J-19_FRP_Reference_List_Document.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
USS SAMPSON 8C1 DSRA Federal contract opportunity
Solicitation number
N4523A-18-R-0550
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to USS SAMPSON 8C1 DSRA, newest first.
File Type Posted
N4523A-18-R-0550_Amendment_0018.pdf PDF
DDG-102_SA_288K_HAZMINCEN_POAM.PDF PDF
551-8749120_Rev_A,_HYBRID_ELEC_DRIVE_PIPING_-AIR_SYS_MODS_&_ML.pdf PDF
J-1_Work_Package_ERRATA_6.pdf PDF
BQ_026_Missing_Refs-Answered_Redacted.pdf PDF
BQ_025_Missing_Refs-Answered_Redacted.pdf PDF
BQ_21_123-21-001_-_Redacted.pdf PDF
BQ_020_077-10-001_-_Answered_1-16-18_Redacted.pdf PDF
J-14_Pricing_Workbook_111517_rev001_(ECN).xlsx XLSX spreadsheet
BQ_010_077-10-001_vs_solicitation_-_Answered_1-11-18_Redacted.pdf PDF
BQ_013_53711-5808784M.PDF PDF
J-1_Work_Package_Errata_5_-_Addendum_1.pdf PDF
BQ_006_437-012-001_Possible_Source_-_Answered_1-5-18_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_009_-_Answered_09JAN18_Redacted.pdf PDF
BQ_004_Bearing_Staves_-_Answered_1-5-18_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_003_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_001_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_014_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_005_Redacted.pdf PDF
N4523A-18-R-0550_J-12_Pre-Proposal_Information_(PPI)_Form_Q_015_Map_3.pdf PDF
BQ_001_Extension_Request.pdf PDF
J-11_8010_Manual_19April2016_REV_00_ACN_1A.PDF PDF
J-16_CDRL_A006_Request_for_Technical_Deviation.pdf PDF
J-16_CDRL_A031_Demand_Only_Transactions.pdf PDF
J-17_Integrated_Schedule_&_Testing_-_Rev_1.docx DOCX document
MIL_STD_777F.pdf PDF
J-16_CDRL_B002_Logistics_Mgmt_-_EDFP.pdf PDF
MIL-STD-2191.pdf PDF
J-16_CDRL_A018_Critically_Coated_Surfaces_Rprt.pdf PDF
N4523A-18-R-0550_Solicitation.pdf PDF
J-16_CDRL_A013_Process_Control_Procedure.pdf PDF
J-16_CDRL_A019_Incident_Report.pdf PDF
J-16_CDRL_A010_Tank_Report.pdf PDF
J-12_Pre-Proposal_Information_(PPI)_Form.doc DOC document
J-16_CDRL_A035_Progress,_Status_and_Mgmt_Rprt.pdf PDF
J-16_CDRL_A030_Weight_and_Stability_Rprt.pdf PDF
J-16_CDRL_A026_Comp_Closeout_Insp_Rprt.pdf PDF
J-3_Key_Events_and_Milestone_Listing.pdf PDF
MIL-STD-3026.pdf PDF
J-20_Open_and_Inspect_Reports.xlsx XLSX spreadsheet
29_CFR_1915_Occupational_Safety_and_Health_Admin.,_Labor.pdf PDF
J-16_CDRL_A037_Contractor's_Training_Plan.pdf PDF
J-16_CDRL_A005_Purchase_Order.pdf PDF
NFPA_70,_National_Electrical_Code.pdf PDF
J-16_CDRL_A034_Technical_Report_-_Configuration.pdf PDF
J-16_CDRL_A009_Work_Completion_Certification.pdf PDF
J-8_Contractor_Proposal_Guide.pdf PDF
J-16_DIDs_Package.pdf PDF
59312-3-005_Rev_A,_VCHT_Tank_Level_Indicator_Sensor_Test.pdf PDF
J-9_Env_Guide_For_Contractors_at_NSE_-_May16.pdf PDF
Show all 50

USS SAMPSON 8C1 DSRA has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

LMADockingClarification
Standard Item
009-07:
3.2Responsible
3.2.1Responsible8010 requirement section 4.3.5 / 4.2.1e / 4.2.1g
3.2.2Responsible8010 requirement section 4.2.1h / 4.2.1i
3.2.3Responsible8010 requirement section 4.2.2
3.2.4Responsible
3.2.4.1Responsible
3.2.4.2Responsible
