AMENDMENT_0012.pdf
PDF 274 KB Posted
- Attached to
- IDIQ MACC FOR LARGE CONSTRUCTION PROJECTS, HAMPTON ROADS, VIRGINIA NAVFAC MID-ATLANTIC Federal contract opportunity
- Solicitation number
- N4008518R1104
About this file
This document provides a pre-solicitation notice for an indefinite delivery indefinite quantity multiple award construction contract for large general construction projects in the Hampton Roads area of Virginia. The contract will be awarded to no more than five offerors and have a total estimated value of $249 million over five years, including four one-year option periods after the base year. The first task order will be for the design and construction of a new 78,727 square foot Marine Corps bachelor enlisted quarters at Naval Weapons Station Yorktown, Virginia, with an estimated value between $25-100 million. The BEQ will house 127 Marines in 2+0 room configurations and be designed according to all applicable Navy and Marine Corps unified facilities criteria. The contract type will be firm fixed price and proposals are due in December 2017.
AMENDMENT_0012.pdf
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
INDEFINITE DELIVERY INDEFINITE QUANTITY MULTIPLE AWARD CONSTRUCTION CONTRACT FOR LARGE GENERAL CONSTRUCTION
PROJECTS PRIMARILY IN THE HAMPTON ROADS AREA OF VIRGINIA, NAVFAC MID-ATLANTIC
PHASE II PROPOSAL DUE DATE REMAINS UNCHANGED, 31 MAY 2018 at 1400 LOCAL TIME
Please see continuation page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 30
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-May-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R1104
X 9B. DATED (SEE ITEM 11)
22-Dec-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-May-2018
CODE
COMMANDER NAVFAC ATLANTIC
6506 HAMPTON BLVD
NORFOLK VA 23508-1278
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008518R1104
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0012
This Amendment is being issued to provide the following:
1. Revisions to the RFP Package
2. Responses to PPIs 151-300
3. Attachments:
VA Radon Map Performance-Rating-Method-Compliance-Form-2013
The RFP Package has been revised as follows:
PART 3 PROJECT PROGRAM
D30 HVAC
General System Requirements, Delete Paragraphs 1 and 2, page 385 in their entirety, “All mechanical equipment shall have factory applied painted finishes that pass a salt-spray test conducted per ASTM B117 for duration of at least 3000 hours. All coils shall have factory applied coating that passes a salt spray test conducted per ASTM B117 for duration of at least 3000 hours” and replace with “All outdoor mechanical equipment and condenser coils shall have factory applied painted finishes that pass a salt-spray test conducted per ASTM B117 for duration of at least 3000 hours.”
PART 3 PROJECT PROGRAM
D20 PLUMBING
D202003 Domestic Water Equipment Delete second sentence of paragraph 4, “Water meter on service less than or equal to 2” shall be positive displacement type and for service greater than 2” shall be compound type.” and replace with, “Water meter on service less than or equal to 2” shall be positive displacement type and for service greater than 2” shall be turbine type.”
PART 3 PROJECT PROGRAM
5.0 Room Requirements
Elevator Equipment Room Delete “Uniformat number D203003, Floor Drains”
PART 3 PROJECT PROGRAM
D20 PLUMBING
D209003 Interceptors Delete the words “Not Used” and replace with “Provide lint interceptors as needed for laundry room service.”
PART 3 PROJECT PROGRAM
5.0 Room Requirements
Corridor Add “Uniformat number D201006, Water Coolers, quantity and type as required.”
PART 3 PROJECT PROGRAM
2.5 Workflow Process
2.5.1 Hours of Operation
Add “The building will provide housing for permanent party enlisted personnel, the hours of operation will be 24 hours a day, 7 days a week.”
PART 3 PROJECT PROGRAM
D20 PLUMBING
General System Requirements Second sentence paragraph 2 delete “Provide a commercial natural gas-fired storage tank type water heater located in the Mechanical Room” in its entirety.
PART 6 ATTACHMENTS
See attached EPA maps for Radon Zones.
PART 3 PROJECT PROGRAM
B10 SUPERSTRUCTURE
System Description Extraordinary Events After the first paragraph add the following: The building framing system shall be designed to withstand the effects of the following extraordinary (i.e. low probability event): ATFP Blast and Progressive Collapse complying with the requirements of UFC 4-010-01. This includes roof construction components of steel roof deck on light-gage metal framing.
PART 3 PROJECT PROGRAM
D50 ELECTRICAL
General System Requirement Seismic Bracing Delete Paragraph 9 “Bracing of electrical equipment to resist seismic events [is] [is not] required based on site seismic design criteria and building importance factor.” and replace with “Bracing of electrical equipment to resist seismic events is not required based on site seismic design criteria and building importance factor.”
PART 3 PROJECT PROGRAM
B30 ROOFING
B301006 Roof Openings and Support Paragraph 2 first sentence delete “from the Elevator Equipment Room” and replace with “from an Egress Stair (Enclosed)”
PART 3 PROJECT PROGRAM
5.0 Room Requirements
Egress Stair (Enclosed) Under the heading “Access” in the third sentence, delete the words “each stair” and replace with “One Egress Stair (Enclosed)”
PART 3 PROJECT PROGRAM
5.0 Room Requirements
Bedroom Closet Module Under the heading “Ideal Plan Dimensions:” delete the dimensions 3’-0” x 4’-0” and replace with
“FC 4-721-10N”
PART 3 PROJECT PROGRAM
5.0 Room Requirements
Bedroom Module Bathroom Uniformat C103009 Cabinets Specific Requirements delete the words “full height” and replace with “vanity counter top height”
4.0 Room Requirements
Delete “Part 4 Building Requirements” in its entirety and replace with “Part 4X Building Requirements”
5.0 Room Requirements
Add Multi-Media Room Requirements sheet to Part 3, Chapter 5, See attachment
PART 3 PROJECT PROGRAM
5.0 Room Requirements
Bedroom Module- Bath Uniformat number C103008 Counters, Specific Requirements, second sentence delete the words “full height” and replace with “1/4" solid surface on wall between countertop and underside of wall-hung cabinets”.
PART 3 PROJECT PROGRAM
5.0 Room Requirements
Delete Room Requirement Sheet titled “Large Storage” and replace with Room Requirements Sheet titled “House Keeping”
PART 3 PROJECT PROGRAM
B10 SUPERSTRUCTURE
B1010 Floor Construction Delete the paragraph in its entirety and replace with the following: “The floor construction may include non-composite concrete slabs on form deck on steel joists, non-composite concrete slabs on form deck on steel beams, composite concrete slabs on composite steel deck, cast-in place concrete slabs on removable forms, precast concrete slabs or autoclaved aerated concrete. The floor deck shall be supported on cast-in place concrete walls, pre-cast concrete walls, concrete masonry walls, steel columns and steel beams, steel columns and joist girders, or concrete columns and concrete beams.”
Responses to PPIs 151-300 are provided below:
PPI#
Reference
Question Government
Response Page/D wg
Section Paragraph
151 385
Part 3, Section 6, D30
HVAC
General System
Requirements
Coils are to have 3000 hour salt spray test. Does this include the reheat coils in the VAV terminal units?
See Amendment
152 319 Part 3, Section
5, Multi-purpose Prep
Kitchen, Multi-purpose room
D303002 states to have a separate heat pump with hot water heating coil. D304001 states to provide VAV series fan powered units. Which is the desired system or are both systems required?
See Amendment
153 N/A N/A N/A
Please provide guidance to the proposers as to how the government intends to mitigate or share the risk of the ever changing tariff actions currently being implemented by the administration. The proposers can not accept the risk of market pricing adjustments as a result of the tariffs on virtually every product on the project that contains steel and/or aluminum.
Bid Per RFP
154 Part 3 D204090
1) Section D204090 OTHER RAIN WATER DRAINAGE SYSTEM – discusses a rainwater management system to achieve LID, and to help with LEED credits. In this same section there is a reference pertaining to the HQ building. Is the reference to HQ Building a typo?
2) Is the rainwater system meant to feed toilet and urinals, or landscape irrigation, or both? Is there is a minimum percentage of savings/threshold the project is required to meet?
3) May the rainwater system for the building be omitted if LEED water use reduction objectives are met with other solutions?
See Amendment
243, 245, 263 and
Part 3, 1.0, 2.2 and 4.1
The project description located on page 243 and the facility function section on page 245 indicate that the BEQ shall be a maximum of 67,000 SF.
The Space Tabulation on pages 263 and 264 shows a total of 78,727 SF Net. Please clarify the maximum size of the building.
See Amendment
156 305
Part 3, Room
Require ments
The room requirement sheet for the Elevator indicates that the ITG NAVFAC elevator design guide must be met. Based on this guideline, we are to provide one elevator for a three story building and two elevators for a four story building. Because of the nature of the design, please advise if you consider this to be a three or four story building requiring one or two elevators.
See Amendment
157 4 01 33
29.05 20 1.4.4
Specification section 01 33 29.05 20, 1.4.4, requires third party certification through GBI Guiding Principles (GP). Parts 2 and 3 of the RFP also include numerous references to LEED and USGBC. Please confirm that this project requires third party certification through GBI and not the USGBC/LEED.
See Amendment
158 407
Part 3, Section
6, D503003
Intercom Systems
Please provide additional information regarding the Intercomm System requirements. Is a call button required at each appartment unit? Are the speakers required to have talk-back functions?
Where will the intercom head-end reside?
Bid per RFP
159 407,408
Part 3, Section
6, D503005
ESS Systems
The first paragraph in D503005 indicates that the Electronic Security Systems are rough-in only.
Please confirm that the additional descriptions of the ESS in later paragraphs are for informational purposes only.
Bid Per RFP
160 452
Part 3, Section
6, G401002
Transformers
This paragraph references a 480V, 1500kVA service transformer for this project. Will the Design Build teaming be responsible for sizing the transformer or are the teams required to use the referenced sizing?
UFC 4-
721-10n
3-29.2 Please confirm if separate metering is required for each Apartment unit. Bid Per RFP
162 315 Part 3, Section 5 Laundry
Please confirm if the dryers are required to be served at 240V or if 208V is acceptable. Bid Per RFP
163 255 Part 3 3.2
Reference Part 3, Section 3.2 Site Development Requirements – Parking; Please clarify as to the modifications required to the 8 inch existing storm sewer and manholes (69 & 71) at the remote parking area and as shown on CD105 and
CD113.
Bid per RFP
164 371 Part 3 D201005
In order to size domestic water heating equipment, we will need to know the estimated showering time and number of showering periods per hour. We assume the shower heads will be
1.5 GPM. In the past, we have sometimes been
asked in an RFP to provide enough domestic water for enlisted quarters assuming that a ramp-up of military personnel has occurred (four members per room in lieu of just two). Question:
Can the Government provide the estimated showering time and number of showering times per hour?
Bid per RFP
165 539 Part 4 B301001
Section 1.5.3.b.1 is calling for a 5 year, no penal sum warranty from the Contractor for the Standing Seam Metal Roof. This warranty also calls for the Installer and Manufacturer to supplement with their own 5 year warranties.
The Contractor's bonding company will charge the project a bond premium to co-sign this 5 year warranty, that is already being provided by the manufacturer and installer. Please confirm the 5 year weather-tight warranty can be provided directly by the SSMR installer and manufacturer, and not co-signed by the Contractor (since they are the ones providing and installing the materials).
Bid Per RFP
166 517 Part 4 B202004
The Exterior Glazing spec in Part 4 is asking for the Contractor to provide a 10 year warranty on insulated glazing units. Section B202003, 1.1.3 (Page 513) notes the IGU in Curtainwall is to have a 5 year warranty, with the warranty coming directly from the Manufacturer. Please confirm if the warranty on exterior IGU's is 5 or 10 years.
Also confirm that the warranty can be issued directly from the manf. to the Gov't.
167 Part 4
B203008, C102007, D202003, D502002
There are several extended warranties noted in Part 4, with no note on who is to sign/provide them. Please confirm the 5 year warranties on the Pushbutton Combination Locks, Electronic Key Card Readers, Electric/Gas Water Heaters, and Electronic Lighting Ballasts are Manufacturer warranties.
Bid per RFP
168 361 Part 3 C30
The Engineering System Requirements says that the painter applying industrial coatings must be (SSPC) QP 1 certified. Please confirm where, if any, industrial coatings are required.
Bid Per RFP
169 13 01 14
00.05 20 1.5.b
Please confirm if the U.S. Citizenship requirement for workers applies to the entire project, or only to limited portions (i.e. working on finishes inside the completed structure). In addition, please confirm if workers with Green Cards will be allowed access to the site, or if it is strictly limited to U.S. Citizens.
Bid per RFP
170 113 01 35
13.05 20 3.3.1
Please define the location of the model unit to be constructed (will it be on site or off site … if off site, approximately where). Please define what the structure of the unit will consist of (plywood, or is it created using CMU and concrete). The RFP also asks for two bedrooms and a connecting bathroom. A typical unit has one bedroom (two beds) and one bathroom. What is desired ... one complete unit (one bedroom, one bath, two closets, and a kitchen)?
BId per RFP
171 Civil There is a test well located under the new building footprint. Does this well need to be relocated or is it okay to abandon it.
Bid per RFP
Site
Utilities
During the site visit, it was noted that there is a utility marker on the north side of the new building site. It appears to be for a buried communication line, but it is not shown on any of the as-builts we were provided. How should we deal with this line?
Bid per RFP
173 ATFP
Are anti-ram bollards required to be located between the building and the parking and roadway areas?
Bid per RFP
Please consider extending the proposal due date to April 24, 2018. Design-build projects which require this level of effort to complete pricing and technical solutions generally require 6 weeks from the time the solicitation is released to the due date.
See Amendment
ESR
D4030
RFP Section D4030 indicates that a standpipe must be provided where required by UFC 3-600-
01. The wording in UFC 3-600-01 section 9-
10.2.2 is open to two different interpretations. We read that section to indicate that as long as every portion of the facility can be reached within 450 feet from an exterior door that a standpipe is not required. From a fire protection engineering standpoint this makes logical sense. This is consistent with interpretations on other projects (but can be read to have two opposite meanings).
Please confirm that this is the Government’s interpretation as well since this has significant cost implications.
Bid per RFP
Please confirm the pricing schedule found in Phase 1 solicitation is not applicable to the Phase 2 response.
Bid per RFP
177 Will field testing for STC ratings be required? Bid per RFP
178 D503001
RFP D503001 states to provide a 25 pair CAT 6 UTP cable in 5” concrete encased conduit to the nearest telephone pedestal. Please provide location on site plan of this existing pedestal.
See Amendment
179 G403001
RFP G403001 states to provide 50 pair copper and 12 stand single mode fiber optic cable from Fire Station Building 703 via CMH3.
a. Are we to install new conduit from the new P995 BEQ exterior handhole mentioned in G4030 to this existing Fire Station Building?
b. Is there existing telecom ductbank system we are to connect to so that required cable can be provided, if yes please provide location?
See Amendment
180 G4030
RFP G4030 states to provide 4 -6” concrete encased conduits for the communication service entrance. Are we to provide these conduits all the way to the existing communication manhole as indicated in Part 6 Attachment Electrical Drawings?
See Amendment
181 D503001 RFP D503001, we could not find requirements for backbone cabling between telecom rooms.
Please define these cable requirements.
Part 4, Section
D20, Paragraph D201001
Paragraph D201001 describes that the dual function flush valves for the water closets shall have flushing rates of 0.8 to 1.1 GPF, with a maximum flush volume of 1.28 GPF. After checking with four (4) nationally recognized manufactures of dual function flush valves, they all had the same dual flushing volumes of 1.1 to
1.6 GPF. Would a dual flush rate of 1.1 to 1.6
GPF is acceptable, or could a single rate flush valve with a flush volume of 1.28 be acceptable?
Bid Per RFP
Page
Part 3, Chapter
Elevator Equipment Room describes that a floor drain with trap primer is required in this room.
Providing a floor drain in the Elevator Equipment Room is contrary to the requirements of the
NAVFAC Elevator Equipment Guide. Please confirm if a fllor drain is required as described.
See Amendment
Page
Part 3, Elevator describes that a oil/water separator is to be provided. RFP Part 3, Chapter 6, Section D20, Paragraph D203004 calls for an oil sensing type sump be provided in the Elevator pit. The NAVFAC Elevator Design Guide requires that a sump pump with an oil sensing control system is to be provided Elevator Hoistway Pit. Is it acceptable to provide a sump pump with an oil-minder control system, in lieu of an oil/water separator?
See Amendment
Pages
313-315
Part 3, Laundry, Special Dimensions calls for 21 washers and 42 dryers (62 total) to be provided.
RPD Part 6C, Drawing A-102 shows 40 appliances total in the Laundry. Please confirm total number of washers and drryers to be provided.
