Sheet1
| Required Reports for O&I | |||
| O&I Reports Due | |||
| No. | Work Item | Title | Paragraph |
| 1 | 110-11-001 | Underwater Hull; inspect | 3.2.1 - Visual Inspection Results |
| 2 | 110-11-001 | Underwater Hull; inspect | 3.3.1 - UT results (100 Locations) |
| 4 | 113-11-001 | Machinery Space Bilge Drain Well; repair | 3.5.1.1- Visual Inspection Results (9 Locations) |
| 5 | 113-11-001 | Machinery Space Bilge Drain Well; repair | 3.5.2.6 - UT Results (31 Locations) |
| 8 | 123-11-001 | Compensated Fuel Tank; preserve | 3.4.1.1 - Visual Inspection Results |
| 9 | 123-11-005 | Compensated Fuel Tank; preserve | 3.5.1 - Visual Inspection Results |
| 10 | 123-11-006 | Compensated Fuel Tank; preserve | 3.5.1 - Visual Inspection Results |
| 11 | 123-11-008 | Fuel Service Tank and Gravity Head Tank; preserve | 3.3.1 - Visual Inspection Results |
| 12 | 123-11-010 | Compensated Fuel Tank; preserve | 3.5.1 - Visual Inspection Results |
| 13 | 123-11-011 | Compensated Fuel Tank; preserve | 3.5.1 - Visual Inspection Results |
| 14 | 123-11-012 | Compensated Fuel Tank; preserve | 3.4.1.1 - Visual Inspection Results |
| 15 | 123-11-013 | Compensated Fuel Tank; preserve | 3.5.1 - Visual Inspection Results |
| 16 | 123-11-014 | Compensated Fuel Tank; preserve | 3.4.1.1 - Visual Inspection Results |
| 17 | 123-11-015 | Compensated Fuel Tank; preserve | 3.5.1 - Visual Inspection Results |
| 18 | 123-11-019 | Fuel Service Tank; preserve | 3.3.1 - Visual Inspection Results |
| 19 | 123-12-001 | JP-5 Tank; preserve | 3.3.1.1 - Visual Inspection Results |
| 20 | 123-14-002 | Potable Water Tank; preserve | 3.4.1 - Visual Inspection Results |
| 21 | 123-17-002 | Contaminated Oil Tank; preserve | 3.4.1.1 - Visual Inspection Results |
| 22 | 123-19-002 | Waste Water Tank; preserve | 3.3.1.1 - Visual Inspection Results |
| 23 | 123-19-004 | Vacuum Collection Holding Tank; preserve | 3.3.1.1 - Visual Inspection Results |
| 24 | 123-21-002 | Fueling At Sea Accessible Void; repair | 3.3.1.1 - Visual Inspection Results |
| 25 | 123-22-001 | Chain Locker and Chain Locker Sump; preserve | 3.2.1.1 - Visual Inspection Results |
| 26 | 123-22-002 | Accessible Void; preserve | 3.2.1.1 - Visual Inspection Results |
| 27 | 150-11-001 | Structural Deck Repair; accomplish | 3.3.1 - Visual Inspection Results |
| 31 | 165-11-002 | Sonar Dome Rubber Window (SDRW); inspect and repair | 3.2.1.1 - Visual Inspection Results |
| 32 | 165-11-003 | Sonar Dome Rubber Window (SDRW) Radiographic Evaluation; accomplish | 3.2.7.1 - Radiography Results |
| 33 | 167-11-001 | Bolted Equipment Removal Plate (BERP) Repair; accomplish | 3.3.1 - Visual Inspection Results |
| 34 | 167-11-002 | Watertight Scuttle; repair | 3.3.1.1 - Visual Inspection Results |
| 35 | 241-11-001 | Number One Main Reduction Gear (MRG) Turning Gear; repair | 3.4.2.1 - Visual Inspection Results |
| 36 | 243-11-001 | Starboard Propulsion Shafting; inspect and repair | 3.2.1 - Measurements & Borescope Results |
| 37 | 243-11-002 | Starboard Stern Tube Shaft Seal; overhaul | 3.3.2.1 - Visual and Dimensional Inspection |
| 38 | 243-12-001 | Port Propulsion Shafting; inspect and repair | 3.2.1 - Measurements & Borescope Results |
| 40 | 245-11-001 | Starboard Controllable Pitch Propeller (CPP) System; repair | 3.2.1 - Pre-Docking Inspection Results |
| 41 | 245-12-001 | Port Controllable Pitch Propeller (CPP) System; repair | 3.2.1 - Pre-Docking Inspection Results |
| 42 | 251-30-001 | Gas Turbine Intake; repair and preserve | 3.4.2 - Visual Inspection Results |
| 43 | 251-30-002 | Gas Turbine Intake; repair and preserve | 3.4.2 - Visual Inspection Results |
