About this file

This solicitation is for an Indefinite Delivery Indefinite Quantity Multiple Award Construction Contract for large general construction projects in the Hampton Roads area of Virginia. The Naval Facilities Engineering Command Mid-Atlantic seeks to award up to five contracts for construction work between $14 million and $37 million, though smaller and larger projects may be considered. The total estimated value of the multiple award contract is $249 million over five years.

The scope of work includes new construction, demolition, repair, alteration, and renovation of buildings and infrastructure such as administrative facilities, industrial buildings, warehouses, hangars, medical facilities, and training facilities. An initial project, the design and construction of a 127-room Marine Corps barracks with an estimated value between $25-100 million, will be the first task order issued against the contract. Offerors must submit a bid guarantee of at least 20% of the largest award amount up to $3 million with their proposals. Proposals are due in December 2017 and awards will be made as best value tradeoff selections.

AMENDMENT_0002.pdf

View the file

Other files for this federal contract opportunity

Other files attached to IDIQ MACC FOR LARGE CONSTRUCTION PROJECTS, HAMPTON ROADS, VIRGINIA NAVFAC MID-ATLANTIC, newest first.
File Type Posted
AMENDMENT_0021.pdf PDF
AMENDMENT_0020.pdf PDF
ATTACH_19C_Spec_section_01_91_00.15_Total_Bldg_Commissioning.pdf PDF
ATTACH_19B_Revised_spec_sec_01_20_00.00_Price_and_Pymt_Proc.pdf PDF
ATTACH_19A_P995_Price_Proposal_Form_rev_12JUL18.pdf PDF
AMENDMENT_0019.pdf PDF
AMENDMENT_0018.pdf PDF
AMENDMENT_0017.pdf PDF
Amendment_0016.pdf PDF
AMENDMENT_0015.pdf PDF
AMENDMENT_0014.docx.pdf PDF
SECNAV_F0RM_5512-1.pdf PDF
Amendment_Room_Requirement_Sheet_multi-media_room.pdf PDF
Amendment_0013.pdf PDF
building_requirements_RLJ_RGG.pdf PDF
Amendment_Room_Requirements_Sheet_house_keeping.pdf PDF
PPI_201_VA_Radon_Map.pdf PDF
Performance-Rating-Method-Compliance-Form-2013.pdf PDF
AMENDMENT_0012.pdf PDF
AMENDMENT_0011_.docx.pdf PDF
Amendment_0010.pdf PDF
P-984-SITE_ELECTRICAL-ES601.pdf PDF
P-985-SITE_ELECTRICAL-ES601.pdf PDF
AMENDMENT_0009.pdf PDF
P-984-SITE_ELECTRICAL-ES604.pdf PDF
Amendment_0008.pdf PDF
Amendment_0007.pdf PDF
P-995_SITE_VISIT_ATTENDEESlist_.pdf PDF
Amendment_0006.pdf PDF
AMENDMENT_0005.pdf PDF
AMENDMENT_0004.pdf PDF
2018_1380460_P-995_DB_MCSFRBEQ_Part_4.pdf PDF
2018_1380460_P-995_DB_MCSFRBEQ_Part_3.pdf PDF
AMENDMENT_0003.pdf PDF
2018_1380460_P-995_DB_MCSFRBEQ_Part_1_and_2.pdf PDF
AMENDMENT_0001.pdf PDF
Attachment_A_-_Construction_and_Design_Experience_Project_Data_Sheet.docx DOCX document
Attachment_C_-_Small_Business_Subcontracting_Record.docx DOCX document
18R1104_SOLICITATION.pdf PDF
Attachment_B_-_Past_Performance_Questionnaire.docx DOCX document
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

INDEFINITE DELIVERY INDEFINITE QUANTITY MULTIPLE AWARD CONSTRUCTION CONTRACT FOR LARGE GENERAL CONSTRUCTION

PROJECTS PRIMARILY IN THE HAMPTON ROADS AREA OF VIRGINIA, NAVFAC MID-ATLANTIC

The Proposal due date is Wednesday, 31 January 2018 @ 1400 EST. and remains unchanged.

SEE SECTION SF-30 BLOCK 14 CONTINUATION PAGE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Jan-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R1104

X 9B. DATED (SEE ITEM 11)

22-Dec-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Jan-2018

CODE

NAVFAC MID ATLANTIC

HAMPTON ROADS IPT

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008518R1104

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

INDEFINITE DELIVERY INDEFINITE QUANTITY MULTIPLE AWARD CONSTRUCTION CONTRACT

FOR LARGE GENERAL CONSTRUCTION PROJECTS PRIMARILY IN THE HAMPTON ROADS AREA OF

VIRGINIA, NAVFAC MID-ATLANTIC

The purpose of this amendment is to provide the following:

(1) Response to PPIs 39-50

(2) Solicitation Revisions

(3) Clause Revisions

1. PPI RESPONSES:

Count

Reference Question

Government Response Pag e

Section Para-graph

NA NA NA

In an effort to provide a more significant depth of expertise and resources, our team is contemplating a joint venture arrangement among two to three design-engineering firms. The members would not be submitting projects that were completed together. In this case, please identify whether each member of the joint venture would be required to submit 3-5 projects.

Or, whether the expectation would be that the joint venture as a whole is to submit 3-5 projects.

SEE

AMENDMENT

11 00100 2

Will the Government lower the final construction cost requirement from $15,000,000 to $10,000,000 for relevant similar projects?

BID PER RFP

11 00100 2

Will the Government increase the recency from 5 years to 10 years for relevant projects, as we have seen numerous other Federal agency allow this?

BID PER RFP

11 00100 2

Many Government agencies, including the Navy, have allowed projects that were 80% complete to be acceptable as experience. Will the Government consider projects 80% complete for this solicitation?

BID PER RFP

9 00100 1

For Joint Ventures, will you accept a bank reference letter for each member of the Joint Venture?

SEE

AMENDMENT

9 00100 1

For Joint Ventures, will you accept line of credit information for each member of the Joint Venture?

SEE

AMENDMENT

1 SF1442 13A

Due to the recent extreme weather and shut down of roads/offices, it has been difficult for some of our clients to get PPQ's executed. Will the Government consider a 14 day extension for the proposal due date to make up for lost time during the holiday season and this severe weather event?

SEE

AMENDMENT

BI

D

FO

RM

In light of the RFP being posted the Friday before Holiday Break, and the Hampton Roads area being hit with an additional 5 work day loss due to weather, we are requesting a reasonable extension to allow us to prepare and submit the required paperwork for the project. We ask for your consideration in this matter.

SEE

AMENDMENT

Ge ner al

We are requesting additional time to prepare the paperwork for the MACC. Given the fact that the RFP was issued just before Christmas/New Years break, it does not allow us to file all the paperwork required to be found responsive.

SEE

AMENDMENT

of

Section 00100

4.

Evaluati on Factors

For Award, Factor 2 Experie nce, (2) Design Experie nce

Please clarify RFI Response 33 issued in Amendment 0001," INTENT COMMENT - The intent here is not to limit the number of proposed A/E Firms as DOR however submittal requirements is expected for each DOR identified in the proposal." When you say submittal requirement for all AE/DOR firms identified, do you want Experience and Past Performance submitted for each designer identified? Should we submit 5 projects for each designer? Or 5 projects total representing all design partners?

SEE

AMENDMENT

11-of

Section 00100,

4. Evaluation Factors for

Award, Factor 2: Experience

N/A

Factor 2 (2) Design Experience requests documentation of sustainable features, while (1) Construction Experience does not request such documentation. If the Offeror has LEED (or equivalent) documentation for Construction Experience, may it be provided?

SEE

AMENDMENT

20/

5.2.1. Price

Proposal and

Non-Cost/Price Factors

Proposal

1. Will a contractor’s proposal submitted without a CAGE code be considered compliant if all SAM’s Registration information is complete and the firm or JV is awaiting the assignment of the Code by the Government?

The SAM’s system is currently very slow regarding the assignment of CAGE numbers, a situation that is beyond a contractor or new JV’s control.

FAR 52.204-7 System for Award Management.

States (b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any

BID PER RFP

contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

FAR 52.204-16, COMMERCIAL AND

GOVERNMENT ENTITY REPORTING (JUL

2016) directs: (f) Do not delay submission of the offer pending receipt of a CAGE code.

Our Joint Venture is currently engaged in the process but we are concerned that we may not receive our CODE prior to the proposal due date.

2. SOLICITATION REVISIONS

CURRENT:

ADDITIONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL PACKAGE:

RESPONSIBILITY DETERMINATION INFORMATION - In order to be eligible for award, the offeror must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards. In a separate Tab, the offeror shall provide the following information in the price proposal package:

1. One (1) Signed Bank Reference demonstrating adequate financial resources. If offeror’s firm has a line of credit – provide information on how many figures offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required).

REVISED TO:

ADDITIONAL INFORMATION TO BE SUBMITTED WITH PRICE PROPOSAL PACKAGE:

RESPONSIBILITY DETERMINATION INFORMATION - In order to be eligible for award, the offeror must be determined responsible in accordance with FAR Part 9, specifically 9.104-1, General Standards. In a separate Tab, the offeror shall provide the following information in the price proposal package:

1. One (1) Signed Bank Reference demonstrating adequate financial resources. If offeror’s firm has a line of credit – provide information on how many figures offeror can borrow against the line of credit (i.e. medium 6 figures – exact line of credit is not required). For Joint Venture arrangements, a Signed Bank Reference for each company in the Joint Venture in addition to any available line of credit information.

REVISED AS FOLLOWS:

Factor 2 – Experience:

(i) Solicitation Submittal Requirements:

The Offeror shall submit the following information:

(1) Construction Experience:

Submit a minimum of three (3) up to a maximum of five (5) relevant construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the projects proposed for this MACC. For purposes of this evaluation, a relevant project is further defined as:

Size: A final construction cost of $15,000,000 or greater. At least one (1) project must have a final construction cost of $35,000,000 or greater.

Scope/Complexity: New building construction and/or interior/exterior alteration or renovation of facilities that include repairs to multiple building systems and infrastructures. Projects submitted that only include horizontal or civil site work will not be considered relevant.

Additionally, submitted relevant projects shall, cumulatively, demonstrate the following characteristics:

a) Offerors shall have acted as the prime contractor on submitted projects. Offeror’s experience performing as subcontractor will not be considered, nor will experience of companies proposed to work as subcontractors on the awarded contract.

b) Experience with both new construction (at least one (1) project) and renovation (at least one

(1) project).

c) Experience with design-build (at least one (1) project).

Projects submitted for the Offeror shall be must have been completed within five (5) years of the date of issuances of this RFP.

A project is defined as a complete design effort performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project;

rather Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. Clearly identify the LEED rating level for projects that are certified by the U.S. Green Building Council (USGBC) or equivalent organization. Also identify if the project is LEED “Self Certified” or “Sustainable Validated” project (i.e. those that were not able to achieve LEED certification). The Offeror shall provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process. The validation/certification for sustainable features documentation is not included in the Factor 2 –Experience Page limitation.

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the JV members. Offerors who fail to submit experience for all JV members may be rated lower. Offerors are still limited to a total of five (5) projects combined. For a JV, the offeror shall submit the signed JV agreement. For 8(a) Mentor-Protégé Joint Ventures, the offeror shall submit the signed and U.S. Small Business Administration (SBA) approved Mentor-Protégé agreement.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.

Experience of proposed subcontractors will not be considered for construction experience.

(2) Design Experience

Both design-build and design-bid-build projects may be contemplated under this MACC. Therefore, the Offeror is required to address the design firm to be proposed on the seed project and anticipated future projects. Offerors shall clearly state the Architect-Engineer firm that is proposed to be utilized as the Designer of Record (DOR) for the seed project and future task orders under this MACC. Provide the full name of the firm, address, DUNS number, and CAGE code. The designated firm will be required to be utilized as the DOR on future design-build task orders under the resulting MACC, unless a substitution is approved by the Contracting Officer for the proposed task order. The Offer must provide a supporting signed joint venture agreement, partnership agreement, teaming agreement, or letter of commitment with the Architect-Engineer firm that is proposed to be utilized as the Designer of Record (DOR).

Submit a minimum of three (3) up to a maximum of five (5) relevant projects performed by the proposed Designer Of Record that best demonstrates your experience in a diverse range of design tasks similar in size, scope and complexity to the projects proposed for this MACC. If the Offeror is proposing more than one DOR, relevant project experience may be submitted for all proposed DORs. Offerors who fail to submit experience for all proposed DORs may be rated lower. Offerors are still limited to a total of five (5) projects combined for design experience.

For purposes of this evaluation, a relevant project is further defined as:

Size: A final construction cost of $15,000,000 or greater. At least one (1) project must have a final construction cost of $35,000,000 or greater.

Scope/Complexity: Design of new building construction and/or interior/exterior alteration or renovation of facilities that include repairs to multiple building systems and infrastructures. Projects submitted that only include horizontal or civil site work will not be considered relevant.

Additionally, submitted relevant projects shall, cumulatively, demonstrate the following characteristics:

a) Experience as the designer of record on all submitted projects.

b) Experience with both new construction (at least one (1) project) and renovation (at least one (1) project).

c) Experience with design-build (at least one (1) project).

Projects submitted shall be completed within five (5) years prior to the date of issuance of this RFP. For design-build projects, the design portion of the contract shall have been completed within five (5) years prior to the date of issuance of this RFP. The design completion date shall be clearly stated on the Construction & Design Experience Project Data Sheet (Attachment C).

A project is defined as a complete design effort performed under a single task order or contract/subcontract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

The attached Construction & Design Experience Project Data Sheet (Attachment C) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods). In addition, the description should also address any sustainable features for the project, including specific descriptions of those features. The Offeror shall provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or the equivalent organization or process. The validation/certification for sustainable features documentation is not included in the Factor 2 –Experience Page limitation.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract. If meaningful involvement is not demonstrated, experience of the affiliate/subsidiary/parent firm will not be considered.

The Offeror may utilize experience of a design subcontractor as the Designer of Record in order to demonstrate design experience under this evaluation factor. The Offer must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement for the design subcontractor. If the agreement/letter is not provided or meaningful involvement is not demonstrated, experience of the proposed designer will not be considered.

(ii) Basis of Evaluation:

The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction and design projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five projects for construction and five for design. Any projects submitted in excess of the five (5) for Construction Experience and five (5) for Design Experience will not be considered.

Relevant projects where the Offeror and the proposed design firm(s) have previously worked together may receive a higher rating than those that have not worked together.

Relevant projects that demonstrate design-build experience may receive a higher rating than those that do not have design-build experience.

Relevant projects that demonstrate experience with sustainable features may receive a higher rating than those that do not demonstrate experience with sustainable features.

Relevant projects that demonstrate the ability to perform multiple projects simultaneously may be considered more favorably than those who do not have experience performing multiple simultaneous projects.

(End of Summary of Changes)