The file's text, extracted by GovTribe without its formatting.
A001
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A001 | Engineering Change Proposal | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-SESS-80639 | | | SOW Paragraph 3.1.c | | | | NAWCAD 4.11.2 | | | |
| 7. DD 250 REQ | 9.DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| LT | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | |
| D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | ASREQ | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | Code 4.11.2 | 0 | 1 | 0 |
| Engineering Change Proposals (ECPs) shall be developed in accordance with the authority identified in Block 4. | | | | | | | | | | |
| Block 14: |
| All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and |
| any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the |
| Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or |
| DVD-ROM to the following address: |
| ATTN: COR |
| NAWCAD 4.11.2 |
| Combat Integration & Identification Systems Division |
| 17472 Webster Field Road |
| Building 8164 |
| St. Inigoes, MD 20684-4012 |
| | | 15. TOTAL | 0 | 1 | 0 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| NAWCAD 4.11.2 | 8/25/15 | | | | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 1 | of | 27 |
| 1007/183 | | | | | |
A002
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A002 | Technical Report | | | | | Analysis & Recommendations | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-MISC-80508 | | | SOW Paragraphs 3.1.e, 3.2.c, 3.2.f, 3.2.h, 3.3.a, 3.3.g, 3.4.b, 3.4.c, & 3.7.b | | | | NAWCAD 4.11.2 | | | |
| 7. DD 250 REQ | 9.DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| LT | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | |
| D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | ASREQ | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | Code 4.11.2 | 0 | 1 | 0 |
| Reports shall include any issues identified during analysis or review of program plans, acquisition strategies, acquisition documentation | | | | | | | | | | |
| materials, CID/NCTR/ATC equipment and systems, other documents and provide recommendations. | | | | | | | | | | |
| Block 14: |
| All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and |
| any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the |
| Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or |
| DVD-ROM to the following address: |
| ATTN: COR |
| NAWCAD 4.11.2 |
| Combat Integration & Identification Systems Division |
| 17472 Webster Field Road |
| Building 8164 |
| St. Inigoes, MD 20684-4012 |
| | | 15. TOTAL | 0 | 1 | 0 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| NAWCAD 4.11.2 | 8/25/15 | | | | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 1 | of | 27 |
| 1007/183 | | | | | |
A003
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A003 | Technical Data Package | | | | | CI&IDS Specifications & Technical Standards | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-SESS-80776 | | | SOW Paragraph 3.1.f | | | | NAWCAD 4.11.2 | | | |
| 7. DD 250 REQ | 9.DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| LT | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | |
| D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | ASREQ | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | Code 4.11.2 | 0 | 1 | 0 |
| Specifications & Standards shall be developed in accordance with the authority identified in Block 4. Situational contractor format may be | | | | | | | | | | |
| acceptable at the Government's discretion. | | | | | | | | | | |
| Block 14: |
| All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and |
| any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the |
| Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or |
| DVD-ROM to the following address: |
| ATTN: COR |
| NAWCAD 4.11.2 |
| Combat Integration & Identification Systems Division |
| 17472 Webster Field Road |
| Building 8164 |
| St. Inigoes, MD 20684-4012 |
| | | 15. TOTAL | 0 | 1 | 0 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| NAWCAD 4.11.2 | 8/25/15 | | | | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 1 | of | 27 |
| 1007/183 | | | | | |
A004
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A004 | Engineering Drawings | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| See Block 16 | | | SOW Paragraph 3.1.g | | | | NAWCAD 4.11.2 | | | |
| 7. DD 250 REQ | 9.DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| LT | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | |
| D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | ASREQ | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | Code 4.11.2 | 0 | 1 | 0 |
| The report shall include all engineering drawings that have been created or modified. The following Data Acquisition Documentation applies | | | | | | | | | | |
| depending on the design phase or product: | | | | | | | | | | |
| DI-SESS-81000* Product Drawings; DI-SESS-81001* Conceptual Design Drawings; DI-SESS-81002* Developmental Design Drawings; |
| DI-SESS-81003* Commercial Drawings; DI-SESS-81004* Special Inspection Equipment (SIE) Drawings; DI-SESS-81008* Special Tooling |
| (ST) Drawings |
| Block 14: |
| All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and |
| any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the |
| Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or |
| DVD-ROM to the following address: |
| ATTN: COR |
| NAWCAD 4.11.2 |
| Combat Integration & Identification Systems Division |
| 17472 Webster Field Road |
| Building 8164 |
| St. Inigoes, MD 20684-4012 |
| | | 15. TOTAL | 0 | 1 | 0 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| NAWCAD 4.11.2 | 8/25/15 | | | | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 1 | of | 27 |
| 1007/183 | | | | | |
A005
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A005 | Technical Manuals | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| MIL-DTL-81919 | | | SOW Paragraphs 3.2.a & 3.3.f | | | | NAWCAD 4.11.2 | | | |
| 7. DD 250 REQ | 9.DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| LT | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | |
| D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | ASREQ | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | Code 4.11.2 | 0 | 1 | 0 |
| Technical Manuals shall be developed in accordance with the authority identified in Block 4. Situational contractor format may be acceptable | | | | | | | | | | |
| at the Government's discretion. | | | | | | | | | | |
| Block 14: |
| All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and |
| any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the |
| Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or |
| DVD-ROM to the following address: |
| ATTN: COR |
| NAWCAD 4.11.2 |
| Combat Integration & Identification Systems Division |
| 17472 Webster Field Road |
| Building 8164 |
| St. Inigoes, MD 20684-4012 |
| | | 15. TOTAL | 0 | 1 | 0 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| NAWCAD 4.11.2 | 8/25/15 | | | | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 1 | of | 27 |
| 1007/183 | | | | | |
A006
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A006 | Conference Materials | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-ADMN-81308A | | | SOW Paragraphs 3.2.d & 3.8.f | | | | NAWCAD 4.11.2 | | | |
| 7. DD 250 REQ | 9.DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| LT | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | |
| D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | ASREQ | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | Code 4.11.2 | 0 | 1 | 0 |
| Report shall include presentation materials (including graphs, diagrams, videos or other briefing materials), conference agendas, conference | | | | | | | | | | |
| minutes to include attendees, action items, or other metrics as determined by the Government. | | | | | | | | | | |
| Block 14: |
| All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and |
| any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the |
| Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or |
| DVD-ROM to the following address: |
| ATTN: COR |
| NAWCAD 4.11.2 |
| Combat Integration & Identification Systems Division |
| 17472 Webster Field Road |
| Building 8164 |
| St. Inigoes, MD 20684-4012 |
| | | 15. TOTAL | 0 | 1 | 0 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| NAWCAD 4.11.2 | 8/25/15 | | | | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 1 | of | 27 |
| 1007/183 | | | | | |
A007
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A007 | Technical Report | | | | | Test Report | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| See Block 16 | | | SOW Paragraphs 3.2.e & 3.3.g | | | | NAWCAD 4.11.2 | | | |
| 7. DD 250 REQ | 9.DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| LT | REQUIRED | ASREQ | | See Block 16 | | | | b. COPIES | | |
| D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | See Block 16 | | See Block 16 | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | Code 4.11.2 | 0 | 1 | 0 |
| Reports shall identify the test procedure document, defects identified, and a list of proposed solutions. | | | | | | | | | | |
| Block 4: The following Data Acquisition Documents apply depending on the test phase: DI-QCIC-80512 Installation Test Report; |
| DI-IPSC-81440 Software Test Report; and MIL-HDBK-831A Preparation of Test Reports |
Block 12: The contractor shall submit within 30 days of a test event.
| Block 14: |
| All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and |
| any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the |
| Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or |
| DVD-ROM to the following address: |
| ATTN: COR |
| NAWCAD 4.11.2 |
| Combat Integration & Identification Systems Division |
| 17472 Webster Field Road |
| Building 8164 |
| St. Inigoes, MD 20684-4012 |
| | | 15. TOTAL | 0 | 1 | 0 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| NAWCAD 4.11.2 | 8/25/15 | | | | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 1 | of | 27 |
| 1007/183 | | | | | |
A008
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A008 | Technical Report | | | | | Software Documentation | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-MISC-80508 | | | SOW Paragraphs 3.2.g & 3.3.d | | | | NAWCAD 4.11.2 | | | |
| 7. DD 250 REQ | 9.DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| LT | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | |
| D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | ASREQ | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | Code 4.11.2 | 0 | 1 | 0 |
| Software Documentation shall be developed in accordance with the authority identified in Block 4. Situational contractor format may be | | | | | | | | | | |
| acceptable at the Government's discretion. | | | | | | | | | | |
| Block 14: |
| All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and |
| any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the |
| Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or |
| DVD-ROM to the following address: |
| ATTN: COR |
| NAWCAD 4.11.2 |
| Combat Integration & Identification Systems Division |
| 17472 Webster Field Road |
| Building 8164 |
| St. Inigoes, MD 20684-4012 |
| | | 15. TOTAL | 0 | 1 | 0 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| NAWCAD 4.11.2 | 8/25/15 | | | | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 1 | of | 27 |
| 1007/183 | | | | | |
A009
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A009 | Test Plans & Procedure | | | | | Test Plans & Procedures, Integration Plans & Installation Procedures | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-SESS-81704 | | | SOW Paragraph 3.3.b | | | | NAWCAD 4.11.2 | | | |
| 7. DD 250 REQ | 9.DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| LT | REQUIRED | ASREQ | | See Block 16 | | | | b. COPIES | | |
| D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | See Block 16 | | See Block 16 | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | Code 4.11.2 | 0 | 1 | 0 |
| Plans and procedures shall be developed in accordance with the authority identified in Block 4. | | | | | | | | | | |
Blocks 11, 12 & 13: The contractor shall submit within 30 days of an event.
| Block 14: |
| All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and |
| any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the |
| Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or |
| DVD-ROM to the following address: |
| ATTN: COR |
| NAWCAD 4.11.2 |
| Combat Integration & Identification Systems Division |
| 17472 Webster Field Road |
| Building 8164 |
| St. Inigoes, MD 20684-4012 |
| | | 15. TOTAL | 0 | 1 | 0 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| NAWCAD 4.11.2 | 8/25/15 | | | | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 1 | of | 27 |
| 1007/183 | | | | | |
A010
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A010 | Technical Report | | | | | Design Documentation | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| See Block 16 | | | SOW Paragraphs 3.3.c & 3.4.b | | | | NAWCAD 4.11.2 | | | |
| 7. DD 250 REQ | 9.DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| LT | REQUIRED | ASREQ | | See Block 16 | | | | b. COPIES | | |
| D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | See Block 16 | | See Block 16 | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | Code 4.11.2 | 0 | 1 | 0 |
| The report shall include all software or hardware documentation that has been created or modified. | | | | | | | | | | |
| Block 4: The following Data Acquisition Documents apply depending on the system, subsystem, component and/or design phase: |
| DI-DRPR-80651 Engineering Drawings; DI-IPSC-81427* Software Development Plan; DI-IPSC-81428* Software Installation Plan; |
| DI-IPSC-81434* Interface Requirements Specifications; DI-IPSC-81438* Software Test Plan; DI-IPSC-81436* Interface Design |
| Description. Situational contractor format may be acceptable at the Government's discretion. |
Blocks 11, 12 & 13: The contractor shall submit within 30 days of an event.
| Block 14: |
| All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and |
| any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the |
| Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or |
| DVD-ROM to the following address: |
| ATTN: COR |
| NAWCAD 4.11.2 |
| Combat Integration & Identification Systems Division |
| 17472 Webster Field Road |
| Building 8164 |
| St. Inigoes, MD 20684-4012 |
| | | 15. TOTAL | 0 | 1 | 0 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| NAWCAD 4.11.2 | 8/25/15 | | | | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 1 | of | 27 |
| 1007/183 | | | | | |
A011
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A011 | Technical Report | | | | | Failure Analysis | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-SESS-81927 | | | SOW Paragraph 3.4.a | | | | NAWCAD 4.11.2 | | | |
| 7. DD 250 REQ | 9.DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| LT | REQUIRED | ASREQ | | See Block 16 | | | | b. COPIES | | |
| D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | See Block 16 | | See Block 16 | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | Code 4.11.2 | 0 | 1 | 0 |
| Failure Analyses shall be developed in accordance with the authority identified in Block 4. Situational contractor format may be acceptable | | | | | | | | | | |
| at the Government's discretion. | | | | | | | | | | |
Blocks 11, 12 & 13: The contractor shall submit within 30 days of an event.
| Block 14: |
| All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and |
| any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the |
| Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or |
| DVD-ROM to the following address: |
| ATTN: COR |
| NAWCAD 4.11.2 |
| Combat Integration & Identification Systems Division |
| 17472 Webster Field Road |
| Building 8164 |
| St. Inigoes, MD 20684-4012 |
| | | 15. TOTAL | 0 | 1 | 0 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| NAWCAD 4.11.2 | 8/25/15 | | | | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 1 | of | 27 |
| 1007/183 | | | | | |
A012
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A012 | Technical Report | | | | | Lab Maintenance Report | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-MISC-80508 | | | SOW Paragraph 3.5 | | | | NAWCAD 4.11.2 | | | |
| 7. DD 250 REQ | 9.DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| LT | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | |
| D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | ASREQ | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | Code 4.11.2 | 0 | 1 | 0 |
| Reports shall include lab name, operational procedures, failure logs, document files and configuration drawings. | | | | | | | | | | |
| Block 14: |
| All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and |
| any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the |
| Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or |
| DVD-ROM to the following address: |
| ATTN: COR |
| NAWCAD 4.11.2 |
| Combat Integration & Identification Systems Division |
| 17472 Webster Field Road |
| Building 8164 |
| St. Inigoes, MD 20684-4012 |
| | | 15. TOTAL | 0 | 1 | 0 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| NAWCAD 4.11.2 | 8/25/15 | | | | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 1 | of | 27 |
| 1007/183 | | | | | |
A013
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A013 | Test Plans & Procedures | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-SESS-81704 | | | SOW Paragraph 3.5 | | | | NAWCAD 4.11.2 | | | |
| 7. DD 250 REQ | 9.DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| LT | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | |
| D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | ASREQ | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | Code 4.11.2 | 0 | 1 | 0 |
| Plans and procedures shall be developed in accordance with the authority identified in Block 4. | | | | | | | | | | |
Blocks 11, 12 & 13: The contractor shall submit within 30 days of an event.
| Block 14: |
| All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and |
| any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the |
| Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or |
| DVD-ROM to the following address: |
| ATTN: COR |
| NAWCAD 4.11.2 |
| Combat Integration & Identification Systems Division |
| 17472 Webster Field Road |
| Building 8164 |
| St. Inigoes, MD 20684-4012 |
| | | 15. TOTAL | 0 | 1 | 0 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| NAWCAD 4.11.2 | 8/25/15 | | | | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 1 | of | 27 |
| 1007/183 | | | | | |
A014
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A014 | Inventory Control Record | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-MISC-81107A | | | SOW Paragraphs 3.5 & 3.6.e | | | | NAWCAD 4.11.2 | | | |
| 7. DD 250 REQ | 9.DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| LT | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | |
| D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | ASREQ | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | Code 4.11.2 | 0 | 1 | 0 |
| Inventory Control Reports shall be developed in accordance with the authority identified in Block 4. Situational contractor format may be | | | | | | | | | | |
| acceptable at the Government's discretion. | | | | | | | | | | |
| Block 14: |
| All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and |
| any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the |
| Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or |
| DVD-ROM to the following address: |
| ATTN: COR |
| NAWCAD 4.11.2 |
| Combat Integration & Identification Systems Division |
| 17472 Webster Field Road |
| Building 8164 |
| St. Inigoes, MD 20684-4012 |
| | | 15. TOTAL | 0 | 1 | 0 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| NAWCAD 4.11.2 | 8/25/15 | | | | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 1 | of | 27 |
| 1007/183 | | | | | |
A015
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A015 | Technical Report | | | | | Accreditation Documentation | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-ADMN-80239 | | | SOW Paragraphs 3.7.a & 3.7.b | | | | NAWCAD 4.11.2 | | | |
| 7. DD 250 REQ | 9.DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| LT | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | |
| D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | ASREQ | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | Code 4.11.2 | 0 | 1 | 0 |
| Accreditation Documentation shall be developed in accordance with the authority identified in Block 4. Situational contractor format may be | | | | | | | | | | |
| acceptable at the Government's discretion. | | | | | | | | | | |
| Block 14: |
| All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and |
| any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the |
| Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or |
| DVD-ROM to the following address: |
| ATTN: COR |
| NAWCAD 4.11.2 |
| Combat Integration & Identification Systems Division |
| 17472 Webster Field Road |
| Building 8164 |
| St. Inigoes, MD 20684-4012 |
| | | 15. TOTAL | 0 | 1 | 0 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| NAWCAD 4.11.2 | 8/25/15 | | | | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 1 | of | 27 |
| 1007/183 | | | | | |
A016
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A016 | Technical Report | | | | | Program Management Report | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-MGMT-81797 | | | SOW Paragraph 3.8 | | | | NAWCAD 4.11.2 | | | |
| 7. DD 250 REQ | 9.DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| LT | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | |
| D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | ASREQ | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | Code 4.11.2 | 0 | 1 | 0 |
| Program Management Reports shall be developed in accordance with the authority identified in Block 4. Situational contractor format may be | | | | | | | | | | |
| acceptable at the Government's discretion. | | | | | | | | | | |
| Block 14: |
| All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and |
| any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the |
| Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or |
| DVD-ROM to the following address: |
| ATTN: COR |
| NAWCAD 4.11.2 |
| Combat Integration & Identification Systems Division |
| 17472 Webster Field Road |
| Building 8164 |
| St. Inigoes, MD 20684-4012 |
| | | 15. TOTAL | 0 | 1 | 0 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| NAWCAD 4.11.2 | 8/25/15 | | | | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 1 | of | 27 |
| 1007/183 | | | | | |
A017
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A017 | Presentation Materials | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-ADMN-81373 | | | SOW Paragraph 3.8.e | | | | NAWCAD 4.11.2 | | | |
| 7. DD 250 REQ | 9.DIST STATEMENT | 10. FREQUENCY | | 12. DATE OF FIRST SUBMISSION | | | 14. DISTRIBUTION | | | |
| LT | REQUIRED | ASREQ | | ASREQ | | | | b. COPIES | | |
| D | | | | | | | | | |
| 8. APP CODE | | 11. AS OF DATE | | 13. DATE OF SUBSEQUENT SUBMISSION | | | a. ADDRESSEE | Draft | Final | |
| N/A | | ASREQ | | ASREQ | | | | | Reg | Repro |
| 16. REMARKS | | | | | | | Code 4.11.2 | 0 | 1 | 0 |
| Presentation Materials shall be developed in accordance with the authority identified in Block 4. Situational contractor format may be | | | | | | | | | | |
| acceptable at the Government's discretion. Presentation Materials developed on behalf of NAWCAD 4.11.2 shall include any Government | | | | | | | | | | |
| approved, NAWCAD 4.11.2 markings and logos at the COR's direction and should not be marked "Proprietary" to the vendor. | | | | | | | | | | |
| Block 14: |
| All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and |
| any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the |
| Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or |
| DVD-ROM to the following address: |
| ATTN: COR |
| NAWCAD 4.11.2 |
| Combat Integration & Identification Systems Division |
| 17472 Webster Field Road |
| Building 8164 |
| St. Inigoes, MD 20684-4012 |
| | | 15. TOTAL | 0 | 1 | 0 |
| G. PREPARED BY | H. DATE | I. APPROVED BY | | J. DATE | | |
| NAWCAD 4.11.2 | 8/25/15 | | | | | |
| DD Form 1423-1, JUN 90 | Previous editions are obsolete | Page | 1 | of | 27 |
| 1007/183 | | | | | |
A018
| CONTRACTS DATA REQUIREMENTS LIST | | | | | | Form Approved | | | | |
| (1 Data Item) | | | | | | OMB No. 0704-0188 | | | | |
| Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and | | | | | | | | | | |
| maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, | | | | | | | | | | |
| including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway, | | | | | | | | | | |
| Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to | | | | | | | | | | |
| either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E. | | | | | | | | | | |
| A. CONTRACT LINE ITEM NO. | | B. EXHIBIT | | C. CATEGORY: | | | | | | |
| CLIN XXXX | | A | | TDP_________ | TM | Other _______X________ | | | | |
| D. SYSTEM/ITEM | | | E. CONTRACT/PR NO. | | | F. CONTRACTOR | | | | |
| CI&IDS Mission Engineering Support | | | N00024-15-R-#TBD | | | TBD | | | | |
| 1. DATA ITEM NO. | 2. TITLE OF DATA ITEM | | | | | 3. SUBTITLE | | | | |
| A018 | Trip Report | | | | | | | | | |
| 4. AUTHORITY (Data Acquisition Document No.) | | | 5. CONTRACT REFERENCE | | | | 6. REQUIRING OFFICE | | | |
| DI-MISC-81943 | | | SOW Paragraph 4.0 | | | | NAWCAD 4.11.2 | | | |
This is the start of the file's text. The full file is on GovTribe.