment. The contractor shall be required by SUPERVISOR to report the amount of work accomplished by Work Item via Condition Found Report (CFR) which will be used to determine the net amount of work to descope and recoup.

The Contractor shall identify and submit to the Government a list of all work requiring front load actions by the Government within the first 50% of the ship’s time on dock. The Contractor shall include the date and CFR number associated with each action.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

INSTRUCTIONS TO BIDDERS

1.0 INTRODUCTION

This solicitation is a Request for Proposals (RFP) that will result in the award of a single Firm Fixed-Price contract for the FY18 Docking Selected Restricted Availability (DSRA) for USS SAMPSON (DDG-102). The Government anticipates awarding a single Firm-Fixed-Price contract to the offeror whose proposal represents the Best Value to the Government using the trade-off process in accordance with FAR 15.101-1.

ALL INQUIRIES shall be made in writing and directed to Eric Niemann and Jason Herrera, at eric.c.niemann2@navy.mil and jason.herrera@navy.mil. To ensure the Government is able to adequately address and respond to offeror requests for Pre-Proposal Information (PPI) via amendment, it is requested questions be submitted no later than 23 January 2018 at 3:00pm Pacific Standard Time (PST). The Navy reserves the right to not answer any requests received after 23 January 2018 at 3:00 pm PST. Furthermore, offerors should note that the proposal due date will not be extended solely on the basis of requests received after 23 January 2018. PPI’s should reference the solicitation and/or specification page and paragraph number and be submitted on the PPI form (Attachment J-12) provided with this solicitation. PPI form (Attachment J-12) is to be submitted for each inquiry and question.

Estimated Award Date: The Government anticipates making a single award on or around 17 April 2018. Offerors must provide a period of 150 calendar days from the proposal due date for Government acceptance of the offer (Complete block 12 of the Standard Form (SF) 33).

2.0 INSTRUCTIONS FOR THE SUBMISSION OF OFFERS

Proposal Due Date: NAVSEA will not accept electronic submission of proposals. All copies of the proposals (Volumes I & II) shall be received by the PCO no later than 10:00 am PST, on 06 February 2018 at the address below. Late proposals will not be considered. Partial proposals or attachments submitted late will not be considered.

Proposals shall be sent via United States Post Office (USPS) certified mail or other methods (FEDEX, UPS, or etc.)

with signature required upon delivery or hand delivered. If hand delivery method is selected, offerors shall notify in writing Eric Niemann and Jason Herrera, at eric.c.niemann2@navy.mil and jason.herrera@navy.mil no later than 3:00 pm PST, on 05 February 2018 in order to arrange for hand delivery at Naval Station Everett.

Proposals shall be sent to:

PUGET SOUND NAVAL SHIPYARD & INTERMEDIATE MAINTENANCE FACILITY, DETACHMENT

EVERETT

ATTN: ERIC NIEMANN / JASON HERRERA

NAVAL STATION EVERETT

BUILDING 2200

2000 WEST MARINE VIEW DRIVE

EVERETT, WASHINGTON 98207

Hand Delivered Proposals:

ATTN: ERIC NIEMANN / JASON HERRERA

NAVAL STATION EVERETT

BUILDING 2200 RM167

2000 WEST MARINE VIEW DRIVE

EVERETT, WASHINGTON 98207

Offerors shall mark all submittals “DO NOT OPEN PACKAGE IN MAIL ROOM—FORWARD UNOPENED DIRECTLY TO CODE 440.13”. The outside of the package shall clearly indicate the offerors name, the solicitation number, and the contents of the package.

Offerors shall submit:

Volume Title Number of Paper Originals

Number of Paper Copies

Number of CDs

I Price Proposal 1 1 1 II Non-Price Proposal 1 3 1

Note 1: The CDs must be scanned to ensure that the files contained on them do not contain any computer viruses.

The CDs shall be labeled to indicate the Offerors name, the solicitation number and the associated volume numbers.