3.2.4.3Responsible
3.2.4.4Responsible
3.3.2Responsible8010 requirement section 4.2.1h / 4.2.1i
3.3.2.1Responsible8010 requirement section 4.4.2
3.3.3Responsible8010 requirement section 4.2.1g
3.3.3.1Responsible8010 requirement section 4.4.3b
3.3.4Responsible8010 requirement section 4.4.4
3.3.5Responsible8010 requirement section 4.3.5
3.3.5.1Responsible8010 requirement section 4.4.6
3.3.6Responsible
3.3.6.1Responsible8010 requirement section 4.3.6.1
3.3.7Responsible8010 requirement section 8.2.4
3.4Responsible
3.4.1Responsible
3.4.3Responsible8010 requirement section 5.1.8
3.4.4Responsible
3.5Responsible
3.5.1Responsible
3.5.2Responsible
3.5.3Responsible
3.5.4Responsible
3.6Responsible
3.6.3Responsible
3.6.4Responsible
3.7Responsible8010 requirement section 5.3.4
3.7.1ResponsibleSupport
3.7.2Responsible8010 requirement 5.1.3.3
3.7.3Responsible
3.7.7Responsible
3.8.1Responsible8010 requirement section 9.2
3.8.2Responsible8010 requirement section 9.1
3.9.1Responsible8010 requirement section 11.1.3
3.9.2Responsible8010 requirement section 10.1.3
3.9.3Responsible
3.1 0Responsible8010 requirement section 5.4.1
3.10.2Responsible
3.11.1Responsible8010 requirement section 11.1.5 *Fire Zone Boundaries (FZB) will be maintained as FR. 126, FR. 254 and FR. 338
3.11.1.1Responsible
3.11.2Responsible8010 requirement section 11.1.1
3.11.2.1Responsible8010 requirement section 11.1.1
3.11.3Responsible8010 requirement section 11.1.5
3.11.3.1Responsible8010 requirement section 10.4.7
3.12ResponsibleSupport
3.13ResponsibleSupport
3.13.1Responsible
3.14ResponsibleSupport
3.14.1.1ResponsibleSupport
3.14.1.2ResponsibleSupport
3.14.1.3ResponsibleSupport
3.14.1.4ResponsibleSupport
3.14.1.5ResponsibleSupport
3.14.1.6Responsible
3.14.1.7ResponsibleSupport
3.14.1.8ResponsibleSupport
3.14.1.9ResponsibleSupport
3.14.1.10Responsible
3.14.12Responsible
3.14.2ResponsibleSupport
3.15ResponsibleSupport
3.16Responsible
009-08:
3.1.1Responsible
3.3Responsible
3.3.1Responsible
3.3.2Responsible
3.3.3Responsible
3.3.4Responsible
3.3.5Responsible
3.3.5.1Responsible
3.3.5.2Responsible
3.3.5.3Responsible
3.4Responsible
3.4.1Responsible
3.5Responsible
3.6.Responsible
3.6.1Responsible
3.6.1.1ResponsibleSupport8010 requirement section 7.2.3.1/ 7.1.9
3.6.1.2Responsible
3.6.1.3ResponsibleSupport8010 requirement section 7.2.3.3
3.6.2Responsible
3.6.2.1Responsible8010 requirement section 7.2.3.3 / 7.1.9/ 7.3.2.9
3.6.6.2Responsible
3.6.3.1Responsible8010 requirement section 7.2.3.3 / 7.1.9/ 7.3.2.9
3.6.3.2Responsible
3.6.3.3Responsible8010 requirement section 7.1.9
3.6.3.4Responsible
3.6.3.5Responsible
3.6.3.6Responsible8010 requirement section 7.1.9
3.6.3.7Responsible
3.6.8Responsible8010 requirement section 7.3.2.2
3.6.9Responsible
3.6.9.1Responsible
3.6.10Responsible
3.6.11Responsible
3.7.1ResponsibleSupport8010 requirement section 8.1.1
3.7.1.1ResponsibleSupport8010 requirement section 8.1.1
3.7.1.2ResponsibleSupport8010 requirement section 8.1.3.2
3.7.1.3Responsible
3.7.1.4ResponsibleSupport8010 requirement section 8.2.2
3.7.2Responsible
3.8ResponsibleSupport
3.8.1Responsible
3.8.2Responsible
3.8.3ResponsibleSupport
3.8.4ResponsibleSupport
3.8.7Responsible
3.8.8Responsible
3.9ResponsibleSupport
3.9.1Responsible
3.1 0Responsible
3.11ResponsibleSupport8010 requirement section 8.1.1
3.11.1ResponsibleSupport8010 requirement section 8.1.1
3.11.2ResponsibleSupport8010 requirement section 8.1.1
3.12.1Responsible
3.13Responsible
3.14Responsible
3.14.1Responsible
3.14.1.1Responsible
3.15Responsible
3.15.1Responsible
3.15.2Responsible
3.15.3Responsible
3.15.3.1Responsible
3.15.3.2Responsible
3.16Responsible
3.17Responsible
3.18Responsible8010 requirement section 7.3.2.10
3.19Responsible
3.2 0Responsible8010 requirement section 10.4
3.21Responsible8010 requirement section 10.4.2
3.21.1Responsible8010 requirement section 10.4.2a
3.21.2Responsible8010 requirement section 10.4.2b
3.22Responsible
3.22.1Responsible
3.23Responsible
3.23.1Responsible
3.23.2Responsible8010 requiremnent section 10.4.5a,b,c,d
3.23.2.5Responsible8010 requirement section 10.4.5.1
3.23.2.6Responsible
3.24Responsible8010 requirement section 10.4.7
3.24.1.1Responsible
3.25Responsible
3.26Responsible
4.1Responsible8010 requirement section 7.3.2.1
009-74:
3.9Responsible8010 requirement section 9.2.1 / 9.2.3
3. 10Responsible8010 requirement section 10.4.4
3.10.1Responsible8010 requirement section 10.6
3.10.2Responsible8010 requirement section 10.6
3.11Responsible8010 requirement section 10.4.6
3.11.1Responsible8010 requirement section 10.4.2
3.11.2Responsible
3.11.3Responsible
3.11.4.1Responsible8010 requirement section 5.1.3.4
3.22ResponsibleSupport8010 requirement section 8.1.5
3.23ResponsibleSupport8010 requirement section 8.1.1 / 8.1.3.2
3.27Responsible
3.27.1Responsible
3.27.2Responsible
3.27.3Responsible
8010
Chapter 1
1.5ResponsibleSupport
Chapter 3
3.2ResponsibleSupport
3.2.2.3ResponsibleSupport
3.2.3.1ResponsibleSupport
3.2.7ResponsibleSupport
3.2.7.1ResponsibleSupport
3.2.7.2SupportResponsible
3.2.7.3ResponsibleSupport
3.3.7SupportResponsible
3.4SupportResponsibleDocking Contractor shall provide lay dwon area for DC CONEX Box
3.5SupportResponsibleDocking contractor shall maintain Fire Lanes
3.5.1SupportResponsible
3.5.2SupportResponsible
3.5.3SupportResponsible
Chapter 4
4.2.1ResponsibleNSI 009-07 3.2.1 / 3.2.2
4.2.2ResponsibleNSI 009-07 3.2.1 / 3.2.3
4.3.5ResponsibleNSI 009-07 3.3.5
4.3.6.1ResponsibleNSI 009-07 3.3.6.1
4.4.2ResponsibleNSI 009-07 3.3.2.1
4.4.3ResponsibleNSI 009-07 3.3.3.1
4.4.4ResponsibleNSI 009-07 3.3.4
4.4.5Responsible
4.4.6ResponsibleNSI 009-07 3.3.5.1
4.4.7Responsible
4.4.8Responsible
Chapter 5
5.1.2Responsible
5.1.3.3Responsible
5.1.3.4ResponsibleNSI 009-74 3.11.4.1
5.1.7Responsible
5.1.8ResponsibleNSI 009-74 3.4.3
5.1.10Responsible
5.1.11Responsible
5.2Responsible
5.3.2Responsible
5.3.2.1Responsible
5.3.4ResponsibleNSI 009-07 3.7.3
5.4.1ResponsibleNSI 009-07 3.10
5.4.2Responsible
Chapter 7
7.1.1ResponsibleNSI 009-08 3.1
7.1.1.4Responsible
7.1.2Responsible
7.1.2.1ResponsibleNSI 009-08 3.5
7.1.2.2Responsible
7.1.2.4Responsible
7.1.3ResponsibleDuring transit from drydock to wet berth, all ships without installed pumping and dewatering capability shall maintain portable saltwater pumping capability.
7.1.7.2ResponsibleNSI 009-08 3.6.3.3
7.1.9Responsible
7.1.9.2Responsible
7.2.2.2Responsible
7.2.2.3ResponsibleSupport
7.2.2.5ResponsibleNSI 009-08 3.6.3.3
7.2.3.1Responsible
7.2.3.3Responsible
7.3.2ResponsibleNSI 009-08 3.6.9
7.3.2.1ResponsibleNSI 009-08 3.6.9.1
7.3.2.2ResponsibleNSI 009-08 3.6.8
7.3.2.3Responsible
7.3.2.4Responsible
7.3.2.5Responsible
7.3.2.6ResponsibleNSI 009-08 3.6.11
7.3.2.8ResponsibleNSI 009-08 3.6.10
7.3.2.9ResponsibleNSI 009-08 3.6.3.3
7.3.2.10ResponsibleNSI 009-08 3.18
7.3.2.11Responsible
7.3.2.12Responsible
Chapter 8
8.1Responsible
8.1.1ResponsibleSupportNSI 009-08 3.7.1
8.1.3ResponsibleSupport
8.1.3.2ResponsibleSupportNSI 009-08 3.7.1.2
8.1.5ResponsibleSupportNSI 009-74 3.22
8.2.2ResponsibleNSI 009-08 3.7.1.4
8.2.4ResponsibleNSI 009-07 3.3.7
Chapter 9
9.1ResponsibleNSI 009-07 3.8.2
9.2ResponsibleNSI 009-07 3.8.1
9.2.1ResponsibleNSI 009-74 3.9
9.2.2ResponsibleNSI 009-74 3.9
Chapter 10
10.1Responsible
10.1.3ResponsibleNSI 009-07 3.9.2
10.1.4ResponsibleSupport
10.2.1ResponsibleSupport
10.2.2Responsible
10.2.3Responsible
10.4Responsible
10.4.2ResponsibleNSI 009-08 3.21 / 3.21.1 / 3.21.2
10.4.4ResponsibleNSI 009-74 3.10
10.4.5ResponsibleNSI 009-08 3.23
10.4.5.1ResponsibleNSI 009-08 3.23.2.5
10.4.6ResponsibleNSI 009-74 3.11
10.4.7ResponsibleNSI 009-07 3.11.3 / 3.24
Chapter 11
11.1.1ResponsibleNSI 009-07 3.11.2 / 3.11.2.1
11.1.3ResponsibleNSI 009-07 3.11.3 / 3.9.1
11.1.5ResponsibleNSI 009-07 3.11.2 *Fire Zone Boundaries (FZB) will be maintained as FR. 126, FR. 254 and FR. 338
Chapter 12
12.5ResponsibleSupport
Fire Drill
Fire Drill CoordinationResponsibleSupportSupport PSNS SSO to ensure a fire drill is excuted within the first 30 days after the start of tha availablity.
FRP
FRP CoordinationResponsibleSupportEnsure Security notifies 911 in the event of a casualty
ResponsibleInvite Seattle Fire Department in firefighting and fire prevention events
ResponsibleSupportConduct firefighting conference as per NSI
ResponsibleCoordinate staffing of security in securing pier access required by Seattle Fire Department.
ResponsibleEnsure SF recieves training on temporary services and connection of quick disconnectsfittings as per NSI
ResponsibleSupportManage firefighting contaiment efforts
ResponsibleResponsibleDesignate personnel to secure and restore shore power
ResponsibleResponsibleMaintain a 15ft fire lane for firefighting access and response
ResponsibleResponsibleEnsure laydown space is available for DC Conex
ResponsibleEnsure Temporary service Isolation List is updated
ResponsibleResponsibleEnsure all contractors evacuate the ship and muster to their designated area within 20 minutes
ResponsibleResponsibleNotify PSNS PM of missing personnel in the event of a casualty
ResponsibleSupportStage materials to provide for temporary closure for access cuts, hatches and other penetrations to control airflow in the event of a shipboard fire
SupportResponsibleEnsure contractors are standing by for crane, rigging support, and removal of temporary services
ResponsibleSupportEnsure containment, sampling, and clean-up of firefighting efforts
ResponsibleReport any hot work or other hazardous sites that were required to be abandoned during evacuation
SupportResponsibleEnsure air and water environmental monitoring is conduct.