This document is a construction phasing plan for a federal project to relocate hazardous cargo pads and EOD proficiency ranges. The plan details the activities and sequencing for Phase 4 of the project, including taxiway closures, demolition and construction of pavement, installation of fencing and barricades, and coordination with airfield operations. Precise timelines are provided for completion of work and reopening of taxiways. Notes provide requirements for daily check-ins with airfield management during construction periods, surveys of existing lighting equipment, and use of street sweepers to control foreign object debris on airfield pavements. Enlarged views referenced in the plan can be found in separate drawing GI-115.

View the file

Other files for this federal contract opportunity

Other files attached to N4008023R0020 LARGE PROJECTS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC), newest first.
File Type Posted
N4008023R0020 Amendment 0009.pdf PDF
N4008023R0020 Amendment 0007.pdf PDF
N4008023R0020 Amendment 0006.pdf PDF
E-500_Amend 6.pdf PDF
E-501_Amend 6.pdf PDF
Concrete Vault and Water Main additional Site photos (2).pdf PDF
CG-121_Amend 6 (2).pdf PDF
CU-505_Amend 6 (2).pdf PDF
CS-102_Amend 6 (2).pdf PDF
31 23 00.00 20_Amend 6 (2).pdf PDF
01 17 00_Amend 6 (2).pdf PDF
01 14 00_Amend 5.pdf PDF
CG-503_Amend 5.pdf PDF
CG-111_Amend 5.pdf PDF
CG-123_Amend 5.pdf PDF
CT-104_Amend 5.pdf PDF
ATTACHMENT H - P-3002 HCP PRICE SCHEDULE-BLANK 041323.pdf PDF
Workers Acknowledgement of Explosives Hazards AMEND 4.pdf PDF
Attachment G - SBSP.pdf PDF
N4008023R0020 Amendment 0004.pdf PDF
MDE 18-SF-0054 JADOC BORROW PITS SIGNED DWGS_2 of 3 AMEND 4.pdf PDF
SSK-PreBid-Detonation Bunker Sand Layer Clarification AMEND 4 (1).pdf PDF
E-103_AMEND 4.pdf PDF
CG-202_REV_AMEND 4.pdf PDF
CG-201_AMEND 4.pdf PDF
03___Boring Logs (1) AMEND 4.pdf PDF
01___Boring Location Diagram AMEND 4.pdf PDF
Attachment F - SBPCD.pdf PDF
02___Cross Sections AA and BB AMEND 4.pdf PDF
MDE 18-SF-0054 JADOC BORROW PITS SIGNED DWGS_3 of 3 AMEND 4.pdf PDF
S-600_Rev AMEND 4.pdf PDF
Site Visit Details.pdf PDF
Wage D Heavy Prince Georges 3-24-23 AMEND 4.pdf PDF
CP-103_AMEND 4.pdf PDF
CT-102_AMEND 4.pdf PDF
Attachment F - SBPCD.docx DOCX document
GI-501_REV.pdf PDF
N4008023R0020 Amendment 0003.pdf PDF
P3002_31 11 00_AMENDMENT 001.pdf PDF
N4008023R0020 Amendment 0002.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 3 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 7 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 4 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 2 of 7.pdf PDF
P-3002 IFC PLANS_REV_signed_Part 1 of 7.pdf PDF
Attachment G - SBSP.docx DOCX document
2022.09.26 P-3002 IFC Specifications_signed_N40080-23-R-0020.pdf PDF
Attachment F - SBPCD.docx DOCX document
Attachment B - PPI Log.xlsx XLSX spreadsheet
Attachment E - Historical Utilization of SB.docx DOCX document
Show all 50

N4008023R0020 LARGE PROJECTS MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SG

x x

T/ W

E

T/W E

T/W A2

PAD 91

SATISFACTORY TO

APPROVED

ACTIVITY

DATE

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E P A R T M E N T

O F

T H E

N A V Y

N A V A L

F A C I L I T I E S

E N G I N E E R I N G

C O M M A N D

DRAWFORM REVISION: 06 APRIL 2017

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

C O

M M

A N

D

W A

S H

IN

G

TO

N

J O I N T

B A S E

A N D R E W S

N A V A L

A I R

F A C I L I T Y

C A M P

S P R I N G S

M D

S Y M

D E S C R I P T I O N

D A T E

A P P R

P -3

R E

LO

C

A

TE

H A

ZA

R

D O

U S

C A

R G

O P

A D

A N

D E

O D

P R

O

FI

C

IE

N C

Y R

A N

G E

W A S H I N G T O N

N A V Y

Y A R D

W A S H I N G T O N

D C

N40080-22-R-8580

1396650

PROFESS IONAL ENG

I N

EE

R

ST

AT

E OF MARYLANDE

I

L IP

C

H

CR

R K

U

No . 28557

M A

AT

M

ON

S F

C O

N S

TR

U

C

TI

O N

P H

A S

IN

G

P

LA

N

P H

A S

E

GI-114

N

PHASE 4 NOTES: PHASE 4 ACTIVITIES

LEGEND

SG

x x

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 241.36

AutoCAD SHX Text 241.36

AutoCAD SHX Text

AutoCAD SHX Text 253.71

AutoCAD SHX Text

WL

AutoCAD SHX Text 259.7

AutoCAD SHX Text

GENERATORS

AutoCAD SHX Text

STM/SEW

AutoCAD SHX Text

TOPO THIS

AutoCAD SHX Text

OBSCURE AREA

AutoCAD SHX Text

DIRT ROAD

AutoCAD SHX Text

DIRT ROAD

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SOUTH PERIMETER ROAD

AutoCAD SHX Text

SOUTH PERIMETER ROAD

AutoCAD SHX Text

SOUTH PERIMETER ROAD

AutoCAD SHX Text

SOUTH PERIMETER ROAD

AutoCAD SHX Text

STORMWATER MANAGEMENT FACILITY

AutoCAD SHX Text

STORMWATER MANAGEMENT FACILITY

AutoCAD SHX Text

EXISTING BUILDING

AutoCAD SHX Text

EXISTING ASPHALT ROAD

AutoCAD SHX Text

EXISTING ASPHALT ROAD

AutoCAD SHX Text

AutoCAD SHX Text 259.3

AutoCAD SHX Text

MSS-1

AutoCAD SHX Text

AutoCAD SHX Text 259.6

AutoCAD SHX Text

MCR-5

AutoCAD SHX Text

AutoCAD SHX Text 236.1

AutoCAD SHX Text

TFA-5

AutoCAD SHX Text

AutoCAD SHX Text

DMT-3

AutoCAD SHX Text

AutoCAD SHX Text 240.7

AutoCAD SHX Text

TFA-1

AutoCAD SHX Text

AutoCAD SHX Text

DMT-5

AutoCAD SHX Text

AutoCAD SHX Text 230.5

AutoCAD SHX Text

TFA-6

AutoCAD SHX Text

AutoCAD SHX Text

DMT-7

AutoCAD SHX Text

AutoCAD SHX Text 256.08

AutoCAD SHX Text

DMT-6

AutoCAD SHX Text

AutoCAD SHX Text 260.5

AutoCAD SHX Text

MCR-6

AutoCAD SHX Text

AutoCAD SHX Text 244.11

AutoCAD SHX Text T-12

AutoCAD SHX Text

AutoCAD SHX Text 245.59

AutoCAD SHX Text T-13

AutoCAD SHX Text

AutoCAD SHX Text 252.55

AutoCAD SHX Text T-16

AutoCAD SHX Text

AutoCAD SHX Text 261.22

AutoCAD SHX Text

MSA-1

AutoCAD SHX Text

AutoCAD SHX Text 257.29

AutoCAD SHX Text

MSA-2

AutoCAD SHX Text

AutoCAD SHX Text 256.08

AutoCAD SHX Text

MSA-3

AutoCAD SHX Text

AutoCAD SHX Text 252.76

AutoCAD SHX Text

HCP-1

AutoCAD SHX Text

AutoCAD SHX Text 259.53

AutoCAD SHX Text

HCP-2

AutoCAD SHX Text

SCE

AutoCAD SHX Text

SCE

AutoCAD SHX Text

MB

AutoCAD SHX Text A-2

AutoCAD SHX Text

TEMPORARY GATE

AutoCAD SHX Text

STABILIZED CONSTRUCTION ENTRANCE

AutoCAD SHX Text

MSA FENCE

AutoCAD SHX Text

NEW ROLLING GATE TO BE CLOSED AT ALL TIMES

AutoCAD SHX Text

AIRFIELD SECURITY FENCE TO BE FULLY CONSTRUCTED ON THE NORTH SIDE OF THE ROAD

AutoCAD SHX Text

AIRFIELD FENCE TO BE FULLY CLOSED OFF WITH NEW GATES

AutoCAD SHX Text

ORANGE SAFETY FENCE IN UNPAVED AREAS

AutoCAD SHX Text

LOW PROFILE BARICADES PHASE 4B TAXIWAY CLOSURE SEE NOTE 4

AutoCAD SHX Text TEMPORARY CONSTRUCTION FENCE TO BE MOVEABLE AND TO BE COMPLETELY CLOSED DURING NON WORKING HOURS TO SECURE AIRFIELD

AutoCAD SHX Text

DEMO PAVEMENT

AutoCAD SHX Text

DEMOLISH EXISTING PAVEMENT, GRADE AREA, CONSTRUCT NEW PAVEMENT. SEE NOTE 3 AND 4

AutoCAD SHX Text

SEE NOTE 3

AutoCAD SHX Text

NEW ROLLING GATE TO BE CLOSED AT ALL TIMES

AutoCAD SHX Text

TEMPORARY CONSTRUCTION FENCE

AutoCAD SHX Text REMOVE TEMPORARY CONSTRUCTION ACCESS ROAD AND STABILIZE PRIOR TO CONCLUSION OF PHASE 4.

AutoCAD SHX Text

ORANGE SAFETY FENCE ON NORTH & SOUTH SIDE OF ROADWAY TO BE REMOVED

AutoCAD SHX Text

INSTALL BIOSWALES AFTER FINAL STABILIZATION

AutoCAD SHX Text

INSTALL BIOSWALES AFTER FINAL STABILIZATION

AutoCAD SHX Text

INSTALL BIOSWALES AFTER FINAL STABILIZATION

AutoCAD SHX Text

TAXIWAY CLOSURE PHASE 4B. SEE NOTE 3

AutoCAD SHX Text

EXISTING FUEL TANK AND EQUIPMENT FOR FIRE PIT. DO NOT DISTURB.

AutoCAD SHX Text PHASE 4 ACCESS ON SHOULDER. DO NOT PAVE PORTION OF SHOULDER UNTIL COMPLETION OF PHASE 4 AIRFIELD WORK.

AutoCAD SHX Text

ACCESS GATE TO PHASE 4 WORK AREA

AutoCAD SHX Text

LOW PROFILE BARICADES PHASE 4B TAXIWAY CLOSURE SEE NOTE 4

AutoCAD SHX Text

F16 ACCESS FOR OPERATIONS DURING PHASE 4B

AutoCAD SHX Text

SEE ENLARGED VIEWS ON GI-115 FOR PHASE 4A AND 4B.

AutoCAD SHX Text

REMOVE TEMPORARY CONSTRUCTION FENCE AT COMPLETION OF ALL CONSTRUCTION ACTIVITIES

AutoCAD SHX Text PROFESSIONAL CERTIFICATION: I HEREBY CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NO. 53990 , EXPIRATION DATE: 02-24-2023.

AutoCAD SHX Text 09/26/2022

AutoCAD SHX Text

AutoCAD SHX Text 0 ISSUE FOR CONSTRUCTION 09/26/2022ISSUE FOR CONSTRUCTION 09/26/2022 09/26/202209/26/2022

AutoCAD SHX Text

1 AMENDMENT 0004 04/01/2023AMENDMENT 0004 04/01/2023 04/01/202304/01/2023

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text 13140287

AutoCAD SHX Text

AutoCAD SHX Text 240'

AutoCAD SHX Text 0'

AutoCAD SHX Text 1"=120'

AutoCAD SHX Text 120'

AutoCAD SHX Text 480'

AutoCAD SHX Text 360'

AutoCAD SHX Text 600'

AutoCAD SHX Text

1. SEE GENERAL PHASING NOTES ON GI-111. SEE GENERAL PHASING NOTES ON GI-111. 2. IN THE PRESENCE OF THE CONTRACTING OFFICER, PERFORM A SURVEY OF EXISTING IN THE PRESENCE OF THE CONTRACTING OFFICER, PERFORM A SURVEY OF EXISTING TAXIWAY EDGE LIGHTS TO DETERMINE AND RECORD THE LOCATION OF ANY NON-FUNCTIONAL OR DAMAGED UNITS ON THIS CIRCUIT PRIOR TO PHASE 4B CONSTRUCTION. CONTRACTOR SHALL MEGGER THE EXISTING CIRCUIT PRIOR TO PHASE 4B CONSTRUCTION AND REPORT RESULTS TO JBA AIRFIELD OPERATION AND THE COR PRIOR TO DEMOLITION. THE CONTRACTOR SHALL SUBMIT A REPORT TO THE GOVERNMENT FOR REVIEW. ANY DAMAGE OR LOSS OF FUNCTION SHOWN TO HAVE OCCURRED DURING CONSTRUCTION MUST BE REPAIRED BY THE CONTRACTOR AT NO EXPENSE TO THE GOVERNMENT. 3. TAXIWAY CLOSURE IN PHASE 4A IS FOR ALL AIRCRAFT EXCEPT F16 OPERATIONS AND IS TAXIWAY CLOSURE IN PHASE 4A IS FOR ALL AIRCRAFT EXCEPT F16 OPERATIONS AND IS LIMITED TO 120 CONSECUTIVE DAYS, THIS INCLUDES THE 30 DAYS OF COMPLETE CLOSURE FOR WORK IN PHASE 4B. THIS DURATION IS TO COMPLETE PAVEMENT CONNECTION, STRIPING, LIGHTING, REMOVAL OF TEMPORARY SIGNS, BARRICADES, AND TO OPEN TAXIWAY TO AIRCRAFT OPERATIONS. 4. PROVIDE FULL TIME ACTIVE STREET SWEEPER/ VACUUM TRUCK ON EXISTING AIRFIELD TO PROVIDE FULL TIME ACTIVE STREET SWEEPER/ VACUUM TRUCK ON EXISTING AIRFIELD TO CONTROL FOD. LIMIT CONSTRUCTION VEHICLES ON THE EXISTING AIRFIELD PAVEMENTS. 5. CONTRACTOR MUST CHECK IN AND OUT WITH AIRFIELD MANAGEMENT OPERATIONS DAILY CONTRACTOR MUST CHECK IN AND OUT WITH AIRFIELD MANAGEMENT OPERATIONS DAILY DURING THE DURATION OF CONSTRUCTION ACTIVITIES ASSOCIATED WITH THE CONNECTION TO TAXIWAY ECHO. AS WELL AS DURING THE REMOVAL OF TEMPORARY AIRFIELD SECURITY FENCE. 6. CONTRACTORS SHOULD REMAIN SOUTH OF THE BARRICADES. IF THEY NEED ACCESS TO CONTRACTORS SHOULD REMAIN SOUTH OF THE BARRICADES. IF THEY NEED ACCESS TO THE NORTH SIDE OF THE BARRICADES DURING PHASE 4A, IT MUST BE COORDINATED WITH AIRFIELD MANAGEMENT OR CONDUCTED DURING PHASE 4B.

AutoCAD SHX Text TAXIWAY CLOSURE, SEE NOTE 3. INSTALL LOW PROFILE BARRICADES AND ORANGE SAFETY FENCE, SEE GI-115 FOR ENLARGED VIEW. MOVE SECTION OF TEMPORARY FENCE TO ACCESS WORK AREA ADJACENT TO TAXIWAY WITH A GATE. DEMOLISH PAVEMENT FOR TAXIWAY CONNECTOR. REMOVE EXISTING STORM SEWER PIPE AND REPLACE. SEE GI-115. CONNECT TEMPORARY AIRFIELD LIGHTING WITH JUMPERS. FINISH GRADING FOR TAXIWAY SECTIONS. PAVE CONNECTION AND SECTION OF TAXIWAY. COMPLETE ALL STRIPING, SIGNAGE, SEEDING, ALL CLEANUP WORK WITHIN 125-FT OF TW E/F CENTERLINES. COMPELETE FOD CHECK AND INSPECTION BY 89 OSS AND COR PRIOR TO REOPENING TAXIWAYS FOR TRAFFIC. ALL AIRFIELD PAVEMENTS TO BE OPEN TO AIRCRAFT TRAFFIC BY NOV 15TH AND NOT CLOSED UNTIL AFTER MARCH 1ST. WORK OUTSIDE OF TAXIWAY CLEARANCE LINE - FINALIZE ALL STRIPING SIGNAGE OF ROADS, AND TAXIWAY, COMPLETE FENCING.

AutoCAD SHX Text TEMPORARY CONSTRUCTION FENCE ORANGE SAFETY FENCE SECURITY GUARD (SEE NOTE 8) TEMPORARY CONSTRUCTION ENTRANCE LOW PROFILE BARRICADES

AutoCAD SHX Text C1

AutoCAD SHX Text

GI-501

AutoCAD SHX Text C4

AutoCAD SHX Text

GI-502

AutoCAD SHX Text A4

AutoCAD SHX Text

GI-501

AutoCAD SHX Text C1

AutoCAD SHX Text

GI-502

AutoCAD SHX Text

File details come from the government source that posted it. Updated .