N39430-14-R-1409.pdf
PDF 2 MB Posted
- Attached to
- Engineering Services for Very Low Frequency TowersConstruction Services. Federal contract opportunity
- Solicitation number
- N3943014R1409
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PPC_attendee_list.pdf | ||
| Amendment_0004.pdf | ||
| Tower_Schematics.pdf | ||
| PPC_Agenda.pdf | ||
| Amendment_0003.pdf | ||
| Aguada_map.docx | DOCX document | |
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| ATTACHMENT_C.pdf | ||
| ATTACHMENT_D.pdf | ||
| ATTACHMENT_E.docx | DOCX document | |
| ATTACHMENT_B.docx | DOCX document | |
| ATTACHMENT_A.docx | DOCX document | |
| ATTACHMENT__F.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR3055613
WILLIAM HEPLER 805-982-2515
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
21-Feb-2014
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, notice to proceed. This performance period is mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________2 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________25 Mar 2014 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVFAC EXWC
CODE ACQ / NAVAL BASE VENTURA COUNTY
1100 23RD AVE BLDG 1100
PORT HUENEME CA 93043-4301
N39430
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
04:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
N39430-14-R-1409 75
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 1 Each Base Ordering Period
FFP
CONSTRUCTION SERVICES FOR SPECIALIZED ANTENNAS, TOWERS,
AND COMMUNICATION FACILITIES WORLD-WIDE
FOB: Destination
PURCHASE REQUEST NUMBER: ACQR3055613
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 1 Each OPTION Option Ordering Period 1
FFP
CONSTRUCTION SERVICES FOR SPECIALIZED ANTENNAS, TOWERS,
AND COMMUNICATION FACILITIES WORLD-WIDE
UNIT UNIT PRICE MAX AMOUNT
0003 1 Each OPTION Option Ordering Period 2
FFP
CONSTRUCTION SERVICES FOR SPECIALIZED ANTENNAS, TOWERS,
AND COMMUNICATION FACILITIES WORLD-WIDE
UNIT UNIT PRICE MAX AMOUNT
0004 1 Each OPTION Option to Extend Services Period
FFP
CONSTRUCTION SERVICES FOR SPECIALIZED ANTENNAS, TOWERS,
AND COMMUNICATION FACILITIES WORLD-WIDE See FAR 52.217-8 Option to Extend Services
TABLE OF CONTENTS
PART 1 – CONTRACT REQUIREMENTS
STANDARD FORM 1442 – SOLICITATION, OFFER, AND AWARD
SECTION 00100 – INSTRUCTIONS TO OFFERORS
SECTION 00210 – BASIS OF AWARD AND EVALUATION FACTORS
SECTION 00600 – REPRESENTATIONS AND CERTIFICATIONS
SECTION 00700 – CONTRACT CLAUSES
SECTION 00801 – CONTRACT TYPE/PERFORMANCE/SPECIAL CONTRACT REQUIREMENTS
SECTION 00802 – CONTRACT ADMINISTRATION DATA
SECTION 00803 – TASK ORDER ISSUANCE PROCEDURES
PART 2 – GENERAL REQUIREMENTS DESIGN-BUILD (SMALL PROJECT)
PART 2A - PROJECT-SPECIFIC GENERAL REQUIREMENTS (SMALL PROJECT)
To be Tailored for each Task Order
PART 3 – PROJECT PROGRAM
See individual Task Orders
PART 4 – MINIMUM MATERIALS, ENGINEERING AND CONSTRUCTION
REQUIREMENTS
A10 FOUNDATIONS
B10 SUPERSTRUCTURE
B20 EXTERIOR LIGHTING
B30 ROOFING
C10 INTERIOR CONSTRUCTION
C20 STAIRS
D20 PLUMBING
D30 HVAC
D40 FIRE PROTECTION
D50 ELECTRICAL
E10 EQUIPMENT
E20 FURNISHINGS
F10 SPECIAL CONSTRUCTION
F20 SELECT BUILDING DEMOLITION
G10 SITE PREPARATION
G20 SITE IMPROVEMENTS
G30 SITE CIVIL/MECHANICAL UTILITIES
G40 SITE ELECTRICAL UTILITIES
PART 5 – PRESCRIPTIVE TECHNICAL SPECIFICATIONS
See individual Task Orders
PART 6 – ATTACHMENTS
Performance Assessment Plan Project Signs
REQUEST FOR PROPOSAL ATTACHMENTS:
Attachment A – Construction & Design Experience Project Data Sheet
Attachment B – Past Performance Questionnaire
Attachment C – Table of key personnel fully burdened labor rates and home office overhead/G&A rate
Attachment D – Seed Task Order Request For Proposal
Attachment E – Financial Questionnaire
Attachment F – Request For Information (RFI) form
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 POP 01-MAY-2014 TO
30-APR-2015
N/A NAVAL FACILITIES ENGINEERING
SERVICE CNT
GEOFFREY DANN
ESC231
1100 23RD AVENUE
PORT HUENEME CA 93043-4370
805-982-1366
N69218
0002 POP 01-MAY-2015 TO
30-APR-2016
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 01-MAY-2016 TO
30-APR-2017
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 01-MAY-2017 TO
31-OCT-2017
N/A (SAME AS PREVIOUS LOCATION)
Section 00100 - Bidding Schedule/Instructions to Bidders
00100 INSTRUCTIONS TO OFFERORS
SECTION 00100
INSTRUCTIONS TO OFFERORS
1. Inquiries Inquiries regarding the Request for Proposal (RFP) shall be submitted electronically to the contract specialist, Bill Hepler at william.hepler@navy.mil utilizing the Request For Information (RFI) form to ensure the question is fully understood (Attachment F). The Government does not intend to respond to inquiries submitted less than 10 days before the proposal receipt date.
2. Proposal Submittal Requirements Proposals submitted in response to this solicitation shall be formatted as follows and furnished in the number of copies stated herein. A cover letter shall accompany the proposal.
The cover letter shall include—
(a) The solicitation number;
(b) The name, address, telephone and facsimile numbers, and e-mail addresses of the Offeror;
(c) The DUNS Number and CAGE Code of the Offeror;
(d) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(e) Names, titles, and phone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation and;
(f) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority.
Proposals shall be submitted in three ring binders or bound, with tabs or separators. Page limits, if stipulated, must be adhered to. Proposals shall be submitted on 8.5” X 11” paper, utilizing both sides of the paper.
The format for the proposal is as follows:
Volume 1:
Cover Page First two Pages of SF-1442 - with blocks 14 through 20c completed Representations and Certifications – Section 00600 of RFP Tab 1 - Factor 1 – Recent, Relevant Experience of the Offeror and the Offeror’s Lead Design Firm(s) (Attachment “A”) Tab 2 - Factor 2 – Management Approach Tab 3 - Factor 3 – Project Execution Approach (Seed Task Order)
3.1 – Technical Approach for Seed Task Order
3.2 – Schedule and schedule narrative
Tab 4 - Factor 4 – Safety Tab 5 - Factor 5 – Past Performance on Recent, Relevant Projects (Attachment “B”) Volume 2:
Joint Venture Agreement (if applicable) Schedule of partially burdened labor rates (Attachment “C”) Schedule of price for Seed Task Order Bid Bond (in the amount of 20% for Seed Task Order or $3 million, whichever is less)
Financial Questionnaire completed by firm’s financial institution (in sealed envelope from financial institution) Letter of Bondability
Offerors are requested to submit only the information/exhibits required. Do not submit any additional information such as brochures, CDs, or other pre-printed materials.
A total of one (1) original and two (2) hard copies of Volume 1, and the original and zero (0) copies of volume 2 must be received by this office no later than the date and time stated in Block 13 of the SF1442.
Offerors should address all evaluation factors and shall submit the proposal to the following address:
Naval Facilities Engineering and Expeditionary Warfare Center Acquisitions, Code ACQ-71 Attention: Bill Hepler 1100 23rd Ave, Bldg. 1100 Port Hueneme, CA 93043-4301
If proposals are hand carried, Offeror’s are advised to contact the contract specialist or contracting officer to coordinate receipt of the proposal at the Pass and ID office located at the Sunkist Gate. The Contract Specialist is Bill Hepler: (805) 982-2515. The Contracting Officer is Cecilia Marquez: (805) 982-2172
LATE SUBMITTALS WILL NOT BE CONSIDERED. Proposal must be clearly marked on the outside of the package with the solicitation number.