Bid Per RFP
Pages
313-315
Part 3, Laundry, Special Dimensions describes that commercial grade top loading washers are to be provided? Please provide make/model, or cut sheets or definition of "commerical grade" for the intended washers to be used.
Bid Per RFP
Pages
313-315
Part 3, Laundry, Special Dimensions describes that commercial grade front loading dryers are to be provided. Please confirm if dryers are to be natural gas of electric. And provide cut sheets or specifications for the intended dryers to be used.
Pages
313-315
Part 3, Laundry, Other/Special Requirements calls for
(4) wash sinks; Uniformat Section D201004 calls for (2) 2-compartment laundry sinks; RFP Part 4, Section D20, Paragraph D201004 states that the laundry sinks are to be 2-compartment; RPF Part
6C, Drawing A-102 shows (4) single compartment sinks being provided. How many laundry sink, with how many compartments each, are to be provided in the Laundry?
Bid Per RFP
Part 3, Chapter
6, Section
D20
Paragraph D202003
Paragraph D202003 call for a compound-type water meter be provided for services greater than 2”. But the subsequent sub-paragraph calls for a turbine water meter be provided for water services above 2” . What type of water meter should be provided for water services larger than 2”?
See Amendment
Part 3, Chapter
6, Section
D20
Paragraph D209003
Paragraph D209003 states that Interceptors are “Not Used”. But per International Plumbing Code, lint interceptors are to be provided for
Laundries. Please confirm that a lint interceptor be provided or not for the Laundry.
See Amendment
Part 3, Chapter
6, D20
General System Requirements states that the drain connection from the backflow preventer shall discharge to grade outside the building. But in a subsequent paragraph, it states that floor drains shall be sized to handle the discharge from the RPZ backflow preventer. Where should the drain connection from the RZP backflow preventer discharge – to exterior grade or a floor drain?
Bid per RFP
Pages
319-320
Part 3, Multi-Purpose Room Prep Kitchen/Access states that the room shall be adjacent to the exterior with gas grill. Are there cut sheets available of the gas grill to be used?
Bid Per RFP
Pages
319-320
Part 3, Multi-Purpose Room Prep Kitchen calls for a double bowl stainless steel sink. Should a garbage disposal be provided in the sink?
Bid Per RFP
Part 6, Section
D20
Paragraph D201005
Paragraph D201005 states to refer to Room Requirement Section for the number and type of water coolers required, but no reference could be found for water coolers in the Room Requirements Section. Please coinfirm if water coolers are required in this building. ANd if yes, locations desired and quantities.
See Amendment
Part 3, Chapter
Paragraph 2.5.1
Paragraph 2.5.1, what are the anticipated hours of operation for the facility. What is the anticipated annual days of operation?
See Amendment
Part 3, Chapter Paragraph
2.5.2 Paragraph 2.5.2, what is the anticipated
male/female ratio for the Staffing/Occupancy?
Part 3, Chapter
6, General System Requirements states that domestic piping below the building floor slab is prohibited. Does this exclude water service main and trap primer piping?
Bid Per RFP
RFP Part 3, Chapter 6, General System Requirements states that a gas-fired storage type water heater is to be provided.
Due to the significant amount of hot water required for this type of facility, would it be permissible to use a commercial, gas-fired, condensing-type water heater with a separate hot water storage tank, in lieu of a storage-type water heater?
See Amendment
A-101 to A-
Only the telecommunicaiton rooms (TR) on floors 3 and 4 are stacked. 1st floor and 2nd floor are not and not under floors 3 and 4.
Bid Per RFP
200 377 ESR D30 1st
PART 3 PROJECT PROGRAM Paragraph 2.4 Appropriate Design as well as ESR D30 HVAC – 1st Paragraph, states to use UFC 4-721-10 Navy and Marine Corps Bachelor Housing – this UFC cannot be found on the WBDG.org (only a “Cancelled” version “including Change 4, January 2011). Is this reference intended to be FC 4-721-10N (1-November 2012, Change 6, 20 May 2015) NAVY AND MARINE CORPS UNACCOMPANIED HOUSING? This appears to be the current document/version of this FC (not
UFC)
Bid Per RFP
FC 4-
721- 10N
3-10 Radon
FC 4-721-10N Section 3-10 Radon requires checking EPA’s Map of Radon Zones, to determine Radon Priority Area (it is Zone 3), but it also requires checking the results of the “Navy radon survey conducted under the Navy Radon Assessment and Mitigation Program (NAVRAMP)….”. The UFC stated to provide passive sub slab depressurization systems for projects located in Priority Area No. 1 (this project is not) and all areas identified by NAVRAMP to have expected radon levels greater than 4 pCi/L. Can you please provide the NAVRAMP information and/or confirm radon mitigation system(s) are or are not required?
See
202 377 ESR D30 1st
ESR D30 HVAC – 1st Paragraph, states “The latest edition of ASHRAE 90.1 and the ASHRAE
62.1 User Manual Shall be used” – this would be
the 2016 versions of these standards. Please confirm that the 2013 version of ASHRAE Standard 90.1 is to be used as the baseline benchmark in accordance with current UFC 1- 200-02 requirements.
See Amendment
203 377 ESR D30 1st
ESR D30 HVAC states to “Obtain the current utility costs from the Contracting Officer for use with the energy efficiency and TOC life cycle cost analyses” – can this be provided now so that the proposers can evaluate the permissible system alternatives in order to predict/determine which HVAC systems and components may be required for the project pending the required LCCA efforts?
See Amendment
204 378/379 ESR D30
ESR D30 RFP Pages 378 (bottom) / 379 (top) provides numerous references to “UFC 3-400-01, Energy Conservation dated 5 July 2002 with change 4 dated Aug 2008” – this document is currently indicated on the WBDG as being replaced by UFC 1-200-02. Please confirm designs shall confirm to UFC 1-200-02 and no specific information in the replaced (“cancelled”) UFC needs to be considered.
