This solicitation requests bids for a smart grid and facility controls project at Naval Air Facility Atsugi in Japan. The project involves installing direct digital controls at six buildings to monitor and control HVAC, electrical, and other building systems. It will provide a BACnet-compliant control network integrated with the base's control system platform. Bidders must provide network equipment, cabling, fiber optic lines, and controls integration to allow remote monitoring from the Far East Facility Energy Operations Center. The bid due date was extended to August 9, 2022. The estimated value is between $1-5 million.

View the file

Other files

File Type Posted
N40084-22-B-8003 0006.pdf PDF
Attachment 6 - Pre-Bid Inquiries_resp (All).pdf PDF
N40084-22-B-8003 0005.pdf PDF
N40084-22-B-8003 0004.pdf PDF
N40084-22-B-8003 0003.pdf PDF
N40084-22-B-8003 0002.pdf PDF
N40084-22-B-8003 0001.pdf PDF
CJA Japan FRCS-Final_Signed_Redacted 21-JA-FECON-0020.pdf PDF
Att 3_SiteVisitRequestForm.xlsx XLSX spreadsheet
Att 4_PreBidInquiryForm.xlsx XLSX spreadsheet
N4008422B8003.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: N40084-22-B-8003 Question

No.

Reference

(Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

Each section Some submittals required in the specifications start from the Notice to Proceed for submissions. Does the NTP mean the award date, the date of pre-conference, or other? Could you clarify that?

仕様書の中の要求で提出物について、Notice to Proceedを 起算日としているものがあります。Notice to ProceedとはAward Dateでいいのでしょうか?それともプレコン開催日でしょうか?それと

も別にNTPが発行されるのでしょうか?

Notice to Proceed will be the date of Award.

Sect 23 08 00.00 20 Para 1.4.1

We can't find a company with a Retro-Commissioning Firm qualification.

Is it possible for a company with Commissioning Firm and TAB Firm qualifications to make up for it if it currently has similar construction experience at other bases? Or is it required to meet the requirements according to the specifications?

Retro-Commissioning Firmの資格証を持っている会社が見当たりません。Commissioning Firm及びTAB Firmの資格証を持っている会社であり、 さらに現在、他の基地で同様の工事の実績があればそれで補えるもので

しょうか?それとも仕様書通りの要求を満たすことが求められるのでし

ょうか?

The specification requirements shall be met.

Sect 23 05 93 Para 3.3.3

A Duct air leakage test (DALT) is required for this project, but if DALT is performed and the required values are not obtained, do we need to repair the ducts and duct connections? In that case, should we bid with the estimated cost of repair? Or will the modification be issued after the contract?

このプロジェクトではDALTが要求されていますが、もしDALTを実施し

て要求を満たす数値が出ない場合はダクトの接続部およびダクトの修理

が要求されますか?その場合その金額もある程度想定した金額で入札す

るべきでしょうか?それともあとで契約変更が発行されるのでしょうか

DALT is not required for this project.

CUI//FEDCON [when filled in]

No.

Reference

(Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

Sec 23 05 93 Para 3.4.6.2 Pgae 19

We would like to ask you to maintain the fairness of the bid.

In this paragraph, the contractor are requied to do TAB season 2, however, should we actually do TAB season 2?

入札の公平性を保つためお聞きします。

このパラグラフではTAB season2を実施するように書いてありますが、

実際にはTAB Season2を実施するべきでしょうか?

TAB Season 2 is required.

Sec 02 82 00 Para 1.3.1 Pgae 6

Although the specification mentions the handling of Asbestos containing material (ACM), we are not sure which material is ACM.

Could you tell us which material should be treated as ACM?

Or if available, could you provide us with the Sampling report for each building?

仕様書ではACM(Asbestos containing material)の取り扱いについて

言及されていますが、どの部材がACMであるかがわかりづらいです。ど

の部材をACMとして取り扱うべきか指示願います。

または各建物のSampling reportを提供していただけますか?

Please refer to the Environmental/ Hazardous Material Report that was submitted to the government.

MA604 DWG,

Sequence of ACU Operation #5

It is described that SD (duct smoke detector) must provide signal to FACP via DDC. But we cannot calculate the QTY and/or type of conductor because there is no detail about EXST FACP. Please provide the information about FACPs (i.e. Installation Location, OEM, Model, Type) at Bldg.949, 3076, 1524, 1300 and 1440.

As indicated in the design duct smoke detector must be directly integrated to the DDC system by means of providing signal to the DDC system and the DDC system must automatically stop the supply fan operation upon confirmation that there is smoke in the air distribution duct. The integration of duct smoke detector to FACP via DDC is not part of the project scope but at minimum for future connection ensure that DDC system has the capability to send signal to the FACP when smoke is detected in the air distribution duct.

AG101 DWG,

Bldg1310 SOW

It is uncertain about the requirement of task light. Could you provide the information about subject light (i.e. Model, Type, Lux, Sketch)?

Please refer to the minimum requirements as specified in Section 27 10 00 attached herewith entitled "UPS requirement". This is part of the submittal as well and will be reviewed by the Command Information Office (CIO) prior to approval.

Specification, SECTION 26 05

00.00

Regarding the conduits for remote controller & switches to be replaced or renewed, may we use metal raceway (B-type) at riser/drop portion insted of conduit?

Metal raceway is acceptable.

IFB letter, 52.236-

Since we could not check site condition at Bldg.1440, 1502 and 1524 on 11 July, so could you hold an additional site visit about Bldg.1440, 1502 and 1524? Or please provide site pictures about subject buildings.

An additional site investigation was held July19.

No.

Reference

(Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

SECTION 01 11 00,

SUMMARY OF

WORK

1.1.1 Project

Description

SECTION 23 09 00,

1.4.2 Building

Automation and Control Network (BACnet)

As described in the spec., this project will include the provision of new DDC System at six (6) facilities with BACNet openprotocol and an open license to be maintained by the installation. It is also described that the six

(6) DDC buildings will be monitored at the Far East Facility Energy Operations Center (FEOC) at CFA Yokosuka in the future.

Is the BAC net ANSI/ASHRAE Standard 135-2012 (BACnet®-2012) acceptable as compliant version?

The latest BACNet protocol shall be followed: ANSI/ASHRAE 135- 2020.

TA601-603, TB601-

603, TC601-603,

TD601-603, TE601-

603, TE601-603,

TG-601, TH-601

DWG

There seems some descrepancies the QTY of network equipment listed in ONE-LINE DIAGRAM against the one described in CYBERSECURITY 5- LEVEL ARCHITECTURE OF DDC SYSTEM. There is also a point where it is difficult to determine which is the scope of work or which is existing. If possible, please provide new equipment list which we can determine new or EXST.

This is to clarify that Cybersecurity 5-Level Architecture of DDC System was portrayed as described and depicted or shown in the UFC for Cybersecurity (UFC 4-010-06), please refer to the attachement entitled "UFC 4-010-06". Cybersecurity involves an in depth or comprehensive understanding and implimentation of the logical configurations for the related control system network devices, hence a Cybersecurity Specialist is required (key person) in order to properly guide, implement and manage the cybersecurity related control systems in coordination with the Command Information Officers (CIO2 & CIO4), also emphasized in specs section 25 05 11 - 1.7.1.1 Cybersecurity Representative.

The scope is pretty much straight forward and almost typical per building. Major network components or devices were covered, drawing annotations and notes are also provided.

TA601-603, TB601-

603, TC601-603,

TD601-603, TE601-

603, TE601-603,

TG-601, TH-601

DWG

Please provide detail information about UPS (i.e. Capacity, Duration of power disconnection, Shutdown method, Power supply control method, Power supply switching method, outlet spec., etc), and power strip (i.e.

QTY of ports, 2/3 pin, source etc)

Please refer to the minimum requirements as specified in Section 27 10 00 attached herewith entitled "UPS requirement". This is part of the submittal as well and will be reviewed by the Command Information Office (CIO) prior to approval.

