BQ_011_Clarification_-_Answered_1-16-18_Redacted.pdf

PDF 21 KB Posted

Attached to
USS SAMPSON 8C1 DSRA Federal contract opportunity
Solicitation number
N4523A-18-R-0550
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to USS SAMPSON 8C1 DSRA, newest first.
File Type Posted
N4523A-18-R-0550_Amendment_0019.pdf PDF
N4523A-18-R-0550_Amendment_0017.pdf PDF
N4523A-18-R-0550_Amendment_0016.pdf PDF
N4523A-18-R-0550_Amendment_0012.pdf PDF
N4523A-18-R-0550_Amendment_0011.pdf PDF
235-8749114_Rev_A,_HYBRID_ELEC_DRIVE_CONSOLIDATED_ELEC_MODS_&_ML.pdf PDF
BQ_027_4720_request_Redacted.pdf PDF
DDG_102_DSRA_A-7_4720_Report_dtd_18_DEC_17.pdf PDF
512-8718347-VENT12_REV-A_SANITARY_VENT_MODS.pdf PDF
640-8718343-ARR01_REV-A_BERTHING_ARR_MODS.pdf PDF
331-8718349-ELEC32_REV-A_SANITARY_ELEC_MODS.pdf PDF
N4523A-18-R-0550_J-12_PPI_Q_010_Redacted.pdf PDF
BQ_015_588-21-001_-_Redacted.pdf PDF
N4523A-18-R-0550_Amendment_0007.pdf PDF
BQ_022_980-90-007_References-Redacted.pdf PDF
BQ_007_437-012-001_Para_3.2_-_Redacted.pdf PDF
BQ_013_462-11-001_Missing_Ref_-_Answered_1-12-18_Redacted.pdf PDF
BQ_008_Extension_Request_-_Answered_01-16-18_Redacted.pdf PDF
N4523A-18-R-0550_Amendment_0004.pdf PDF
J-18_Access_and_User_Agreement_rev_002_01102018.pdf PDF
N4523A-18-R-0550_Amendment_0003.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_002_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_017_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_007_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_016_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_015_Map_1.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_006_Redacted.pdf PDF
N4523A-18-R-0550_Amendment_0001.pdf PDF
BODY_OF_PAGE_LEFT_INTENTIONALLY_BLANK.pdf PDF
BODY_OF_PAGE_LEFT_INTENTIONALLY_BLANK.pdf PDF
J-16_CDRL_A021_Heavy_Weather_Plan.pdf PDF
MIL-STD-1310.pdf PDF
J-16_CDRL_A004_CFM_Report.pdf PDF
J-13_NSE_Pier_Load_Limit_Summary.pdf PDF
J-1_Work_Package_ERRATA_3.pdf PDF
J-16_CDRL_A036_Certification_Data_Report.pdf PDF
J-16_CDRL_A027_Equal_Component_Rprt.pdf PDF
J-21_ALO_Compt_Release_Sched_Memo.docx DOCX document
J-16_CDRL_C001_COTS_Equip_Manual_Support.pdf PDF
J-10_Local_Standard_Item_099-01NW.pdf PDF
VLS_INSTR_86-2D_US_NAVY_MK_41_VERTICAL_LAUNCHING_SYSTEM_PERSONNEL_CERTIFICATION_PROGRAM.pdf PDF
J-16_CDRL_A024_Incident_Report.pdf PDF
J-16_CDRL_A014_Asbestos_Containing_Material.pdf PDF
SAMPSON_DDG-102_SRA15_-_SDI.pdf PDF
MIL-STD-1689.pdf PDF
J-4_Planning_Event_Readiness_List_-_PERL.pdf PDF
J-19_FRP_Reference_List_Document.xlsx XLSX spreadsheet
J-16_CDRL_A022_Contractor's_Safety_Plan.pdf PDF
MIL-STD-2035.pdf PDF
MIL-STD-2199.pdf PDF
Show all 50

USS SAMPSON 8C1 DSRA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J-12 eric.c.niemann2@navy.mil jason.herrera@navy.mil

N4523A-18-R-0550 Pre-Proposal Information (PPI) Form

One question per form

DATE OF REQUEST: 1/10/18 QUESTION NO: 011

SHIP/HULL NO: 102 WORK ITEM/CSWT NO: Solicitation

CONTRACTOR: CONTRACTOR POC & PHONE:

PARA. NO: PAGE NO: 001 ATTACH. NO:

CONTRACTOR QUESTION:

Errata 4 contains all Errata’s and the original solicitation for work items to date, totaling 619 pages. Errata 3 contained all Errata’s and the original solicitation for work items to the date it was published, totaling 606 pages.

There appears to be missing info, approximately 59 pages worth in Errata 4. Errata 4 is 71 pages long, when added to Errata 3, Errata 4 should have been 677 pages.

An example of missed info is on pages 279-283. 279-280 are 241-11-001, then 281-283 goes into 243-11-002 – no work item cover page.

Please release the missing info and if the intent is to add onto an existing Errata when issuing a new one, contractor requests individual work items be provided to reduce missing information or provide in a separate manner the new information.

DO NOT WRITE BELOW THIS LINE

(FOR GOVERNMENT USE ONLY)

The government’s intent was not to issue obsolete work item requirements. Due to this oversight. Errata’s and Addendums will be issued with all previous versions of the work package.

PLANNER

REVIEW

DATE: SUPERVISOR REVIEW: D Richey DATE: 1/16/18

CODE 230

REVIEW: DATE: ADV PLAN REVIEW: DATE:

SPEC CHG: Y/N No DWG/REF CHG. Y/N No RQMTS CHG: Y/N No MAT'L CHG: Y/N No

RESPONSE TO SEA 02:

File details come from the government source that posted it.