See
205 380 ESR D30
ESR D30 – page 380 Ventilation Systems – this section required that each Room Plan be provided with a minimum of 40 CFM of ventilation air, and that ventilation (OA) to the building is to exceed exhaust air by a minimum of 15%.
Current UFC 3-410-01 (w/Change 4 dated 01- November 2017) required that DOAS air inlets and outlets must deliver airflow quantities equal to or greater than 50 cfm to allow for proper system balancing. If living quarter toilet/shower room exhaust is therefore required to be 50 cfm (per the UFC) and ventilation 15% greater (57.5 cfm) this is 44% greater ventilation rates that indicated in the RFP. ASHRAE Standard 62.1 – 2013 & 2016 would require only 32 cfm outside air (based on double occupancy, 355 sqft area) and 25 cfm exhaust (based on continuous exhaust). Thus to comply with ASHRAE for 127 guest rooms a total ventilation rate of 4,064 OA / 3175 exhaust. UFC compliance would require
57.5 x 127 = 7300 cfm OA / 6350 exhaust (180% of the ASHRAE requirement); RFP 40 cfm OA / 35 cfm exhaust = 5080 OA/4,445 exhaust (125% of ASHRAE requirement). With the treatment of outdoor air being a significant operational energy cost – please confirm if the RFP minimum 40 cfm ventilation per room will be permitted in lieu of the current UFC requirement.
Bid per RFP
206 377 ESR D30 1st
ESR D30 – Page 377 1st Paragraph & Page 378 – 4th Paragraph. The paragraph on the first page says to “Consider” providing heat recovery from chiller to domestic hot water system, while the paragraph on page 378 states simply to “Provide heat energy recovery from the chiller to the domestic hot water system” – is this system required, or only an option to consider in order to achieve the energy goals if necessary and LCCA effective?
See Amendment
207 378 ESR D30 2 & 3
ESR D30 Page 378 paragraphs 2 & 3: These paragraphs appear to require an HVAC system consisting of Air Cooled Chiller, hydronic heating and VAV with Fan powered terminal units, however page 379 implies that other system options are acceptable pending LCCA (VAV, GSHP & WSHP). Please confirm that any of the 3 systems listed on page 379 are acceptable if supported by LCCA.
See
208 387 ESR D30 2nd
ESR D303001 Chilled Water Systems: This paragraph requires primary/secondary pumping of the chilled water system while the “VAV Systems” under D30 system description (LCC optional system choices) allows for either Primary / Secondary OR constant flow pumping.
Based on this system option only serving a very limited quantity of coils (AHU’s and DOAS) – it may be more economical and energy efficiency to use constant volume pumping with 3 way valves on the limited quantity of chilled water coils.
Please confirm constant flow pumping is an acceptable alternative as indicated in the LCCA systems option descriptions.
See Amendment
209 378/79 ESR D30 last of 378
ESR D30 Page 378/79 requires the LCCA evaluation of “Three general HVAC system types and two heat distribution systems”. The three alternative general HVAC systems are described however section D3020 Heat Generating Systems requires boiler heating (hydronic heating) – please clarify what are the two types of heat distribution systems that are to be evaluated?
See Amendment
UFC
4/721/10 N
ESR D30 Page 378/79 requires the LCCA evaluation of “Three general HVAC system types and two heat distribution systems”. The three alternative general HVAC systems are described however section D3020 Heat Generating Systems requires boiler heating (hydronic heating) – please clarify what are the two types of heat distribution systems that are to be evaluated?
See
211 378 ESR D30 4th
This paragraph requires that the DOAS system be “designed to provide 100% design capacity in the event of a failure of the heat wheel” – if LCCA alternative #1 is chosen this may be feasible through sizing through oversizing/selection of the cooling coil to account for wheel failure. If using the GSHP or WSHP LCCA alternatives the DOAS will utilize a condenser water to air DX cooling coil as part of a packaged DOAS system from a manufacturer. Equipment with oversized cooling capacity to account for failure of the enthalpy wheel is not available, nor would it be efficient due to excessive oversizing when wheel is operating as the DOAS unit is intended. As alarms to the DDC system will be provided for failure of the DOAS unit – is this wheel failure requirement necessary, particularly if a GSHP or WSHP system is pursued?
See Amendment
212 379/80 ESR D30
The DOAS system requirements for both the GSHP and WSHP DOAS LCCA alternatives require that the DOAS systems supporting these design alternatives utilize “hot water heating, pre-heat and reheat using hot water”. As the DOAS units for these LCCA alternatives will be heat pump type is hot water heat still required? When the unit requires heating, the heat pump will operate in a heating mode, and when cooling/dehumidification is required – hot gas reheat from the refrigeration cycle should be used to reheat to room neutral delivery temperatures without having to energize boilers and expend energy.
See
213 389 ESR D30 4th
Paragraph states to “Provide all piping with cellular glass or polyisocyanurate insulation” ….
And then says “for closed condenser water piping provide fully insulated High Density Polyethylene Pipe (HDPE). PVC or CPVC must not be used. No deviations will be allowed.” Is the HDPE intended for outdoor and or geothermal well piping - or is this the requirement for indoor condenser water distribution piping also? Additionally UFGS 23 07 00 INSULATION SYSTEMS, editors notes allow for the omission of insulation on piping where there is no risk of condensation. If WSHP loop piping is maintained within temperature ranges such that condensation will not occur, is insulation on such piping required? It would be more energy advantageous to not insulate WSHP loop piping provided it is maintained such that condensation will not occur.
Bid per RFP
214 387
ESR
D303002 2nd
RFP Section ESR D303002,2nd paragraph states “If space does not allow for vertical heat pump unit, provide horizontal heat pump units in the overhead with a means for removal and maintenance of system through lockable access panels” – to provide an access panel sized to allow for removal of the heat pump unit will require an access panel taking up most of the entryway ceiling impacting the placement of lighting and sprinkler heads. Would a drop ceiling be permitted in this area?
Bid per RFP
B1020
Section 6
Please confirm that pre-engineered light gage metal trusses with metal deck are an acceptable roof construction type per section B 1020 Roof Construction in Section 6 Engineering Systems Requirements of the Project Program. In addition, please confirm that the trusses must be analyzed for the effects of blast loads per UFC 4- 010-01 even when conventional construction standoff distances are met per Table B-2 (UFC 4- 010-01) due to the fact that pre-engineered light gage metal trusses are not listed in Table 2-3 of
UFC 4-010-01.
See Amendment
Chapter 6, Section D50
General
Are Seismic bracing requirements to be included. RFP was not edited to state which requirement is to be followed.
See
6, Section D5020
Lighting and
Branch Wiring
Are LED fixtures to be used exclusively or is there to be a mix of LED and Fluorescent fixtures. Section G5020 states LED lighting throughout all spaces, but some of the room data sheet state fluorescent fixtures. Please clarify requirements.
Bid Per RFP
Chapter 6, Section D502002 Lighting Equipme nt
Section has an LED/Fluorescent conflict Please clarify requirements.
Bid Per RFP
Chapter 6, Section D502002 Lighting Equipme nt
Section states that LED fixtures shall be energy star compliant. LED fixtures are not associated with energy star. Only some fluorescent style fixtures were energy star compliant. Please clarify requirements.
Bid Per RFP
Chapter 6, Section G40 Site Electrical Utilities System
Descripti on
First paragraph of Amendment 5 states:“Naval Weapons Station Yorktown is supplied electrical power from Dominion Virginia Power by two overhead 13.2 KV, 3 phase, 4 wire feeders which enter the base and pass thru the worksite prior to looping thru the Naval Weapons Station. This project will require demolition and/or replacement of tap feeders from the west feeder.
The west feeder routes through the area of the Parade Ground and future BEQ’s as shown in Part 6 Attachments (General Site Information), Overall Site Concept Plan, therefore, will be relocated as indicated in Part 3A, G40 of this RFP. See Existing Electrical Site Plan in Part 6 Attachments (Electrical) of this RFP.”
See Amendment
1) The route described for the Dominion Virginia Power overhead 13.2kV line running through the new BEQ and parade site does not match what is shown in Google earth views. Google shows an overhead power line running along the east boundary of the site and connecting to overhead lines along Shupper Drive to the south of the site, which corresponds to what is shown on drawing CU103 Utility Plan – Parade Ground of Attachment 6C of the RFP.
See
2) Paragraph goes on to say that a drawing, part of Attachment 6C, Overall Site Concept Plan, shows additional info on this overhead line running through the site. Please indicate what drawing number this sheet has, as I cannot find it in the Attachment 6C drawings.
See Amendment
3) Paragraph also states to see Part 3A, G40 for additional info on relocated overhead 13.2kV line, and to see existing electrical site plan. First, G40 is in Part 6, not 3A, and amended G40 does not give any further direction on relocating this line. Second, the reference is made to the existing site electrical plan, I can find no site electrical plans in the attachment 6C drawings, they are all Civil drawings. Please provide this/these electrical drawings.
See Amendment
Chapter 6, Section G4010
Electrical Power
Distributi
First paragraph of Amendment 5 states to get BEQ power from Switchgear #1 and that it is shown on drawings in the MCSFR Consolidated Overall Site Concept for projects P-984 and P- 985 Electrical drawings. Please provide these drawings as I could not find any electrical drawings in Attachment 6C. Drawing CU102 – Utility Plan BEQ does show switchgear locations by P985 BEQ, but they are not numbered and not sure any of them are switchgear #1.
See Amendment
225 D503005
D503005 contains conflicting statements regarding the Electronic Security System. It states first to provide raceways and supporting structures for ESS provided and installed by the ESS supplier (like that is someone the base hires directly); then it states later to provide a complete ESS including all equipment, testing, etc. This includes ACS, IDS and CCTV so it will be a sizeable number. Please confirm if the contractor should be carrying the coat of the actual wiring, equipment, monitors, testing, etc. or just the raceways and power connections for the equipment.
Bid Per RFP
91 &
94, 267
FC 4-
721-10N, Part 4.2
Please confirm which room module requirements are applicable; FC 4-721-10N, 4-2 Navy Shared / Mobilization Unit, 5-3 Marine Corp 2+0 Room, or other. Bubble diagram indicated Marine 2+0 but drawings appear to be a hybrid.
See
Part 3 &
Part 6
Part 3, Chapter 5 Room Requirements sheets reference "Typical Bedroom Module Layout Plan in Part 6 Attachments". There did not appear to be any drawings in Part 6 with this drawing name. Please provide enlarged plan showing minimum required dimensions and required features.
See Amendment
Part 3, 5.0
Room
Please clarify interior partition wall construction requirements for walls entirely within each Bedroom Module. Confirm if metal stud walls with gypsum board (or cement board at locations tile) are permitted anywhere within the Bedroom Module. Note Part 3, 5.0 Room Requirements for Bedroom Module - Closet indicate wall finish to be gypsum board.
Bid Per RFP
Part 3, 1.0
Project Descripti
1.0 Project Description indicates "The interior
walls of the facility shall be...designed and constructed to span from floor to the bottom of structure above." Please confirm if walls entirely within each Bedroom Module (Ex: wing wall at shower) are required to extend full height to the bottom of structure above, or if they can be terminated above the space's ceiling.
Bid Per RFP
Part 3, 6.0
Engineer ing
Systems Require ments
B301006
B301006 indicates roof access is to be via roof ladder and roof hatch from the elevator equipment room. This conflicts with information indicating the elevator equipment room is to be located on the first floor.
See Amendment
Part 3, Room Data
Sheet, Egress Stair
(Enclose d)
Room data sheet indicates roof access is to be provided "at each stair." Please confirm if roof access is required at all 3 enclosed stair towers.
See Amendment
Part 3, Room Data
Sheet, Bedroom Module
Part 3, Room Data Sheet, Bedroom Module indicates bedrooms to have "two extra-long twin beds". FC 4-721-10N, Paragraph 5-3.1 "Living/Sleeping Area" indicates bedrooms are to have "two (2) twin extra-long pop-top captains beds with double storage compartments below, storage headboard" which occupies more space and clear access space than a standard xl twin.
Please confirm which bed type is the minimum required.
Part 3, 5.0
Room
Confirm the minimum area of the personal closets in the bedroom modules. Part 3, 5.0 Room Requirements indicates "Ideal Plan Dimensions: 3'-0" x 4'-0" +/-" or 12SF. FC 4- 721-10N, 5-3.1 indicates personal closets of 22SF are required.
See Amendment
Part 3, 1.0
Project Descripti on; Part 3, 2.2
Facility Function;
Part 3, 4.1
Space Tabulatio n
Confirm the maximum gross area of the building.
Part 3 paragraphs 1.0 and 2.2 indicate a gross area of 67,000sf. 4.1 Space Tabulation indicates a total gross area of 78,727 SF. Please also indicate how the maximum gross area is to be tabulated.
See Amendment
Part 3, 5.0
Room
Confirm Bedroom Module Bathroom Cabinet requirements. The room data sheet indicates "full height cabinet between sinks". Confirm if this means a 36" height base drawer cabinet with countertop. This cabinetry is not depicted on Part 6C floor plans. Also, this cabinetry does not exist on the existing adjacent BEQ toured during the site visit. Pleas
See Amendment
FC 4-
721-10N
Confirm the number of required elevators. FC 4- 721-10N, 3-30.8 indicates two elevators are required for 4-story buildings. RFP documents indicate one elevator is to be provided.
See Amendment
Part 3.
4.1
Space
Room area requirements for janitor closets & housekeeping appear to be derived from notional layout indicated in Part 6 floor plans. Please confirm if these are the minimum required areas, or if the minimum required areas indicated in FC 4-721-10N, paragraph 4-3.2 (90sf for Janitor closets) is acceptable.
Bid per RFP
Part 3.
4.1
Space
Room area requirements for Main Telecommunication Room and Telecommunications Room appear to be derived from notional layout indicated in Part 6 floor plans. Please confirm if these are the minimum required areas, or if the minimum required areas indicated in UFC 3-580-01, paragraph 4-2.3.3 (8'x10' for TR on first floor, and 8'x6' on subsequent floors) are acceptable.
Bid per RFP
5.0
Room
There is a Multi-Media room is listed in Part 3,
4.1 Space Tabulation and indicated on Part 6
plans. It does not appear that a room data sheet has been provided for this space. Please provide a room data sheet for the Multi-Media room.
See Amendment
240 271 Part 3 Floor and wall base and wall finish of Bedroom Module Bathroom is not described. Confirm products to be used.
Bid Per RFP
241 38 of 65
Section 00700 Clauses Incorpor ated by Referenc e
Clause 52.219-4
Clause 52.219-4 is listed under Section 00700, which confirms price evaluation preference may be given to HUBZone Offerors. If this preference is to remain as applicable please identify if any of the Offeror's are Hubzone registered.
Bid Per RFP
242 17 of 65
Section 00100 - Bidding Schedule /Instructi ons to Bidders
Factor 6 – Energy and Sustainable Design / (b) Whole Building Energy Simulation
Factor 6 – Energy and Sustainable Design under
(b) Whole Building Energy Simulation lists a number of documents included in Part 6 of this RFP. We are unable to locate these templates.
Please confirm location.
Bid Per RFP
243 17 of 65
Section 00100 - Bidding Schedule /Instructi ons to Bidders
Factor 6 – Energy and Sustainable Design
Will an Offeror be rated higher if the Offeror provides an energy reduction that exceeds the RFP stated goal?
See Amendment
244 17 of 65
Section 00100 - Bidding Schedule /Instructi ons to Bidders
Factors 5 and
Please confirm that betterments will not be accepted/evaluated in any part as a basis of award.
See Amendment
245 246 Part 3 Chapter 2 Page 2
2.3.6
Per NAVADMIN 026/18, exceptions to the ATFP requirements can be used for future Navy projects. Will P995 utilize the ATFP exceptions in the NAVADMIN?
246 264 Part 3 Chapter chart
The space tabulation chart includes the square footage for corridors and is included in the square footage subtotal. A net to gross factor for circulation is added resulting in a total gross square footage of 78,727 square feet which matches the 1391. Part 3, Chapter 2, Page 1 section 2.2 states a total square footage of 67,000.
Please confirm that the total square footage is 78,727.
See Amendment
247 263 Part 3 Chapter number 2
In the space tabulation, number 2 states that any area remaining shall be allocated towards a covered roof portico at the entrance or covered patio at the multi-purpose area. The multi-purpose area is located on the second floor.
Please confirm that a covered roof portico at the main entrance on the parade side is applicable or if both entrances, north and south, require covered portico.
See Amendment
248 265 Part 3 Chapter
The RFP states that the public spaces (multipurpose, laundry vending and recycling) shall be located on the first floor. Please confirm that the public spaces are to be on the second floor as indicated in the concept drawings.
