CDRLS.xlsx

XLSX spreadsheet 182 KB Posted

Attached to
FACSFAC Hardware
Solicitation number
N00421-16-R-0058
Issued by

About this file

CDRLs

View the file

Other files

File Type Posted
N00421-16-R-0058_FACSFAC_Questions_20161102.docx DOCX document
N00421-16-R-0058_FACSFAC_RFP_Amendment_2.docx DOCX document
N00421-16-R-0058_FACSFAC_Questions_20161012.docx DOCX document
N00421-16-R-0058_FACSFAC_Questions_20161012.docx DOCX document
N00421-16-R-0058_FACSFAC_RFP_Amendment_1.docx DOCX document
N00421-16-R-0058_FACSFAC_Questions_20161012.docx DOCX document
PPQ.doc DOC document
N00421-16-R-0058_FACSFAC_RFP_Amendment_1.docx DOCX document
Cost.xls XLS spreadsheet
Data_Transmittal.doc DOC document
DD_254.pdf PDF
Fully_Burdened_Rate.xls XLS spreadsheet
OCI_List.docx DOCX document
QASP.doc DOC document
WD_05-2104.pdf PDF
PPQ.xls XLS spreadsheet
N00421-16-R-0058_FACSFAC_RFP.docx DOCX document
DRAFT_PWS.doc DOC document
Personnel_Qualifications.docx DOCX document
Draft_Labor_Categories_and_Labor_Hours.xlsx XLSX spreadsheet
DRAFT_CDRLS.xlsx XLSX spreadsheet
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A001

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TMOther ______X_________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A001RETURN ITEM FORMFACSFAC REPAIR FACILITY RETURN ITEM FORM
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
SEE BLOCK 16PBWS Sow Para: 3.1.1.2, 3.1.5.1NAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
LTSee Block 16See Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.710

Block 4 -Sample FACSFAC Return Item Form is Attached as Annex (1).

Block 10, 11, 12, & 13 One form shall be completed for every item; All forms shall be available
for Government review on a daily basis. Contractor shall submit forms as deliverable at contract conclusion.
Block 14 - Electronic Copy shall be made available in Microsoft Office 2010 format or earlier.
Hard copy shall be made available upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE

DD Form 1423-1, JUN 90 Previous editions are obsolete Page 1 of 19

A002

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TMOther MISC
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A002Certification/Data ReportBEYOND ECONOMICAL REPAIR BER REPORT
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MISC-80678PBWS Sow Para: 3.1.5.2NAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
LTASREQSee Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.710

Block 8 - This report shall be generated after the contractor has deemed it necessary to make a BER recommendation and shall be delivered within 5 working days of this decision The Government will have 20 working days for review and comment. The Contractor shall have 10 working days to incorporate Government comments. Subsequent Government approval is required 10 working days after incorporation of comments by Contractor.

Block 10, 11, 12 & 13 - The Final Certification/Verification Report is due 20 working days after Certification/Verification
testing is completed.
Block 14 - Electronic Copy shall be made available in Microsoft Office 2010 format or earlier.
Hard copy shall be made available upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage2of19
1007/183

A003

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TMOther NDTI
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A003Test PlanTEST AND QUALITY CONTROL PROCEDURES
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-NDTI-80566APBWS Sow Para: 3.1.4.1, 3.1.5.3NAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
LTASREQSee Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AN/AN/ARegRepro
16. REMARKSNAWCAD 4.11.710

Block 12 - The report shall be initially delivered 14 days after contract award

Block 14 - Electronic Copy shall be made available in Microsoft Office 2010 format or earlier.
Hard copy shall be made available upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage3of19
1007/183

A004

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TMOther Misc
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A004Inventory/Utilization ReportInventory List Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MISC-81107APBWS Sow Para: 3.2.3.aNAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
LTANNUALLYSEE BLOCK 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16ANNUALLYRegRepro
16. REMARKSNAWCAD 4.11.710
CONTRACTORS SHALL PROVIDE AN ANNUAL INVENTORY LISTING IN ACCORDANCE WITH PBWS 3.2 IN THE CONTRACTORS
FORMAT.

Block 11, 12, & 13 - REPORT SUBMITTED EACH YEAR BY 30 OCTOBER AND UPDATES AS REQUESTED.

Block 14 - Electronic Copy shall be made available in Microsoft Office 2010 format or earlier.
Hard copy shall be made available upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage4of19
1007/183

A005

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
3001ATDP_________TMOther Misc
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A005Scientific and Technical ReportsRecommendation Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MISC-80711ASee Block 16NAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
LTASREQASREQ
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.710

Block 5 - PBWS Sow Para: 3.2.3.b, 3.4.2.c, 3.5.2.a, 3.5.2.e

Block 10, 11, 12 & 13 - Submit in accordance with PBWS SOW 3.2.3.b, 3.4.2.c, 3.5.2.a, 3.5.2.e

Block 14 - Electronic Copy shall be made available in Microsoft Office 2010 format or earlier.
Hard copy shall be made available upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage5of19
1007/183

A006

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
3001ATDP_________TMOther MGMT
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A006Engineering and Technical Service Accomplishment ReportTrip Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MGMT-80061APBWS Sow Para: 3.3.2.a, 3.4.2.a, 3.5.2.c, 6.1.a,NAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDb. COPIES
See Block 16See Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.710

Block 10, 11, 12 & 13 - Due within 10 working days after completion of trip.

Block 14 - Electronic Copy shall be made available in Microsoft Office 2010 format or earlier.
Hard copy shall be made available upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage6of19
1007/183

A007

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TMOther X
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A007Fleet Metrics ReportFleet Metrics Forms
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
CONTRACTOR FORMATPBWS Sow Para: 3.3.2.b, 3.5.2.dNAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
LTWEEKLYSee Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.710

Block 10, 11, 12 & 13 - CONTRACTOR TO SUBMIT WEEKLY STATUS USING FORM PROVIDED BY ANNEX 2

Block 14 - Electronic Copy shall be made available in Microsoft Office 2010 format or earlier.
Hard copy shall be made available upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage7of19
1007/183

A008

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TMOther ______X_________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A008TEST PLANS AND PROCEDURESTest Plans & Procedures
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
CONTRACTOR FORMATPBWS Sow Para: 3.4.2.b, 3.5.2.b,NAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXAS REQAS REQ
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
AAS REQAS REQRegRepro
16. REMARKSNAWCAD 4.11.710

Block 10, 11, 12 & 13 - Submit in accordance with PBWS Sow Para: 3.4.2.b and 3.5.2.b

Block 14 - Electronic Copy shall be made available in Microsoft Office 2010 format or earlier.
Hard copy shall be made available upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage8of19
1007/183

A009

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TMOther DRPR
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A009Engineering DrawingsLevel I/II/III Drawing Revisions
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-DRPR-80651PBWS Sow Para: 3.5.2.fNAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XXAS REQAS REQ
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
AAS REQAS REQRegRepro
16. REMARKSNAWCAD 4.11.710

Block 10, 11, 12 & 13 - ELECTRONIC COPIES SHALL BE MADE AVAILABLE UPON REQUEST.

Block 14 - Electronic Copy shall be made available in Microsoft Office 2010 format or earlier.
Hard copy shall be made available upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage9of19
1007/183

A010

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TMOther __X____
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A010Production Program PlanPRODUCTION PROGRAM PLAN
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
CONTRACTOR FORMATPBWS Sow Para: 3.5.2.gNAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
LTAS REQAS REQ
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AAs REQAS REQRegRepro
16. REMARKSNAWCAD 4.11.710

Block 10, 11, 12 & 13 - ELECTRONIC COPIES SHALL BE MADE AVAILABLE UPON REQUEST.

Block 14 - Electronic Copy shall be made available in Microsoft Office 2010 format or earlier.
Hard copy shall be made available upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage10of19
1007/183

A011

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TMOther __X__
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A011Technical Report - Study/ServicesPRODUCTION ACCEPTANCE TEST RESULTS
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
CONTRACTORS FORMATPBWS Sow Para: 3.5.2.hNAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
LTAS REQAS REQ
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AAS REQAS REQRegRepro
16. REMARKSNAWCAD 4.11.710
Block 10, 11, 12 & 13
THE CONTRACTOR SHALL PROVIDE PRODUCTION ACCEPTANCE TEST RESULTS IN ACCORDANCE WITH THE PBWS.
Block 14 - Electronic Copy shall be made available in Microsoft Office 2010 format or earlier.
Hard copy shall be made available upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage11of19
1007/183

A012

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TMOther MGMT
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A012Maintenance Service ReportEQUIPMENT MAINTENANCE LOG REPORT
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MGMT-80995APBWS Sow Para: 3.6.2.aNAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
LTQRTLYQRTLY
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AQRTLYQRTLYRegRepro
16. REMARKSNAWCAD 4.11.710
Block 14 - Electronic Copy shall be made available in Microsoft Office 2010 format or earlier.
Hard copy shall be made available upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage12of19
1007/183

A013

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TMOther FNCL
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A013FUNDS & LABOR HOUR EXPENDITURE REPORTFUNDS EXPENDITURE/VOUCHER RECONCILIATION REPORT
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-FNCL-81537PBWS Sow Para: 4.0.1, 4.0.2NAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
LTMTHLYSee Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.710

Block 10, 11, 12 & 13 - Due 10 working days after completion of the previous month.