Note 2: The files on the CD shall be in a format that is compatible with and capable of being opened in Microsoft Office Suite 2010 or Adobe Acrobat. The material presented in electronic format shall be identical to the paper copy of the proposal. In cases where the hard copy and the electronic copy of the proposal conflict, the hard copy shall take precedence. All spreadsheets shall be in Microsoft Excel format such that each mathematical equation is obvious. No fields shall be password protected. If files are compressed, the necessary decompression program must be included.

Note 3: Originals may be shipped in the same boxes as the copies to eliminate excess shipping costs. However, originals should be separately wrapped inside the container, and clearly labeled “ORIGINAL TECHNICAL PROPOSAL” or “ORIGINAL PRICE PROPOSAL.” The exterior of each box must clearly indicate its contents.

3.0 GENERAL INFORMATION

Ship Checks: The USS SAMPSON (DDG 102) will not be available for a ship check prior to the proposal submission due date. Offerors, including significant subcontractors, may inspect a sister ship located in the Everett region during the week of 11-12 December 2017. To schedule a ship check, offerors shall email a request for ship check to Eric Niemann, eric.c.niemann2@navy.mil and Jason Herrera, jason.herrera@navy.mil no later than 2:00 pm PST 11-12 December 2017. Participants will be provided additional information to the ship check and will be subject to security, safety, and other applicable regulations established by Naval Station Everett and the Commanding Officer of the available in port sister ship. Subject to the available sister ship Commanding Officer’s final approval, photography is anticipated to be authorized during the ship checks scheduled for 19-20 December 2017; between 8:30 am to 3:00 pm PST. Schedule of ship checks are the following:

1. 19 December 2017 at 8:30 am to 11:30 am PST

2. 19 December 2017 at 1:00 pm to 3:00 pm PST

3. 20 December 2017 at 8:30 am to 11:30 am PST

4. 20 December 2017 at 1:00 pm to 3:00 pm PST

Reference documentation: The Government will provide an electronic copy of all Work Item References on Federal Business Opportunities (FBO) website as part of this solicitation.

Alteration of Solicitation: Offerors shall respond to the solicitation as posted. Offerors who alter the solicitation (except for completing appropriate “fill-in” blocks and certifications) may be considered non-responsive and thus ineligible for award.

Proposal Information: Offerors shall not presume the Government has knowledge outside of information provided in the proposal. Additionally, offerors are advised that statements such as: “the offeror understands”, “the offeror has a long history of outstanding support”, “standard procedures shall be used”, “well known techniques shall be employed”, or any paraphrasing of the solicitation, shall be considered inadequate to demonstrate experience, knowledge of, or compliance with solicitation requirements. Offerors are encouraged to provide specific and concise information to validate all assertions.

Amendments: The Government may revise the solicitation at any time by means of an Amendment. It is an offerors responsibility to ensure it is accessing the FBO website to view potential amendments and procurement notifications for this solicitation.

Teaming Arrangements: Proposals must be submitted by one (1) prime contractor. An Offeror may be listed as a subcontractor in multiple proposals but may only submit one (1) proposal as a prime contractor with a unique Commercial and Government Entity code and Taxpayer Identification Number. To be evaluated as a Joint Venture (JV), offerors must provide a notarized agreement (with the price proposal) delineating roles and responsibilities for all proposed work and have JV pre-approved by the government.

4.0 PROPOSAL FORMAT

To facilitate efficiency and consistency in proposal evaluation the following is mandatory. Proposals which do not follow this direction may be rejected as non-responsive and thus ineligible for award.

Hard Copy Proposals: All pages shall be double-sided on 8.5 x 11 inch paper with a one-inch margin. The text used shall be Times New Roman with a minimum font size of 12-point. Each side of the page will count as one “page”.

Any type contained on graphics pages will not be smaller than 10-point font. Any pages that may be revised as a result of discussions (if required) shall contain revision numbers and date of the proposal revision submission.

Offerors shall use the attachments provided with this solicitation for their proposal content as specified in Section

5.0 where required.

Page Limits:

The cover letter is limited to three (3) pages Non-price proposals submitted as Volume II shall be limited to seventy-five (75) pages.

There are no other page limitations

5.0 PROPOSAL CONTENT

VOLUME I

Price Proposal: The price proposal shall not contain non-price factor information. The price proposal shall be comprised of the following documentation:

a. Cover Letter (page limit of 3 pages)

b. Signed SF 33 with all amendments acknowledged,

c. Any Joint Venture / teaming agreements (if applicable),

d. Completed Section B carrying forward information from J-14, and

e. Pricing Workbook Spreadsheet containing Work Item Pricing and Labor & Material Burden Rates (J- 14)

Cover Letter: The cover letter, which shall not exceed three (3) pages, shall meet all the requirements of the “first page of the proposal” outlined in FAR 52.215-1(c)(2)(i-v). In addition to those requirements, the offeror shall include the following in the cover letter:

Identification of all enclosures included with the proposal, CAGE and Data Universal Numbering System (DUNS) numbers for the Prime contractor, Notice of any alterations to the solicitation, such as “fill-in” blocks and certifications, and Notice of any alterations to the solicitation (except for completing appropriate “fill-in” blocks and certifications).

Standard Form 33 (SF 33): As part of the price proposal package, the offeror shall submit the completed SF 33 with blocks 12 through 18 completed, as well as all sections with applicable “fill-ins” filled in and shall acknowledge all amendments. The representative who signs this form must be authorized to contractually bind the company providing the offer. Section B CLIN pricing must also be completed for ALL CLINs. The Offeror shall complete and provide all Representations, Certifications, and Other Statements included in Section K of the solicitation.

Submission of a signed offer to the Government constitutes agreement and acceptance of the terms and conditions of Firm Fixed Price in the solicitation.

Completed Section B and Attachment J-14 : Offerors must propose on all contract line items (CLINs), complete the clause entitled “SCHEDULE OF PRICES / RATES: SHIP REPAIR LABOR RATE (FULLY BURDENED)” in Section B, complete the Pricing Workbook Spreadsheet containing Work Item Pricing, Labor & Material Burden Rates (J-14) to be considered responsive. CLIN 0002 is non-priced. CLIN 0003 is a priced option item. Offerors shall include the price associated with CLIN 0002 as part of the total price entered for CLIN 0001. Offerors shall also include pricing for CLIN 0003.

The contractor must submit prices on both CLIN 0001 Section and J-14 Pricing Workbook Spreadsheet in the format provided. CLIN 0001 pricing will be the same as the “Total Work Item Price” amount contained at the bottom of the “DDG102 Work Item Index” worksheet. This is the dollar value that the Government will place on contract at time of award. For Attachment J-14, offerors are to insert pricing in all yellow shaded fields.

The RFP specified 35,000 labor man hours and $750,000 included for material in the Labor & Material Burden Rate worksheet contained in Attachment J-14 are for evaluation purposes only. The proposed labor and material burden rates included in Attachment J-14 and inserted in Section B, Note A paragraph (7) shall be the fixed rates and be used for negotiating growth and new work during the entire availability regardless of how many labor hours and material dollars are negotiated and procured.

The proposed change rates included in Attachment J-14 and inserted in Section B, Note A paragraph (8) shall be the fixed rates and be used for negotiating Government caused delay during the entire availability regardless of how many days are negotiated and procured.

Volume I will be evaluated in accordance with Section M as Factor 6.

VOLUME II

Non-Price Proposal: The non-price proposal shall be limited to seventy-five (75) pages.

Factor 1: Eligibility

This factor is to determine basic eligibility of the contractor to perform ship repair for the U.S. Navy.

a. Provide an approved Master Ship Repair Agreement (MSRA) or Agreement for Boat Repair (ABR) or provide proof of MSRA/ABR Equivalency to demonstrate capability

b. Provide proof of the ability to obtain insurance as outlined in Attachment J-21 for the work conducted at Vigor Marine, LLC, Seattle, WA (Commercial Shipyard). RESOLUTE AFDM 10 will be used for the docking of USS SAMPSON (DDG 102) Docking Selected Restricted Availability (DSRA) at Vigor Marine, LLC, Seattle, WA by the selected prime contractor under U. S. Navy lease N00024-05-L-4405 Factor 2: Management Capabilities

This factor is comprised of 3 equally weighted sub factors.

Sub-Factor 2a – Management Capabilities:

Provide a written plan that delineates and demonstrates the ability to provide a management team that has experience in completing highly complex ship repair requirements for the US Navy. The written plan should outline the following abilities based on the management team’s qualifications, credentials, and experience (years). Include in the project management plan any of tools and processes the Offeror will use to manage a complex availability.

Sub-Factor 2b – Sub-Contract Management The Offeror shall provide sufficient detail to permit a complete evaluation. This factor applies to every offeror (U.S.

and non-U.S.), regardless of size status or locations of working facilities or headquarters. Small Business Participation shall include the following:

(a) All offerors shall provide the names and CAGE codes of small business concerns (including the offeror if a small business concern) who would participate in accomplishing the proposed contract; the small business classification of each U.S. small business concern (i.e. SB, SDB, WOSB, HUBZone SB, VOSB, and SDVOSB); and a short description of the specific supplies or services to be provided by each small business concern. If a small business does not have a CAGE code, insert the word “NONE.” List all SB classifications that apply to each concern. Note that during the evaluation, the Government may require that the offeror submit a letter from the small business affirming the information provided in your proposal.

(b) All offerors, including offerors who are themselves U.S. small business concerns based on the North American Industry Classification System (NAICS) code and size standard applicable to this procurement, are to identify the extent to which U.S. small business concerns will be utilized as first-tier subcontractors in the performance of this proposed contract. U.S. small business concerns are defined (1) in FAR 19.001 and (2) by the criteria and size standards in FAR 19.102 for the applicable NAICS code.

(c) Propose a percentage for this contract. A small business offeror shall indicate the percentage of work performed by themselves, as well as by any Small Business subcontractors. Proposals submitted by Large Business Concerns shall indicate the percentage of work performed by Small Business Subcontractors. The Small Business Participation percentage shall be calculated as follows:

Participation % = Total Small Business Contract + Subcontract Dollars Total Contract Value

(d) The Government’s estimated minimum Small Business Participation percentage for this contract is: 5.0% The offeror is encouraged to propose a Small Business Participation objective percentage as high as practicable, as long as the percentage is supported by the related Small Business participation approach outlined in paragraph (e) below.

The Offeror’s proposed Small Business Participation percentage for this contract shall be incorporated into the contract upon award.

(e) Provide an approach for how the Offeror intends to meet the proposed Small Business participation percentage.

The Offeror shall provide rationale that demonstrates the tasks assigned to the selected Small Businesses are meaningful to the overall success of this contract. A Small Business Offeror shall include work performed as the prime contractor as well as any work performed by Small Business subcontractors. In addition, the Offeror shall describe their management approach for enhancing service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business subcontractors’ technical capability. The Offeror shall explain the reason for and advantages of selecting particular Small Business subcontractors.

Provide a written sub-contractor management plan that clearly delineates or demonstrates experience when performing as the prime contractor the ability to:

1. Select and integrate minimum of 3 sub-contractors into the project to include schedule and awareness of overall project;

2. Manage the progress of a minimum of 3 subcontractor to ensure timely completion of their work; and

3. Manage sub-contractor performance issues. If no relevant experience is available as the prime contractor, provide evaluation of experience as a sub-contractor which would demonstrate the stated objectives.

Sub-Factor 2c – Navy Maintenance Database (NMD) Provide a written description or plan to utilize the full capabilities of NMD. Briefly outline staffing plan to accomplish timely reporting within the time limits as defined in Section C with ability to gain access and utilize

NMD.

Factor 3: Schedule Integration The Offeror shall provide a proposal in the form of a written description or plan that documents their understanding of what is required to successfully complete the highly complex USS SAMPSON (DDG-102) FY 18 DSRA maintenance and modernization requirements. The proposal’s plan and written description shall provide the following information:

a. Overall Schedule Integration Plan:

The narrative plan to perform the overall creating and management of the integrated production schedule as the Lead Maintenance Activity (LMA). The plan should demonstrate and show the Offeror has the capability to schedule, integrate, control, and progress complex ship repair requirements for not only the work for the prime contractor, but also the work of the Government sponsored AIT’s, Fleet Maintenance Activity, and Ship’s Force Work.

b. High Level Integrated Production Schedule:

A Gantt chart showing a high level integrated production schedule for all work items (at the work item level vice activity level) based on the key events and milestones in Attachment J-3 and the Planning Event Readiness List in Attachment J-4. There is no page limit associated with this documentation and this documentation shall not count against the Offerors overall seventy-five (75) page count limit.

c. Detailed Integrated Production Schedule:

A detailed schedule at the activity level for the following specific Work Items: 113-11-001, 243-11-001, 245-11-002, and 259-10-001. The Offerors proposal will be evaluated using the proposed work breakdown structure and a resource loaded schedule to determine prime contractors ability to schedule and resource plan for completing several controlling work items within the requirements of the solicitation. Minimum requirement is submission of the detailed integrated schedule where each Work Item is scheduled at the activity level listing the planned start, planned completion dates, and durations for each activity. Each activity shall be displayed to reflect its relevancy to the applicable key events and milestones. Assign each activity in the Integrated Production Schedule a short title to describe the nature of the activity, system and equipment or machinery involved. Scheduled work to support the Key Events and Milestones in Attachment J-3 and the Planning Event Readiness List in Attachment J-4.

Factor 4: Hybrid Electric Drive (HED) Support Capabilities (Option Item) The Offeror shall provide a narrative that addresses risks and potential mitigations for the requirements of Work Item 980-90-007.

Factor 5: Past Performance The Government will evaluate the Offerors past performance as a prime contractor. In the review of an Offeror’s past performance, the Government reserves the right to contact former customers and Government agencies and other private and public sources of information.

Past performance information is documented as a Contractor Performance Assessment Report (CPAR) and available in the Past Performance Information Retrieval System (PPIRS). The Government will utilize all recent and relevant past performance reports in demonstrating their ability to perform the proposed effort. The contractor will not be required to submit these reports as they are available in the database already.

Offerors are authorized to identify up to five past or current projects (Federal, State, local government or private) of a similar nature to the requirement presented in this solicitation by using attachment J-15.

In accordance with FAR 15.305 offerors with no record of relevant past performance will not be regarded as favorable or unfavorable.

All offerors are requested to address historical compliance with the requirements of FAR Part 52.219-8 (Utilization of Small Business Concerns) in a separate narrative not to exceed one page.

SECTION M - EVALUATION FACTORS FOR AWARD

SECTION M

1.0 GENERAL

The Government intends to award a single Firm Fixed-Price contract to the offeror whose proposal represents the Best Value to the Government after evaluation in accordance with the evaluation factors below.

Offerors are advised that the Government intends to make award on the basis of initial proposals without conducting discussions with Offerors, but reserves the right to conduct discussions if determined by the Contracting Officer to be necessary (see FAR 52.215-1(f)(4)). Therefore, each initial offer should contain the Offerors best terms from a price, technical and past performance standpoint. Statements and representations made in the Offerors proposal may be subject to verification by other sources or through an onsite survey by Navy evaluators.

Offerors are advised that except for past performance information, the Government will not evaluate any proposal information not contained within the body of the proposal. Letters of transmittal and/or cover letters that forward the proposal to the Government are not considered part of the body of the proposal.

2.0 BASIS OF AWARD

The evaluation of proposals submitted in response to this solicitation will be conducted on a Best Value basis using Source Selection Trade-Off Procedures described in FAR 15.101-1.

As such, the Source Selection Authority (SSA) will weigh the merits of the Non-Price Factors against the evaluated Price in arriving at the final Source Selection Decision. As part of the Best Value determination, the relative strengths/weaknesses and risks of each Offerors proposal in the Non-Price Factor as well as the total evaluated Price shall be considered in selecting the offer which is most advantageous and represents the Best Value to the Government. This determination may result in an award that is not necessarily the offeror with the lowest evaluated Price.

A best value tradeoff process will be used for the award of this contract. During the best value tradeoff process the Government may find that it is in its best interest to award to other than the lowest priced proposal or other than the highest technically rated offeror. The Government will make a best value award, taking into consideration both technical and price factors. The best value award will be made in accordance with the established criteria herein.

Offerors who are other than Small Businesses are required to submit a Small Business Subcontracting Plan, as described in HQ L-2-0009 that addresses this requirement. This is in addition to the Small Business Participation Plan. Offers from Small Business concerns must demonstrate that no single subcontractor will perform more than the Small Business Prime. Unlike small business set-asides which require the small business prime to perform at least 50% of the proposed effort, this solicitation is not reserved for small business and therefore the 50% rule does not apply, however no subcontractor can perform a greater amount of the effort than the Prime.

In order to make a Best Value determination, the Government will evaluate the non-price factors and the offerors total evaluated price as described in FAR 15.404. The factors are:

Non- Price Factors – listed in descending order of importance Factor 1: Eligibility Factor Factor 2: Management Capabilities

Sub-factors are equally weighted Factor 3: Schedule Integration Factor 4: Hybrid Electric Drive (HED) Capabilities Factor 5: Past Performance

Price Factor Factor 6: Price Factor

All evaluation factors other than price, when combined are significantly more important than price. The following order of importance is:

Factor 1 is required to be satisfied to be considered Technically Acceptable. No other Factor will be rated if Factor 1 is not met.

Factor 2 is more important than Factor 3.

Factor 3 is more important that Factor 4.

Factor 4 is more important that Factor 5.

Factor 5 is least important.

EVALUATION FACTORS

Factors will be evaluated as stated below.

Factor 1: Eligibility

a. Only Offerors that provide an Acceptable MSRA or ABR per Section L or provide an Acceptable MSRA/ABR Equivalency requirement per Section L will be considered eligible.

b. Only Offerors that provide ability to obtain insurance in the amounts required in Attachment J-21 per Section L will be considered eligible. If Insurance is not obtained within 45 days of award, the contract will be voided.

This factor will be rated as acceptable/unacceptable and if the proposal is not rated as acceptable in this factor it will not be evaluated further.

Factor 2: Management Capability

The objective of this factor is to gauge the offerors management and organizational capabilities as a prime contractor for completing the complex ship repair work required in response to this solicitation. The offerors proposal will be evaluated to determine the Offerors management abilities as they pertain to planning and executing USS SAMPSON (DDG-102) FY18 DSRA. Each of the three sub-factors will be rated independently.

The Government’s evaluation will utilize Tables 2 and 3 to rate each subfactor, and those ratings combined will determine the overall Factor 2 rating.

Sub-Factor 2a – Management Capabilities:

The overall management team plan will be evaluated on their written plan demonstrating the ability to provide a management team that provides overall project management functions. Offerors that demonstrate use of NAVSEA Standard Item Tools and Processes will be rated higher.

Sub-Factor 2b – Sub-Contract Management The Government will evaluate the proposed Small Business Participation approach in conjunction with the proposed Small Business participation percentage. The proposed Small Business participation percentage must be supported by the proposed Small Business participation approach. Failure to support a proposed Small Business participation percentage will result in a lower rating than one where a Small Business percentage that is supported.

The Government will evaluate the Small Business Participation in the following areas:

(a) The extent of first-tier small business participation which the Offeror credibly proposes to subcontract with U.S. small business (SB) concerns throughout the performance of this contract. For the purpose of this evaluation, the extent of Offeror (or joint venture partner/teaming arrangement) participation in proposed contract performance, where the Offeror is a U.S. small business concern for the applicable NAICS code and size standard for this procurement will also be considered small business participation.

(b) The extent for which the proposal identified challenging goals for participation by U.S. small business concerns and the adequacy of the rationale that supports those goals. The extent of participation of such concerns will be evaluated in terms of the percentage of the Offeror’s total contract value.

(c) As assessment of the feasibility and adequacy of the approach proposed to the proposed Small Business participation percentage.

Offerors will be evaluated on their plan to perform Sub-Contractor Management as follows:

1. Offerors must outline how they plan to select and integrate a minimum of three Sub-Contractors into the project. Offerors that demonstrate a detailed vetting plan to select sub-contractors and split work scope based on cost efficiencies will be rated higher.

2. Offerors will be evaluated on their plan to manage and document the progress of each sub-contractor to ensure completion of all assigned work. Offerors that provide project management tools and processes to manage more than 3 Sub-Contractors will be rater as higher.

3. Offerors will be evaluated on their plan to formally address performance issues with their subcontractors.

A proposal that demonstrates a range of multiple Courses of Action for addressing Sub Contractor deficiencies will be rated higher.

Sub-Factor 2c – Navy Maintenance Database (NMD) Offerors will be evaluated on the quality of their plan and experience level of their NMD staff. Offerors with demonstrated proficiency in NMD will be rated higher. Also, a proposal that addresses NMD staffing requirements as a function of program requirements during various phases of the project will be rated higher.

Factor 3: Schedule Integration The objective of this factor is to evaluate the offerors response to the Section L requirement and to assess the offerors understanding and approach of what is required to successfully act as the Lead Maintenance Activity (LMA) and integrate, schedule, and complete the highly complex USS SAMPSON (DDG-102) FY 18 DSRA maintenance and modernization requirements. For this factor the Government’s evaluation will utilize Tables 2 &3 to develop a combined rating that will determine the Factor 3 rating.

a. The Offeror’s Overall Schedule Integration Plan will be evaluated on their ability to outline their schedule development process including the creation, integration of Government sponsored AIT’s, Fleet Maintenance Activity, and Ship’s Force Work, and updating through certification and completion. A plan that outlines specific processes and tools to be used to support schedule management (such as Work Breakdown Structures and Resource Loading) will be rated higher. Also, a plan that details a certification management process will be rated higher.

b. The Offeror’s High Level Integrated Production Schedule should demonstrate an understanding of the overall scope of work on the project. The GANTT chart should reflect the offerors plan to integrate and schedule all work based on key events and milestones. Minimum requirements include all work is scheduled to complete by the required key event and milestones and listed in Attachment J-3 and J-4 of the solicitation. A higher grade may be given to a more detailed and accurate Gantt chart with attention to start and stop dates of work items that support the Key Events. Furthermore, to the extent that AIT work is integrated (with ties) to contractor work will be rated higher.

c. The Offeror’s Detailed Integrated Production Schedule will be evaluated on their ability to develop an accurate integrated schedule at the Work Item Activity Level that will support Milestone and Key Event management for 4 specific work items. Offerors that show logical scheduling ties between the work items will be rated higher.

Detailed integrated schedules which delineate the critical path and the associated constraints (i.e. resources, space restrictions, etc.) will be rated higher.

Factor 4: Hybrid Electric Drive (HED) Capabilities The objective of this factor is to evaluate the offerors response to the Section L requirements for this factor in order to assess the offerors understanding of what is required to successfully support the highly complex Ship Alt DDG51- 82710K Hybrid Electric Drive (HED) requirements.

The Offeror’s response will be evaluated on their ability to identify major risks associated with the complex alteration. A plan that identifies specific execution risks and mitigations, such as welding of HY-80 Steel on the Main Reduction Gear Sub Base to prevent cracking, will be rated higher. Also, plans that identify any challenges to the critical path to the base work as a result of alteration support work will be rated higher.

Factor 5: Past Performance The Government will measure how well an offeror has performed on relevant contracts in the past as an indicator of the offerors probability of meeting the solicitation requirements and an indicator of the successful performance on the current requirement.

The Contractor is authorized but not required to submit a Past Performance Questionnaire (PPQ) for up to five projects that meet the criteria or would benefit from more information than PPIRS would provide. The PPQ form is provided as Attachment J-15 (PPQ). The submission of the PPQ will not guarantee a higher rating.

To develop the overall rating, the Government’s evaluation will utilize Table 4 Past Performance Relevancy Ratings and Table 5 Performance Confidence Assessments that take into account recent and relevant contract information to the requirements of this solicitation as contained in the Past Performance Information Retrieval System (PPIRS), the Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Report System (eSRS), as well as any other sources reasonably available to the Government to include PPQs if provided. For purposes of this Factor, the following definitions apply:

“Recent” is defined as a contract in-progress or completed within the last three (3) years as of the date of the initial solicitation. If the offeror has not completed up to five (5) contracts within the last three (3) years as of the date of the initial solicitation, information on recent and relevant subcontracts and/or commercial contracts may be submitted.

“Relevant” is defined as a contract that is of similar scope, magnitude, and complexity to the requirements as set forth in this solicitation.

- Scope: Experience in the areas defined in the Solicitation Section C Statement of Work.

- Magnitude: The measure of the similarity of the volume, dollar value and/or duration of the work actually performed under the offerors submitted contracts to the requirements of this solicitation.

- Complexity: The measure of the similarity of technical difficulty, managerial intricacy and/or required coordination of efforts and disciplines performed by the offeror in its submitted contracts to the requirements of this solicitation. For complexity, not only will the tasks performed by the offeror be considered, but also the offerors ability to coordinate tasks (e.g., concurrent performance requirements).

For all offerors, the Government will consider historical compliance with the requirements of FAR Part 52.219-8 (Utilization of Small Business Concerns).

Assessment of past performance will be a subjective assessment based on consideration of all relevant facts and circumstances. The Government is seeking to determine whether the offeror has consistently demonstrated a commitment to customer satisfaction and timely delivery of quality goods and services at fair and reasonable prices.

In accordance with FAR 15.305(a) (2) (iv), an offeror without a record of relevant past performance or for whom information on past performance is not available, will not be evaluated favorably or unfavorably on past performance. If an offeror lacks relevant past performance information, the evaluators will assign a Neutral rating.

In terms of Acceptable / Unacceptable, a Neutral rating is considered Acceptable.

Factor 6: Price The Government will analyze price proposals in accordance with FAR 15.404 using the information contained in Attachment J-14 to make the best value determination based on an Offeror’s Total Evaluated Price (TEP). The Government will review the offerors CLIN and individual Work Item prices for the USS SAMPSON (DDG-102) FY 18 DSRA to identify any significant disparities that may indicate a lack of understanding of contract requirements. A price proposal that is found unreasonable may be rejected.

The Growth numbers are based on historical data and reflect the typical amount of growth and new work for an average DSRA on a DDG 51 class ship. Offerors are advised that the number of 35,000 labor man-hours and $750,000 provided in Attachment J-14 are for evaluation purposes only. The proposed labor and material burden rates provided in the accepted Offer will be set as fixed rates for the entire availability regardless of how many hours and how much material are procured.

The proposed change rates provided in the accepted Offer will be set as fixed rates for the entire availability regardless of how many days are procured. Offerors are advised that the number of 30 days provided in Attachment J-14 are for evaluation purposes only.

The following definition of Total Price (TP) and Total Evaluated Price (TEP) describes how this factor will be evaluated. Change Rate (CR) and Option Items (OI) will be included in the TEP.

TP = The Offeror’s Price for All Work Items

TP is equal to the total of all individual Work Item prices.

TP is the amount the Offeror shall enter as “amount” for CLIN 0001 in Section B.

In the event an Offer is accepted, TP will be equal to the contract award amount

CR = The Offeror’s Price for a defined volume of Growth and New Work by including labor and material burden rates.

Per Attachment J-14, the projected Growth is :

35,000 labor man-hours $750,000 of material

CR = ((35,000 man-hours) x (Offerors Hourly Rate)) + (($750,000) x (Offerors Material Burden Rate as a percentage))

GDCR = (30 days) x (Daily Rate)