See Amendment
249 265 Part 3 Chapter
The RFP states that the multi-purpose room shall have outdoor patio area with seating. The RFP concept drawings show the multi-purpose room on the second floor with no direct exterior access.
Please confirm the outdoor area on the north side of the building is accessible only from the first floor.
Bid per RFP
250 266 Part 3 Chapter
4.2 bubble diagrams
The first floor bubble diagram indicates a fire sprinkler room on the first floor. In the RFP concept drawings, a fire sprinkler room is not shown. Please confirm a fire sprinkler room can be located on the first floor within the electrical room footprint on the concept drawings with direct exterior access.
Bid per RFP
Part 3 E201002 1
E201002Window treatments states to provide manually and electrically operated solar shading system. Part 3 Room requirements indicate manual shades. Please confirm whether manual or electrically operated shades are required in the project.
See
Part 3 Chapter 2 Page 1 2
Under Part 3, 2.2 Facility Function, the RFP states that circulation shall be achieved through three stairwells and one elevator. Under Part 3 Room Requirements, Elevator, the RFP states to provide one (1) elevator for three (3) story or less BEQ; two (2) elevators for four (4). Per NFPA 3.3.126.1, the story on the north side is considered the first story, not a basement, resulting in a total of 4 stories for the building.
Please confirm that two (2) elevators are required for the project and indicate preferred location of second elevator in the concept plans.
See PPI #79
Part 3 Chapter 1 1.0 2
The RFP states that exterior walls shall consist of concrete masonry block, rigid insulation, air space, and brick veneer. Please confirm no substitutions are permitted on the project.
Concept drawings
Please confirm that no deviations from the RFP provided floor plans are allowed.
Bid per RFP
Part 3 B201001 3
P-985 BEQ roof line shows equally sized gabled roofs on the west and east side of the building.
Due to the footprint of P-995, as provided in the RFP concept drawings, the center core protrudes from the main roof line. Due to length of the protrusion the center gable roof is much larger than the P-985 center gables. Please confirm that a deviation from the P-985 appearance is acceptable since the RFP states the BEQ shall have visual aesthetics and architectural balance that strongly relates to the exterior of P-984, P- 985, and P-991.
Bid per RFP
Part 3 Page
D5020 2
Section states to "Provide LED lighting and general purpose receptacles throughout all spaces as required." As required seems to be by the UFC 3-530-01 Paragraph 3-11 which denotes the requirement to be "LED or fluorescent 2700K - 3000K". Therefore the question: "Does the contract call for LED lighting only or is a fluorescent option acceptable?"
Bid Per RFP
257 336
A101002 Deep Foundati
A foundation system using only pile supported grade beam is not permitted by the RFP.
However, if the grade beam is wide enough to cover the pile per code, can a system using pile and grade beams be used?
G10
G10 System Description states that site preparation consists of hazardous waste remediation. Please identify the type and extent of hazardous waste remediation that is required under this contract.
G204001 G204001 The last sentence appears to be missing wording. Please clarify this sentence.
D204090
D204090 states to provide a collection system for a rainwater harvesting system for the HQ building. Please confirm that the intent is to provide a rainwater harvesting system collection from the BEQ roof.
See PPI #91
G20190 Concept Site Plan 8
Please confirm that the fire access lane can encroach into the parade grounds as shown on the Concept Site Plan provided in the RFP.
Bid per RFP
G20190
Per NFPA 1 Chapter 18.2.3.2.1, at least one fire department access road shall extend to within 50 feet of at least one exterior door. Per 18.2.3.2.2, the fire department access road shall be provided such that any portion of the facility or any portion of an exterior wall of the first story of the building is located not more than 450 feet, with approved automatic sprinkler system, from fire department access roads as measured by approved route around the exterior of the building. Per NFPA 18.2.3.3, please confirm that an additional fire access lane is not required per the AHJ due to the condition of the terrain on the site.
Bid per RFP
263 414 E1090 "Other Equipment"
Is the equipment for the Multi-Purpose rooms part of the FF&E budget and considered to be "specialty equipment" as stated in section E20?
Or is this part of the construction contract?
Bid Per RFP
264 414 E109002 "Food Service Equipment"
Are the Freestanding Ice Makers also part of the construction contract or FF&E budget?
Bid Per RFP
355 C103004 "Identifying Devices"
What is the overall dimension of the Command Board Display? And is there a specific backboard material type that will need to be used for the board's design?
Will the Government please make the sign-in sheet from the site visit available to all Offerors?
See Amendment
267 263 Part 3 Chapter number 2
It appears that circulation was double counted in the RFP space tabulation, there is a surplus of allowable building square footage. Item 2 in the space tabulation states to apply any remaining area to a roof portico or covered patio. Please provide approximate square footage of desired patio area for bidding purposes.
See
Concept drawings
In the concept drawings, there is a housekeeping room on each floor. Part 3 Room Requirements does not list the space. Please provide room requirements.
See Amendment
321 Part 3 Chapter 5
The room requirements state to provide minimum of 20 lounge seats, the concept floor plans show 15 seats in the multimedia room, and the space tabulation shows 368 square feet. Please confirm the required number of seats.
See Amendment
321 Part 3 Chapter 5
The room requirements state to provide 8 gaming areas, but the concept floor plan depicts 4, and the space tabulation shows 374 square feet that will only fit 4. Please confirm the required number of gaming stations.
Bid Per RFP
287 Part 3 Chapter 5
The room requirements for the second floor lobby state to provide STC 35. Per the concept drawings, the space is open to adjacent spaces.
Please confirm STC rating is not required.
Bid Per RFP
287 Part 3 Chapter 5
In the room requirements for the lobby on the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .