QASP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N00421-16-R-0058_FACSFAC_Questions_20161102.docx | DOCX document | |
| N00421-16-R-0058_FACSFAC_RFP_Amendment_2.docx | DOCX document | |
| N00421-16-R-0058_FACSFAC_Questions_20161012.docx | DOCX document | |
| N00421-16-R-0058_FACSFAC_Questions_20161012.docx | DOCX document | |
| N00421-16-R-0058_FACSFAC_RFP_Amendment_1.docx | DOCX document | |
| N00421-16-R-0058_FACSFAC_Questions_20161012.docx | DOCX document | |
| PPQ.doc | DOC document | |
| N00421-16-R-0058_FACSFAC_RFP_Amendment_1.docx | DOCX document | |
| OCI_List.docx | DOCX document | |
| Fully_Burdened_Rate.xls | XLS spreadsheet | |
| Cost.xls | XLS spreadsheet | |
| Data_Transmittal.doc | DOC document | |
| DD_254.pdf | ||
| CDRLS.xlsx | XLSX spreadsheet | |
| WD_05-2104.pdf | ||
| PPQ.xls | XLS spreadsheet | |
| N00421-16-R-0058_FACSFAC_RFP.docx | DOCX document | |
| DRAFT_PWS.doc | DOC document | |
| Personnel_Qualifications.docx | DOCX document | |
| Draft_Labor_Categories_and_Labor_Hours.xlsx | XLSX spreadsheet | |
| DRAFT_CDRLS.xlsx | XLSX spreadsheet |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00421-16-R-0058
N00421-16-R-0058
Quality Assurance Surveillance Plan (QASP)
For Area Control Systems
Technical, Engineering Products and Services
1. Purpose
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure the systematic quality assurance methods are used in the administration of the performance based service contract. The intent is to ensure that the contractor performs in accordance with the performance metrics and the Government receives the quality of services called for in the contract.
The requirement of this contract is to provide services for integration, test and evaluation, installation, maintenance, configuration, and management of Air Traffic Control (ATC) Systems Division equipment. This contract requires services in support of Fleet Area Control and Surveillance Facility (FACSFAC) Air Control Tracking System (FACTS), comprised of the AN/FYK-39 and OJ-753, the FACSFAC Navy Scheduling System (NAVSKED, AN/FYK-37), Integrated Range Status System (IRSS), the Target Data Extractor (TDX), CV-4346/UPX, Automatic Carrier Landing Systems (ACLS), Precision Global Positioning System (PGPS) and similar Air Traffic Control Systems. The majority of work shall be performed on-site at NAWCAD St. Inigoes; however, the contractor may be required to travel to various equipment installation sites. Area Control Systems (ACS) services shall also encompass systems and displays, such as the Standard Terminal Automation Replacement System (STARS), the Air Defense System Integrator (ADSI), the Air 02 Digital Audio Data Recorder (DADR) System, the Control and Reporting Center (CRC) Simulation Package (SP), and other similar systems.
The resulting vehicle will be a single award Indefinite Delivery/Indefinite Quantity (IDIQ) contract that will have a five (5) year ordering period plus task orders that contain a one (1) year base plus four (4) one (1) year option periods. The performance based contract will have cost-plus-fixed-fee labor CLINs and cost-reimbursable other direct costs (ODC) CLINs for travel and material. A properly executed QASP will assist the Government in achieving the objectives of this procurement.
2. Authority
Authority for issuance of this QASP is provided under Contract Section E – Inspection and Acceptance, which provides for inspections and acceptance of the services and documentation called for in contracts, to be executed by the Contracting Officer or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between Quality Control Plan and the Quality Assurance Surveillance Plan. The contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the order.
The QASP on the other hand, is put in place to provide Government surveillance oversight of the contractor’s efforts to assure that they are timely, effective and are delivering the results specified in the order.
4. Government Resources
The following definitions for Government resources are applicable to this plan:
Contracting Officer - A person duly appointed with the authority to enter into (Procuring Contracting Officer (PCO)) or administer (Administrative Contracting Officer (ACO)) contracts and make related determination and findings on behalf of the Government. The PCO for this contract can be reached at NAVAIR 2.5.1.4. The ACO will be designated in the resulting contract. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.
Contracting Officer Representative (COR) - An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be appointed in the resulting contract. The limitations of authority are contained in a written letter of appointment.
5. Responsibilities
The following Government resources shall have responsibility for the implementation of this QASP:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Contracting Officer Representative (COR) – The COR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.
6. Methods of QA Surveillance
a. Contractor Performance Assessment Report System (CPARS) – The market place for information technology, engineering, and management support services is very competitive. As such, the successful offeror has a vested interest in the Government generated CPARS under this contract. Additionally, an evaluation using the CPARS format will be performed at the midpoint of each period of performance. This evaluation will be one determinant in exercising an option or award term. The Government for this procurement will address the quality of product or service, schedule, cost control, business relations, management, and other important areas. As this information may affect future source selections throughout DoD, and the continuation of the order, the annual Government assessment will be used appropriately as an additional performance oversight and communication tool with the QASP.
b. QASP - The below listed methods of surveillance shall be used by the COR in the technical administration of this QASP. In addition to the below instructions, the form to be used for documentation of quality assurance surveillance is the Surveillance Activity Checklist provided as Enclosure (4) herein.
7. Surveillance
Enclosures (1), (2), and (3) set forth the performance standards, incentives, and surveillance methods for the contractor and COR. Enclosure (4) provides a checklist and means for the COR to document, on a quarterly basis, the results of the surveillance process. The COR shall provide the surveillance document to the Contracting Officer on a quarterly basis.
8. Documentation
In addition to providing quarterly reports to the Contracting Officer, the COR will maintain a complete Quality Assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the originals of the Quality Assurance Checklists. All such records will be maintained for the life of the order. The COR shall forward these records to the Contracting Officer at termination or completion of the contract.
9. Enclosures
Enclosure (1) – Performance Standards
Enclosure (2) - Data Performance Standards
Enclosure (3) - Incentives
Enclosure (4) - Surveillance Activity Checklist
PERFORMANCE STANDARDS
| Description |
| Performance Standard and Acceptable Quality Level (AQL) |
| Surveillance Method / Measure |
| Incentives |
| Provide fault verification testing on LRUs returned from field users. Verify and record item configuration and complete FACSFAC Repair Facility Return Item Form (FACSFAC RFFI). |
| 90 %of LRU’s are diagnosed for return or repair within five business days with no more than 10% exceeding 10 business days. |
Based upon feedback from the responsible Government Project Lead, the fault testing and analysis provided are deemed comprehensive and technically acceptable.
| - Government Project Lead quarterly input |
| See Enclosure 2 |
| Repair priority managed per the Ready-For-Issue (RFI) level and site demand for an item. Contractor shall update components / LRUs to the latest authorized baseline revision level prior to testing. The physical Repair and Replacement (R&R) of faulty hardware items. |
| Based upon feedback from the responsible Government Project Lead, the data provided in R&R actions section of FCSFAC RFFI or the Beyond Economic Repair (BER) written reports are deemed comprehensive and technically acceptable. |
| - Government Project Lead quarterly input |
| See Enclosure 2 |
| Procure replacement parts when fleet priorities and the untimely non-availability of government stock dictate. |
| 95% of items to be procured costing less than $3000 initiated and on order within five business days with no more than 5% on order after five business days and no later than 10 business days. |
| - Government Project Lead quarterly input |
| See Enclosure 2 |
| Perform post component / LRU R&R testing. Test process shall employ Area Control System (ACS) test bed hardware and original equipment manufacturer (OEM) specifications. |
| Based upon feedback from the cognizant Government official certifying the quality assurance and satisfactory completion of repairs section, FACSFAC RFFI Part IV, Section 2. |
| - Government Project Lead quarterly input |
| See Enclosure 2 |
| Provide general and system maintenance engineering services including fabrication (cables & component assemblies), development of test/quality control procedures, and R&D to offset equipment technology and repair obsolescence. |
| Based upon feedback from the cognizant Government Project Leads. The general system maintenance and engineering services are deemed comprehensive and technically acceptable. |
| - Government Project Lead quarterly input |
| See Enclosure 2 |
| Provide test bed equipment and software maintenance. Monitor performance and operation capability. Report related failures to Government representative and initiate repairs immediately. |
| Based upon feedback from the cognizant Government Project Leads. The contractor applied all available resources to return system to operational status by the end of one business day. |
| - Government Project Lead quarterly input |
| See Enclosure 2 |
| Description |
| Performance Standard and Acceptable Quality Level (AQL) |
| Surveillance Method / Measure |
| Incentives |
| Provide an acceptable Test and Quality Control Procedures Plan to the Government. |
| Based upon final acceptance by the Government Project Lead. |
| - Government Project Lead quarterly input |
| See Enclosure 2 |
| Provide the government with a sufficiently robust supply support infrastructure to support the fleet equipment, spares and repair parts. The task includes all ordering, receiving, inventory tracking, and shipping functions. |
| Based upon feedback from the Government Project Leads, feedback received from the ACSs, and other internal reports and observations. The supply support is deemed technically acceptable. |
| - Government Project Lead quarterly input |
| See Enclosure 2 |
| Provide the minimum acceptable stores inventory sufficient to service fleet and internal demands. Acquire replacement inventory from the Federal Supply System (FSS). Verify availability of replacement stores with the FSS Item Manager (IM). Report anticipated low/no stock availability to the Contracting Officers Representative (COR) or Alternate COR (A-COR). |
| Based upon feedback from the Government Project Leads, feedback received from the ACSs, monthly progress reports, and observations. The stores inventory is deemed comprehensive and ultimately acceptable. |
| - Government Project Lead quarterly input |
| See Enclosure 2 |
| Provide resident technical support at listed ACS sites. This includes on-call support during non-core hours, grooms, routine equipment maintenance, configuration assessments, the installation of field changes, On-The-Job (OJT) and Integrated Logistics Support (ILS). Respond to requests for support personnel (with valid U.S. Passports) to travel within 24 hours of notification. |
| Based upon feedback from the Government Project Leads, feedback received from the ACSs, monthly progress reports, and observations. The resident technical support is deemed technically acceptable. |
| - Government Project Lead quarterly input |
| See Enclosure 2 |
| Provide engineering and technical services to test and evaluate ACS hardware and software. Prepare test and operating procedures for new equipment; participate in the test process; prepare interim and final engineering reports; participate in Technical Information Meetings (TIMs), Software Requirement Reviews (SRR), Preliminary Design Reviews (PDRs) and Critical Design Reviews (CDRs) when requested. |
| Based upon feedback from the Government Project Leads, feedback received from the ACSs, monthly progress reports, trip, and engineering reports. The engineering and technical service to test and evaluate ACS hardware and software is acceptable. |
| - Government Project Lead quarterly input |
| See Enclosure 2 |
| Provide assistance with the design, development, procurement, fabrication, assembly, testing, and installation of ACS hardware. Perform the packing, crating, and transportation functions, if required, for all ASC equipment. |
| Based upon feedback from the Government Project Leads, feedback received from the ACSs, monthly progress reports, trip, and engineering reports. The assistance and design development, fabrication, tests and installation is acceptable. |
| - Government Project Lead quarterly input |
| See Enclosure 2 |
| Description |
| Performance Standard and Acceptable Quality Level (AQL) |
| Surveillance Method / Measure |
| Incentives |
| Provide technical design review services including production planning, material acquisition, fabrication, assembly, and testing of ACS hardware. |
| Based upon feedback from the Government Project Leads, and information contained in the submitted progress reports, production plans, and engineering drawings. The design review services are deemed acceptable. |
| - Government Project Lead quarterly input |
| See Enclosure 2 |
| Provide maintenance and operational services for the NAWCAD ACS test beds. Perform preventative and corrective maintenance, fault isolation and repair, and integration services. Record all maintenance/service activity. |
| Based upon feedback from the Government Project Leads, and information contained in the equipment maintenance log, monthly progress reports, and test bed equipment operational availability. The maintenance and operational services are deemed acceptable. |
| - Government Project Lead quarterly input |
| See Enclosure 2 |
DATA PERFORMANCE STANDARDS
| SOW/CDRL Task Description |
| Standard |
| AQL |
| Surveillance |
Method/
Measure Incentives
| Funds and Labor Hours Expenditure Report |
| Submission is in accordance with CDRL A013. |
| 90% submitted on time with no more than two per year requiring rework, 100% acceptable on 2nd submission to Government. |
| 100% Inspection by COR. |
| See enclosure 3. |
| Material Tracking Report |
| Submissions shall include a copy of each purchase request and the purchase order in accordance with CDRL A016. |
| 100% acceptable on 1st submission to Government. |
| 100% Inspection by COR. |
| See enclosure 3. |
| FACSFAC Repair Facility Return Item Form |
| Submission is in accordance with CDRL A001 at completion of task order. |
| 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government. |
| Quarterly Review and Random Inspection of FACSFAC RFR Item File by COR. |
See enclosure 3.
| Beyond Economical Repair (BER) Report |
| Submission is in accordance with CDRL A002. |
| Submit within 5 working days of BER decision. 95% acceptable on first submission to Government, 100% acceptable on 2nd submission to Government. |
| 100% Inspection by COR. |
See enclosure 3.
| Test and Quality Control Procedures |
| Submission is in accordance with CDRL A003. |
| Documented Test and Quality Control Procedures shall be delivered 14 days after contract award. |
| 100% Inspection by COR. |
See enclosure 3.
| ACS Inventory List Report |
| Maintain a database containing an inventory of all ACS equipment IAW PBWS 3.2.1.1(f). Contractor format acceptable. CDRL A004. |
| COR approves contractor format. 90% submitted on time with no more than two per year requiring rework, 100% acceptable on 2nd submission to Government. |
| Random sampling of known ACS equipment versus inventory list by COR. |
See enclosure 3.
| Inventory List Report |
| Submission is in accordance with CDRL A004. |
| 100% submitted on time with no rework required. |
| 100% Inspection by COR. |
See enclosure 3.
| Recommendations Report – Contractor Item Procurement |
| Submission is in accordance with the CDRL A005. |
| Provide report of contractor recommended engineering changes or fabrication status. 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government. |
| 100% Inspection by COR. |
See enclosure 3.
| SOW/CDRL Task Description |
| Standard |
| AQL |
| Surveillance |
Method/
Measure Incentives
| Recommendations Report – Engineering Study and Test Results |
| Submission is in accordance with the CDRL A005. |
| Deliver Engineering Study/Change Report as directed and Test Results within 10 days of completing a systems Test and Evaluation. 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government. |
| 100% Inspection by COR. |
See enclosure 3.
| Trip Report |
| Submission is in accordance with the CDRL A006. |
| Provide the Trip Report within 10 working days after completion of the trip. 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government. |
| 100% Inspection by COR. |
See enclosure 3.
| Fleet Metrics Form |
| Submission is in accordance with the CDRL A007. |
| Provide Fleet Metrics Form on a bi-weekly basis. 90% submitted on time with no more than two per year requiring rework, 100% acceptable on 2nd submission to Government. |
| 100% Inspection by COR. |
See enclosure 3.
| Test Plans and Procedures |
| Submission is in accordance with the CDRL A008. |
| 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government. |
| 100% Inspection by COR. |
See enclosure 3.
| Level I / II / III Drawing Revisions |
| Submission is in accordance with the CDRL A009. |
| Provide the specific drawing level as directed by the COR. 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government. |
| 100% Inspection by COR. |
See enclosure 3.
| Production Program Plan |
| Submission is in accordance with the CDRL A010. |
| 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government. |
| 100% Inspection by COR. |
See enclosure 3.
| Test Report – Production Acceptance Test Results |
| Submission is in accordance with the CDRL A011. |
| Provide when tasked to fabricate / produce ACS hardware by COR. 95% acceptable on first submission to Government; 100% acceptable on 2nd submission to Government. |
| 100% Inspection by COR. |
See enclosure 3.
| Equipment Maintenance Log Report |
| Submission is in accordance with the CDRL A012. |
| 90% submitted on time with no more than two per year requiring rework.100% acceptable on 2nd submission to Government. |
| 100% Inspection by COR. |
See enclosure 3.
| SOW/CDRL Task Description |
| Standard |
| AQL |
| Surveillance |
Method/
Measure Incentives
| Funds Expenditure/Voucher Reconciliation Report |
| Submission is in accordance with the CDRL A013. |
| 90% submitted on time with no more than two per year requiring rework, 100% acceptable on 2nd submission to Government. |
| 100% Inspection by COR. |
See enclosure 3.
| Monthly Fund Expenditure Report |
| Submission is in accordance with the CDRL A014. |
| 90% submitted on time with no more than two per year requiring rework, 100% acceptable on 2nd submission to Government. |
| 100% Inspection by COR. |
See enclosure 3.
| 75% Notification Letter |
| Submission is in accordance with the CDRL A015. |
| As needed. The Contractor shall notify the Government when cost for any one task has reached 75% of the funded amount. |
| 100% Inspection by COR. |
See enclosure 3.
| OPSEC Plan |
| Submission is in accordance with the CDRL A017. |
| Preliminary Plan due 90 days after contract award. Final Plan due 45 days after Government approval of preliminary plan. |
| 100% Inspection by COR. |
See enclosure 3.
| Information Technology Personnel Security Report for COR |
| Submission is in accordance with the CDRL A018. |
| Submit report within 30 days after contract award. Subsequent report due every 365 days after contract award. Updated report required 30 days after gain or loss of employee that will have access to Government IT. |
| 100% Inspection by COR. |
See enclosure 3.
| Incurred Cost Reporting |
| Submission is in accordance with the CDRL A019. |
| 90% submitted on time with no more than two per year requiring rework.100% acceptable on 2nd submission to Government. |
| 100% Inspection by COR. |
See enclosure 3.
INCENTIVES
The following incentives shall apply to performance on the Task Order(s) under the IDIQ contract.
| Assessment Period |
| Acceptable Performance Definition |
| How Measured |
Incentives
Base
Not more than 2 of the measurement areas rated below “Satisfactory.” None of the measurement areas are rated below “Marginal.”
See * note below.
| Midpoint of the assessment period (6 months) evaluation using the CPARS format covering the previous 6 months. |
| (+) Meet the acceptable performance definition as a condition for exercise of option 1.* |
(-) Does not meet the acceptable performance definition as a condition for exercise of option 1.*
Option 1
Not more than 2 of the measurement areas rated below “Satisfactory.” None of the measurement areas are rated below “Marginal.”
| Midpoint of the assessment period (18 months) evaluation using the CPARS format covering the previous 12 months. |
| (+) Meet the acceptable performance definition as a condition for exercise of option 2.* |
(-) Does not meet the acceptable performance definition as a condition for exercise of an option. 2.*
| Option 2 |
| Not more than 2 of the measurement areas rated below “Very Good.” Not more than 1 of the measurement areas rated below “Satisfactory.” None of the measurement areas are rated below “Marginal.” |
See * note below.
| Midpoint of the assessment period (30 months) evaluation using the CPARS format covering the previous 12 months. |
| (+) Meet the acceptable performance definition as a condition for exercise of option 3.* |
(-) Does not meet the acceptable performance definition as a condition for exercise of an option. 3.*
| Option 3 |
| Not more than 2 of the measurement areas rated below “Very Good.” Not more than 1 of the measurement areas rated below “Satisfactory.” None of the measurement areas are rated below “Marginal.” |
See * note below.
| Midpoint of the assessment period (42 months) evaluation using the CPARS format covering the previous 12 months. |
| (+) Meet the acceptable performance definition as a condition for exercise of option 4.* |
(-) Does not meet the acceptable performance definition as a condition for exercise of an option 4.*
| Option 4 |
| Not more than 2 of the measurement areas rated below “Very Good.” Not more than 1 of the measurement areas rated below “Satisfactory.” None of the measurement areas are rated below “Marginal.” |
Midpoint of the assessment period (54 months) evaluation using the CPARS format covering the previous 12 months.
* The Government will not exercise a Task Order Option unless all regulatory requirements are met and the contractor meets the acceptable performance definition.
All PWS/CDRL tasks, including PWS/CDRL sub-tasks, will be assessed focusing on the following:
Quality – Assess the achieved product performance relative to performance parameters required by the contract/order. Assess the contractor's effort to transform operational needs and requirements into an integrated system design solution. Areas of focus should be the planning and control of technical program tasks, integration, test and evaluation, installation, maintenance, configuration, and the management of a totally integrated effort to meet cost, technical performance, and schedule objectives. The evaluation for test and evaluation should consider success/problems/failure in developing test and evaluation objectives; planning (ground/air/sea) test; in accomplishing those objectives and on the timeliness of coordination and feedback of the test results. Other activities include: supportability considerations (maintenance personnel/skills availability or work-hour constraints, operating and cost constraints, allowable downtime, turn-around-time to service/maintain the system, standardization requirements), survivability, human factors, reliability, quality, maintainability, availability, inspectability, etc.
Assess how successfully the contractor meets program quality objectives; e.g., producibility, reliability, maintainability, inspectability, testability, and system safety, and controls the overall process. The PM or contracting officer must be flexible in how contractor success is measured, e.g., data from design test/operational testing successes, field reliability and maintainability and failure reports, user comments and acceptance rates, and improved subcontractor and vendor quality.
Assess all the other technical activity critical to successful contract/order performance. Identify any additional evaluation aspects that are unique to the contract/order or that cannot be captured in another sub-element.
Schedule – Assess the timeliness of the contractor against the completion of the contract, task orders, milestones, delivery schedules, and administrative requirements (e.g., efforts that contribute to or affect the schedule variance).
This evaluation of the contractor’s adherence to the required delivery schedule should include the contractor’s efforts during the evaluation period that contribute to or affect the schedule variance. Also, address significance of scheduled events (e.g., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.
This element applies to contract/order closeout activities as well as contract/order performance. Instances of adverse actions such as the evaluation of liquidated damages or issuance of Cure Notices, Show Cause Notices, and Delinquency Notices is indicators of problems, which may have resulted in variance to the contract/order schedule and should be noted in the evaluation.
Questions to consider include the following:
· Is the contractor completing the design/engineering services activities in a timely manner? This includes administrative activities, as well as meeting all scheduled milestones in the design process.
· Did the contractor adequately schedule the work?
· Has the contractor met administrative milestone dates?
· Has the contractor met physical milestone dates specified by contract/order or agreed to in the project schedule?
· If the schedule has slipped through the contractor’s fault or negligence, has he taken appropriate corrective action of his own volition?
· Has the contractor furnished all required deliverables on or ahead of schedule?
· Has the contract furnished updated project schedules on a timely basis?
Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract/order cost. If the contractor is experiencing cost growth or underrun, discuss the causes and contractor-proposed solutions for the cost overruns or underruns. For contracts/orders where task or contract sizing is based upon contractor-provided person hour estimates, the relationship of these estimates to ultimate task cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources, in each work effort should be assessed. Include, as applicable, the following information:
· Does the contractor keep within the total estimated cost (what is the relationship of the negotiated costs and budgeted costs to actuals)?
· Did the contractor do anything innovative that resulted in cost savings?
· Were billings current, accurate and complete?
· Are the contractor’s budgetary internal controls adequate?
· Has the contractor provided a design that can be constructed with the available funds?
· Has the contractor notified the Government and taken necessary corrective actions when the cost estimate exceeds available funds?
Management – Assess the integration and coordination of all activity needed to execute the contract/order, specifically the timeliness, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s history of reasonable and cooperative behavior (to include timely identification of issues in controversy), customer satisfaction, timely award and management of subcontracts. Include, as applicable, information on the following:
· Is the contractor oriented toward the customer?
· Is interaction between the contractor and the government satisfactory or does it need improvement?
· Include the adequacy of the contractor’s accounting, billing, and estimating systems and the contractor’s management of Government Furnished Property (GFP) if a substantial amount of GFP has been provided to the contractor under the contract/order.
· Address the timeliness of awards to subcontractors and management of subcontractors, including subcontract costs. Consider efforts taken to ensure early identification of subcontract problems and the timely application of corporate resources to preclude subcontract problems from impacting overall prime contractor performance.
· Assess the prime contractor’s effort devoted to managing subcontracts and whether subcontractors were an integral part of the contractor’s team. Are the contractor’s management, on-site, and home office personnel exhibiting the capacity to adequately plan, schedule, resource, organize and otherwise manage the work? If not, describe and relate to other rated elements.
Regulatory Compliance – Assess compliance with all terms and conditions in the contract/order related to applicable regulations and codes. Consider aspects of performance such as compliance with financial, environmental (example: Clean Air Act, Clean Water Act), safety, and labor regulations as well as any other reporting requirements in the contract. Consider questions such as the following:
Has the contractor complied with all contract clauses and reporting requirements (e.g., FAPIIS, FAR Subsection 9.104-6, FAR Clause 52.209-9)?
· Has the contractor complied with Cost Accounting Standards and disclosure statements (FAR Subpart 30.2, FAR Clauses 52.230-2, 52.230-3, 52.230-6)?
· Has the contractor complied with the reporting requirements relating to recovered material content utilized in contract performance (see FAR Subpart 23.4)?
· Has the contractor complied with contractual safety requirements and labor laws (see FAR Subsection 22.407, FAR Clause 52.222-4)?
· Perform engineering surveillance to assess compliance with contractual terms for schedule, cost, and technical performance in the areas of design, development, and production (FAR Subpart 42.302).
· Has the contractor complied with specifications or other contractual requirements requiring the delivery or use of environmentally preferable products, energy-efficient products, products containing recovered materials, and biobased products (FAR Subparts 23.2, 23.4, 23.7)? Monitor the contractor's environmental practices for adverse impact on contract performance or contract cost, and for compliance with environmental requirements specified in the contract.
· Is the contractor complying with affirmative action and EEO compliance requirements (see FAR Subpart 22.8, FAR Clause 52.222-26)?
· Has the contractor complied with combating trafficking in persons (see FAR Subpart 22.17, FAR Clause 52.222-50)
Utilization of Small Business – FAR Subpart 19.7 and 15 U.S.C. 637 contains statutory requirements for complying with the Small Business Subcontracting Program. Assess whether the contractor provided maximum practicable opportunity for Small Business (including Alaska Native Corporations (ANCs) and Indian Tribes) (including Small Disadvantaged Businesses (which also includes ANCs and Indian Tribes), Women Owned Small Businesses, HUBZone, Veteran Owned, Service Disabled Veteran Owned Small Business, and ANCs and Indian Tribes that are not Small Disadvantaged Businesses or Small Businesses) to participate in contract/order performance consistent with efficient performance of the contract/order. Assess compliance with all terms and conditions in the contract/order relating to Small Business participation (including FAR 52.219-8, Utilization of Small Businesses and FAR 52.219-9, Small Business Subcontracting Plan (when required). Assess any small business participation goals, which are stated separately in the contract/order. Assess achievement on each individual goal stated within the contract/order or subcontracting plan including good faith effort if the goal was not achieved.
Other areas – Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the Contractor were highly effective.
Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.
Marginal - Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the Contractor has not yet identified corrective actions. The Contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the Contractor’s actions appear or were ineffective.
SURVEILLANCE ACTIVITY CHECKLIST
Quarterly Surveillance:
The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, Business Relations, Utilization of Small Business, Management, and Other Areas as applicable utilizing the CPARS evaluation rating definitions listed in enclosure 3.
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Complete |
| Quality |
| Schedule |
| Cost |
Control Business Relations Utilization of small business Mgmt.
Other
| rovide fault verification testing on LRUs returned from field users. Verify and record item configuration and complete FACSFAC Repair Facility Return Item Form (FACSFAC RFFI). |
| Government Project Lead quarterly input |
| TBD |
| Perform the physical Repair and Replacement (R&R) of faulty components. Repair priority managed per the Ready-For-Issue (RFI) level and site demand for an item. Contractor shall update components / LRUs to the latest authorized baseline revision level prior to testing. |
| Government Project Lead quarterly input |
| TBD |
Procure replacement parts when fleet priorities and the untimely non-availability of government stock dictate.
| Government Project Lead quarterly input |
| TBD |
Perform post component / LRU R&R testing. Test process shall employ Area Control System (ACS) test bed hardware and original equipment manufacturer (OEM) specifications.
| Government Project Lead quarterly input |
| TBD |
| Provide general and system maintenance engineering services including fabrication (cables & component assemblies), development of test/quality control procedures, and R&D to offset equipment technology and repair obsolescence. |
| Government Project Lead quarterly input |
| TBD |
| Provide test bed equipment and software maintenance. Monitor performance and operation capability. Report related failures to Government representative and initiate repairs immediately. |
| Government Project Lead quarterly input |
| TBD |
| Provide an acceptable Test and Quality Control Procedures Plan to the Government. |
| Government Project Lead quarterly input |
| TBD |
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Complete |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Utilization |
of small business Mgmt.
Other
| Provide the government with a supply support infrastructure to support the fleet equipment, spares and repair parts. The task includes all ordering, receiving, inventory tracking, and shipping functions. |
| Government Project Lead quarterly input |
| TBD |
| Provide the minimum acceptable stores inventory sufficient to service fleet and internal demands. Acquire replacement inventory from the Federal Supply System (FSS). Verify availability of replacement stores with the FSS Item Manager (IM). Report anticipated low/no stock availability to the Contracting Officers Representative (COR) or Alternate COR (A-COR). |
| Government Project Lead quarterly input |
| TBD |
| Provide resident technical support at listed ACS sites. This includes on-call support during non-core hours, grooms, routine equipment maintenance, configuration assessments, the installation of field changes, On-The-Job (OJT) and Integrated Logistics Support (ILS). Respond to requests for support personnel (with valid U.S. Passports) to travel within 24 hours of notification |
| Government Project Lead quarterly input |
| TBD |
| Provide engineering and technical services to test and evaluate ACS hardware and software. Prepare test and operating procedures for new equipment; participate in the test process; prepare interim and final engineering reports; participate in Technical Information Meetings (TIMs), Software Requirement Reviews (SRR), Preliminary Design Reviews (PDRs) and Critical Design Reviews (CDRs) when requested. |
| Government Project Lead quarterly input |
| TBD |
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Complete |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Utilization |
Mgmt.
Other
| Provide assistance with the design, development, procurement, fabrication, assembly, testing, and installation of ACS hardware. Perform the packing, crating, and transportation functions, if required, for all ASC equipment. |
| Government Project Lead quarterly input |
| TBD |
| Provide technical design review services including production planning, material acquisition, fabrication, assembly, and testing of ACS hardware. |
| Government Project Lead quarterly input |
| TBD |
| Provide maintenance and operational services for the NAWCAD ACS test beds. Perform preventative and corrective maintenance, fault isolation and repair, and integration services. Record all maintenance/service activity. |
| Government Project Lead quarterly input |
| TBD |
| Time Expenditure Report |
| 100% Inspection by COR. |
| TBD |
Funds Expenditure Report
| 100% Inspection by COR. |
| TBD |
| Material Tracking Report |
| 100% Inspection by COR. |
| TBD |
| FACSFAC Repair Facility Return Item Form |
| Quarterly Review and Random Inspection of FACSFAC RFR Item File by COR. |
TBD
| Beyond Economical Repair (BER) Report |
| 100% Inspection by COR. |
TBD
| Test and Quality Control Procedures |
| 100% Inspection by COR. |
TBD
| ACS Equipment Inventory |
| Random sampling of known ACS equipment versus inventory list by COR. |
TBD
| Description |
| Surveillance Method/ |
Measure
| Date Planned |
| Date Complete |
| Quality |
| Schedule |
| Cost Control |
| Business Relations |
| Utilization |
Mgmt
Other
| Inventory List Report |
| 100% Inspection by COR. |
TBD
| Recommendations Report – Contractor Item Procurement |
| 100% Inspection by COR. |
TBD
| Recommendations Report – Engineering Study and Test Results |
| 100% Inspection by COR. |
TBD
| Trip Report |
| 100% Inspection by COR. |
TBD
| Fleet Metrics Form |
| 100% Inspection by COR. |
TBD
| Test Plans and Procedures |
| 100% Inspection by COR. |
TBD
| Level I / II / III Drawing Revisions |
| 100% Inspection by COR. |
TBD
| Production Program Plan |
| 100% Inspection by COR. |
TBD
| Test Report – Production Acceptance Test Results |
| 100% Inspection by COR. |
TBD
| Equipment Maintenance Log Report |
| 100% Inspection by COR. |
TBD
Quarterly Summary of Ratings:
Quality
Schedule
Number of Exceptional Number of Exceptional
Number of Very Good
Number of Satisfactory
Number of Marginal
Number of Unsatisfactory
Cost Control
Business Relations
Number of Exceptional
Utilization of Small Business Management
Number of Exceptional
Other Areas
Checklist Completed By: ____________________________
Date Completed: ____________________________ Annual Surveillance:
The COR will perform an annual assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in enclosure 3 and the quarterly summary of ratings. This annual assessment will occur at the midpoint of each period and cover the previous 12 months, except for the base period, which will cover only the previous 6 months.
| Description |
| Surveillance Method/Measure |
| Date Planned |
| Date Completed |
| Summary Rating/Results |
| Quality |
| Review of Quarterly Ratings. |
| TBD |
| Schedule |
| Review of Quarterly Ratings. |
| TBD |
| Cost Control |
| Review of Quarterly Ratings. |
| TBD |
| Management |
| Review of Quarterly Ratings. |
| TBD |
| Regulatory Compliance |
| Review of Quarterly Ratings. |
| TBD |
| Utilization of Small Business |
| Review of Quarterly Ratings. |
| TBD |
| Other Areas |
| Review of Quarterly Ratings. |
| TBD |
Checklist Completed By: ____________________________
Date Completed: ____________________________ Enclosure 1