J-19_FRP_Reference_List_Document.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- USS SAMPSON 8C1 DSRA Federal contract opportunity
- Solicitation number
- N4523A-18-R-0550
View the file
Other files for this federal contract opportunity
Show all 50
USS SAMPSON 8C1 DSRA has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| LMA | Docking | Clarification | |
| Standard Item | |||
| 009-07: | |||
| 3.2 | Responsible | ||
| 3.2.1 | Responsible | 8010 requirement section 4.3.5 / 4.2.1e / 4.2.1g | |
| 3.2.2 | Responsible | 8010 requirement section 4.2.1h / 4.2.1i | |
| 3.2.3 | Responsible | 8010 requirement section 4.2.2 | |
| 3.2.4 | Responsible | ||
| 3.2.4.1 | Responsible | ||
| 3.2.4.2 | Responsible | ||
| 3.2.4.3 | Responsible | ||
| 3.2.4.4 | Responsible | ||
| 3.3.2 | Responsible | 8010 requirement section 4.2.1h / 4.2.1i | |
| 3.3.2.1 | Responsible | 8010 requirement section 4.4.2 | |
| 3.3.3 | Responsible | 8010 requirement section 4.2.1g | |
| 3.3.3.1 | Responsible | 8010 requirement section 4.4.3b | |
| 3.3.4 | Responsible | 8010 requirement section 4.4.4 | |
| 3.3.5 | Responsible | 8010 requirement section 4.3.5 | |
| 3.3.5.1 | Responsible | 8010 requirement section 4.4.6 | |
| 3.3.6 | Responsible | ||
| 3.3.6.1 | Responsible | 8010 requirement section 4.3.6.1 | |
| 3.3.7 | Responsible | 8010 requirement section 8.2.4 | |
| 3.4 | Responsible | ||
| 3.4.1 | Responsible | ||
| 3.4.3 | Responsible | 8010 requirement section 5.1.8 | |
| 3.4.4 | Responsible | ||
| 3.5 | Responsible | ||
| 3.5.1 | Responsible | ||
| 3.5.2 | Responsible | ||
| 3.5.3 | Responsible | ||
| 3.5.4 | Responsible | ||
| 3.6 | Responsible | ||
| 3.6.3 | Responsible | ||
| 3.6.4 | Responsible | ||
| 3.7 | Responsible | 8010 requirement section 5.3.4 | |
| 3.7.1 | Responsible | Support | |
| 3.7.2 | Responsible | 8010 requirement 5.1.3.3 | |
| 3.7.3 | Responsible | ||
| 3.7.7 | Responsible | ||
| 3.8.1 | Responsible | 8010 requirement section 9.2 | |
| 3.8.2 | Responsible | 8010 requirement section 9.1 | |
| 3.9.1 | Responsible | 8010 requirement section 11.1.3 | |
| 3.9.2 | Responsible | 8010 requirement section 10.1.3 | |
| 3.9.3 | Responsible | ||
| 3.1 0 | Responsible | 8010 requirement section 5.4.1 | |
| 3.10.2 | Responsible | ||
| 3.11.1 | Responsible | 8010 requirement section 11.1.5 *Fire Zone Boundaries (FZB) will be maintained as FR. 126, FR. 254 and FR. 338 | |
| 3.11.1.1 | Responsible | ||
| 3.11.2 | Responsible | 8010 requirement section 11.1.1 | |
| 3.11.2.1 | Responsible | 8010 requirement section 11.1.1 | |
| 3.11.3 | Responsible | 8010 requirement section 11.1.5 | |
| 3.11.3.1 | Responsible | 8010 requirement section 10.4.7 | |
| 3.12 | Responsible | Support | |
| 3.13 | Responsible | Support | |
| 3.13.1 | Responsible | ||
| 3.14 | Responsible | Support | |
| 3.14.1.1 | Responsible | Support | |
| 3.14.1.2 | Responsible | Support | |
| 3.14.1.3 | Responsible | Support | |
| 3.14.1.4 | Responsible | Support | |
| 3.14.1.5 | Responsible | Support | |
| 3.14.1.6 | Responsible | ||
| 3.14.1.7 | Responsible | Support | |
| 3.14.1.8 | Responsible | Support | |
| 3.14.1.9 | Responsible | Support | |
| 3.14.1.10 | Responsible | ||
| 3.14.12 | Responsible | ||
| 3.14.2 | Responsible | Support | |
| 3.15 | Responsible | Support | |
| 3.16 | Responsible | ||
| 009-08: | |||
| 3.1.1 | Responsible | ||
| 3.3 | Responsible | ||
| 3.3.1 | Responsible | ||
| 3.3.2 | Responsible | ||
| 3.3.3 | Responsible | ||
| 3.3.4 | Responsible | ||
| 3.3.5 | Responsible | ||
| 3.3.5.1 | Responsible | ||
| 3.3.5.2 | Responsible | ||
| 3.3.5.3 | Responsible | ||
| 3.4 | Responsible | ||
| 3.4.1 | Responsible | ||
| 3.5 | Responsible | ||
| 3.6. | Responsible | ||
| 3.6.1 | Responsible | ||
| 3.6.1.1 | Responsible | Support | 8010 requirement section 7.2.3.1/ 7.1.9 |
| 3.6.1.2 | Responsible | ||
| 3.6.1.3 | Responsible | Support | 8010 requirement section 7.2.3.3 |
| 3.6.2 | Responsible | ||
| 3.6.2.1 | Responsible | 8010 requirement section 7.2.3.3 / 7.1.9/ 7.3.2.9 | |
| 3.6.6.2 | Responsible | ||
| 3.6.3.1 | Responsible | 8010 requirement section 7.2.3.3 / 7.1.9/ 7.3.2.9 | |
| 3.6.3.2 | Responsible | ||
| 3.6.3.3 | Responsible | 8010 requirement section 7.1.9 | |
| 3.6.3.4 | Responsible | ||
| 3.6.3.5 | Responsible | ||
| 3.6.3.6 | Responsible | 8010 requirement section 7.1.9 | |
| 3.6.3.7 | Responsible | ||
| 3.6.8 | Responsible | 8010 requirement section 7.3.2.2 | |
| 3.6.9 | Responsible | ||
| 3.6.9.1 | Responsible | ||
| 3.6.10 | Responsible | ||
| 3.6.11 | Responsible | ||
| 3.7.1 | Responsible | Support | 8010 requirement section 8.1.1 |
| 3.7.1.1 | Responsible | Support | 8010 requirement section 8.1.1 |
| 3.7.1.2 | Responsible | Support | 8010 requirement section 8.1.3.2 |
| 3.7.1.3 | Responsible | ||
| 3.7.1.4 | Responsible | Support | 8010 requirement section 8.2.2 |
| 3.7.2 | Responsible | ||
| 3.8 | Responsible | Support | |
| 3.8.1 | Responsible | ||
| 3.8.2 | Responsible | ||
| 3.8.3 | Responsible | Support | |
| 3.8.4 | Responsible | Support | |
| 3.8.7 | Responsible | ||
| 3.8.8 | Responsible | ||
| 3.9 | Responsible | Support | |
| 3.9.1 | Responsible | ||
| 3.1 0 | Responsible | ||
| 3.11 | Responsible | Support | 8010 requirement section 8.1.1 |
| 3.11.1 | Responsible | Support | 8010 requirement section 8.1.1 |
| 3.11.2 | Responsible | Support | 8010 requirement section 8.1.1 |
| 3.12.1 | Responsible | ||
| 3.13 | Responsible | ||
| 3.14 | Responsible | ||
| 3.14.1 | Responsible | ||
| 3.14.1.1 | Responsible | ||
| 3.15 | Responsible | ||
| 3.15.1 | Responsible | ||
| 3.15.2 | Responsible | ||
| 3.15.3 | Responsible | ||
| 3.15.3.1 | Responsible | ||
| 3.15.3.2 | Responsible | ||
| 3.16 | Responsible | ||
| 3.17 | Responsible | ||
| 3.18 | Responsible | 8010 requirement section 7.3.2.10 | |
| 3.19 | Responsible | ||
| 3.2 0 | Responsible | 8010 requirement section 10.4 | |
| 3.21 | Responsible | 8010 requirement section 10.4.2 | |
| 3.21.1 | Responsible | 8010 requirement section 10.4.2a | |
| 3.21.2 | Responsible | 8010 requirement section 10.4.2b | |
| 3.22 | Responsible | ||
| 3.22.1 | Responsible | ||
| 3.23 | Responsible | ||
| 3.23.1 | Responsible | ||
| 3.23.2 | Responsible | 8010 requiremnent section 10.4.5a,b,c,d | |
| 3.23.2.5 | Responsible | 8010 requirement section 10.4.5.1 | |
| 3.23.2.6 | Responsible | ||
| 3.24 | Responsible | 8010 requirement section 10.4.7 | |
| 3.24.1.1 | Responsible | ||
| 3.25 | Responsible | ||
| 3.26 | Responsible | ||
| 4.1 | Responsible | 8010 requirement section 7.3.2.1 | |
| 009-74: | |||
| 3.9 | Responsible | 8010 requirement section 9.2.1 / 9.2.3 | |
| 3. 10 | Responsible | 8010 requirement section 10.4.4 | |
| 3.10.1 | Responsible | 8010 requirement section 10.6 | |
| 3.10.2 | Responsible | 8010 requirement section 10.6 | |
| 3.11 | Responsible | 8010 requirement section 10.4.6 | |
| 3.11.1 | Responsible | 8010 requirement section 10.4.2 | |
| 3.11.2 | Responsible | ||
| 3.11.3 | Responsible | ||
| 3.11.4.1 | Responsible | 8010 requirement section 5.1.3.4 | |
| 3.22 | Responsible | Support | 8010 requirement section 8.1.5 |
| 3.23 | Responsible | Support | 8010 requirement section 8.1.1 / 8.1.3.2 |
| 3.27 | Responsible | ||
| 3.27.1 | Responsible | ||
| 3.27.2 | Responsible | ||
| 3.27.3 | Responsible | ||
| 8010 | |||
| Chapter 1 | |||
| 1.5 | Responsible | Support | |
| Chapter 3 | |||
| 3.2 | Responsible | Support | |
| 3.2.2.3 | Responsible | Support | |
| 3.2.3.1 | Responsible | Support | |
| 3.2.7 | Responsible | Support | |
| 3.2.7.1 | Responsible | Support | |
| 3.2.7.2 | Support | Responsible | |
| 3.2.7.3 | Responsible | Support | |
| 3.3.7 | Support | Responsible | |
| 3.4 | Support | Responsible | Docking Contractor shall provide lay dwon area for DC CONEX Box |
| 3.5 | Support | Responsible | Docking contractor shall maintain Fire Lanes |
| 3.5.1 | Support | Responsible | |
| 3.5.2 | Support | Responsible | |
| 3.5.3 | Support | Responsible | |
| Chapter 4 | |||
| 4.2.1 | Responsible | NSI 009-07 3.2.1 / 3.2.2 | |
| 4.2.2 | Responsible | NSI 009-07 3.2.1 / 3.2.3 | |
| 4.3.5 | Responsible | NSI 009-07 3.3.5 | |
| 4.3.6.1 | Responsible | NSI 009-07 3.3.6.1 | |
| 4.4.2 | Responsible | NSI 009-07 3.3.2.1 | |
| 4.4.3 | Responsible | NSI 009-07 3.3.3.1 | |
| 4.4.4 | Responsible | NSI 009-07 3.3.4 | |
| 4.4.5 | Responsible | ||
| 4.4.6 | Responsible | NSI 009-07 3.3.5.1 | |
| 4.4.7 | Responsible | ||
| 4.4.8 | Responsible | ||
| Chapter 5 | |||
| 5.1.2 | Responsible | ||
| 5.1.3.3 | Responsible | ||
| 5.1.3.4 | Responsible | NSI 009-74 3.11.4.1 | |
| 5.1.7 | Responsible | ||
| 5.1.8 | Responsible | NSI 009-74 3.4.3 | |
| 5.1.10 | Responsible | ||
| 5.1.11 | Responsible | ||
| 5.2 | Responsible | ||
| 5.3.2 | Responsible | ||
| 5.3.2.1 | Responsible | ||
| 5.3.4 | Responsible | NSI 009-07 3.7.3 | |
| 5.4.1 | Responsible | NSI 009-07 3.10 | |
| 5.4.2 | Responsible | ||
| Chapter 7 | |||
| 7.1.1 | Responsible | NSI 009-08 3.1 | |
| 7.1.1.4 | Responsible | ||
| 7.1.2 | Responsible | ||
| 7.1.2.1 | Responsible | NSI 009-08 3.5 | |
| 7.1.2.2 | Responsible | ||
| 7.1.2.4 | Responsible | ||
| 7.1.3 | Responsible | During transit from drydock to wet berth, all ships without installed pumping and dewatering capability shall maintain portable saltwater pumping capability. | |
| 7.1.7.2 | Responsible | NSI 009-08 3.6.3.3 | |
| 7.1.9 | Responsible | ||
| 7.1.9.2 | Responsible | ||
| 7.2.2.2 | Responsible | ||
| 7.2.2.3 | Responsible | Support | |
| 7.2.2.5 | Responsible | NSI 009-08 3.6.3.3 | |
| 7.2.3.1 | Responsible | ||
| 7.2.3.3 | Responsible | ||
| 7.3.2 | Responsible | NSI 009-08 3.6.9 | |
| 7.3.2.1 | Responsible | NSI 009-08 3.6.9.1 | |
| 7.3.2.2 | Responsible | NSI 009-08 3.6.8 | |
| 7.3.2.3 | Responsible | ||
| 7.3.2.4 | Responsible | ||
| 7.3.2.5 | Responsible | ||
| 7.3.2.6 | Responsible | NSI 009-08 3.6.11 | |
| 7.3.2.8 | Responsible | NSI 009-08 3.6.10 | |
| 7.3.2.9 | Responsible | NSI 009-08 3.6.3.3 | |
| 7.3.2.10 | Responsible | NSI 009-08 3.18 | |
| 7.3.2.11 | Responsible | ||
| 7.3.2.12 | Responsible | ||
| Chapter 8 | |||
| 8.1 | Responsible | ||
| 8.1.1 | Responsible | Support | NSI 009-08 3.7.1 |
| 8.1.3 | Responsible | Support | |
| 8.1.3.2 | Responsible | Support | NSI 009-08 3.7.1.2 |
| 8.1.5 | Responsible | Support | NSI 009-74 3.22 |
| 8.2.2 | Responsible | NSI 009-08 3.7.1.4 | |
| 8.2.4 | Responsible | NSI 009-07 3.3.7 | |
| Chapter 9 | |||
| 9.1 | Responsible | NSI 009-07 3.8.2 | |
| 9.2 | Responsible | NSI 009-07 3.8.1 | |
| 9.2.1 | Responsible | NSI 009-74 3.9 | |
| 9.2.2 | Responsible | NSI 009-74 3.9 | |
| Chapter 10 | |||
| 10.1 | Responsible | ||
| 10.1.3 | Responsible | NSI 009-07 3.9.2 | |
| 10.1.4 | Responsible | Support | |
| 10.2.1 | Responsible | Support | |
| 10.2.2 | Responsible | ||
| 10.2.3 | Responsible | ||
| 10.4 | Responsible | ||
| 10.4.2 | Responsible | NSI 009-08 3.21 / 3.21.1 / 3.21.2 | |
| 10.4.4 | Responsible | NSI 009-74 3.10 | |
| 10.4.5 | Responsible | NSI 009-08 3.23 | |
| 10.4.5.1 | Responsible | NSI 009-08 3.23.2.5 | |
| 10.4.6 | Responsible | NSI 009-74 3.11 | |
| 10.4.7 | Responsible | NSI 009-07 3.11.3 / 3.24 | |
| Chapter 11 | |||
| 11.1.1 | Responsible | NSI 009-07 3.11.2 / 3.11.2.1 | |
| 11.1.3 | Responsible | NSI 009-07 3.11.3 / 3.9.1 | |
| 11.1.5 | Responsible | NSI 009-07 3.11.2 *Fire Zone Boundaries (FZB) will be maintained as FR. 126, FR. 254 and FR. 338 | |
| Chapter 12 | |||
| 12.5 | Responsible | Support | |
| Fire Drill | |||
| Fire Drill Coordination | Responsible | Support | Support PSNS SSO to ensure a fire drill is excuted within the first 30 days after the start of tha availablity. |
| FRP | |||
| FRP Coordination | Responsible | Support | Ensure Security notifies 911 in the event of a casualty |
| Responsible | Invite Seattle Fire Department in firefighting and fire prevention events | ||
| Responsible | Support | Conduct firefighting conference as per NSI | |
| Responsible | Coordinate staffing of security in securing pier access required by Seattle Fire Department. | ||
| Responsible | Ensure SF recieves training on temporary services and connection of quick disconnectsfittings as per NSI | ||
| Responsible | Support | Manage firefighting contaiment efforts | |
| Responsible | Responsible | Designate personnel to secure and restore shore power | |
| Responsible | Responsible | Maintain a 15ft fire lane for firefighting access and response | |
| Responsible | Responsible | Ensure laydown space is available for DC Conex | |
| Responsible | Ensure Temporary service Isolation List is updated | ||
| Responsible | Responsible | Ensure all contractors evacuate the ship and muster to their designated area within 20 minutes | |
| Responsible | Responsible | Notify PSNS PM of missing personnel in the event of a casualty | |
| Responsible | Support | Stage materials to provide for temporary closure for access cuts, hatches and other penetrations to control airflow in the event of a shipboard fire | |
| Support | Responsible | Ensure contractors are standing by for crane, rigging support, and removal of temporary services | |
| Responsible | Support | Ensure containment, sampling, and clean-up of firefighting efforts | |
| Responsible | Report any hot work or other hazardous sites that were required to be abandoned during evacuation | ||
| Support | Responsible | Ensure air and water environmental monitoring is conduct. |
Sheet2
Sheet3
File details come from the government source that posted it.