This is a pre-solicitation notice for an indefinite delivery indefinite quantity multiple award construction contract for large general construction projects in the Hampton Roads area of Virginia. The Naval Facilities Engineering Command Mid-Atlantic intends to award up to five firm fixed price contracts for a one year base period plus four one-year options, with a total estimated value of $249 million. Projects will range from $14 million to $37 million but may be smaller or larger. The initial task order will be for the design and construction of a $25 million to $100 million Marine Corps bachelor enlisted quarters building at Naval Weapons Station Yorktown. Offerors must submit a bid guarantee of at least 20% of the largest award amount up to $3 million. The request for proposal will be issued on December 15, 2017 via the Navy Electronic Commerce Online website.
AMENDMENT_0009.pdf
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
INDEFINITE DELIVERY INDEFINITE QUANTITY MULTIPLE AWARD CONSTRUCTION CONTRACT FOR LARGE GENERAL CONSTRUCTION
PROJECTS PRIMARILY IN THE HAMPTON ROADS AREA OF VIRGINIA, NAVFAC MID-ATLANTIC
PHASE II PROPOSAL DUE DATE HAS BEEN EXTENDED TO THURSDAY, 10 MAY 2018 AT 1400 LOCAL TIME.
PLEASE SEE SECTION SF 30 BLOCK 14 CONTINUATION PAGE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 28
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Apr-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R1104
X 9B. DATED (SEE ITEM 11)
22-Dec-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Apr-2018
CODE
NAVFAC MID ATLANTIC
HAMPTON ROADS IPT
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008518R1104
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0009
The purpose of this amendment is to provide the followings:
1. Phase II Proposal Due Date has been extended to: THURSDAY, MAY 10, 2018 @ 1400 local time
2. PPI Responses 57-150. Additional NAVFAC PPI Responses are forthcoming in a future amendment
3. Solicitation Revision
4. RFP Revisions
5. Attachment List (Separate Attachments)
2. PPI RESPONSES:
(ACQ)
COUNT
REFERENCE
QUESTION
GOVERNMENT
RESPONSE
PAGE
SECTION
PARA-
GRAPH
(ACQ)
16 of
Factor 6
Please confirm the Energy baseline is ASHRAE 90.1-2013 as referenced in Factor 6. Spec Section 01 33 29.05 20 makes reference to Ashrae 90.1- 2010.
See Amendment
58 243 Part Three
1.0 Project Descripti on
This paragraph tells us that the "structural frame of the building will be comprised of load bearing reinforced concrete masonry walls supporting concrete floor". Please confirm that structural steel framing (with bar joist and metal decking) is not allowed for the building structure.
Bid per RFP
Is there a Geotechnical Data Report for the P-995 site? The RFP package contains Geotechnical Data Reports for P-984-989 and 991, but not for P- 995.
See Amendment
Part 6C Drawin gs
The Part 6C drawings provided additional information regarding the P-995 project and surrounding projects. Are any of the civil/site files available in electronic format?
Bid per RFP
61 243 Part 3 1 States "The project site will also include a smoking gazebo and site
See Amendment amenities." Please provide additional information on size and structure and prefered location of the gazebo.
62 1385
Part 6C Attachment s (Drawings)
Conceptual Site Plan shows grasspave fire access on only one (1) side of the building. Per UFC 3-600- 01, Para 2-10-1.1 emergency access for residential facilities must be provided to three (3) sides. Please confirm that the project must meet this requirement.
Bid per RFP
198 &
Part 3 & Part 6C
Attachment s
(Drawings)
G204003
RFP requires bike racks for 5% of the building occupants. (260 x .05 = 13) Please confirm 13 bike racks are required.
Bid per RFP
64 1385
Part 6C Attachment
Please provide a "scaled" conceptual site plan for both the BEQ and parking area. Dimensions off the architectural floor plans are not matching up with the conceptual plan layout.
Bid per RFP
65 254 Part 3 3.2.1
This paragraph says the finished "ground floor" should be 69.00 feet (NAVD88). Please confirm whether the ground floor refers to either the first floor (A-101) or the second floor (A-102).
See Amendment
66 254 Part 3 3.2.1
This paragraph says the finished "ground floor" should be 69.00 feet (NAVD88). If ground floor refers to the second floor (A-102), then the first floor elevation may have drainage issues as the neareast parking is at elevation 57. Please provide the elevation of the 100-year storm through the adjacent stormwater ponds.
See Amendment
67 98
Part 2 Section 01 33 29.05
1.4.4
This section calls for GBI GB Compliance but there are multiple references in Part 3 to the project being LEED certified. See Part 3 Paragraph D202003 Page 372 where it states the designer must meet LEED Silver requirements. Please confirm the sustainability compliance requirements.
See Amendment
68 246 Part 3 2.3.2 Did adjacent stormwater features account for P-995 BEQ impervious footprint in their design?
Bid per RFP.
Part 6C Attachment
Please provide .dwg or .dgn files of site plans.
Bid per RFP.
70 406 D503001 2 Section calls out for a 25 pair Cat6 See Amendment
Cable however Section G403001 calls for a 50 pair voice grade connection. Which is correct?
71 406 D503001 2
Section calls out for 5" concrete encased ducts however Section G403001 calls for 6" ducts. Please identify the duct size we are to use/price for the telecommunications entrance requirements.
See Amendment
72 455 G4030 3
Section identifies that telecommunications service will originate in building 703 and route via existing duct to manhole CMH12 or nearest MH. The drawings identifying the location of 703 and existing manhole CMH12 are not provided.
Can those be provided for an accurate footage estimate?