Block 14 - Electronic Copy shall be made available in Microsoft Office 2010 format or earlier.
Hard copy shall be made available upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage13of19
1007/183

A014

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A014Segregation of Costs & Invoice RequirementsMonthly Fund Expenditure Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
See Block 16PWS Para: 4.0.3, 4.1.2NAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDMTHLYSee Block 16b. COPIES
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.7010

Block 4: Contractor format in accordance with contract Section H-1: Segregation of Costs and Invoice Requirements (NAVAIR 5552.232-9525, Mar 2011 (Variation))

Blocks 11, 12 & 13: Report shall be submitted concurrently with each invoice to the COR and shall be for the exact dollar amount and period of performance as the invoice.

Block 14: Deliverables to be provided in electronic format (Microsoft 2003 or greater).
Hard copy due only upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8270
17192 Aegis Way
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage14of19
1007/183

A014 (Attc 1)

Schedule A - Direct Labor$ 1.00
Schedule B - Material$ 2.00
Schedule C - Travel$ 3.00
Schedule D - Other Direct Charges$ 4.00
Schedule E - Indirect Charges$ 5.00
Schedule F- Adjustments$ 6.00
TOTAL$ 21.00
Schedule G - Outstanding Commitments$ 6.00
Schedule A - Direct Labor
Employee IdentifierLabor CategoryPeriod Covered
Hours BilledCumulative
Off-SiteOn-SiteBurdened Cost**Hours BilledBurdened Cost*
Smith, John A. Jr.Electrical Tech, Level II8-12 June15-17 June$ 750,000.002,000.00$ 999,925.00
$ - 00.00$ - 0
$ - 00.00$ - 0
$ - 00.00$ - 0
$ - 00.00$ - 0
$ - 00.00$ - 0
$ - 00.00$ - 0
$ - 00.00$ - 0
$ - 00.00$ - 0
$ - 00.00$ - 0
$ - 00.00$ - 0
$ - 00.00$ - 0
TOTAL$ 750,000.002,000.00$ 999,925.00
* On-site work is considered to be work performed at a Government installation. Off-site work is work performed at the contractor’s facility.
Schedule B - Material
Material charges shall be itemized and shall include the invoice number, date, total amount, company, purchase order number, and description of the item. A copy of the paid invoice shall be made available upon request.
Invoice NumberDateTotal AmountCompanyPO#Description
CV-10987-654-321-A11/29/15$ 78,654.32Whatchamacallit, Inc123A-4567-89Frama-stan Widget, WX123

110 M, Black

Schedule C - Travel
Travel Charges shall be itemized and shall include the dates of travel, names of individuals traveling, destination, purpose, and total cost. A copy of the travel voucher shall be made available upon request. Copies of back-up receipts need not be submitted; however, they should be retained and are subject to review.
Date
From - ToEmployee IdentifierLocationPurposeCost
06/21/12Fife, Barney G.651 Center St
Mayberry, WV 12378Initial installation of AN/FY-117; Upgrade of Electron Dissembler to Rev 5$ 2,156.34
06/25/12
Schedule D - Other Direct Charges
Other direct charges shall be itemized. Copies of invoices shall be available upon request. Subcontractor invoices shall be in the same format and require the same detail.
Tracking / Invoice
NumberDateTotal AmountSourceDescription
CV-10987-654-321-A11/29/15$ 78,654.32Whatchamacallit, IncFrama-stan Widget, WX123

110 M, Black

Schedule F- Adjustments
Current fiscal year invoice adjustments shall be shown in this section along with the justification. Adjustments that pertain to prior fiscal years shall be invoiced separately.
Invoice NumberFYBase AmountAdjustment
Plus / (Minus)Corrected AmountDescription
100000585937005912$ 78,654.32$ (15,731.00)$ 62,923.3220 Pc, Circuit Cards, Motorola P/N XN-78-9A; Defective - Returned for credit

Attachment 1

A014 (Attc 2)

Schedule E - Indirect Charges
Indirect charges include those charges based upon a rate that is subject to verification by DCAA at contract closeout.
Invoice NumberPOPTotal AmountLabor

Material Other Rate Per Hour /

UnitDescription
CV-10987-654-321-A11/29/12
12/14/12$ 78,654.32Material$ 786.55100 PCCircuit Cards; Motorola P/N Xn-78-9A; Replentish Bench Stock

Attachment 2

A015

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
3001ATDP_________TMOther ______X_________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A015PROGRESS REPORT

Felps, Delia J CIV: Felps, Delia J CIV:

Do we need a separate CDRL for 75% ???4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
CONTRATOR FORMATPBWS Sow Para: 4.0.4, 4.1.aNAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
LTMonthlyMonthly
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AMonthlyMonthlyRegRepro
16. REMARKSNAWCAD 4.11.710
The Contractor shall notify the Government when costs for any one task has reached 75% of the funded amount.

Block 10, 11, 12 & 13 - Report is due 10 working days after completion of each month.

Block 14 - Electronic Copy shall be made available in Microsoft Office 2010 format or earlier.
Hard copy shall be made available upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage15of19
1007/183

A016

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
3001ATDP_________TMOther MGMT
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A016Government Owned Material (GOM) Status ReportMaterial Tracking Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MGMT-81543PBWS Sow Para: 4.3NAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
LTSee Block 1645 DAC
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.710

Block 10 - After initial delivery, report is due 10 days after the beginning quarterly in accordance with PWBS PARA 4.3.

Block 11, 12 & 13 - Due 15 working days after contract award and annually thereafter.

Block 14 - Electronic Copy shall be made available in Microsoft Office 2010 format or earlier.
Hard copy shall be made available upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage16of19
1007/183

A017

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TMOther MGMT
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A017Operations Security (OPSEC) PlanN/A
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MGMT-80934C (See Block 16)PBWS Sow Para: 7.0NAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
XX (See Block 16)0TIMESee Block 16
8. APP CODEC11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.710
Block 4 - Delete reference in DI-MGMT-80934C. Instead use the definition of sensitive information given in public law 100-235,
Use National Security Decision Directive (NSDD) 298 for the concept of operations security.
Block 7 - XX Acceptance will be by the COR via the Data Transmittal/Acceptance/Rejection Form. If this form has not been
transmitted within 10 working days of submission of the CDRL, the CDRL is considered accepted.
Block 11, 12 &13 - Preliminary draft plan due 90 DACA. Final due 45 days after Government approval of the draft. Revisions as
required after approval of final plan only to comply with Government data protection policy documents revision.
Block 14 - Electronic Copy shall be made available in Microsoft Office 2010 format or earlier.
Hard copy shall be made available upon request.
Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage17of19
1007/183

A018

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
ATDP_________TMOther MGMT
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
ACS Technical, Engineering Products and ServicesN00421-16-R-0058TBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A018Status ReportInformation Technology Personnel Security report for COR
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MGMT-80368A (See Block 16)PBWS Sow Para: 7.0NAWCAD 4.11.7
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
REQUIREDb. COPIES
DDSee Block 16See Block 16
8. APP CODED11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
ASee Block 16See Block 16RegRepro
16. REMARKSNAWCAD 4.11.710

Block 4: Digital media to be in IBM compatible Microsoft Excel 2000 or later format.

Contractor to submit IT Personnel Security Report for all employees requiring access to Government IT
systems. Ensure that only the following information is included:
User's Last Name; First Name; MI; Suffix; Exact Sigma User Name (if none - leave blank); Employee Type: Civ/Mil/CSS/FN;
Contractor No.; Customer AIR/PMA/PEO Code; Org Hdqtrs/NAWC/NATEC, etc.; Duty Location; Work Email Address;
IA Training Date (verified by transcript); Date of User Signature (SAAR Blk 12); Type of Investigation (SAAR Blk 28);
Date Investigation Finalized (SAAR Blk 28c) -- do not put pending; Highest IT Level (SAAR Blk 28c); Date Security Verified
Clearance/Investigation (SAAR BLK 32); Date COR Signature (SAAR Blk 19); COR Name (SAAR Blk 20); COR Email;
Date rec'd Sigma Customer Support Ctr.; Date System Access Granted & COR Notified; Date System Access No Longer
Required; N-ERP IT System (if appc. Put N-Erp), Other IT System/s (separate by comma's); Company Name.
Block 10 & 11: Update report required within (30) days of gain or loss of employee(s) that have or will access Government IT systems.
Block 12: First report is required (30) days after contract award
Block 13: Subsequent reports due (365) days after contract award

Block 14 - Electronic Encrypted Copy shall be provided.

Block 14 Address:
Department of the Navy
Commander, NAVAIRWARCENACDIV
ATTN: Code 4.11.7. Bldg 8271
17454 Webster Field Road
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
DD Form 1423-1, JUN 90Previous editions are obsoletePage18of19
1007/183

A019

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .