This document is a specification section outlining requirements for clearing and grubbing work on a construction project at Joint Base Andrews in Camp Springs, Maryland. It details preparation requirements including protecting roads, walks, trees, shrubs and existing facilities. It also specifies that trees, stumps, roots, brush and other vegetation are to be cut off flush with or below the original ground surface in clearing areas. Grubbing requirements include removing stumps, roots and matted roots to a depth of at least 18 inches below the original surface level. Disposal of excess materials must be in accordance with the approved solid waste management permit. All wood and wood-like materials from clearing and grubbing, except salable timber, will become the property of the contractor to dispose of as specified.

The related federal contract opportunity is a multiple award construction contract for large projects with the Naval Facilities Engineering Command. Offerors should refer to SAM.gov for the full solicitation, attachments and amendments under solicitation number N40080-23-R-0020.

View the file

Other files for this federal contract opportunity

Other files attached to N4008023R0020 LARGE PROJECTS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC), newest first.
File Type Posted
N4008023R0020 Amendment 0010.pdf PDF
N4008023R0020 Amendment 0008.pdf PDF
GI-113_Amend 6.pdf PDF
CS-503_Amend 6 (2).pdf PDF
CU-202_Amend 6 (2).pdf PDF
CU-204_Amend 6 (2).pdf PDF
Additional Site Photos (2).pdf PDF
01 50 00_Amend 6 (2).pdf PDF
GC-005_Amend 6.pdf PDF
GI-112_Amend 6.pdf PDF
CG-122_Amend 6 (2).pdf PDF
CD-102_Amend 6 (2).pdf PDF
CT-502_Amend 6 (2).pdf PDF
32 92 19_Amend 6 (2).pdf PDF
21-SF-0064_Mod 2 stamped plans_P-3002_ESC_Stage_0 Amend 5.pdf PDF
CG-122_Amend 5.pdf PDF
Flashing Beacon Specification and Details Amend 5.pdf PDF
Site Visit Seed Project Photos (P-3002 HCL).pdf PDF
N4008023R0020 Amendment 0005.pdf PDF
P-3002 HCP Price Schedule_BLANK 4-5-23 AMEND 4.pdf PDF
CG-102A_AMEND 4.pdf PDF
CS-102_REV_AMEND 4.pdf PDF
GI-115_AMEND 4.pdf PDF
CT-501 AMEND 4.pdf PDF
Additional Information on Batch Plant Site AMEND 4.pdf PDF
33 10 00 Water Piping Structures and Appurtenances_AMEND 4.pdf PDF
MDE 18-SF-0054 JADOC BORROW PITS SIGNED DWGS_3 of 3 AMEND 4.pdf PDF
S-600_Rev AMEND 4.pdf PDF
Site Visit Details.pdf PDF
Wage D Heavy Prince Georges 3-24-23 AMEND 4.pdf PDF
CP-103_AMEND 4.pdf PDF
CT-102_AMEND 4.pdf PDF
Attachment F - SBPCD.docx DOCX document
GI-102_REV.pdf PDF
Attachment P-3002 Price Proposal Form 3-22-23.pdf PDF
N4008023R0020 Amendment 0002.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 3 of 7.pdf PDF
Attachment H - Base Access Form 4973-16FEB2023.xlsx XLSX spreadsheet
P-3002 IFC PLANS_REV_signed_Part 2 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 1 of 7.pdf PDF
2022.09.26 P-3002 IFC PLANS_N4008023R0020 INSTRUCTIONS.docx DOCX document
Attachment C - CONSTRUCTION DESIGN EXPERIENCE PROJECT DATA SHEET.docx DOCX document
N40080-23-R-0020 LARGE PROJECTS MACC.pdf PDF
Attachment A- PIEE Vendor Access Instructions.pdf PDF
P-3002 HCP Price Schedule_BLANK 3-1-23.pdf PDF
Attachment D - PPQ.docx DOCX document
2022.09.26 P-3002 IFC Specifications_signed_N40080-23-R-0020.pdf PDF
Attachment F - SBPCD.docx DOCX document
Attachment B - PPI Log.xlsx XLSX spreadsheet
Attachment E - Historical Utilization of SB.docx DOCX document
Show all 50

N4008023R0020 LARGE PROJECTS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-3002 Relocated HCP & EOD Proficiency Range eProjects # 1396650 Joint Base Andrews, Camp Springs, MD IFC, September 26, 2022

SECTION 31 11 00

CLEARING AND GRUBBING

11/18

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES.

1.2 DELIVERY, STORAGE, AND HANDLING

Deliver materials to the site, and handle in a manner which will maintain the materials in their original manufactured or fabricated condition until ready for use.

PART 2 PRODUCTS

2.1 MATERIALS

NOT USED

PART 3 EXECUTION

3.1 PREPARATION

3.1.1 Protection

3.1.1.1 Roads and Walks

Keep roads and walks free of dirt and debris at all times.

3.1.1.2 Trees, Shrubs, and Existing Facilities

Protect trees and vegetation to be left standing from damage incident to clearing, grubbing, and construction operations by the erection of barriers or by such other means as the circumstances require.

3.1.1.3 Utility Lines

Protect existing utility lines that are indicated to remain from damage.

Notify the Contracting Officer immediately of damage to or an encounter with an unknown existing utility line. The Contractor is responsible for the repair of damage to existing utility lines that are indicated or made known to the Contractor prior to start of clearing and grubbing operations. When utility lines which are to be removed are encountered within the area of operations, notify the Contracting Officer in ample time to minimize interruption of the service. Refer to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS and Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS for additional utility protection.

SECTION 31 11 00 Page 1

3.2 CLEARING

Clearing consists of the felling, trimming, and cutting of trees into sections and the satisfactory disposal of the trees and other vegetation designated for removal, including downed timber, snags, brush, and rubbish occurring within the areas to be cleared. Clearing also includes the removal and disposal of structures that obtrude, encroach upon, or otherwise obstruct the work. Cut off flush with or below the original ground surface trees, stumps, roots, brush, and other vegetation in areas to be cleared, except such trees and vegetation as may be indicated or directed to be left standing. Trim dead branches 1-1/2 inches or more in diameter on trees designated to be left standing within the cleared areas and trim all branches to the heights indicated or directed. Neatly cut close to the bole of the tree or main branches, limbs and branches to be trimmed.

3.2.1 Tree Removal

Where indicated or directed, trees and stumps that are designated as trees shall be removed from areas outside those areas designated for clearing and grubbing. This work includes the felling of such trees and the removal of their stumps and roots as specified in paragraph GRUBBING.

Dispose of trees as specified in paragraph DISPOSAL OF MATERIALS.

3.2.2 Grubbing

Grubbing consists of the removal and disposal of stumps, roots larger than 3 inches in diameter, and matted roots from the designated grubbing areas. Remove material to be grubbed, together with logs and other organic or metallic debris not suitable for foundation purposes, to a depth of not less than 18 inches below the original surface level of the ground in areas indicated to be grubbed and in areas indicated as construction areas under this contract, such as areas for buildings, and areas to be paved. Fill depressions made by grubbing with suitable material and compact to make the surface conform with the original adjacent surface of the ground.

3.3 DISPOSAL OF MATERIALS

Dispose of excess materials in accordance with the approved solid waste management permit and include those materials in the solid waste management report.

All wood or wood like materials, except for salable timber, remaining from clearing, prunning or grubbing such as limbs, tree tops, roots, stumps, logs, rotten wood, and other similiar materials shall become the property of the Contractor and disposed of as specified. All non-saleable timber and wood or wood like materials remaining from timber harvesting such as limbs, tree tops, roots, stumps, logs, rotten wood, and other similiar materials shall become the property of the Contractor and disposed as specified.

3.3.1 Saleable Timber

All timber removed from the project site shall become the property of the Contractor. A valuation survey for the timber within project limits was determined to have no commerical value.

SECTION 31 11 00 Page 2 bbullock Cloud bbullock Text Box

-- End of Section --

SECTION 31 11 00 Page 3

31 11 00 - CLEARING AND GRUBBING
PART 1 GENERAL
1.1 SUBMITTALS
1.2 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 MATERIALS
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Protection
3.1.1.1 Roads and Walks
3.1.1.2 Trees, Shrubs, and Existing Facilities
3.1.1.3 Utility Lines
3.2 CLEARING
3.2.1 Tree Removal
3.2.2 Grubbing
3.3 DISPOSAL OF MATERIALS
3.3.1 Saleable Timber