TA601-603, TB601-

603, TC601-603,

TD601-603, TE601-

603, TE601-603,

TG-601, TH-601

DWG

New network equipment made by CiSco needs periodrical maintenance service. Should we include the PMIS cost within warranty period?

Recommend including cost estimate for planning/budget purposes.

Cisco equipment will be registered into Cisco Global Enterprise Modernization Software and Services (GEMSS) formerly Joint Enterprise License Agreement (JELA). This will provide Navy with required levels of product support...but each Command will be billed separately so cost estimate data needs captured.

No.

Reference

(Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

TA601-603, TB601-

603, TC601-603,

TD601-603, TE601-

603, TE601-603,

TG-601, TH-601

DWG

May we consider required software for "Cisco C3172PQ" as shown below? Are there any other special requirements?

Comprehensive Layer 2 feature set: VLAN, IEEE 802.1Q Trunking, vPC, Link Aggregation Control Protocol (LACP), Unidirectional Link Detection UDLD (standard and aggressive), Multiple Spanning Tree Protocol (MSTP), Rapid Spanning Tree Protocol (RSTP), spanning-tree guards, and Transparent VLAN Trunk Protocol (TVTP)

- Security: Authentication, authorization, and accounting (AAA); access control lists (ACLs), Dynamic Host Configuration Protocol (DHCP) snooping, storm control, private VLAN (PVLAN), and configurable Control- Plane Policing (CoPP)

- Management features: Cisco Data Center Network Manager (DCNM) support, console, Secure Shell Version 2 (SSHv2) access, Cisco Discovery Protocol, SNMP, and syslog

- Layer 3 IP routing: inter-VLAN routing (IVR), static routes, RIPv2, ACLs, OSPFv2, EIGRP stub, Hot Standby Router Protocol (HSRP), Virtual Router Redundancy Protocol (VRRP), and Unicast Reverse-Path Forwarding (uRPF)

- Multicast: PIM SM, SSM, and MSDP

Previously commented on this...Cisco C3172PQ is a Data Center level model. Consideration of Catalyst series model such as the C90300-24P-A being proposed in SCADA project would be a more cost efficient model to meet the requirements.

Salient characteristics are listed below:

Ethernet network IP switch - Climate-controlled environment

- Key Features:

i. Location: Lockable ICS cabinet in the main GTR

ii. Form Factor: Rack-Mountable

iii. Minimum Required Protocol Support: CDP, EIGRP

iv. Software-Defined Access Compatible

v. Stackable

vi. Advanced Switching Layer 3

vii. Managed-type

viii. Trade Agreements Act (TAA) compliant

ix. Listed on DISA’s Approved Products List Integrated Tracking System (APLITS) or National Information Assurance Partnership

(NIAP).

x. The construction contractor should contact NAVFAC Far East CIO for review/approval of proposed model and/or most recent product equivalents list in AOR.

T602 DWG, SCADA

Network Configuration Diagram

May we consider the EXST equipment seems like router at Bldg.971 (Not Equipment #9) is out of scope in this project? If so, please provide the information about this equipment such as specification, connection method and so one.

This is to clarify that the equipment or device in drawing T602 beside equipment #9 is the Existing Cisco 4510 R+E. This was identified as the Control System Platform Enclave (CSPE) in coordiantion with the Command Information Office (CIO). Please refer to the related drawing TH601 attached herewith entitled "BLDG 971". Thorough coordination with the Command Information Office (CIO) and Base Communication Office (Navy's Telecommunications Manager) is a must in order to established the network or circuit through cable patching. Also, Cybersecurity requires a Cybersecurity specialist (key person) in order to properly guide, implement and manage the cybersecurity related control systems in coordination with the Command Information Officers (CIO2 & CIO4).

No.

Reference

(Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

T602 DWG, SCADA

Network Configuration Diagram

Are the equipment #1(CISCO:IE-4000-16GT4-E and #2 (CICSCO:C9300-24P-A) also out of scope in this project? May we condider that any installation, testing and adjustment for these equipment will not be included in?

Cybersecurity of installed equipment for SCADA project is the requirement and should be in-scope.

Specification Section 23 09 00, Paragraph 1.1.1

It states that the control system provided must be Johnson Controls Inc.

Metasys BAS. Would the Government be willing to accept an approved alternate so long as the system is based on an open BACnet platform and capable of being integrated into the Control System Platform Enclave

(CSPE)?

A Class Justification and Approval (CJ&A) has been provided to specify Facilities Related Control Systems (FRCS) that are peculiar to one manufacturer, Johnson Controls Incorporated (JCI). All new construction and renovation projects must adhere to FRCS Standardization in accordance with Reference (w)

NAVINST 11000.2.

Specification Section 02 82 00

ASBESTOS & 02

83 00 LEAD and All Drawings (17285646-870)

There seem no drawings that show the specific location for ACM / Lead to be removed. If these removal work is included in this contract, please clarify the ACM/lead locations and the estimated quantity in order for us to make quotation.

The removal of ACM or lead pertains or is associated only to the drilling of wall when installing new conduit in order to protect the workers and inhabitants of the facility. However, this project does not refer to the removal of all ACM or lead in all locations. Please use the design drawings and Environmental Report to assess the location and quantity. The environmental report should be included in the design package.

Drawings EA101 (Page 92 of 225) through EG601 (161 of 225)

Regarding the replacement of existing wiring, should the wiring conduit be replaced at the same time as the wiring replacement?

Or if the existing conduit can be reuseful, can it be reused?

It is recommended to replace the conduit with new. However, if it is difficult to install new conduits due to existing site conditions or unforseen site conditions, it is permitted to reuse existing metal conduits.

Bldg.1300

MB604 MB605

Does this mean that the humidifier shall be just monitored and humidity shall be controlled on the humidifier side?

Humidifier must be monitored and controlled through the DDC system.

Bldg.1300

MB604 MB605

8.WHEN THE DUCT SMOKE DETECTOR IS ACTIVATED, THE DDC SYSTEM

MUST AUTOMATICALLY DISABLED THE ACU FAN OPERATION, OA-MD AND

RA-MD MUST BE CLOSED, EA-MD MUST BE FULLY OPENED AND RETURN

FAN (FR-1) MUST OPERATE AT FULL AIR FLOW CAPACITY.

We would like to make a quotation for disaster prevention work including the main body of duct smoke detector and fire control separately.

Disaster prevention work is not in the scope of this project.

No.

Reference

(Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

Bldg.1300

MB604 MB605

Regarding the temperature sensor for outside air temperature, there's a possibility it may not be able to take in the outside air when ACU stopped, so we would like to set 1 sensor for the outside temperature and humidity on the outside of the building instead of setting temperature sensor for each ACU.

Modification to provide 1 temperature and humidity sensor on the outside of the building instead of setting temperature sensor for each ACU is acceptable.

Note:

The schematic diagram shown is for Bldg 3076 not for Bldg. 1300

Bldg.1300

MB602

There are 2 sensors, but is it possible to set only 1 sensor since the measurement points and the purpose are the same?

As indicated in the schematic diagram there are two measuring points with different purposes one is to modulate which is the two way motorized modulating valve and the other one is to open/close which is the motorized ball valve.

Note:

The schematic diagram shown is for Bldg 3076 not for Bldg. 1300

Bldg.1300

MC002

It is mentioned that the same size valve shall be replaced as the existing ones as shown below, however, there are no manufacturers including our company that produce Φ100 x 80 valves currently. We would like to select control valves for port size and isolation valves, switching valves for valve diameter.

The indicated valve size of 3-way diverting valvewas taken from the as-built drawings. Existing actual valve size must be check at the site prior to material submittal.

Bldg.1300

MC002

Same as the above

All control valves have spring return function, does it mean it is normally open (all bypass when closed) when spring return is actuating with 3-way valve?

This means a "fail-safe open position" actuator returns to a pre-set home position when power is removed from the actuator.

No.

Reference

(Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

Bldg.1300

MC602

Is it considered as the air handling unit is cold/hot water coil?

Notations around chiller and air handling unit in the piping diagram show "C/CR" but it is written as cold/hot water in the control content.

AHU's are with cold/hot water coil.

Bldg.1300

MC603

Regarding the monitor of VAV, is the main body of VAV capable of responding to written input/output signal? Or, is it necessary to provide individual controller for VAV on JCI side? (If controllers to be provided by JCI this time, VAV temperature sensors need to be replaced by JCI as well)

The existing VAV's are not capable of providing I/O signals, a new controller module with associated accessories that are compatible and able to connect to DDC must be provided.

Bldg.1300

MC601

Is it considered as the unit control of these 2 chillers is the function provided? For JCI, just monitoring operation is necessary?

Chillers must be monitored and controlled through the DDC system.

Bid sumission data We believe the bid submission data has been pushed back to 02 August 2022, however still we need more time to make accurate quote. We would like to request to extend (2) more weeks?

Bid submission due date has been changed to 09 August 2022 at 1400 (02:00 PM) local Japan Standard time (JST).

No.

Reference

(Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

Bldg.1440

MD602

Is it correct that measurement of load flow rate and heat on the secondary side is not necessary?

The indicated schematic diagram is based on the existing system configuration at site without load flow rate measurement.

Bldg.1440

MD603

It is necessary to replace the temperature sensor for FCU as well.

(Existing thermostat can not be used for FCU DDC.)

External input/output terminal provided for ACP and HEA? Or, is there manufacturer's BACNET interface available (or added)?

As indicated in dwg # MD101, provide fcu switch that are compatible and able to connect to the DDC.

For ACP and HEA requirements refer to dwg # MD601.

Bldg.1440

MD604

Regarding the temperature sensor for outside air temperature, there's a possibility it may not be able to take in the outside air when ACU stopped, so we would like to set 1 sensor for the outside temperature and humidity on the outside of the building instead of setting temperature sensor for each ACU.

Modification to provide 1 temperature and humidity sensor on the outside of the building instead of setting temperature sensor for each ACU is acceptable.

No.

Reference

(Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

MD604 7. DUCT SMOKE DETECTOR (SD) MUST PROVIDE SIGNAL TO THE DDC

SYSTEM AND THE DDC SYSTEM MUST AUTOMATICALLY STOP THE

SUPPLY FAN OPERATION UPON CONFIRMATION THAT THERE IS SMOKE IN

THE AIR DISTRIBUTION DUCT. THE DDC SYSTEM MUST SEND SIGNAL TO

THE FIRE ALARM CONTROL PANEL (FACP) WHEN SMOKE IS DETECTED IN

THE AIR DISTRIBUTION DUCT.

We would like to make a quotation for disaster prevention work including the main body of duct smoke detector and fire control separately.

Disaster prevention work is not in the scope of this project.

Bldg.1502

ME602

It is necessary to replace the temperature sensor for FCU as well.

(Existing thermostat can not be used for FCU DDC.)

External input/output terminal provided for ACP and HEA? Or, is there manufacturer's BACNET interface available (or added)?

Provide fcu switch that are compatible and able to connect to the

DDC.

For ACP and HEA requirements refer to dwg # ME601.

Bldg.1502

ME602

For which part shall temperature measurement be conducted? Please refer to dwg #: ME101 for temperature measurement location.

No.

Reference

(Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

Bldg.1502

ME603

What is the start condition for the pump?

Is it considered as optional operation, not controlled operation?

The recovery circulation pump is used during OAU hot water demand operation and it must be controlled and monitored thru DDC system.

Bldg.1502

MD604

7. DUCT SMOKE DETECTOR (SD) MUST PROVIDE SIGNAL TO THE DDC

SYSTEM AND THE DDC SYSTEM MUST AUTOMATICALLY STOP THE

SUPPLY FAN OPERATION UPON CONFIRMATION THAT THERE IS SMOKE IN

THE AIR DISTRIBUTION DUCT. THE DDC SYSTEM MUST SEND SIGNAL TO

THE FIRE ALARM CONTROL PANEL (FACP) WHEN SMOKE IS DETECTED IN

THE AIR DISTRIBUTION DUCT.

We would like to make a quotation for disaster prevention work including the main body of duct smoke detector and fire control separately.

Disaster prevention work is not in the scope of this project.

Bldg.1524

MF602

Is it correct that measurement of load flow rate and heat on the secondary side is not necessary?

The indicated schematic diagram is based on the existing system configuration at site without load flow rate measurement.

Bldg.1524

MF603

It is necessary to replace the temperature sensor for FCU as well.

(Existing thermostat can not be used for FCU DDC.)

External input/output terminal provided for ACP and HEA? Or, is there manufacturer's BACNET interface available (or added)?

Provide fcu switch that are compatible and able to connect to the

DDC.

For ACP and HEA requirements refer to dwg # MF601.

No.

Reference

(Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

Bldg.1524

MF605

Does this mean that the humidifier shall be just monitored and humidity shall be controlled on the humidifier side?

Humidifier must be monitored and controlled through the DDC system.

Bldg.1524

MF605-606

11. NIGHT SET-BACK CONTROL DURING UNOCCUPIED PERIODS THE

ROOM TEMPERATURE MUST BE MAINAINED AT THE DESIRED

TEMPERATURE THRU DDC.

What is the difference against the operation during the day time?

Difference against the operation during the day time must be determine during testing and commissioning stage in coordination with the actual site requirements.

Bldg.3076

MB604

MB605

Does this mean that the humidifier shall be just monitored and humidity shall be controlled on the humidifier side?

Humidifier must be monitored and controlled through the DDC system.

Bldg.3076

MB604

MB605

8.WHEN THE DUCT SMOKE DETECTOR IS ACTIVATED, THE DDC SYSTEM

MUST AUTOMATICALLY DISABLED THE ACU FAN OPERATION, OA-MD AND

RA-MD MUST BE CLOSED, EA-MD MUST BE FULLY OPENED AND RETURN

FAN (FR-1) MUST OPERATE AT FULL AIR FLOW CAPACITY.

We would like to make a quotation for disaster prevention work including the main body of duct smoke detector and fire control separately.

Disaster prevention work is not in the scope of this project.

No.

Reference

(Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

Bldg.3076

MB604

MB605

Regarding the temperature sensor for outside air temperature, there's a possibility it may not be able to take in the outside air when ACU stopped, so we would like to set 1 sensor for the outside temperature and humidity on the outside of the building instead of setting temperature sensor for each ACU.

Modification to provide 1 temperature and humidity sensor on the outside of the building instead of setting temperature sensor for each ACU is acceptable.

Bldg.3076

MB602

There are 2 sensors, but is it possible to set only 1 sensor since the measurement points and the purpose are the same?

As indicated in the schematic diagram there are two measuring points with different purposes one is to modulate which is the two way motorized modulating valve and the other one is to open/close which is the motorized ball valve.

Bldg.3076

MB002

It is mentioned that the same size valve shall be replaced as the existing ones as shown below, however, there are no manufacturers including our company that produce Φ100 x 65 and Φ125 x 80 valves currently. We would like to provide control valves for port size and isolation valves, switching valves for valve diameter.

2. THE MOTORIZED VALVE TO BE PROVIDED /INSTALLED MUST BE THE

SAME SIZE WITH THE EXISTING VALVE TO BE REPLACED.

The indicated valve size of 3-way diverting valve was taken from the as-built drawings. Existing actual valve size must be check at the site prior to material submittal.

No.

Reference

(Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

Bid Due Date N40084-22-B- 8003+0002

Request government consideration to extend proposal due date by two weeks due to U.S. government fiscal year end solicitation surge, which places additional constraints on companies responding to solicitations.

Bid submission due date has been changed to 09 August 2022 at 1400 (02:00 PM) local Japan Standard time (JST).

48 TA601-603, TB601-

603, TC601-603,

TD601-603, TE601-

603, TE601-603,

TG-601, TH-601

DWG

There seems some descrepancies the QTY of network equipment listed in ONE-LINE DIAGRAM against the one described in NETWORK ARCHITECTURE OF DDC SYSTEM (For further information, please refer to the yellow highlighted portion described in the attached QTY sheet).

Please clarify which should be the priority for making the quotation.

This is to clarify that Cybersecurity drawings are shown as intended based on or as per UFC for Cybersecurity (4-010-06).

Consulting a Cybersecurity specialist with regards to this matter is highly recommended in order to fully understand the concept and guidance for implementation. Either way, as part of the requirement, Cybersecurity Representative is emphasized as specified in section 25 05 11 - 1.7.1.1. Cybersecurity is as much as priority as telecommunication equipment or devices.

Cybersecurity and Telecommunications are two distinct disciplines. TA602-603, TB602-603, TC602-603, TD602-603, TE602-603, TF602-603 are mainly Cybersecurity related drawings. Please refer to drawings TA601, TB601, TC601, TD601, TE601, TF601, TG601 and TH601 respectively for detailed telecommunication equipement or devices required per building. Also refer to the attachment entitled "Reference 949" with mark ups as basis, it should be enough to figure out the other buildings.

49 TA603, TB603,

TC603, TD603, TE

603 DWG

Should we include the equipment between the Network SW and patch panel in our quotatation as scope of work? (i.e. Legend #D thru.OPS SINGLE MODE FIBER PATCH PANEL in TA603 DWG)

Yes, please also refer to OSP Fiber Cabling Site Plan (T-003) for building 949. To better understand, please see attachement entitled "Bldg 949 correlation".

50 TB101, TC101,

TD101, TE101,

TF101 DWG

Please let us know the installation location of new workstation at Bldg.949, 1300, 1400, 1502, 1524 and 3076.

This is to clarify that there are no related work in providing workstation at building's 949, 1300, 1400, 1502, 1524 and 3076.

The only related work for workstation is at building 1310 (GFGI workstation).

51 TG101 DWG There is a description that "V100-6/D46" in the TG101 DWG. May we consider this is a model name of workstation?

This is to clarify that "V100-6/D46" is an existing One-Net work outlet tag provided by Base Communication Office (Navy's Telecommunications Manager).

No.

Reference

(Sect/Para/Page)

QUESTION GOVERNMENT RESPONSE

52 SECTION 23 09 00,

INSTRUMENTATIO

N AND CONTROL

FOR HVAC, 1.1.2.1

Proprietary Systems Exempted From Open Protocol Requirements

SECTION 23 09 00,

INSTRUMENTATIO

N AND CONTROL

FOR HVAC, 1.4.5

BACnet Building Controller (B-BC) (BACnet)

As described in para 1.1.2 Proprietary Systems Exempted From Open Protocol Requirements, the definition of hardware device should be as a HMI and/or B-BC in BACnet. If we will conncet as SMART GRID, there need modifying to apply B-BC, and additional device installation will be necessary. Should we include this work in our quotation at Bldg.949, 1300, 1440, 1502, 1524 and 3076?

This is to confirm that HMI (Human Machine Interface) such as tablet to be added in the DDC Panel is not required in this project per the CIO's direction as was done in the other Smart Grid Projects. Rather a maintenance laptap will be provided as required in this project. On the other hand, per SOW No. 3 in TA101 and similar to other buildings states "Provide a complete and operable DDC Smart Grid System. a. Establish the communications network and connections between the DDC and the building communications rack or WIC Box and to the outside plat fiber optic utility cable connections for the building side.

Provide all necssary network components, equipment, devices and cablings for the DDC system netowrk." Also, per drawing TA601 and other Smart Grid One-Line Diagrams, Note 9 states "Ensure to provide necessary Equipments and wiring for a complete and operational DDC System."