About this file

This memorandum outlines safety requirements for contractors working near explosive materials at Joint Base Andrews in Maryland. The document requires contractors to acknowledge in writing the risks of working within explosive hazard zones of the base's Munitions Storage Area. Personnel will receive explosive safety briefings and must evacuate a minimum of 2,500 feet in the event of an emergency. Contractors will perform construction of a Hazardous Cargo Pad and Explosives Ordnance Disposal Range between 55 to 1,250 feet from the storage area, closer than the typical separation distance but justified through a risk assessment and oversight measures. Signatures on the risk assessment will be collected and maintained until all work is complete.

The related federal contract opportunity is a multiple award construction contract for large projects to be issued by the Naval Facilities Engineering Command. Interested offerors should consult SAM.gov for full solicitation documents and updates under opportunity number N40080-23-R-0020.

View the file

Other files for this federal contract opportunity

Other files attached to N4008023R0020 LARGE PROJECTS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC), newest first.
File Type Posted
23R0020 0012.pdf PDF
23R0020 Amendment 0011.pdf PDF
Propane Tank Information as shown on V-101.pdf PDF
V-101_Amend 6.pdf PDF
Specifications Table of Content_Amend 6.pdf PDF
GI-111_Amend 6.pdf PDF
E-102_Amend 6.pdf PDF
E-203_Amend 6.pdf PDF
E-504_Amend 6.pdf PDF
CG-403_Amend 6 (2).pdf PDF
CD-101_Amend 6 (2).pdf PDF
CS-502_Amend 6 (2).pdf PDF
CT-501_Amend 6 (2).pdf PDF
CT-102_Amend 6 (2).pdf PDF
GI-112_Amend 6.pdf PDF
CG-122_Amend 6 (2).pdf PDF
CD-102_Amend 6 (2).pdf PDF
CT-502_Amend 6 (2).pdf PDF
CG-112_Amend 5.pdf PDF
CG-103A_Amend 5.pdf PDF
CU-103_Amend 5.pdf PDF
Bird Protection Netting Spec Amend 5.pdf PDF
Grade Crossing Active Control Device Specification and Details Amend 5.pdf PDF
L-104_Amend 5.pdf PDF
Pre-proposal and Site Visit Attendee Presentation.pdf PDF
Pre-proposal and Site Visit Attendee Log.pdf PDF
N4008023R0020 Amendment 0005.pdf PDF
MDE 18-SF-0054 JADOC BORROW PITS SIGNED DWGS_1 of 3 AMEND 4.pdf PDF
CG-503_AMEND 4.pdf PDF
CG-403_AMEND 4.pdf PDF
CD-101_AMEND 4.pdf PDF
04___Soil Lab Test Results AMEND 4.pdf PDF
MDE 18-SF-0054 JADOC BORROW PITS SIGNED DWGS_3 of 3 AMEND 4.pdf PDF
S-600_Rev AMEND 4.pdf PDF
Site Visit Details.pdf PDF
Wage D Heavy Prince Georges 3-24-23 AMEND 4.pdf PDF
CP-103_AMEND 4.pdf PDF
CT-102_AMEND 4.pdf PDF
Attachment F - SBPCD.docx DOCX document
CS-503_REV.pdf PDF
N4008023R0020 Amendment 0002.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 6 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 5 of 7.pdf PDF
N4008023R0020 Amendment 0001.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 2 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 1 of 7.pdf PDF
2022.09.26 P-3002 IFC Specifications_signed_N40080-23-R-0020.pdf PDF
Attachment F - SBPCD.docx DOCX document
Attachment B - PPI Log.xlsx XLSX spreadsheet
Attachment E - Historical Utilization of SB.docx DOCX document
Show all 50

N4008023R0020 LARGE PROJECTS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS 316TH WING (AFDW)

JOINT BASE ANDREWS, MARYLAND 20762

MEMORANDUM FOR 316 CES

FROM: AFDW/SEW

SUBJECT: CONTRACTORS ACKNOWLEDGEMENT OF EXPLOSIVES HAZARDS

References: (a) DESR 6055.09_AFMAN 91-201 EXPLOSIVES SAFETY STANDARDS

1. Workers must follow guidance provided in the safety briefings they will receive prior to entering the explosives environment by their escort. The personnel listed below understand that they will be working inside of the explosives clear zone of the Munitions Storage Area. This explosive clear zone presents a hazard to anyone within it, due to the risk of a mishap incident. In the event of a mishap, follow directions of your escort and evacuate to a minimum of 2500ft for accountability.

OPTION 1- NORTHEAST EVACUATION POINT- SUPPLY BUILDING PARKING LOT

OPTION 2- SOUTHWEST EVACUATION POINT - BASE LAKE ROAD

2. Likelihood of a Mishap: IMPROBABLE // CONTINUOUS //MARGINAL //HIGH

3. By signing this statement, we the undersigned understand and accept the risk of working in and around an explosives clear zone. Personnel below will be provided an explosives safety briefing prior to entering the areas.

4. The following activities fall within the explosive clear zones: Construction of the Hazardous Cargo Pad and Explosives Ordnance Disposal Proficiency Range.

5. Please return signed copies to: alan.law.2@us.af.mil, DSN 612-6375//COM: 240-612-6375

LAST NAME FIRST NAME RANK/CIV DATE SIGNATURE

mailto:alan.law.2@us.af.mil

LAST NAME FIRST NAME RANK/CIV DATE SIGNATURE

OPTION 1- NORTHEAST EVACUATION POINT- SUPPLY BUILDING PARKING LOT

OPTION 2- SOUTHWEST EVACUATION POINT – BASE LAKE ROAD

2. Likelihood of a Mishap: IMPROBABLE // CONTINOUS //MARGINAL //HIGH

Exception Decision Nomograph – Day-to-Day Operations

Likelihood Risk Assessment

Title: Contractors Exposed By Munitions Storage Area Explosives Arcs Exception Type: IBD

Standards Not Met

V3.E3.1.1.2.2.6. (Added)(AF) Inhabited Building Distance (IBD/1250ft) will not be maintained to civilian construction workers of the new Hazardous Cargo Pad and Explosives Ordnance Disposal Range from the Munitions Storage Area. This separation requirement applies to all construction activities related to PESs whether being accomplished by civilian, military, or host-nation personnel. Construction activities are tentatively scheduled to start in FY24. Personnel will be inside of the various arcs at the closest point being 55ft outside of the fence line.

Justification

Munitions maintenance consist of storage, inspections, and movement for when munition trailers are transitory to and from the flight line. This documented risk assessment, including the control measures taken, will be briefed and signature required for civilian construction personnel prior to entry inside of the arcs and to ensure they are aware of the explosives risks and evacuation point in case of emergency and lightning within 5 nautical miles. Locally maintain the signatures of the risk assessment brief until operations have been completed and personnel have permanently vacated the work site. DESR 6055.09_AFMAN 91-201 Explosives

Safety Standards, para V1.E3.9.2.2. requires this risk "HIGH" to be accepted by AFDW/CC.

Alternatives

There are no alternatives since this is the location authorized by the Deputy Under Secretary of the Air Force and has an approved restrictive easement for the land outside of the installation affected by the 1250ft quantity distance arc with the incumbent land owner.

P iv o t

L in e

Possible Consequences

Exposure

Seldom Catastrophic

Unlikely

Rare

Unusual

Occasional

Frequent

Continuous

High

Critical

Improbable Marginal

Negligible

Practically

Impossible Low

Medium

Extremely

High

Control Measures Prior to entering the Munitions Storage Area’s explosives arc, personnel will be briefed in case of an emergency event, per

DSER 6055.09_ AFMAN 91-201, Explosives Safety Standards, Table V1.E10.T10 Emergency Withdrawal Distance for

Non-Essential Personnel, to evacuate to a minimum distance of 2500 ft. For accountability purposes, in case of an explosives mishap, Option 1 Northeast, personnel will evacuate to facility 3066 Supply Parking Lot. Option 2, Southwest, personnel will evacuate to the Base Lake Road.

Risk Assessment

PES

Facility Number

ES

Facility Number

Number of

Personnel

Required K-Factor

Actual K-Factor

Required Distance

Actual Distance

PSI

Munition Storage Area

Explosives Clear Zone

30 C K40 K22 1250 FT

55 FT from Fence Line of

MSA

Personnel:

- - Separation is IMD or less

- < K11; > 8 psi overpressure

- Personnel are likely to be seriously injured due to blast, fragments, debris, and translation

(i.e., being struck against hard objects)

- A 20 percent or better chance of eardrum rupture

CIVILIAN CONTRACTORS ACKNOWLEDGEMENT OF EXPLOSIVES RISK 29 MAR 2023
Nomograph High - Civilian Contractors Explosives Risk Assessment Munitions Storage Area 28 Mar 2023
OPTION 1 - JOINT BASE ANDREWS BASE LAKE
OPTION 2 BLDG 3066 SUPPLY PARKING LOT
2023-03-29T17:10:54-0400
LAW.ALAN.R.1167215994