| 44 | 251-31-001 | Ships Service Gas Turbine Generator (SSGTG) Intake Trunk; preserve | 3.5.1 - Visual Inspection Results |
| 45 | 251-31-002 | Air Intake and Exhaust Louver; clean and preserve | 3.2.4 - Visual Inspection Results (44 Items) |
| 46 | 259-10-001 | Number 2 Gas Turbine Mixing Room, Uptake; repair | 3.5.2 - Visual Inspection Results |
| 47 | 259-10-001 | Number 2 Gas Turbine Mixing Room, Uptake; repair | 3.6.1 - UT Inspection Results |
| 48 | 259-10-002 | Number One Gas Turbine Mixing Room, Uptake; repair | 3.5.2 - Visual Inspection Results |
| 49 | 259-10-002 | Number One Gas Turbine Mixing Room, Uptake; repair | 3.6.1 - UT Inspection Results |
| 50 | 259-11-001 | Gas Turbine (GTRB) Exhaust Duct Collector; repair | 3.5.2 - Visual & Liquid Penetrant Test Results |
| 51 | 261-11-001 | Fuel Oil Service Heater; clean and inspect | 3.5.5 - Visual & Resistance Test Results |
| 55 | 512-11-004 | Supply Ventilation; replace | 3.3.1 - Visual Inspection Results |
| 56 | 520-11-001 | Sea Valve; repair and replace | 3.2.1 - Pre-Repair Op Test Results (18 Locations) |
| 57 | 541-11-001 | Fuel Oil Butterfly Valve; replace | 3.1.1 - Pre-Repair Op Test Results |
| 59 | 562-11-001 | Port and Starboard Rudder Bearing Seal and Rudderstock Seal; repair | 3.2.3.1 - Visual Inspection Results |
| 60 | 562-11-002 | Starboard Rudder; inspect and repair | 3.2.2.1 - Visual Inspection Results (Plugs) |
| 61 | 562-11-002 | Starboard Rudder; inspect and repair | 3.3.1 - Visual Inspection Results (Rudder) |
| 63 | 562-11-002 | Starboard Rudder; inspect and repair | 3.4.1 - Mag Particle Inspection Results |
| 63 | 562-11-002 | Starboard Rudder; inspect and repair | 3.5.1 - Shear Wave UT Report |
| 64 | 562-11-002 | Starboard Rudder; inspect and repair | 3.7.1 - Stand-Off Readings Report |
| 65 | 562-11-003 | Port Rudder; inspect and repair | 3.2.2.1 - Visual Inspection Results (Plugs) |
| 66 | 562-11-003 | Port Rudder; inspect and repair | 3.3.1 - Visual Inspection Results (Rudder) |
| 67 | 562-11-003 | Port Rudder; inspect and repair | 3.4.1 - Mag Particle Inspection Results |
| 68 | 562-11-003 | Port Rudder; inspect and repair | 3.5.1 - Shear Wave UT Report |
| 69 | 562-11-003 | Port Rudder; inspect and repair | 3.7.1 - Stand-Off Readings Report |
| 70 | 581-11-001 | Ground Tackle; inspect and preserve | 3.4.11 - Visual Inspection Results |
| 71 | 581-11-001 | Ground Tackle; inspect and preserve | 3.5.2 - Wire Diameter Chain Results |
| 72 | 581-11-001 | Ground Tackle; inspect and preserve | 3.6.2.2 - Wire Diameter Detachable Links Results |
| 73 | 581-11-001 | Ground Tackle; inspect and preserve | 3.6.3.3 - PT Inspection Results (20 Locations) |
| 74 | 583-11-001 | Slewing Arm Davit (SLAD); overhaul | 3.4.5.1 - Visual Inspection Results |
| 75 | 588-21-001 | Recovery Assist, Securing and Traversing (RAST) System Track and Plate; clean and preserve | 3.2.1 - Slot Width / Visual Inspection Results |
| 76 | 588-21-001 | Recovery Assist, Securing and Traversing (RAST) System Track and Plate; clean and preserve | 3.3.1 - Pre-Operational Test Results |
| 79 | 631-21-001 | Mast Preservation; accomplish | 3.2.2 - Visual Inspection Results |
| 80 | 631-31-001 | Underwater Hull; preserve | 3.1.1.1 - Paint Inspection Results |
| 81 | 631-31-001 | Underwater Hull; preserve | 3.7.1.1 - Structural isnpection Results |
| 82 | 631-41-001 | Freeboard; preserve | 3.2.1 - Visual Inspection Results |
| 83 | 993-31-001 | Temporary Main Reduction Gear (MRG) Dehumidifier System; provide | 3.2 - Conditions Found Inspection |