See Amendment
73 409 D503005 5
There is a requirement for a Multi- Protocol, touch screen TFT-color LCD system keyboard/PTZ controller with 3D Joysitck. A previous paragraph requires Fixed cameras ONLY. Is the joystick required knowing that we don’t have any cameras to control via this joystick?
See Amendment
74 409 D503005 3
CCTV UPS Requirement - The UPS required for the CCTV system will require half a rack worth of batteries in order to provide 8 hours of runtime.
Is there a UPS planned for the Communications equipment? If so, would it be prudent to furnish one solution for each Comm Room.
Bid per RFP
75 2 of 10 Amd 3
Amendment 0003 contains over 1,000 pages of RFP specifications, 175 reference drawings, and 320 pages of reference reports. That represents a lot of information to evaluate and properly ensure a design is vetted against.
In addition, Factor 6 of the solicitation is asking for a Whole Building Energy Simulation, and an Energy Efficiency Narrative based on LCCA. These items require the Design-Build teams to run three different LCCAs on the mechanical systems listed in D30, along with subsequent building energy models. A critical first step to running these models is to confirm which ASHRAE baseline year the model is to be based off (several referenced in the RFP, see previous RFI submitted).
To provide all of this information, and still allow ample time for the subcontractor and vendor community to price the design in just over 4 weeks is an extremely difficult task.
We respectfully request a two week bid extension to allow ample time to digest the RFP, assemble a design that meets the RFP, and to run all of the necessary LCCA and Energy Models requested.
76 73, 81 01 33
10.05 20 1.9
Section 1.9 of the Design Submittals references meeting Sustainable Design requirements and submitting and obtaining the LEED certification for the project. Please confirm what level of LEED certification is required (Part 3, D202003 references LEED Silver, but no other references are found).
Spec 01 33 10.05 also references LEED NC 2009. In order to register the project under 2009, the project already needs to be registered. If it isn't, the LEED certification will need to follow v4. Please confirm the project has already been pre-registered with LEED under the 2009 standards.
See Amendment
77 377 D30 HVAC
2 System Descripti on
Under Part 3, ESR D30, the ventilation shall be provided by independent DOAS system. In UFC 3-410-01 Change 4, section 3-2.1, it states that the DOAS must distribute airflow directly to zones without passing through light-duty equipment. We would like to know if a VAV airside system type would be acceptable on this project to supply ventilation air that is dehumidified and conditioned in accordance with all other RFP and UFC requirements to be delivered to either the return deck side of a medium pressure air handling unit, or possibly even a fan power terminal device that then would distribute the ventilation air to the zone. This particular UFC requirement is counterproductive with respect to energy conservation methodology in that it currently requires that all ventilation air to be cooled, dehumidified and then reheated to space temperature neutral. This, in many times of the year, creates scenarios where the ventilation air is unnecessarily reheated by either hot-gas DX or natural gas sources, when that cool and dehumidified air could actually be used to sensibly cool many areas of the facility. The end terminal devices which in accordance with the RFP will have the ability to reheat the ventilation air on an as-needed basis to satisfy the space conditions more energy efficiently, in turn resulting in economic benefits to the end user.
78 N/A N/A N/A
We respectfully request an extension to the proposal due date, which is currently set for April 10th, 1400 EST.
Based on the extent of the design effort in regards to the mechanical system's Life Cost Cycle Analysis (LCCA) required, it would be beneficial to all parties to ensure designers have adequate time to provide a thorough, detailed and effective LCCA to be included in all proposals by all solicitors. In addition, the Portsmouth Ship Training Facility NAVFAC Mid Atlantic proposal is due on the same date. Staggering these due dates will allow adequate time for contractors (particularly small businesses) enough time to provide the most valuable input to both solicitations. Please consider extending this proposal due date 3 weeks.
See Amendment
79 305
5. Room
Requireme nts
N/A
The room data sheet for “ELEVATOR” indicates that (1) elevator is acceptable for (3) story or less BEQ(s), and (2) elevators are necessary for (4) or (5) story BEQ’s.
The bridging documents indicate only one elevator in the building on the floor plans and in Part 3, paragraph
2.2 Facility Function, which states, “Building egress and circulation shall be achieved through three stairwells and one elevator. Part 3, 4.0 Building requirements, in the 4.1 Space Tabulation and 4.2 Bubble Diagrams indicates that the facility will be (4) stories, which would require (2) elevators.
Please clarify if it will be acceptable to provide one elevator, or if we need to modify the floor plan and scope to provide (2) elevators due to the (4) story structure. If (2) elevators are required, please consider a proposal time extension of 3 weeks so that building programming and SF can be thoughtfully adjusted.
80 372 D202003 N/A
Please confirm LEED certification for building P-995 and it's corresponding scope is not required to be included in this proposal.
See Amendment
81 269
4.0 Building
Requireme nts
4.3 Exterior
Characte r
Please provide the most recent set of drawings for adjacent BEQ's. This will be benefical to ensure the RFP requirement to "match the existing structures…" is accomplished in the best way that pleases the customer and final users.
Bid Per RFP.
Amend ment 003;
item #14 N/A
Pursuant to Amendment 03 and confirmed in Amendment 04, the Phase II Proposal Due Date is set for April 10th at 2:00PM EST. We respectfully and responsibly request an extension (not less than two weeks) to the current due date based on following three impacts; (Impact 1) Four weeks is insufficient time to generate pricing documents for bidding purposes, solicit and receive market pricing from subcontractors, and compile the technical solution for submission; (Impact 2) The site visit was confirmed to be a day later than originally set, now just 19 days prior to the due date; (Impact 3) the proposal response period is inclusive of the Easter Holiday and Spring Break vacation week. Many of our subcontractors and vendors will be off this week and we are concerned that having the proposal due the Tuesday after their return to work will tremendously impact the volume and quality of the current market participation.
See Amendment
RFP
Part 3- Project Progra m
Chapter 6 - Engineerin g Systems Requireme nts
A.10 Standard Foundati ons
Pursuant to Part 3 – Project Program, Chapter 6 Engineering Systems Requirements, Section A10 Foundations, 10 (Standard Foundations), the RFP indicates that the DOR is to provide an appropriate Standard foundation system to support the structures associated with this project. Then the next section, Section, A101001 (Shallow Foundations), states “the structure(s)
Bid per RFP shall be entirely supported by a shallow foundation system only as permitted in Section A1010.” Finally, the subsequent section, Section A101002 (Deep Foundations), states “the barracks structure(s) shall be entirely supported by a pile foundation system consisting of auger placed grout piles”. Since Section A101002 specifically states the “barracks” structure(s), (Question 1) is it intended that the barracks structure has to be supported by a pile foundation system consisting of auger placed grout piles or (Question 2) is it possible to propose an alternative foundation system to support the barracks structure, such as shallow foundations or other alternatives, assuming the Geotechnical Engineer determines that such foundations are acceptable and meet the other requirements stipulated in the RFP pending the completion of an additional geotechnical investigation?
Phase
Solicita tion;
Page 16 of
Factor 5 – Technical Solution
(i) Solicitatio n Submittal Require ments
Pursuant to the Phase I Solicitation, Page 16 of 65, Factor 5 – Technical Solution, (i) Solicitation Submittal Requirements, “Up to three (3) conceptual 11” x 17” drawings may be provided to supplement the narrative”.
With this project consisting of a multi-story BEQ facility, we respectfully request this page limitation be increase to at least five (5) pages to allow for adequate depiction of our conceptual floor plans, site layout plan(s), roof plan and building elevations.
See Amendment
RFP
Part 3- Project Progra m
Chapter 5 / Room
Requireme nts
Elevator Uniforma t Section D203004
Part 3 - Chapter 5 / Room Requirements - Elevator Uniformat Section D203004 specific requirements state to provide an oil/water separator to serve elevator equipment room and elevator shaft floor drains/sumps. Provide sump pump. However, Part 3 - Chapter 6 / ESR D20 section D203004 Sanitary & Vent Equipment calls for an oil sensing sump pump in the elevator pit with audible and light at the Quarter Deck. Please clarify which system is preferred?
See Amendment
RFP
Part 3- Chapter 6 /
ESR D20
section D202003
Part 3 - Chapter 6 / ESR D20 section D202003 Domestic Water Equipment
Project Progra m
Domestic Water
Equipme nt requires a solar domestic water system to supply 30% of the daily demand for domestic hot water. The last paragraph states that the solar system is required to be life cycle cost effective for a study of 40 years. Is the requirement of the solar system based solely on the LCAA effectiveness or is the solar domestic water system a requirement of the
RFP?
RFP
Part 3- Project Progra m
Chapter 6 /
ESR D20
Part 3 - Chapter 6 / ESR D20 does not reference a Lint Interceptor. Will a lint interceptor be required on the combined discharge from the washing machines prior to connecting to sanitary?
Bid per RFP
RFP
Part 3- Project Progra m
Chapter 5 / Room
Requireme nts
Multi- Purpose Room Prep
Kitchen Uniforma t Section D201004
Part 3 - Chapter 5 / Room Requirements - Multi-Purpose Room Prep Kitchen Uniformat Section D201004 states to have an undermount countertop kitchen sink with a 10" minimum depth. This depth does not comply with ADAG requirements for a kitchen sink. Is the prep kitchen sink exempt from ADAG requirements or do we indicate a bowl depth in compliance with ADAG?
Bid Per RFP.
RFP
Part 3- Project Progra m
Chapter 5 / Room
Requireme nts
Public Toilets
Part 3 - Chapter 5 / Room Requirements - Public Toilets - Men's & Woman's Uniformat Section D201001 states to provide manual flush valve type water closets.
However, Part 3 -Chapter 6 / ESR D20 Section D201001 Water Closets calls for water closets to be floor mounted dual function flush valve water closets with electronic flush controls in all public restroom spaces.
Which flushing action is preferred manual or electronic? If electronic, hard wired or battery operation?
See Amendment
RFP
Part 3- Project Progra m
Chapter 6 /
ESR B30
Section B301005 Gutters and Downspo uts
Part 3 - Chapter 6 / ESR B30 Section B301005 Gutters and Downspouts states to provide gutters and downspouts compatible with roofing material and finish. However, Part 3 - Chapter 6 / ESR D20 Section D24002 Roof Drains states to provide roof drains that are compatible with roofing system. Which is the preferred rainwater system (gutters or roof drains)?
See Amendment
RFP
Part 3- Chapter 6 /
ESR D20
D204090
Part 3 - Chapter 6 / ESR D20 paragraph D204090 Other Rain
Project Progra m
Other Rain
Water Drainage System
Water Drainage System states to provide a complete rainwater management system with gray water to water closets. Please clarify that this system is required. Also, should the gray water be piped to all water closets throughout the facility or a percentage of the water closets?
RFP
Part 3- Project Progra m
Chapter 6 /
ESR D30
HVAC
Part 3 - Chapter 6 / ESR D30 paragraph D30 HVAC states to comply with specific UFC criteria but does not mention UFC 3-410-
01. Please confirm the project should adhere to UFC 3-410- 01? Additionally, please confirm which year we should adhere to for the UFCs.
See Amendment
RFP
Part 3- Project Progra m
Chapter 6 /
ESR D30
HVAC
Part 3 - Chapter 6 / ESR D30 paragraph D30 HVAC states to comply with the latest edition of ASHRAE 90.1 and 62.1. Please provide the applicable edition for competitive bid purposes.
See Amendment
RFP
Part 3- Project Progra m
Chapter 6 /
ESR D30
System Descripti on
Part 3 - Chapter 6 / ESR D30 System Description states "General system type shall be VAV air handlers with fan powered terminal units." Please confirm this statement is only if the VAV system is deemed as the system per LCCA.
Bid Per RFP.
RFP
Part 3- Project Progra m
Chapter 6 /
ESR D30
Ventilatio n
Systems
Part 3 - Chapter 6 / ESR D30 Ventilation Systems states to provide a minimum of 40 CFM ventilation air;
however, UFC 3-410-01 with Change 4 states that the minimum shall be 50
CFM.
Bid Per RFP.
RFP
Part 3- Project Progra m
Chapter 6 /
ESR D30
Exhaust Systems
Part 3 - Chapter 6 / ESR D30 Exhaust Systems states to comply with ASHRAE 62.1-2007. Please confirm this is the correct version of 62.1 or provide the correct version.
See Amendment
RFP
Part 3- Project Progra m
Chapter 6 /
ESR D30
General System Require ments
Part 3 - Chapter 6 / ESR D30 General System Requirements states H&V inside conditions shall be 92F;
however, it also states a maximum of 10F above ambient which would be 102F. There is no way to guarantee 92F without a cooling system. Please confirm the design intent should be ventilation cooling to limit to a maximum of 10F above ambient.
See Amendment
RFP
Part 3- Project Progra
Chapter 6 /
ESR D30
Equipme nt
Require ment
Part 3 - Chapter 6 / ESR D30 Equipment Requirements states condenser coils shall be copper-fins mechanically bonded to m copper tube sheets. Please verify this requirement applies to all air cooled d condenser coils regardless of size. It is our understanding that some small units (less than 5 tons) did not have to adhere to this requirement. Additionally, it is our understanding that Aluminum fins with copper tubes would be acceptable if they are coated to meet the 3,000 hour salt-spray criteria per ASTM B- 117.
RFP
Part 3- Project Progra m
UFC 4-
721-10, Section 3-30.4
Per UFC 4-721-10, Section 3-30.4, each resident closet shall have "continuous ventilation in closets to resist mold and mildew growth." There have been different interpretation of this section. We have the following options/interpretations:
a) Does this continuous ventilation need to be Fresh Air from the DOAU introduced to the closet which can pressurize this air to the entire module? If yes, please clarify if the rate should be 50 CFM or something else.
b) Does this continuous ventilation need to be exhaust air removed with the bathroom exhaust which will cause the closet to be negatively pressurized and increase the minimum outdoor air requirements to maintain building pressure? If yes, please clarify if the rate should be 50 CFM or something else.
c) Does this continuous ventilation need to be recirculation air returned to the unit serving the module? If yes, please clarify if the rate should be 50 CFM or something else.
Bid Per RFP.
100 379 Part 3, Section 6, D30 HVAC
1. VAV
Systems
The last paragraph under VAV systems discussed a constant volume ventilation by using an "injection fan" putting outside air into the VAV air handler. This appears to be in conflict with Section D304008 which states to provide a "separate and independent" unit to provide the ventilation.
Furthermore, the paragraph seems to contradict the requirements of section
3.2 of UFC 3-410-01 Change 4 which discusses independent ventilation equipment and its delivery to the space. Is the intent to follow the RFP or UFC 3-410-01?
101 273 Part 3, Section 5, Bedroom Module
D304001 requires demand ventilation.
However, Section D30 HVAC, System Description states "economizers are not to be used". Also, section System Description, 1. VAV Systems states to "Maintain a constant volume of outside air ventilation". Is the intent of the RFP to provide demand control ventilation or constant volume ventilation?
See Amendment
102 380 Part 3, Section 6, D30 HVAC
Ventilatio n
Systems
This section states to provide each room plan with a minimum of 40 CFM of ventilation air and exceed the exhaust by 15%. ASHRAE 62.1 ventilation allows for less than 40 CFM of exhaust, but UFC 3-410-01 Change 4 paragraph 3.2 requires a minimum of 50 CFM per diffuser/grille. Is the intent to comply with the RFP, ASHRAE 62.1, or UFC 3-410-01?
Bid Per RFP.
103 379 Part 3, Section 6, D30 HVAC
1. VAV
Systems
The system of choice of the RFP includes VAV series style fan terminal units. UFC 3-410-01 Change 4, Section 3.2 has two types of equipment: "light duty equipment" and "medium duty equipment". VAV series fan terminals do not appear to fall in either category of equipment.
Since the category of equipment denotes the delivery method of the ventilation air, the classification of the VAV terminal is needed. What is the classification of the VAV series fan terminal?
See Amendment
Amendm ent 0003
- Part 6C Drawings
Part 1
In order to comply with the UFC's guidelines, parking count and landscape ratio, we estimate that the P-955 BEQ Remote Parking Lot will need to expand in width by about 210 feet. This should meet the parking count and accommodate two 9' wide bioswales (for stormwater management), 26' drive aisles, and 18.5' parking stalls. Does the Gov't wish to increase the width of this parking lot or should we remain in the boundaries shown in the RFP documents? The latter option will require that some of the current requirements will have to be waived.
See Amendment
Part 6C Drawin gs
The Part 6C drawings provided additional information regarding the P-995 project and surrounding
Bid per RFP projects. Are any of the civil/site files available in electronic format?
Part 3
Pg.
D30
Part 3 section D30 (Pg. 377) indicates that “All facilities shall be designed in conformation with the latest edition of ASHRAE 90.1”. The latest edition of ASHRAE 90.1 is 2016. Please confirm that this is the standard that the facility should be designed according to.
See Amendment
Part 3
Pg.
D30
Part 3 section D30 (Pg. 377) indicates that “General System type shall be variable-air-volume air handlers with fan-powered terminal units”. This appears to in conflict with later direction for the system type to be based on a Life Cycle Cost Analysis. Please clarify.
See Amendment
Part 3
Pg.
D30
Part 3 section D30 (Pg. 377) indicates to: ”Provide a separate and dedicated outdoor air system with total enthalpy wheel for energy recover”, This direction is repeated under the “Ventilation Systems” section. This appears to in conflict with one of the three main system types discussed in D30, “VAV Systems” where the first paragraph ends with the statement “Outside air ventilation air for the facility shall be delivered through the VAV air handling unit(s)….” Please clarify.
See Amendment
Part 3
Pg.
D30
Part 3 section D30 (Pg. 377) in the first paragraph directs the designer that “In addition to meeting EPAct 2005, the 30% energy efficiency requirements, and the Sustainable Building requirements, consider the following items:” and then lists as one item to be considered the following: “Heat recovery for domestic hot water using heat recovery from the chiller.” This appears to in conflict with what appears to be explicit direction on pg.
378 to “Provide heat energy recovery from chill to domestic hot water system”. Please Clarify.
See Amendment
Part 3
Pg.
D30
Part 3 section D30 (Pg. 377) in the first paragraph directs the designer that “In addition to meeting EPAct 2005, the 30% energy efficiency requirements, and the Sustainable Building requirements, consider the following items:” and then lists as one item to be considered the following: “Radiant barriers on mechanical systems and equipment.”
This appears to in conflict with what appears to be explicit direction on pg.
378 to “Provide radiant barrier on mechanical systems and equipment”.
Please Clarify.
Part 3
Pg.
D30
Part 3 section D30 (Pg. 378) states to “Provide radiant barrier on mechanical systems and equipment”.
It is unclear how radiant barriers for equipment would be used or where.
Please provide additional information.
See Amendment
Part 3
Pg.
D30
Part 3 section D30 (Pg. 377) in the first paragraph directs the designer that “In addition to meeting EPAct 2005, the 30% energy efficiency requirements, and the Sustainable Building requirements, consider the following items:” and then lists as one item to be considered the following: “Radiant barriers in the exterior wall system an in the attic/roof system”. This appears to in conflict with what appears to be explicit direction on pg. 378 to “Provide radiant barrier in the exterior wall system”. Please Clarify.
See Amendment
Part 3
Pg.
D30
Part 3 section D30 (Pg. 378) says the following: “Optimize the building envelope and window requirements to exceed ASHRAE 90.1-2007 requirements. ASHRAE 90.1-2007 does not appear to be referenced anywhere else in the RFP, please clarify which version of ASHRAE 90.1 the building envelope should be designed to. Additionally, if ASHRAE 90.1 is the standard to be designed to, would it not be acceptable to meet the requirements as opposed to exceeding the requirements so long as the energy efficiency goals of the building are met otherwise?
See Amendment
Part 3
Pg.
D30
Part 3 section D30 (Pg. 379) under “1.
VAV Systems” there is a description that reads as follows: “It shall consist of VAV air handling units serving VAV fan powered terminal units throughout the facility and a dedicated outdoor air system with 100% exhaust air energy recovery using total enthalpy wheel(s). The last sentence in the same paragraph appears to conflict with the direction for a dedicated outdoor air system, it says: ““Outside air ventilation air for the facility shall be delivered through the VAV air handling unit(s)….”. Please clarify if a dedicated outside air system is required or not.
Part 3
Pg.
D30
Part 3 section D30 (Pg. 379) under “1.
VAV Systems” there is a description that reads as follows: “Maintain a constant volume of outside air ventilation though the central station VAV air handling unit by using an injection fan and a constant volume terminal with a pressure independent velocity controller in order to keep the ventilation airflow constant as the VAV air handling unit modulates”. Is this suggesting that if a VAV system is provided, that demand controlled ventilation is not required as directed in an earlier section of the D30? If so, then does it follow that CO2 sensors will not be required in any of the spaces that call for them in the room functional requirements sheets?
See Amendment
Part 3
Pg.
D30
Part 3 section D30 (Pg. 380) under “Ventilation Systems” there is a sentence that says: “Ventilation air to the building shall exceed room exhaust air by a minimum of 15%”.
This appears to be in conflict with a statement under “VAV Systems” where the following was stated: “It shall consist of VAV air handling units serving VAV fan powered terminal units throughout the facility and a dedicated outdoor air system with 100% exhaust air energy recovery using total enthalpy wheel(s)”.
Bid per RFP
Part 3
Pg.
D30
Part 3 section D30 (Pg. 380) under “Ventilation Systems” there is a sentence that says to: “Provide an independent and dedicated ventilation system for the Multi-Purpose room”.
If a dedicated outside air system is provided for the building, it would be more cost effective, and equally energy efficient to simply provide a CO2 controlled vav box to manage ventilation air to the MP room, would this be acceptable?
See Amendment
Part 3
Pg.
D30
Part 3 section D30 (Pg. 382) System Requirements suggest that
382 Mechanical, Storage and Electrical rooms be mechanically ventilated. Would it be acceptable to condition these rooms to the same temperatures? We believe that the life of the equipment located in these rooms will be extended if not frequently subjected to the dust, pollen and dirt that is introduced into the rooms when mechanically ventilated. Electrical rooms would also benefit due to less derating of the equipment if setpoints are cooler than 10°F above ambient.
Part 3
Pg.
D30
Part 3 section D30 (Pg. 382) System Requirements suggest that Mechanical, Storage and Electrical rooms be mechanically ventilated to:
“Provide supply and exhaust ventilation for the mechanical room if there is no fuel-fired combustion equipment present”. Would it be acceptable to ventilate the mechanical room by exhaust only and provide a makeup air louver? This would reduce maintenance and be a more energy efficient solution, no down side that I can see.
See Amendment
Part 3
Pg.
D30
Part 3 section D30 (Pg. 384) indicates that: “All interior mechanical equipment shall have painted finishes that pass a salt-spray test conducted per ASTM B117 for a duration for at least 500 hours”. Please clarify what kinds of interior mechanical equipment this applies to. For instance, VAV boxes, WSHP units, Unit heaters, are not available from the factory with such coatings and would be very expensive to have treated, we want to make sure this kind of equipment is what the government has in mind for these coatings before we proceed.
See Amendment
Part 3
Pg.
D30
Part 3 section D30 (Pg 380) under “Ventilation System” states: “Outside air ventilation for the BEQ must be provided by an independent and dedicated ventilation system(s)….Provided and maintain a constant volume of outside ventilation air to each Room Plan and other spaces”. This appears to be in conflict with demand controlled ventilation that has been indicated as a requirement on most spaces in the facility in the space criteria sheets.
Please clarify which spaces require demand controlled ventilation.
Part 3
Pg.
D30
Part 3 section D30 (Pg. 385) indicates that: “All mechanical equipment shall have factory applied painted finishes that pass a salt spray test conducted per ASTM B117 for a duration of 300 hours”. This appears to be in conflict with a previous statement that referred only to Interior mechanical equipment, and reference a 500 hour salt spray test. Please clarify what kind of coatings are required for exterior vs interior mechanical equipment.
See Amendment
Part 3
Pg.
D30
Part 3 section D30 (Pg. 388) has a statement that reads: “If ductwork passes through a wall that extends from floor to underside of level above then a security grille shall be installed if the area of the duct exceeds 96 square inches”. This statement seems out of place as there does not appear to be and SCIF rooms in the facility. Please clarify requirement and where it would apply.
See Amendment
Pg.
D30
Part D30 (Pg. 388) provides some direction regarding the type of chilled water and hot water piping to be provided; however does not address the type of piping is acceptable for a common condenser loop if a water source heat pump system is selected.
Please advise.
Bid Per RFP
Part 3
Pg.
D30
Part 3 section D30 (Pg. 389) indicates to: “Provide insulated copper hot water supply and return piping…”. Is copper required regardless of size or can schedule 40 black steel be used on piping 2” and up?
See Amendment
Part 3
Pg.
D30
Part 3 section D30 (Pg. 389) indicates that: “All steel chilled water piping shall be painted and have a solids separator”. Solids separators are typically used on open piping systems such as cooling tower condenser water loops. Was it the intent here to require strainers?
See Amendment
Part 3
Pg.
D30
Part 3 section D30 (Pg. 390) indicates with respect air handling units to:
“Provide with ultraviolet disinfection system”. Please clarify what kinds of air handlers would require UV systems. DOAS only? Above a certain cfm? Only units that handle outside air?
Part 3
Pg.
D30
Part 3 section D30 (Pg. 391) indicates to “Provide integration of the new DDC system to the existing BACnet front-end server and existing application software…”. Please provide additional information regarding the existing DDC system and the level of integrations required. Are we to match the existing system? Johnson controls for example?
Bid Per RFP
Part 3
Pg.
D30
Part 3 section D30 (Pg. 389) indicates regarding dryer exhaust that: “Dryer intake air shall be drawn into the dryer plenum/chase area through the exterior intake/exhaust louver and enter the rear of the dryers. This method prevents the need for conditioning dryer makeup air.” This appears to be in conflict with direction on the room criteria sheets for the Laundry rooms (Pg. 313 for example) which states: “A plenum shall supply treated outdoor air directly to the dryers....”. Please clarify if makeup air should be pre-conditioned or if unconditioned air is acceptable for makeup air into the plenum.
See Amendment
The room criteria sheets for the Bedroom modules indicate that CO2 sensors shall be provided with demand controlled ventilation (DCV). Please confirm that this control strategy is required for all bedrooms. Additionally, since DCV strategies only allow reset to the “Building Component” of the outside air requirement (Ra *Az), is the government certain that the cost of DCV and associated CO2 sensor maintenance/calibration will be justified for the savings of 20 cfm at best during unoccupied times? Also, if DCV is required, will exhaust rates for the bathrooms, which are described as constant in section D30 be required to drop as well to maintain building positive pressure? If this is the case, the “sub-duct” method of exhausting restrooms will not work, nor will a vertical exhaust riser work. Each outside air duct and each exhaust duct to each bedroom module would need to be independently controlled by a damper and/or other mechanical means. We respectfully recommend that DCV strategies be reserved for high occupant density areas as the complexities introduced may outweigh the benefits.
The room criteria sheet for the Vestibules indicates “Provide Pre- Conditioned outside air, return air, exhaust air and supply air for each space/room” as well as “VAV series fan powered units- provide with reheat, and a min of 4 air changes per hour”. As vestibules are naturally ventilated, does the government still want outside air delivered to the vestibules? Also, typically we see vestibules heated only with no exhaust or return. Please clarify requirements for the vestibules.
See Amendment
Part 3 Pg.
D
Part 3 section D30 (Pg. 378) indicates that: “…the designer shall comply with 2009 Professional Engineer’s Guide for ENERGY STAR® label (included as an attachment in part of the this RFP package)”.
However, part 6 does not appear to include this attachment as stated.
Please provide attachment.
See Amendment
Part 3 Pg.
Part 3 section D30 (Pg. 378) indicates that: “After one year of operation, the contractor and his design agent shall accumulate the required energy usage data and submit an application and obtain the Energy Star for the Facility”. Energy Star® label requires the monitoring and reporting of actual energy use after a period of no less than 11 consecutive months of operation, in the past the government has been unwilling to share this data.
Please confirm that the government is prepared to release this energy usage data for the purpose of obtaining the ENERGY STAR® label?
See Amendment
Factor 6 – Energy and Sustainable Design says the following: “The Whole Building Solution requires the use of the following documents included in part 6 of this RFP” and lists a number of documents that are to be used for the energy model simulation. However, part 6 does not appear to include these attachments as stated. Please provide attachments.
Factor 6 – Energy and Sustainable Design says the following: “Provide a detailed narrative describing how the proposed solution will meet baseline ASHRAE 90.1-2013”. Part D30 suggests that the building should be designed to the “Latest” version of ASHRAE 90.1, which would be 2016, which is conflict with the first sentence. Please clarify which version of ASHRAE 90.1 the building should be designed to. (Note that which version the building is designed to, and which Is used for the purposes of demonstrating EPAct-2005 compliance as a “Baseline” building, can be, and typically are, different versions.”
See Amendment
Part 3
Part 3 section D30 (Pg. 378) regarding heat wheels in the dedicated outdoor air system states: “However, equipment must be sized assuming a 50% efficient heat wheel in order to account for the loss in efficiency of the wheel over time.
The next sentence says: “The system shall be designed to provide 100% design capacity in the event of failure of the heat wheel”. These sentences appear to be in conflict. If the system is to be design to provide 100% design capacity in the event of failure of the heat wheel , this would require the equipment to be sized assuming a 0% efficient wheel rather than 50% efficient. Please clarify.
See Amendment
Part 3
Part 3 section D30 (Pg. 380) regarding Water Source Heat Pump system, states: “Provide a separate and dedicated 100% conditioned outdoor air system feeding neutral air to each individual zone/space using WSHP, hot water heating, pre-heat and reheat using hot water, and energy recovery from exhaust air using total enthalpy heat wheel.” If we were to use a WSHP system, we would prefer to include the DOAS unit on the WSHP condenser water loop and thus not use hot water heating, reheating would likely be hot gas reheat which would increase our energy efficiency. Would this approach be acceptable?
The Space criteria sheet for the Multi- Purpose room states: “Direct expansion systems – Provide separate heat-pump system with an independent control and supplemental how water heating coil”.
Is it the intent of this statement to require a hot water distribution system and specifically a hot water heating coil for this space even if the main system type does not require a hot water distribution system?
See Amendment
The space criteria sheets with respect to HVAC systems appear to be inconsistent with Section D30 of the RFP. They appear to assume a specific type of HVAC system will be provided (VAV series Fan powered units). They also apparently suffer from numerous copy/paste oversights such as CO2 sensors and demand controlled ventilation where this would not make sense, such as janitors closets, vestibules, toilets, stairwells etc. and the statement “Provide pre-conditioned outside air, return air, exhaust air and supply air for each space/room” appears to have been copied to every space listed regardless of type, function, or what has been required in section D30.
Would the government please review the space criteria sheets for these issues and provide some direction or clarification?
See Amendment
Part 3 D30
Part 3, Section D30 discusses exhaust systems and describes a vertical riser system to gather exhaust from the Bedroom Module Bathrooms, however; the 2nd floor plan has numerous spaces that interfere with the stacking of the rooms. Would an alternate approach to gathering exhaust without the risers be acceptable?
Bid per RFP
Part 3 305
The Room Requirement Sheet for the Elevator (p.305) states to provide one
(1) elevator for three (3) story or less BEQ(s) and two (2) elevators for four
(4) or five (5) story BEQ(s). The proposed BEQ will have four stops based on the layout provided. Please confirm that two (2) elevators are required.
Part 3
Reference the Room Requirements, several sheets reference the "Typical BedRoom Module Layout Plan in Part 6 Attachments." We cannot locate this document. Can you provide?
See Amendment
271, Part 3
Room Requirements "Bathroom Module Bathroom" calls for Solid Surface Floor & Shower Surround in Showers; but Engineering Systems Requirements C3020 Floor Finishes calls for 2"x2" mosaic tile in showers.
Please clarify what finish is to go in the showers.
Bid per RFP
243, 245, Part 3 4.1
Part 3, Chapter 1.0 and 2.2 both state that the BEQ can not exceed 67,000 SF. Chapter 4.1, Space Tabulation, notes the maximum GSF as 78,727.
Please confirm the maximum allowable GSF is 78,727 SF to accomidate all of the spaces listed in Table 4.1.
See Amendment
263, Part 3 4.1
Part 3, Chapter 5 Room Requirements lists the minimum corridor spacing as 60 inches. Part 3, Chapter 4.1 asks for a betterment, if possible, to increase the corridor width from 64 inches to 72 inches.
Please confirm if the minimum corridor width is 60 inches or 64 inches.
Bid per RFP
263 Part 3 4.1
Part 3, Chapter 4.1 Space Tabulation is calling for an Atrium on the second floor. There is no detailed room sheet for this area. The concept site plan provided appears to show a large atrium area adjacent to the dining patio on the second floor, but concept floor plan A-102 does not show this space. Please confirm if the 250 SF atrium is required.
Bid per RFP
254 Part 3 3.2.1
Part 3, Chapter 3.2.1 is asking for a finished ground floor elevation of
69.00 feet (NAVD88). Please confirm this is the elevation for the second floor of the P-995 structure, and the partial first floor facing the parking lot will sit below this elevation.
See Amendment
246 Part 3 2.3.2
Part 3, Chapter 2.3.2 and G303007 are calling for storm water management calculations as part of the design for this project. Please confirm the affected site area for the P-995 remote parking lot needs to be included in this calculation. If so, with the limits of disturbance tightly enclosing the limits of the parking lot, the only option may be for under ground storage tanks to accommodate the storm water run-off at the parking lot.
Amendm ent 0003
- Part 6C Drawings
Part 1
In order to comply with the UFC's guidelines, parking count and landscape ratio, we estimate that the P-955 BEQ Remote Parking Lot will need to expand in width by about 210 feet. This should meet the parking count and accommodate two 9' wide bioswales (for stormwater management), 26' drive aisles, and 18.5' parking stalls. Does the Gov't wish to increase the width of this parking lot or should we remain in the boundaries shown in the RFP documents? The latter option will require that some of the current requirements will have to be waived.
See Amendment
254 Part Three
3.2 Site
Develop ment Require ments
The paragraph "Finished Floor Elevation" states that the new BEQ building shall match the finished ground floor elevation of the P-985 BEQ building, which is set at 69.00 feet. The basement FFE of the new BEQ building needs to be no lower than 58.0, for drainage purposes.
This only gives a floor-to-floor height of 11'-0" from the basement to the main level. With the min. ceiling heights given for the basement (9'-0 corridors & 9'-4" bedroom modules), this does not allow sufficient space for above-ceiling work. It would seem our only two options are: 1) lower the min. ceiling heights by 1'-0" in the basement or 2) allow a FFE of 70.0 for the main level. Please advise.
3. Solicitation Revision
Factor 5 – Technical Solution
Narrative shall not exceed six (6) double-sided pages (or 12 single-sided pages). Up to three (3) conceptual 11” x 17” drawings may be provided to supplement the narrative.
REVISE AS FOLLOWS:
Narrative shall not exceed six (6) double-sided pages (or 12 single-sided pages). Up to five (5) conceptual 11” x 17” drawings may be provided to supplement the narrative.
4. RFP Revisions:
PART 3 PROJECT PROGRAM
3.0 Site Analysis
3.1.3 Geotechnical Information and Requirements: EXISTING GEOTECHNICAL INFORMATION AND
DATA
Before first paragraph, add the following: “Please note, the information presented in the Geotechnical Data Report for P-991 MCSFR Bachelor Enlisted Quarters Naval Weapons Station Yorktown, Virginia prepared by Geo Environmental Resources, Inc. dated January 12, 2015 is subsurface information for the P-995 project site and is referenced as P-991.”
PART 3 PROJECT PROGRAM
1.0 Project Description
Add following at end of paragraph 5: “Gazebo design is to compliment the architecture of P-995 including the materials and color selection. The structure can be either prefabricated or custom. It will be located outside the AT setbacks of all buildings within the BEQ campus, but in close proximity to serve a maximum number of occupants on the campus. Electricity is to be supplied for light fixtures. Provide three permanently mounted backless benches, one trash receptacle. ABA/ADA accessible (12' x 12' minimum).”
PART 3 PROJECT PROGRAM
D50 ELECTRICAL
D503001 Telecommunications Systems Delete last sentence in paragraph 2 in its entirety: “A 25 pair category 6 Unshielded Twisted Pair (UTP) copper cable (Voice only) in a 5” concrete encased duct shall be brought out to the nearest telephone pedestal for base wide dial tone.” and replace with “A 50 pair category 6 Unshielded Twisted Pair (UTP) copper cable (Voice only) in a 4” concrete encased duct shall be brought out to the nearest telephone pedestal for base wide dial tone.”
PART 3 PROJECT PROGRAM
D50 ELECTRICAL
D503005 Electronic Security Systems (ESS) Closed Circuit Television System (CCTV) Delete first sentence in paragraph 5: “Provide Wide Dynamic Day/Night color, fixed mounting cameras, number as required and spaced to accomplish the following:” and replace with “Provide Wide Dynamic Day/Night color, PTZ cameras, number as required and spaced to accomplish the following:”
PART 6 ATTACHMENTS
See additional attached drawings for electrical site plans from previous NAVFAC project P-984 (Regimental headquarters building) sheets ES-106, 108, 601, and 604; P-985 (BEQ) sheets ES-101, 103, 104, 601, 604.
PART 3 PROJECT PROGRAM
G40 SITE ELECTRICAL
G4030 Site Communication and Security Delete first sentence in paragraph 2: “Provide a minimum of (4)-6” concrete encased ducts for communications service entrance into buildings.” and replace “Provide a minimum of (4)-4” concrete encased ducts for communications service entrance into buildings.”
PART 3 PROJECT PROGRAM
D20 PLUMBING
D201001 Water Closets Paragraph 2 delete the words “electronic flush control” and replace with “manual type flush”.
D20 PLUMBING
D202003 Domestic Water Equipment Paragraph 6, second sentence, delete “Provide solar hot water collectors in accordance with specification section 22.33.31.05.22 Integrated PV thermal System, sized no less that 30% of the building hot water demand.” and replace with “Energy Conservation Measures in excess of…