About this file

This document contains a geotechnical site preparation plan and settlement monitoring details for a construction project. The plan outlines requirements for wick drains, surcharge fill, and settlement monitoring points to control consolidation and post-construction settlement within fill areas. Surcharge heights and estimated settlements are identified for different fill areas. Specifications are provided for installing settlement plates, vibrating wire piezometers, and inclinometers to monitor performance. Readings from monitoring devices are to be taken at defined frequencies throughout construction and post-construction periods.

View the file

Other files for this federal contract opportunity

Other files attached to N4008023R0020 LARGE PROJECTS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC), newest first.
File Type Posted
23R0020 0013.pdf PDF
0012 - Attachment G - SBSP.docx DOCX document
ATTACHMENT H - Price Schedule_IGE - BLANK 05082023.pdf PDF
N4008023R0020 Amendment 0008.pdf PDF
GI-112_Amend 6.pdf PDF
CG-122_Amend 6 (2).pdf PDF
CD-102_Amend 6 (2).pdf PDF
CT-502_Amend 6 (2).pdf PDF
32 92 19_Amend 6 (2).pdf PDF
N4008023R0020 Amendment 0005.pdf PDF
01 14 00_Amend 5.pdf PDF
CG-503_Amend 5.pdf PDF
CG-111_Amend 5.pdf PDF
CG-123_Amend 5.pdf PDF
CT-104_Amend 5.pdf PDF
Workers Acknowledgement of Explosives Hazards AMEND 4.pdf PDF
MDE 18-SF-0054 JADOC BORROW PITS SIGNED DWGS_3 of 3 AMEND 4.pdf PDF
S-600_Rev AMEND 4.pdf PDF
Site Visit Details.pdf PDF
Wage D Heavy Prince Georges 3-24-23 AMEND 4.pdf PDF
CP-103_AMEND 4.pdf PDF
CT-102_AMEND 4.pdf PDF
Attachment G - SBSP.pdf PDF
N4008023R0020 Amendment 0004.pdf PDF
MDE 18-SF-0054 JADOC BORROW PITS SIGNED DWGS_2 of 3 AMEND 4.pdf PDF
SSK-PreBid-Detonation Bunker Sand Layer Clarification AMEND 4 (1).pdf PDF
GI-114_AMEND 4.pdf PDF
E-103_AMEND 4.pdf PDF
CG-202_REV_AMEND 4.pdf PDF
CG-201_AMEND 4.pdf PDF
03___Boring Logs (1) AMEND 4.pdf PDF
01___Boring Location Diagram AMEND 4.pdf PDF
Attachment F - SBPCD.pdf PDF
02___Cross Sections AA and BB AMEND 4.pdf PDF
Attachment F - SBPCD.docx DOCX document
GI-501_REV.pdf PDF
N4008023R0020 Amendment 0003.pdf PDF
P3002_31 11 00_AMENDMENT 001.pdf PDF
N4008023R0020 Amendment 0002.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 3 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 3 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 2 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 1 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 7 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 4 of 7.pdf PDF
2022.09.26 P-3002 IFC Specifications_signed_N40080-23-R-0020.pdf PDF
Attachment F - SBPCD.docx DOCX document
Attachment B - PPI Log.xlsx XLSX spreadsheet
Attachment E - Historical Utilization of SB.docx DOCX document
Attachment G - SBSP.docx DOCX document
Show all 50

N4008023R0020 LARGE PROJECTS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SETTLEMENT PLATE POINTS

VIBRATING WIRE PIEZOMETER POINTS

INCLONIMITER POINTS

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O

F

T

H E

A V

Y N

A V

A L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

C

O M

M A

N D

DRAWFORM REVISION: 06 APRIL 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

W A

S H

IN

G

TO

N

J O

I N

T

B

A S

E

A

N D

R E

W S

V

L

I R

F

C

I L

I T

Y C

A M

P

S

P R

I N

G S

M

D

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

P -3

R E

LO

C

A

TE

H A

ZA

R

D O

U S

C A

R G

O P

A D

A N

D E

O D

P R

O

FI

C

IE

N C

Y R

A N

G E

W A

S H

I N

G T

O

V

Y

Y

A R

D W

A S

H I N

G T

O N

D

C

N40080-22-R-8580

1396650

PROFESS IONAL ENG

I N

EE

R

ST

AT

E OF MARYLANDE

I

L IP

C

H

CR

R K

U

No . 28557

M A

AT

M

ON

S

F

G E

O

TE

C H

IN

C

A L

S

IT

E P

R E

P A

R A

TI

O

N P

LA

N

CG-403

N

LEGEND

NOTES:

WICK DRAINS AND SURCHARGE LIMITS

SETTLEMENT PLATE DETAIL

GEOTECHNICAL NOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 241.36

AutoCAD SHX Text 241.36

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

STM/SEW

AutoCAD SHX Text

TOPO THIS

AutoCAD SHX Text

OBSCURE AREA

AutoCAD SHX Text Soil: UdbB HSG:

AutoCAD SHX Text Soil: BaB HSG:

AutoCAD SHX Text Soil: CwE HSG:

AutoCAD SHX Text Soil: CwE HSG:

AutoCAD SHX Text Soil: BaB HSG:

AutoCAD SHX Text Soil: BaA HSG:

AutoCAD SHX Text Soil: CwE HSG:

AutoCAD SHX Text Soil: UdbB HSG:

AutoCAD SHX Text Soil: BaB HSG:

AutoCAD SHX Text

DIRT ROAD

AutoCAD SHX Text

DIRT ROAD

AutoCAD SHX Text

DIRT ROAD

AutoCAD SHX Text

AutoCAD SHX Text

SOUTH PERIMETER ROAD

AutoCAD SHX Text

SOUTH PERIMETER ROAD

AutoCAD SHX Text

SOUTH PERIMETER ROAD

AutoCAD SHX Text

SOUTH PERIMETER ROAD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text PROFESSIONAL CERTIFICATION: I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NO. 53990 , EXPIRATION DATE: 02-24-2023.

AutoCAD SHX Text 09/26/2022

AutoCAD SHX Text

AutoCAD SHX Text 0 ISSUE FOR CONSTRUCTION 09/26/2022ISSUE FOR CONSTRUCTION 09/26/2022 09/26/202209/26/2022

AutoCAD SHX Text

1 AMENDMENT 0004 04/01/2023AMENDMENT 0004 04/01/2023 04/01/202304/01/2023

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text 13140401

AutoCAD SHX Text

AutoCAD SHX Text 160'

AutoCAD SHX Text 0'

AutoCAD SHX Text 1"=80'

AutoCAD SHX Text 80'

AutoCAD SHX Text 320'

AutoCAD SHX Text 240'

AutoCAD SHX Text 400'

AutoCAD SHX Text WICK DRAIN/PRE-CONSOLIDATION PHASE 1A AREA WICK DRAIN/PRE-CONSOLIDATION PHASE 1B AREA SETTLEMENT PLATE VIBRATING WIRE PIEZOMETER INCLINOMETER

AutoCAD SHX Text

1. MINIMUM 125 PCF MOIST UNIT WEIGHT MATERIAL MUST BE USED AS SURCHARGE FILL. MINIMUM 125 PCF MOIST UNIT WEIGHT MATERIAL MUST BE USED AS SURCHARGE FILL. 2. PREFABRICATED WICK DRAINS WITH WIDTH = 0.33 FT, THICKNESS 0.01, PLACED IN TRIANGULAR PATTERN. PREFABRICATED WICK DRAINS WITH WIDTH = 0.33 FT, THICKNESS 0.01, PLACED IN TRIANGULAR PATTERN. 3. THE REQUIRED WAITING PERIOD IS MEASURED FROM THE COMPLETION OF SURCHARGE PLACEMENT. SURCHARGE MUST REMAIN IN PLACE FOR THE THE REQUIRED WAITING PERIOD IS MEASURED FROM THE COMPLETION OF SURCHARGE PLACEMENT. SURCHARGE MUST REMAIN IN PLACE FOR THE DURATION OF THE SPECIFIED WAITING PERIOD. 4. SURCHARGE AND WICK DRAINS ARE REQUIRED WITHIN FILL AREAS TO MAINTAIN THE POST-CONSTRUCTION SETTLEMENTS LESS THAN 1-INCH. SURCHARGE AND WICK DRAINS ARE REQUIRED WITHIN FILL AREAS TO MAINTAIN THE POST-CONSTRUCTION SETTLEMENTS LESS THAN 1-INCH. POST-CONSTRUCTION SETTLEMENTS ARE ESTIMATED TO OCCUR BETWEEN THE END OF THE SPECIFIED WAITING PERIOD AND 100 YEARS. 5. SURCHARGE MATERIAL MUST NOT BE REMOVED UNTIL APPROVAL FROM GEOTECHNICAL ENGINEER IS PROVIDED. SURCHARGE MATERIAL MUST NOT BE REMOVED UNTIL APPROVAL FROM GEOTECHNICAL ENGINEER IS PROVIDED. 6. REFER TO SHEETS CG-121 TO CG-123 FOR GRADING PLAN. REFER TO SHEETS CG-121 TO CG-123 FOR GRADING PLAN.

AutoCAD SHX Text

STRUCTURE

AutoCAD SHX Text

SURCHARGE HEIGHT (FT)

AutoCAD SHX Text

ESTIMATED SETTLEMENT (IN)

AutoCAD SHX Text

WICK DRAINS

AutoCAD SHX Text

COMMENTS

AutoCAD SHX Text

SPACING (FT)

AutoCAD SHX Text

TIP ELEVATION (FT)

AutoCAD SHX Text

CENTRAL TAXIWAY FILL AREA

AutoCAD SHX Text

FINAL GRADE + 5

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text APPROXIMATELY 3-4 MONTHS WAITING PERIOD IS REQUIRED AFTER THE SURCHARGE IS PLACED

AutoCAD SHX Text

SOUTHWEST TAXIWAY FILL AREA

AutoCAD SHX Text

FINAL GRADE + 5

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text APPROXIMATELY 3-4 MONTHS WAITING PERIOD IS REQUIRED AFTER THE SURCHARGE IS PLACED

AutoCAD SHX Text

WELD GUSSETS TO STEEL BASE PLATE

AutoCAD SHX Text

TOP OF NEW COMPACTED FILL

AutoCAD SHX Text

CAP OVER OPEN END

AutoCAD SHX Text

30-IN BY 30-IN BY 1/4-IN STEEL BASE PLATE

AutoCAD SHX Text

APPROVED SUBGRADE

AutoCAD SHX Text

1. THE SETTLEMENT PLATE SOULD BE PLACED ON THE SUBGRADE, AND THE BASELINE THE SETTLEMENT PLATE SOULD BE PLACED ON THE SUBGRADE, AND THE BASELINE ELEVATION OF THE PLATE AND THE RISER SHOULD BE RECORDED BEFORE FILL PLACEMENT. AT LEAST TWO SETS OF READINGS SHOULD BE TAKEN TO ESTABLISH THE BASELINE ELEVATIONS. 2. THE RISER AND CASING SHOULD BE EXTENDED TO REMAIN ABOVE THE FILL SURFACE. THE RISER AND CASING SHOULD BE EXTENDED TO REMAIN ABOVE THE FILL SURFACE. THE ELEVATION OF THE RISER SHOULD BE RECORDED IMMEDIATELY BEFORE AND AFTER ATTACHING AN EXTENSION. THE ELEVATION ON THE RISER SHOULD BE RECORDED DAILY DURING FILL PLACEMENT AND TWICE PER WEEK AFTER COMPLETION OF THE FILL, UNTIL SETTLEMENT HAS CEASED, OR THE FREQUENCY OF MONITORING REVISED BY THE GEOTECHNICAL ENGINEER. 3. VIBRATING WIRE PIEZOMETERS SHOULD BE INSTALLED AND MADE FUNCTIONAL NOT LESS VIBRATING WIRE PIEZOMETERS SHOULD BE INSTALLED AND MADE FUNCTIONAL NOT LESS THAN ONE WEEK BEFORE THE INSTALLATION OF WICK DRAINS. PROVIDE VIBRATING WIRE PIEZOMETERS AS MANUFACTURED BY ROCTEST, INC., GEOKON, INC., GEONOR INC., OR ACCEPTABLE EQUIVALENT. EACH ARRAY SHOULD HAVE A MINIMUM OF THREE PRESSURE SENSORS. FILTER SAND CONFORMING TO ASTM C778, STANDARD SPECIFICATION FOR STANDARD SAND, SHOULD BE USED. BENTONITE DRILLING MUD SHOULD NOT BE USED FOR INSTALLING THE VIBRATING WIRE PIEZOMETERS. AFTER COMPLETION OF INSTALLATION, THE AS-BUILT SURVEY COORDINATES FOR HORIZONTAL POSITION SHOULD BE DETERMINED TO AN ACCURACY OF +/- 0.01 FOOT. A BASELINE READING SHOULD BE ESTABLISHED BASED ON AN AVERAGE OF THREE STABLE READINGS. 4. READINGS FROM VIBRATING WIRE PIEZOMETERS SHOULD BE RECORDED A MINIMUM OF READINGS FROM VIBRATING WIRE PIEZOMETERS SHOULD BE RECORDED A MINIMUM OF FOUR TIMES PER DAY. ONCE SETTLEMENT CURVES PLATEAU AND GROUNDWATER LEVELS STABILIZE, READING FREQUENCIES ON APPROPRIATE INSTRUMENTATION MAY BE MODIFIED OR STOPPED BASED ON AGREEMENT WITH NAVFAC AND THE GEOTECHNICAL ENGINEER. 5. THREE INCLINOMETERS SHOULD BE INSTALLED AND MADE FUNCTIONAL NOT LES THAN ONE THREE INCLINOMETERS SHOULD BE INSTALLED AND MADE FUNCTIONAL NOT LES THAN ONE WEEK BEFORE THE INSTALLATION OF WICK DRAINS. A BASELINE READING SHOULD BE ESTABLISHED BASED ON AN AVERAGE OF THREE STABLE READINGS. READINGS FROM INCLINOMETERS SHOULD BE RECOURDED A TWICE PER WEEK DURING EMBANKMENT FILL PLACEMENT, ONCE PER WEE DURING SURCHARGE PERIOD. BEWEEKLY AFTER THAT DURING THE CONSTRUCTION TILL THE END OF CONSTRUCTION.

AutoCAD SHX Text

1-IN DIAMETER STEEL RISER

AutoCAD SHX Text

2-IN DIAMETER STEEL CASING PIPE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

File details come from the government source that posted it. Updated .