3. Pre-Proposal Conference
(a) A pre-proposal conference will be held on 5 March 2014 9:00 a.m. local time at Aguada Puerto Rico where questions will be answered relative to this RFP. Comments, constructive criticism, and identification/notification of RFP inconsistencies are solicited as well.
(b) All prospective Offerors are urged to attend this conference. In order to make the conference as productive as possible, Offerors are requested to submit, one week prior to the pre-proposal conference, any questions they may have in writing to the contract specialist at william.hepler@navy.mil. The submission of written questions will not preclude anyone from posing questions during the pre-proposal conference.
(c) Failure of a prospective Offeror to submit any questions or to attend the conference will be construed to mean that the Offeror fully understands all requirements of the solicitation. Prospective Offerors are advised that the pre-proposal conference will be held solely for the purpose of explaining the concepts involved in the project and the specifications, terms, and conditions of this solicitation.
(d) No minutes of this meeting will be issued. All prospective Offerors are advised that this solicitation will remain unchanged unless it is amended in writing. However, if an amendment is issued, normal procedures relating to the acknowledgment and receipt of any such amendment as described in Contract Clause “Amendment to Solicitations” of this section shall be applicable.
(e) A site visit for the seed task order will occur after the pre-proposal conference.
4. Joint Venture Offerors Joint venture Offeror shall provide a copy of the joint venture agreement. The agreement shall include information that identifies the responsibilities for each entity under this contract, demonstrate the relationship between firms, and identify contractual relationships and authorities to bind each entity of the joint venture. The joint venture also needs to complete the online representations and certifications for each joint venture member as well as for the joint venture itself.
Joint Venture and Team Arrangements – FAR Subpart 9.6 defines contractor team arrangements as follows; Contractor team arrangements mean (1) two or more companies form a partnership or joint venture to act as a potential prime contractor or (2) a potential prime contractor agrees with one or more other companies to have them act as its subcontractor under a specified Government contract or acquisition program.
All offerors proposing team members (including a joint venture or key subcontractor (subcontracts performing 20% or more of the prime contract value)) whose resources are relied on in response to the requirement of the RFP, shall submit the following information in the front of the technical and cost proposal:
1. Provide a listing of the team members’ corporate name (no abbreviations), address, point of contact, phone number, DUNS Number, and Cage Code. This information should be provided in both the technical and price proposal. The joint venture must complete the online representations and certifications for each joint venture member as well as for the joint venture itself.
2. Submit a copy of the Joint Venture agreement, other Teaming Arrangement agreement, or signed binding letter of commitment from each team member. All joint ventures, teaming agreements, and letters of commitment shall:
(1) clearly identify the expected relationship, role and responsibility between the firms or of the subcontractor or other entity (type and proportion of work to be performed); identify contractual relationships and authorities to bind each entity of the joint venture, and
(2) shall be signed by the appropriate individual(s) of each firm.
Joint Venture Agreements shall be provided in both the technical and price proposal. Letters of commitment shall be provided in the technical proposal.
Note: Not with-standing the overall proposal page limitation, copies of joint venture agreements, teaming agreements, and letters of commitment shall not be applied against the page limits.
5. Financial Questionnaire Offerors shall submit the Financial Questionnaire to their financial institution and request the financial institution complete the questionnaire with regard to the Offeror’s firm. Upon completion of the questionnaire, the financial institution should place the completed questionnaire in a sealed envelope showing the return address of the financial institution and forward it to the Offeror so that the Offeror can include the questionnaire (in the sealed envelope) with the Offeror’s proposal.
If the Offeror is a joint venture, information should be submitted for the joint venture. If there is no information for the joint venture, information should be submitted for each joint venture partner. The Joint Venture Agreement, Financial Questionnaire, Surety Form, and Representations and Certifications will not be rated. They will, however, be considered in assessing the Offeror’s responsibility. Offerors shall submit the Surety Form to their surety company and request the surety complete the form with regard to the Offeror’s firm so that the Offeror can include the form with the Offeror’s proposal.
Financial information will not be evaluated, but will be used to help determine responsibility.
6. Letter of Bondability The offeror shall provide a letter of bondability, on the Surety’s letterhead, which stipulates the Offeror’s aggregate bonding capacity, current available bonding, as well as single project limit. Ensure the name of the Offeror’s surety, including the name and phone number of the Offeror’s agent is included.
Bondability will not be evaluated, but will be used to help determine responsibility.
7. Subcontracting Information For information regarding the Small Business Administration’s (SBA) Mentor-Protégé Program see http://www.sba.gov. For information regarding the Department of Defense (DoD) Funded Mentor Protégé Program, see http://www.acq.osd.mil/osbp/sb/programs/mpp/index.shtml As part of the outreach program it is recommended that your company/firm consider using the Dynamic Small Business Search as a source of small businesses. The Dynamic Small Business Search is a free Internet database of information on small businesses, small disadvantaged businesses, women-owned small businesses and HUBZone small businesses. The Dynamic Small Business Search is available at http://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm
8. System for Award Management (SAM) Contractors must be registered in the System for Award Management (formerly Central Contractor Register (CCR)) prior to award of a DoD contract. For more information, visit http://www.sam.gov. A contract cannot be awarded to a contractor not registered in SAM. Remember to review the NAICS codes listed in your firms profile and ensure that you have listed the NAICS code for this procurement
(NAICS 237130)
9. Online Representations and Certifications In order to participate on this solicitation, contractors shall complete electronic representations and certifications. To complete the representations and certifications, visit the SAM website listed above.
10. Federal Contractor Program In accordance with Federal Acquisition Regulation (FAR) 22.1303, any contractor or subcontractor with a contract of $100,000 or more with the Federal Government must take affirmative action to hire and promote qualified targeted veterans which includes, special disabled veterans, veterans of the Vietnam-era, recently separated veterans, and any other veterans who served on active duty during a war or in a campaign or expedition for which a campaign badge has been authorized. Companies must file an annual VETS-100 report, which shows the number of targeted veterans in their work force by job category, hiring location, and number of new hires, including targeted veterans hired during the reporting period and the maximum number and minimum number of employees of such contractor during the period covered by the report. Instructions, information and follow-up assistance is provided at VETS-100 Internet site at http://www.dol.gov/vets/vets-100.html A contract cannot be awarded to a contractor that has not submitted a required annual form VETS-100, Federal Contractor Veterans’ Employment Report (VETS-100 Report) if subject to the reporting requirements of 38 U.S.C.
4212(d) for that fiscal year.
11. Incurred Expenses The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.
00210 BASIS OF AWARD AND EVAL
Section 00210 Basis of Award and Evaluation Factors
1. BASIS OF AWARD – MULTIPLE AWARD CONSTRUCTION CONTRACTS
(a) The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contracts; to negotiate with offerors in the competitive range; and to award the contracts to the offerors submitting the proposals determined to represent the best value—the proposals most advantageous to the Government, price and other factors considered.
(b) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.”
(c) The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.
(d) All technical factors when combined are of equal importance to the performance confidence assessment (past performance) rating; and all technical factors and the performance confidence assessment (past performance) rating, when combined are approximately equal to price.
(e) Any proposal found to have a deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions. Proposals may be found to have either a significant weakness or multiple weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board’s assessment of the identified weakness(s) and the associated risk to successful contract performance resulting from the weakness(s). This assessment must provide the rationale for proceeding to award without discussions.
2. BASIS OF AWARD – SEED TASK ORDER
After the Government selects the awardees for the Multiple Award Construction Contract (MACC), the Government will determine which of the awardees will receive the award of the Seed Task Order. The Government will select the proposal from the awardee that offers the best value considering the rating for Factor 3 for the MACC, and the price for the Seed Task Order. Offerors eliminated from consideration to receive a MACC contract will be ineligible to receive award of the Seed Task Order.
3. DEFINITIONS
CONCURRENT PROJECT(S): Projects with multiple starting and ending points, performed under separate task orders, and/or contracts where the period of performance occurred simultaneously for a substantial (two months or more) period of time.
DESIGN-BUILD: Refers to combining design and construction in a single contract with one contractor.
Design-build projects require design of the project by a licensed professional (i.e. engineer, architect).
Projects that only require shop drawing level effort are not design-build projects.
FIVE-YEAR PERIOD: Refers to period of time for which projects may be submitted for experience and past performance. The five-year period is calculated by counting back five years from the issue date of the
RFP.
FULLY DESIGNED PROJECT: Refers to the traditional delivery method where design and construction are sequential and contracted for separately with two contracts and two contractors.
LEAD ARCHITECT: Refers to the Designer of Record and Manager of the Design.
LEAD DESIGN FIRM: Applies to any outside Lead Design Firm and any in-house Lead Designer(s).
OFFEROR: Refers to the Contractor submitting the proposal as Offeror, including joint ventures, whose name appears in Block 14 of Standard Form 1442 (Solicitation, Offer and Award).
OFFEROR’S TEAM: Applies to the Offeror, the Offeror's outside Lead Design Firm, and/or in-house Lead Designer(s) only; does not include subcontractors or consultants.
PAGE: Refers to one printed side of a piece of paper. (For example, 5 pieces of paper printed on both sides would result in 10 pages of narrative.)
PROJECT: A design-build or a fully designed construction activity or task, with a single starting point and a single ending point.
PROGRAM MANAGER: The Program Manager (PM) is the Offeror’s representative who will have full program oversight for the entire MACC. The PM is not expected to be involved in the day-to-day execution of each task order, but will be requested in the event that problems cannot be resolved via other core positions. The Program Manager shall be responsible for the content of all proposals and compliance with the requirements of the basic contract as well as quality assurance for all task orders.
The Program Manager shall be an employee of the prime contractor.
PROJECT MANAGER: The Project Manager is responsible for the status reporting, financial tracking, scheduling and all project correspondence and documentation. The project manager is expected to be the Government’s primary Point of Contact for the task order assigned to them. The Project Manager shall be an employee of the prime contractor.
QUALITY CONTROL MANAGER: The Quality Control Manager (QCM) is responsible to implement and manage the Quality Control Program. The QCM is required to perform the three phases of control, perform submittal review and approval, ensure testing is performed and provide QC certification and documentation required in this contract. The Quality Control Manager shall be an employee of the prime contractor.
SELF-PERFORM: Refers to performing work in-house without subcontractors.
SITE SAFETY AND HEALTH OFFICER: The Site Safety and Health Officer (SSHO) is responsible for managing, implementing and enforcing the Contractor’s Safety and Health Program in accordance with the accepted Accident Prevention Plan (APP). The Site Safety and Health Officer shall be an employee of the prime contractor.
SUBSTANTIALLY COMPLETE: Applies to projects, for which construction is at least 80% complete. 100% COMPLETE: 100% plans and specifications signed off by an Architect-Engineer and ready for construction with final cost estimate. Does not include any Post Construction Award Support.
SUPERINTENDENT: The Superintendent is responsible for quality assurance and scope compliance for the task order they are assigned to. The Superintendent will be expected to be on-site during project execution and oversee all sub-contractor and /or trades work. The Superintendent will be responsible for compliance with all applicable Health, Safety and Environmental regulations specific to the geographic site. The Superintendent shall be an employee of the prime contractor.
4. ADJECTIVAL RATINGS:
(a) Non-Price Factors: Except for Past Performance, non-price factors will be rated using the following adjectival rating scheme:
i. OUTSTANDING: Proposal meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
ii. GOOD: Proposal meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
iii. ACCEPTABLE: Proposal meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
iv. MARGINAL: Proposal does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
v. UNACCEPTABLE: Proposal does not meet requirements and contains one or more deficiencies. Proposal is unawardable.
(b) Past Performance: First, the Government will evaluate the relevancy of all projects/contracts submitted by the offeror and other information available (Relevancy Assessment). Second, the Government will, considering relevancy and the offeror’s performance on those contracts, assign a Performance Confidence Assessment Rating.
(1) For Relevancy, past performance will be rated using the following adjectival rating scheme:
i. VERY RELEVANT: Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
ii. RELEVANT: Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
iii. SOMEWHAT RELEVANT: Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
iv. NOT RELEVANT: Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
(2) For Performance Confidence, past performance will be rated using the following adjectival rating scheme:
i. SUBSTANTIAL CONFIDENCE: Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
ii. SATISFACTORY CONFIDENCE: Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
iii. LIMITED CONFIDENCE: Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
iv. NO CONFIDENCE: Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
v. UNKNOWN CONFIDENCE (NEUTRAL): No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
5. EVALUATION FACTORS FOR AWARD:
Factor 1 - Recent, Relevant Experience of the Offeror and the Offeror’s Lead Design Firm(s)
(i) Solicitation Submittal Requirements: Use Attachment “A” (Offeror’s Experience Data Sheet) to submit Offeror’s projects for evaluation. Use Attachment “A” (Lead Design Firm’s Experience Data Sheet) to submit Lead Design Firm’s projects for evaluation. Submit a maximum of five (5) relevant construction projects for the Offeror and a maximum of five (5) for the Offeror’s lead design firms, that best demonstrates construction and design experience on projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as:
Approximate value of $50,000 to $1,000,000; included tower inspection and repair or tower construction and/or electrical power (generator, UPS, switchgear), HVAC, or similar equipment installation.
Projects submitted must have been completed within the past five (5) years of the date of issuance of this RFP to be considered.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.
The attached Construction & Design Experience Project Data Sheet (Attachment A) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design.
Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods).
If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. Offerors are still limited to a total of five (5) projects combined.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement in the performance of the contract.
The Offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The Offer must provide a letter of commitment and an explanation of the meaningful involvement that the subcontractor will have in performance of this contract.
(ii) Basis of Evaluation: The basis of evaluation will include the Offeror’s and the Offeror’s Lead Design Firm(s) demonstrated experience in designing and performing recent and relevant work such as repair or construction of Very Low Frequency (VLF) or Low Frequency (LF) transmitting stations including antenna, tuning network, feed system, or ground system; repair or construction of Medium Frequency (MF) and High Frequency (HF) radio transmitting and receiving stations including antenna, tuning network, feed system, or ground system; electric utility upgrade or installation of three-phase engine-generator, transfer switch, and Uninterruptible Power Supply (UPS) equipment.
Any projects submitted in excess of five (5) for construction and five (5) for Design will not be considered.
Proposal that fail to provide required and complete information may be rated lower.
Relevant project experience where the Offeror and the proposed subcontractors or joint venture partners have previously worked together may receive a higher rating than those that have not worked together.
Offerors who fail to submit experience for all joint venture partners may be rated lower.
Projects for work on Very Low Frequency (VLF) or Low Frequency (LF) transmitting stations may receive a higher rating than projects for Medium Frequency (MF) and High Frequency (HF) radio transmitting and receiving stations or electric utility upgrade or installation.
Projects for work performed outside the continental United States may be rated higher.
Projects for work where the offeror overcame circumstances beyond the offeror's control may be rated higher.
The Offeror’s projects submitted for evaluation may be rated higher than those submitted by the Offeror’s Lead Design Firm(s) or subcontractors.
Factor 2 - Management Approach This requirement considers the effectiveness of the offeror’s management approach and organization to adequately perform the requirements of the solicitation. The Government seeks a comprehensive approach that will maximize quality, be cost effective, takes into account logistical realities and will result in the optimal use of resources. Additionally, the Government seeks Offerors that can provide a rapid response for both CONUS and OCONUS emergency repair or construction needs.
(i) Solicitation Submittal Requirements: In six pages or less, describe your management approach as it pertains to this solicitation, including the following:
1) Provide an organizational chart with related narrative. The organization chart shall list the position description and identify the key personnel in the home office structure who will support this contract.
Resumes for individuals are not required. The narrative shall provide the following:
a. The offeror proposed program management organizational structure, including organizational relationships.
b. Information provided shall adequately explain the flow and levels of authority and communication, both internally and with the Government.
c. Describe how and to what extent the field program management organization will interact with the home office organization and other supporting offices under the contract.
d. The narrative shall address prime and subcontractor interfaces and responsibilities.
e. Offerors shall submit unconditional letters of commitment for proposed key subcontractors.
f. Describe how the proposed program management structure will enable efficient management of the work to be performed under the contract.
g. If a joint venture is proposed, describe the roles of each joint venture member in the management of the contract. Provide information on the structure and decision making responsibilities of the partners in terms of who will control the manner and method of performance of work.
2) Provide a field-staffing plan that fully supports two concurrent task orders. Include position descriptions of key field personnel. Describe how staffing needed to perform this contract will be acquired. Provide a narrative describing your proposed plan for field staffing and use of local resources.
3) Address the approach to minimize response time between the award of a task order and the mobilization to a site. Include a discussion on coordination with subcontractors for quick response.
Offerors shall provide details on their ability/resources to provide an initial assessment team to an emergency site within thirty-six (36) hours from a Notice to Proceed. Address your plan to obtain and deliver materials, equipment, and workforce globally, including areas with limited and constrained resources.
4) Address the ability to plan, schedule, re-schedule, work teams when unanticipated naval mission needs require construction to halt and the radio station to be placed back into operation with as little as 24 hour recall notice.
5) Address approach for managing quality of work (quality assurance/quality control program), contract administration, and project controls and scheduling. Provide a description of how this QA/QC program has been used successfully on prior projects.
(ii) Basis of evaluation:
The Government will evaluate the extent to which the offeror’s management plan:
(1) demonstrates an effective and efficient organization structure and logical approach to providing a quality end result;
(2) provides an efficient plan for staffing/resourcing all locations covered by this contract, conducting concurrent task orders, and making use of local resources;
(3) demonstrate rapid mobilization capabilities including: coordination with subcontractors, acquisition/delivery of equipment, materials and workforce globally;
(4) demonstrates an understanding of the naval mission and the ability to shift resources to accommodate unanticipated changes to the schedule; and
(5) provides for a QA/QC program, which demonstrate that data quality control measures are in place and have been successfully used on previous projects.
The offeror’s proposal should demonstrate that they possess a management team that has proven experience relevant to the work required under this contract.
Factor 3 – Project Execution Approach (Seed Task Order)
For evaluation of Factor 3 – Project Execution Approach, a seed task order is included in this solicitation as Attachment D. The non-price factors (Technical Approach and Schedule) are elements of this factor will be combined to form the basis of this factor.
(i) Solicitation Submittal Requirements:
(a) Technical Approach: The offeror shall submit a narrative that demonstrates an understanding of the scope and presents the proposed approach to accomplish the requirements of the Project Program (Part 3) and General Requirements (Part 2), including relevant subcontractors; proposed means and methods; plans to mitigate potential problem areas and logistical issues. The Technical Approach should clearly identify any assumptions and/or deviations from the PTO RFP.
(b) Schedule: Offerors shall provide a Critical Path Method (CPM) Schedule limited to 30 activities, identifying critical path activities, milestones, durations and other important activities during post-contract award, design, fabrication, construction, and punchlist. The presentation shall clearly show the logic and sequence of events necessary for the successful execution of the project (assuming no delays as listed in section 00100 note 13).
The number of pages shall be limited to one (1) folded 11X17 sheet. The schedule proposed will be incorporated into the task order award.
(ii) Basis of Evaluation:
(a) Technical Approach: The offeror will be evaluated on the level of understanding of the requirements of the Project Program and General Requirements; the composition of the Offeror’s team;
the technical merit of the proposed means and methods; the identification of potential problem areas and logistical issues, and the technical merit of any such mitigation plans.
Any assumptions or deviations that are in opposition to the PTO RFP may be rated lower.
(b) Schedule: The schedule will be evaluated to determine the whether the duration of the activities and the schedule logic is realistic, given the offeror’s proposed means and methods. Schedules that demonstrate completion before the solicitation completion date, while adhering to all requirements delineated in the PTO RFP, may be rated higher.
The elements of Technical Approach and Schedule are equal to one another.
Factor 4 - Safety
(i) Solicitation Submittal Requirements: The Offeror shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. EMR and DART Rates shall not be submitted for subcontractors.)
(1) Experience Modification Rate (EMR): For the three previous complete calendar years [2011, 2012, 2013], submit your EMR (which compares your company’s annual losses in insurance claims against its policy premiums over a three year period). If you have no EMR, affirmatively state so, and explain why.
Any extenuating circumstances that affected the EMR and upward or downward trends should be addressed as part of this element. Lower EMRs may be given greater weight in the evaluation.
(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate: For the three previous complete calendar years [2011, 2012, 2013], submit your OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate, as defined by the U.S. Department of Labor, Occupational Safety and Health Administration. If you cannot submit an OSHA DART Rate, affirmatively state so, and explain why. Any extenuating circumstances that affected the OSHA DART Rate data and upward or downward trends should be addressed as part of this element (i.e. low number of labor hours in a given year). Lower OSHA DART Rates may be given greater weight in the evaluation.
(3) Technical Approach for Safety: Describe the plan that the Offeror will implement to evaluate safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors.
Also, describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Safety Narrative shall be limited to two pages.
(ii) Basis of Evaluation: The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The Government will evaluate the Offeror’s overall safety record, the Offeror’s plan to select and monitor subcontractors, any and innovative safety methods that the Offeror plans to implement for this procurement. The Government’s sources of information for evaluating safety may include, but are not limited to, OSHA, NAVFAC’s Facility Accident and Incident Reporting (FAIR) database, and other related databases. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittal requirements rests with the Offeror. The evaluation will collectively consider the following:
- Experience Modification Rate (EMR)
- OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate
- Offeror Technical Approach to Safety
- Other sources of information available to the Government
(1) Experience Modification Rate (EMR): The Government will evaluate the EMR to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rating. Lower EMRs may be given greater weight in the evaluation.
The Government will evaluate the EMR to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rating. Lower EMRs may be evaluated more favorably. For consistency, as a general guideline, the Government will use the table below to assist in evaluating the EMRs of the offerors.
Risk EMR Very Low Risk Less than 0.6
Low Risk From 0.6 to less than 0.8 Moderate Risk From 0.8 to 1.0 High Risk Greater than1.0 to 1.1 Extremely High Risk Greater than 1.1
(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate: The Government will evaluate the OSHA DART Rate to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rates. Lower OSHA DART Rates may be given greater weight in the evaluation. For consistency, as a general guideline, the Government will use the table below to assist in evaluating the DART rates of the offerors.
Risk DART Rate Very Low Risk Less Than 1.0 Low Risk From 1.0 to 1.99 Moderate Risk From 2.0 to 2.99 High Risk From 3.0 to 4.0 Extremely High Risk Greater than 4.0
(3) Technical Approach to Safety: The Government will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project. The Government will also evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on this procurement. Those Offerors whose plan demonstrates a commitment to hire subcontractors with a culture of safety and who propose innovative methods to enhance a safe working environment may be given greater weight in the evaluation.
Factor 5 - Past Performance on recent, relevant projects:
(i) Solicitation Submittal Requirements: Offerors shall submit past performance information on the same projects that were submitted by the Offeror under Factor 1. For each project/contract, there are two submittal requirements: (1) past performance evaluation forms; and (2) a narrative statement.
(1) Past Performance Evaluation Forms: If a completed Construction Contractor Appraisal Support System (CCASS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1 for experience. If there is not a completed CCASS evaluation then submit Past Performance Questionnaires (Attachment B) for each project included in Factor 1 for Experience. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror shall complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information.
However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact at Helaine.stallion@navy.mil
(2) Narrative Statement: Offerors must submit a statement for each project/contract submitted that provides an overview of each project/contract and how the project/contract is relevant to the work described in the performance work statement of this solicitation. The statement for each project/contract may not exceed one page. Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Experience. Offerors may also address any adverse past performance issues.
The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .