CDRL's

View the file

Other files

File Type Posted
Questions_and_Answers_17_November_2015.docx DOCX document
N00421-15-R-0007-0005.docx DOCX document
N00421-15-R-0007-0004.docx DOCX document
N00421-15-D-0007-0003.docx DOCX document
Questions_N00421-15-R-0007_10_Nov_15.docx DOCX document
Questions_N00421-15-R-0007_9_Nov_15.docx DOCX document
N00421-15-R-0007-0002.docx DOCX document
Questions_N00421-15-R-0007_4_Nov__15.docx DOCX document
Exhibit_A_-_CDRLs_N00421-15-R-0007.xlsx XLSX spreadsheet
Attachment_5_SGFP.pdf PDF
Q_and_A_N00421-15-R-0007_27_Oct.docx DOCX document
Attachment_6_RGFP.pdf PDF
N00421-15-R-0007-0001.docx DOCX document
Attachment_P5_Past_Performance.doc DOC document
IDS_RFP_Released.pdf PDF
Attachment_5_SGFP.pdf PDF
IDS_RFP_FBO.pdf PDF
Attachment_P7_Subcontractor_CLIN_Breakout_spreadsheet.xls XLS spreadsheet
Attachment_5_GFP.pdf PDF
Advance_Planning_Notice.doc DOC document
Attachment_P6_CLIN_Breakout_spreadsheet_V7z_-_Copy.xls XLS spreadsheet
Attachment_3_DD254.doc DOC document
Attachment_P5_Past_Performance.doc DOC document
Attachment_1_SAC_IDS_Engineering.docx DOCX document
Attachment_4_Data_Transmittal.doc DOC document
Attachment_7_PB_Streamlined_Orders.docx DOCX document
IDS_RFP.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A001

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A001Engineering Change Proposal
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-SESS-80639SOW Paragraph 3.1.cNAWCAD 4.11.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDASREQASREQb. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AASREQASREQRegRepro
16. REMARKSCode 4.11.2010
Engineering Change Proposals (ECPs) shall be developed in accordance with the authority identified in Block 4.
Block 14:
All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and
any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the
Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or
DVD-ROM to the following address:
ATTN: COR
NAWCAD 4.11.2
Combat Integration & Identification Systems Division
17472 Webster Field Road
Building 8164
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
NAWCAD 4.11.28/25/15
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of27
1007/183

A002

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A002Technical ReportAnalysis & Recommendations
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MISC-80508SOW Paragraphs 3.1.e, 3.2.c, 3.2.f, 3.2.h, 3.3.a, 3.3.g, 3.4.b, 3.4.c, & 3.7.bNAWCAD 4.11.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDASREQASREQb. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AASREQASREQRegRepro
16. REMARKSCode 4.11.2010
Reports shall include any issues identified during analysis or review of program plans, acquisition strategies, acquisition documentation
materials, CID/NCTR/ATC equipment and systems, other documents and provide recommendations.
Block 14:
All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and
any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the
Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or
DVD-ROM to the following address:
ATTN: COR
NAWCAD 4.11.2
Combat Integration & Identification Systems Division
17472 Webster Field Road
Building 8164
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
NAWCAD 4.11.28/25/15
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of27
1007/183

A003

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A003Technical Data PackageCI&IDS Specifications & Technical Standards
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-SESS-80776SOW Paragraph 3.1.fNAWCAD 4.11.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDASREQASREQb. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AASREQASREQRegRepro
16. REMARKSCode 4.11.2010
Specifications & Standards shall be developed in accordance with the authority identified in Block 4. Situational contractor format may be
acceptable at the Government's discretion.
Block 14:
All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and
any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the
Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or
DVD-ROM to the following address:
ATTN: COR
NAWCAD 4.11.2
Combat Integration & Identification Systems Division
17472 Webster Field Road
Building 8164
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
NAWCAD 4.11.28/25/15
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of27
1007/183

A004

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A004Engineering Drawings
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
See Block 16SOW Paragraph 3.1.gNAWCAD 4.11.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDASREQASREQb. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AASREQASREQRegRepro
16. REMARKSCode 4.11.2010
The report shall include all engineering drawings that have been created or modified. The following Data Acquisition Documentation applies
depending on the design phase or product:
DI-SESS-81000* Product Drawings; DI-SESS-81001* Conceptual Design Drawings; DI-SESS-81002* Developmental Design Drawings;
DI-SESS-81003* Commercial Drawings; DI-SESS-81004* Special Inspection Equipment (SIE) Drawings; DI-SESS-81008* Special Tooling
(ST) Drawings
Block 14:
All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and
any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the
Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or
DVD-ROM to the following address:
ATTN: COR
NAWCAD 4.11.2
Combat Integration & Identification Systems Division
17472 Webster Field Road
Building 8164
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
NAWCAD 4.11.28/25/15
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of27
1007/183

A005

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A005Technical Manuals
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
MIL-DTL-81919SOW Paragraphs 3.2.a & 3.3.fNAWCAD 4.11.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDASREQASREQb. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AASREQASREQRegRepro
16. REMARKSCode 4.11.2010
Technical Manuals shall be developed in accordance with the authority identified in Block 4. Situational contractor format may be acceptable
at the Government's discretion.
Block 14:
All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and
any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the
Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or
DVD-ROM to the following address:
ATTN: COR
NAWCAD 4.11.2
Combat Integration & Identification Systems Division
17472 Webster Field Road
Building 8164
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
NAWCAD 4.11.28/25/15
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of27
1007/183

A006

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A006Conference Materials
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-ADMN-81308ASOW Paragraphs 3.2.d & 3.8.fNAWCAD 4.11.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDASREQASREQb. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AASREQASREQRegRepro
16. REMARKSCode 4.11.2010
Report shall include presentation materials (including graphs, diagrams, videos or other briefing materials), conference agendas, conference
minutes to include attendees, action items, or other metrics as determined by the Government.
Block 14:
All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and
any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the
Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or
DVD-ROM to the following address:
ATTN: COR
NAWCAD 4.11.2
Combat Integration & Identification Systems Division
17472 Webster Field Road
Building 8164
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
NAWCAD 4.11.28/25/15
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of27
1007/183

A007

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A007Technical ReportTest Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
See Block 16SOW Paragraphs 3.2.e & 3.3.gNAWCAD 4.11.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDASREQSee Block 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSCode 4.11.2010
Reports shall identify the test procedure document, defects identified, and a list of proposed solutions.
Block 4: The following Data Acquisition Documents apply depending on the test phase: DI-QCIC-80512 Installation Test Report;
DI-IPSC-81440 Software Test Report; and MIL-HDBK-831A Preparation of Test Reports

Block 12: The contractor shall submit within 30 days of a test event.

Block 14:
All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and
any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the
Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or
DVD-ROM to the following address:
ATTN: COR
NAWCAD 4.11.2
Combat Integration & Identification Systems Division
17472 Webster Field Road
Building 8164
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
NAWCAD 4.11.28/25/15
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of27
1007/183

A008

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A008Technical ReportSoftware Documentation
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MISC-80508SOW Paragraphs 3.2.g & 3.3.dNAWCAD 4.11.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDASREQASREQb. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AASREQASREQRegRepro
16. REMARKSCode 4.11.2010
Software Documentation shall be developed in accordance with the authority identified in Block 4. Situational contractor format may be
acceptable at the Government's discretion.
Block 14:
All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and
any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the
Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or
DVD-ROM to the following address:
ATTN: COR
NAWCAD 4.11.2
Combat Integration & Identification Systems Division
17472 Webster Field Road
Building 8164
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
NAWCAD 4.11.28/25/15
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of27
1007/183

A009

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A009Test Plans & ProcedureTest Plans & Procedures, Integration Plans & Installation Procedures
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-SESS-81704SOW Paragraph 3.3.bNAWCAD 4.11.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDASREQSee Block 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSCode 4.11.2010
Plans and procedures shall be developed in accordance with the authority identified in Block 4.

Blocks 11, 12 & 13: The contractor shall submit within 30 days of an event.

Block 14:
All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and
any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the
Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or
DVD-ROM to the following address:
ATTN: COR
NAWCAD 4.11.2
Combat Integration & Identification Systems Division
17472 Webster Field Road
Building 8164
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
NAWCAD 4.11.28/25/15
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of27
1007/183

A010

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A010Technical ReportDesign Documentation
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
See Block 16SOW Paragraphs 3.3.c & 3.4.bNAWCAD 4.11.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDASREQSee Block 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSCode 4.11.2010
The report shall include all software or hardware documentation that has been created or modified.
Block 4: The following Data Acquisition Documents apply depending on the system, subsystem, component and/or design phase:
DI-DRPR-80651 Engineering Drawings; DI-IPSC-81427* Software Development Plan; DI-IPSC-81428* Software Installation Plan;
DI-IPSC-81434* Interface Requirements Specifications; DI-IPSC-81438* Software Test Plan; DI-IPSC-81436* Interface Design
Description. Situational contractor format may be acceptable at the Government's discretion.

Blocks 11, 12 & 13: The contractor shall submit within 30 days of an event.

Block 14:
All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and
any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the
Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or
DVD-ROM to the following address:
ATTN: COR
NAWCAD 4.11.2
Combat Integration & Identification Systems Division
17472 Webster Field Road
Building 8164
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
NAWCAD 4.11.28/25/15
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of27
1007/183

A011

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A011Technical ReportFailure Analysis
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-SESS-81927SOW Paragraph 3.4.aNAWCAD 4.11.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDASREQSee Block 16b. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/ASee Block 16See Block 16RegRepro
16. REMARKSCode 4.11.2010
Failure Analyses shall be developed in accordance with the authority identified in Block 4. Situational contractor format may be acceptable
at the Government's discretion.

Blocks 11, 12 & 13: The contractor shall submit within 30 days of an event.

Block 14:
All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and
any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the
Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or
DVD-ROM to the following address:
ATTN: COR
NAWCAD 4.11.2
Combat Integration & Identification Systems Division
17472 Webster Field Road
Building 8164
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
NAWCAD 4.11.28/25/15
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of27
1007/183

A012

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A012Technical ReportLab Maintenance Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MISC-80508SOW Paragraph 3.5NAWCAD 4.11.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDASREQASREQb. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AASREQASREQRegRepro
16. REMARKSCode 4.11.2010
Reports shall include lab name, operational procedures, failure logs, document files and configuration drawings.
Block 14:
All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and
any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the
Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or
DVD-ROM to the following address:
ATTN: COR
NAWCAD 4.11.2
Combat Integration & Identification Systems Division
17472 Webster Field Road
Building 8164
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
NAWCAD 4.11.28/25/15
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of27
1007/183

A013

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A013Test Plans & Procedures
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-SESS-81704SOW Paragraph 3.5NAWCAD 4.11.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDASREQASREQb. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AASREQASREQRegRepro
16. REMARKSCode 4.11.2010
Plans and procedures shall be developed in accordance with the authority identified in Block 4.

Blocks 11, 12 & 13: The contractor shall submit within 30 days of an event.

Block 14:
All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and
any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the
Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or
DVD-ROM to the following address:
ATTN: COR
NAWCAD 4.11.2
Combat Integration & Identification Systems Division
17472 Webster Field Road
Building 8164
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
NAWCAD 4.11.28/25/15
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of27
1007/183

A014

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A014Inventory Control Record
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MISC-81107ASOW Paragraphs 3.5 & 3.6.eNAWCAD 4.11.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDASREQASREQb. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AASREQASREQRegRepro
16. REMARKSCode 4.11.2010
Inventory Control Reports shall be developed in accordance with the authority identified in Block 4. Situational contractor format may be
acceptable at the Government's discretion.
Block 14:
All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and
any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the
Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or
DVD-ROM to the following address:
ATTN: COR
NAWCAD 4.11.2
Combat Integration & Identification Systems Division
17472 Webster Field Road
Building 8164
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
NAWCAD 4.11.28/25/15
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of27
1007/183

A015

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A015Technical ReportAccreditation Documentation
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-ADMN-80239SOW Paragraphs 3.7.a & 3.7.bNAWCAD 4.11.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDASREQASREQb. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AASREQASREQRegRepro
16. REMARKSCode 4.11.2010
Accreditation Documentation shall be developed in accordance with the authority identified in Block 4. Situational contractor format may be
acceptable at the Government's discretion.
Block 14:
All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and
any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the
Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or
DVD-ROM to the following address:
ATTN: COR
NAWCAD 4.11.2
Combat Integration & Identification Systems Division
17472 Webster Field Road
Building 8164
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
NAWCAD 4.11.28/25/15
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of27
1007/183

A016

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A016Technical ReportProgram Management Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MGMT-81797SOW Paragraph 3.8NAWCAD 4.11.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDASREQASREQb. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AASREQASREQRegRepro
16. REMARKSCode 4.11.2010
Program Management Reports shall be developed in accordance with the authority identified in Block 4. Situational contractor format may be
acceptable at the Government's discretion.
Block 14:
All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and
any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the
Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or
DVD-ROM to the following address:
ATTN: COR
NAWCAD 4.11.2
Combat Integration & Identification Systems Division
17472 Webster Field Road
Building 8164
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
NAWCAD 4.11.28/25/15
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of27
1007/183

A017

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A017Presentation Materials
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-ADMN-81373SOW Paragraph 3.8.eNAWCAD 4.11.2
7. DD 250 REQ9.DIST STATEMENT10. FREQUENCY12. DATE OF FIRST SUBMISSION14. DISTRIBUTION
LTREQUIREDASREQASREQb. COPIES
D
8. APP CODE11. AS OF DATE13. DATE OF SUBSEQUENT SUBMISSIONa. ADDRESSEEDraftFinal
N/AASREQASREQRegRepro
16. REMARKSCode 4.11.2010
Presentation Materials shall be developed in accordance with the authority identified in Block 4. Situational contractor format may be
acceptable at the Government's discretion. Presentation Materials developed on behalf of NAWCAD 4.11.2 shall include any Government
approved, NAWCAD 4.11.2 markings and logos at the COR's direction and should not be marked "Proprietary" to the vendor.
Block 14:
All initial CDRL submissions should be uploaded and maintained in a Government approved online repository in which the COR, the ACOR and
any personnel designated by the Government shall have, at a minimum, read access. At the conclusion and closure of each task order, the
Contractor shall deliver hard copy reproductions of all CDRLs submitted within the task order period of performance via CD-ROM or
DVD-ROM to the following address:
ATTN: COR
NAWCAD 4.11.2
Combat Integration & Identification Systems Division
17472 Webster Field Road
Building 8164
St. Inigoes, MD 20684-4012
15. TOTAL010
G. PREPARED BYH. DATEI. APPROVED BYJ. DATE
NAWCAD 4.11.28/25/15
DD Form 1423-1, JUN 90Previous editions are obsoletePage1of27
1007/183

A018

CONTRACTS DATA REQUIREMENTS LISTForm Approved
(1 Data Item)OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,
including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Highway,
Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, D.C. 20503. Please DO NOT RETURN your form to
either of these addresses. Send completed form to the Government issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.B. EXHIBITC. CATEGORY:
CLIN XXXXATDP_________TMOther _______X________
D. SYSTEM/ITEME. CONTRACT/PR NO.F. CONTRACTOR
CI&IDS Mission Engineering SupportN00024-15-R-#TBDTBD
1. DATA ITEM NO.2. TITLE OF DATA ITEM3. SUBTITLE
A018Trip Report
4. AUTHORITY (Data Acquisition Document No.)5. CONTRACT REFERENCE6. REQUIRING OFFICE
DI-MISC-81943SOW Paragraph 4.0NAWCAD 4.11.2

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .