Attachment J-3 - DDG108 DSRA Flex Milestones 15Jul2019.xlsx

XLSX spreadsheet 135 KB Posted

Attached to
USS WAYNE E. MEYER (DDG 108) DSRA
Solicitation number
N00024-19-R-4464
Issued by

About this file

Not Listed

View the file

Other files

File Type Posted
N00024-19-R-4464_RFP_Conformed_through_A0005.pdf PDF
Attachment_J-4_DDG108_WEM_Pricing_Spreadsheet_A0005.xlsx XLSX spreadsheet
N00024-19-R-4464_A0005.pdf PDF
19-R-4464_WEM_QAs_2.pdf PDF
19-R-4464_WEM_QAs.pdf PDF
N00024-19-R-4464_Conformed_RFP_through_A0004.pdf PDF
N00024-19-R-4464_A0004.pdf PDF
Attachment_J-4_DDG108_WEM_Pricing_Spreadsheet_A0004.xlsx XLSX spreadsheet
N00024-19-R-4464_Conformed_through_A0003.pdf PDF
N00024-19-R-4464_A0003.pdf PDF
N00024-19-R-4464_Conformed_RFP_through_A0002.pdf PDF
N00024-19-R-4464_A0002.pdf PDF
N00024-19-R-4464_Conformed_through_A0001.pdf PDF
N00024-19-R-4464_A0001.pdf PDF
Attachment_J-4_DDG108_WEM_Pricing_Spreadsheet_A0001.xlsx XLSX spreadsheet
CDRL C001 PDF
S-5 Eligibility Criteria Data Sheet_USS WEM.docx DOCX document
S_Attachments.zip ZIP file
CDRL B002 PDF
CDRL B009 PDF
J_Attachments.zip ZIP file
Attachment J-11 Government Furnished Property.docx DOCX document
CDRL B001 PDF
CDRL A001 PDF
CDRL A012 PDF
CDRL B003 PDF
Attachment J-12 Enviro Guidlines.docx DOCX document
CDRL A011 PDF
CDRL B005 PDF
Attachment S-7 Evaluator's Review Sheet - DDG108.xlsx XLSX spreadsheet
CDRL A009 PDF
Attachment S-1 Manpower Utilization Data Sheet.xlsx XLSX spreadsheet
CDRL A003 PDF
N00024-19-R-4464.pdf PDF
CDRL B004 PDF
J-10_JBPHHINST_5560.2_PARKING_REGULATIONS.pdf PDF
S-9 Past Performance Questionnaire _USS WEM.docx DOCX document
S-6 —
J-9_SECREQS_FOR_CIA,_CNIA_&_NWA_REV_AUG2013.pdf PDF
CDRL B006 PDF
Attachment J-4 DDG108 WEM Pricing_Spreadsheet.xlsx XLSX spreadsheet
CDRL A014 PDF
CDRL B007 PDF
CDRL A006 PDF
Attachment J-5 QASP WEM —
CDRL C002 PDF
CDRL B008 PDF
CDRL A007 PDF
CDRL A005 PDF
Attachment S-2 PP CPARS Reference List USS WEM.docx DOCX document
Show 40 more

Latest 50 of 56 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Execution Milestones

DDG108 FY20 DSRAOfferors are not to propose milestones highlighted in Orange. These milestones are calculated.
Offerors are to propose milestones highlighted in Blue in accordance with "Notes". Entering dates into cells J5, J7 and J23 will allow the milestone spreadsheet to calculated the remaining interim milestones.
SystemMilestones (Calculated or Proposed)Work Days Prior to "END OF AVAIL" MilestoneNotes
Avail StartTuesday, March 17, 2020
DOCKTuesday, March 17, 2020Offeror to Propose Dock Dates IAW Specification 997-11-001. PHNSY & IMF Dry Dock #4 docking date must occur on a Tuesday or Thursday.
20% Open and InspectSaturday, April 25, 2020Reports due on the date in Column C or, if the date in Column C is on a weekend or Government holiday, due on the next Government business day following the date in Column C
25% CONFERENCETuesday, May 05, 2020Conference to be held on the next Wednesday following the date in Column C
50% CONFERENCEWednesday, June 24, 2020Conference to be held on the next Wednesday following the date in Column C
75% CONFERENCEThursday, August 13, 2020Conference to be held on the next Wednesday following the date in Column C
UNDOCKOfferor to Propose Undock Dates IAW Specification 997-11-001. PHNSY & IMF Dry Dock #4 undock date must occur on a Tuesday or Thursday.
Hab CompleteWednesday, September 23, 202043
PCDFriday, October 02, 202036
Light Off Assessment (LOA) CommenceTuesday, October 13, 202029
Dock TrialsThursday, November 12, 2020
Fast CruiseFriday, November 13, 2020
Sea Trials BeginMonday, November 16, 20205
Sea Trials CompleteFriday, November 20, 20201
KTR Contract CompleteFriday, November 20, 20201
END OF AVAILFriday, November 20, 2020Offeror to Propose "END OF AVAIL" milestone date no later than November 20, 2020.

Entered date must be a Government Work Day.

END OF AVAIL (KEY EVENT) No Later than DateFriday, November 20, 2020
"Days Completed Early" for use in the Value Adjusted Total Evaluated Price Tradeoff (VATEP) Schedule Adjustment and GFP Differential0

DDG108 MS-KE

USS WAYNE E MEYER 0C1 Milestone / Key Events
DescriptionMS/KEDATEA+ DATE
START AVAILABILITYSA0017-Mar-200
DOCKINGDD0024-Mar-207
20% Reports - Critical WorkOI201-May-2045
25% CONFERENCECN256-May-2050
50% CONFERENCECN5017-Jun-2092
75% CONFERENCECN7512-Aug-20148
UNDOCKINGUD0017-Sep-20184
HABITABILITYHB0023-Sep-20190
PRODUCTION COMPLETION DATEWC002-Oct-20199
AEGIS LIGHTOFFAL0113-Oct-20210
LIGHTOFF ASSESSMENTLA0126-Oct-20223
DOCK TRIALSDT0012-Nov-20240
FAST CRUISEFC0013-Nov-20241
48HR CREW RESTRE0114-Nov-20242
SEA TRIALS STARTST0016-Nov-20244
SEA TRIALS ENDST0120-Nov-20248
CNO AVAILABILITY COMPLETECA0020-Nov-20248

Work Item Key Event List

USS WAYNE E MEYER 0C1 Work Item 20% Report / Milestone / Key Event List
Work SpecTitle20% Report Required20% Report ParagraphMS/KEMS/KE Date
110-11-001Underwater Hull; inspectYes3.2.1UD0017-Sep-20
110-11-002Shell Stringer Repair; accomplishYes3.1.1UD0017-Sep-20
113-11-001Auxilary Machinery Room Number One Bilge Drain Well; repairYes3.4.1.1UD0017-Sep-20
113-11-002Auxilary Machinery Room Number 2 Bilge Drain Well; repairYes3.4.1.1UD0017-Sep-20
113-11-003Engine Room Number One Bilge Drain Well; repairYes3.4.1.1UD0017-Sep-20
113-11-004Engine Room Number 2 Bilge Drain Well; repairYes3.4.1.1UD0017-Sep-20
113-11-005Gas Turbine Generator Room Number 3 Bilge Drain Well; repairYes3.4.1.1UD0017-Sep-20
113-11-006VCHT Room Number One Bilge Drain Well; repairYes3.4.1.1UD0017-Sep-20
113-11-007VCHT Room Number 2 Bilge Drain Well; repairYes3.4.1.1UD0017-Sep-20
113-11-008Sonar Cooling Equipment Room Bilge Drain Well; repairYes3.4.1.1UD0017-Sep-20
113-11-009VLS Magazine Bilge Drain Well; repairYes3.4.1.1UD0017-Sep-20
122-00-001Auxilary Machinery Room Number One Transverse Bulkhead; inspect and repairYes3.2.1UD0017-Sep-20
123-11-001Tank and Void Open, Pumping, Clean and Gas Free; accomplishNoUD0017-Sep-20
123-11-008Fuel Oil Service Tank; preserveNoUD0017-Sep-20
123-11-009Fuel Oil Service Tank; preserveNoUD0017-Sep-20
123-11-010Fuel Oil Service Tank; preserveNoUD0017-Sep-20
123-11-011Fuel Oil Service Tank; preserveNoUD0017-Sep-20
123-11-012Fuel Oil Service Tank; repairYes3.2.1.1UD0017-Sep-20
123-11-013Fuel Oil Service Tank; repairYes3.2.1.1UD0017-Sep-20
123-11-014Fuel Oil Service Tank; repairYes3.2.1.1UD0017-Sep-20
123-11-015Fuel Oil Service Tank; repairYes3.2.1.1UD0017-Sep-20
123-11-019Compensated Fuel Tank Group 4; preserve (touch up)NoUD0017-Sep-20
123-11-021Compensated Fuel Tank Group 3; preserve (touch up)NoUD0017-Sep-20
123-11-026Compensated Fuel Tank Group 5; preserve (touch up)NoUD0017-Sep-20
123-11-027Compensated Fuel Tank Group 6; preserve (touch up)NoUD0017-Sep-20
123-11-028Compensated Fuel Tank Group 4; preserve (touch up)NoUD0017-Sep-20
123-11-031Compensated Fuel Tank Group 3; preserveNoUD0017-Sep-20
123-11-032Compensated Fuel Tank Group 4; preserveNoUD0017-Sep-20
123-11-034Compensated Fuel Tank Group 2; preserveNoUD0017-Sep-20
123-11-035Compensated Fuel Tank Group One; preserveNoUD0017-Sep-20
123-11-036Compensated Fuel Tank Group 2; preserveNoUD0017-Sep-20
123-11-037Compensated Fuel Tank Group 3; preserveNoUD0017-Sep-20
123-11-038Compensated Fuel Tank Group 4; preserveNoUD0017-Sep-20
123-11-049Compensated Fuel Tank Group 3; repairYes3.2.1.1UD0017-Sep-20
123-11-052Compensated Fuel Tank Group 3; repairYes3.2.1.1UD0017-Sep-20
123-11-054Compensated Fuel Tank Group 4; repairYes3.2.1.1UD0017-Sep-20
123-11-055Compensated Fuel Tank Group 2; repairYes3.2.1.1UD0017-Sep-20
123-11-056Compensated Fuel Tank Group One; repairYes3.2.1.1UD0017-Sep-20
123-11-057Compensated Fuel Tank Group 2; repairYes3.2.1.1UD0017-Sep-20
123-11-058Compensated Fuel Tank Group 5; repairYes3.2.1UD0017-Sep-20
123-11-059Compensated Fuel Tank Group 4; repairYes3.2.1.1UD0017-Sep-20
123-11-060Compensated Fuel Tank Group 4; repairYes3.2.1UD0017-Sep-20
123-11-061Compensated Fuel Tank Group 6; repairYes3.2.1UD0017-Sep-20
123-11-062Compensated Fuel Tank Group 4; repairYes3.2.1UD0017-Sep-20
123-11-063Compensated Fuel Tank Group 3; repairYes3.2.1UD0017-Sep-20
123-12-007JP-5 Tank; repairYes3.2.1.1UD0017-Sep-20
123-12-008JP-5 Tank; repairYes3.2.1.1UD0017-Sep-20
123-14-001Potable Water Tank; repairYes3.2.1.1UD0017-Sep-20
123-14-002Potable Water Tank; repairYes3.2.1.1UD0017-Sep-20
123-14-003Potable Water Tank; repairYes3.2.1.1UD0017-Sep-20
123-14-004Potable Water tank; repairYes3.2.1.1UD0017-Sep-20
123-14-005Potable Water Tank; preserveNoUD0017-Sep-20
123-14-006Potable Water Tank; preserveNoUD0017-Sep-20
123-17-003Contaminated Oil; repairYes3.2.1UD0017-Sep-20
123-17-004Contaminated Oil; repairYes3.2.1.1UD0017-Sep-20
123-17-005Contaminated Oil; repairYes3.2.1.1UD0017-Sep-20
123-17-006Contaminated Oil; repairYes3.2.1.1UD0017-Sep-20
123-17-007Contaminated Oil; repairYes3.2.1UD0017-Sep-20
123-17-010Contaminated Oil tank; preseve (touch up)NoUD0017-Sep-20
123-17-011Contaminated Oil tank; preseveNoUD0017-Sep-20
123-17-013Contaminated Oil tank; preseveNoUD0017-Sep-20
123-17-014Contaminated Oil tank; preseveNoUD0017-Sep-20
123-17-017Contaminated Oil tank; preseveNoUD0017-Sep-20
123-19-001Vacuum Collection, Holding and Transfer (VCHT)) Tank; preserveNoUD0017-Sep-20
123-19-002Vacuum Collection, Holding and Transfer (VCHT)) Tank; preserveNoUD0017-Sep-20
123-19-003Vacuum Collection, Holding and Transfer (VCHT)) Tank; repairYes3.4.1UD0017-Sep-20
123-19-004Vacuum Collection, Holding and Transfer (VCHT)) Tank; repairYes3.4.1UD0017-Sep-20
123-19-005Waste Water Tank; repairYes3.2.1.1UD0017-Sep-20
123-19-006Waste Water Tank; preserveNoUD0017-Sep-20
123-19-007Waste Water Tank; repairYes3.1.1.1UD0017-Sep-20
123-21-001Accessible Void; preserveNoUD0017-Sep-20
123-21-002Accessible Void; repairYes3.3.1UD0017-Sep-20
150-11-003Vacuum Collection, Holding and Transfer (VCHT)) Room Number 2 Structural Repair; accomplishNoUD0017-Sep-20
161-11-001Strut; repairNoUD0017-Sep-20
163-11-001Waster Sleeve; replaceNoUD0017-Sep-20
163-11-002Sea Chest; inspect and repairNoUD0017-Sep-20
165-11-001Lower Sonar Dome Access Scuttle; repairYes3.1.1UD0017-Sep-20
165-11-002Sonar Dome Rubber Window (SDRW); inspect and repairNoUD0017-Sep-20
165-11-003Sonar Dome; Pump, Clean, and Gas FreeNoUD0017-Sep-20
243-11-002Stern Tube Shaft Seal Starboard; overhaulYes3.2.2.1UD0017-Sep-20
243-11-003Propulsion Shafting Starboard; inspect and repairYes3.1.1.1UD0017-Sep-20
243-11-004Waterborne Propulsion Shafting Alignment Starboard; accomplsihYes3.2.1 and 3.3.1UD0017-Sep-20
243-12-002Stern Tube Shaft Seal Port; overhaulYes3.2.2.1UD0017-Sep-20
243-12-003Propulsion Shafting Port; inspect and repairYes3.1.1.1UD0017-Sep-20
243-12-004Waterborne Propulsion Shafting Alignment Port; accomplsihNoUD0017-Sep-20
244-11-001Outboard Propulsion Shafting, Bearing Clearance Measurement Starboard; accomplishNoUD0017-Sep-20
244-12-001Outboard Propulsion Shafting, Bearing Clearance Measurement Port; accomplishNoUD0017-Sep-20
244-12-002Port Main Thrust Bearing Sump Pumping and Cleaning; accomplsihNoUD0017-Sep-20
245-11-002Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Starboard; repairNoUD0017-Sep-20
245-11-003Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplishNoUD0017-Sep-20
245-11-004Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box MER One; replaceNoUD0017-Sep-20
245-12-002Controllable Pitch Propeller (CPP) Prairie Air and Valve Rod Assembly Port; repairNoUD0017-Sep-20
245-12-003Controllable Pitch Propeller (CPP) Blade Set Repair and Propeller Hub Replacement; accomplishNoUD0017-Sep-20
245-12-004Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box MER 2; replaceNoUD0017-Sep-20
256-11-001Seawater Service valve; replaceNoUD0017-Sep-20
256-71-001Centralized Seawater Service Pump; overhaulNoUD0017-Sep-20
262-11-001Main Reduction Gear (MRG) Lube Oil Cooler; clean and inspectNoUD0017-Sep-20
438-80-001ShipAlt DDG51-76231D, Sonar Dome Stave Cable Connectorization, Stave Cable and Transducer Replacement; accomplishNoUD0017-Sep-20
468-89-001DT-513/BQA-8 Hydrophone and Cable Assembly; repalceNoUD0017-Sep-20
520-11-001Sea Valve; repair and replaceNoUD0017-Sep-20
521-11-001Firemain Piping; replaceNoUD0017-Sep-20
562-11-001Rudder Bearing Seal and Rudderstock Seal; repairNoUD0017-Sep-20
562-12-001Rudder Bearing Seal and Rudderstock Seal; repairNoUD0017-Sep-20
593-11-001Vacuum, Collection, Holding and Transfer (VCHT) Piping System; chemically cleanNoUD0017-Sep-20
631-11-001Tank Top Plating; preserveNoUD0017-Sep-20
631-11-002Tank Top Plating; preserveNoUD0017-Sep-20
631-11-003Tank Top Plating; preserveNoUD0017-Sep-20
631-11-004Shell Plating; preserveNoUD0017-Sep-20
631-11-005Deck Plating; preserveNoUD0017-Sep-20
631-11-006Tank Top Plating; preserveNoUD0017-Sep-20
631-11-007Tank Top Plating; preserveNoUD0017-Sep-20
631-11-008Auxilary Machinery Room Number 2 Bilge, preserveNoUD0017-Sep-20
631-00-009Tank Top Plating; preserveNoUD0017-Sep-20
631-11-010Auxilary Machinery Room Number One Bulkhead, preserveNoUD0017-Sep-20
631-11-011Auxilary Machinery Room Number One Bilge, preserveNoUD0017-Sep-20
631-11-012Auxilary Machinery Room Number One Margin Plate, preserveNoUD0017-Sep-20
631-11-013Auxilary Machinery Room Number One Deck Plating, preserveNoUD0017-Sep-20
631-11-014Tank Top Plating; preserveNoUD0017-Sep-20
631-21-002Superstructure; preserveNoUD0017-Sep-20
631-31-001Underwater Hull; preserveNoUD0017-Sep-20
631-41-001Freeboard; preserveNoUD0017-Sep-20
633-11-001Impressed Curent Cathodic Protection (ICCP) System; inspect and repairNo3.2.2UD0017-Sep-20
991-11-001Temporary Mast and Roller Staging for Ship's Force Use; provideNoUD0017-Sep-20
993-31-001Temporary Main Reduction Gear (MRG) Dehumidifier System; provideYes3.2.1UD0017-Sep-20
512-11-002Galley and Laundry Exhaust Ventilation Cleaning; accomplishNoHB0023-Sep-20
512-80-001ShipAlt DDG51-64238D, Collective Protection System Supply/Exhaust Hoods; replaceNoHB0023-Sep-20
643-80-002ShipAlt DDG51-81670D, Officer Berthing Increase Habitability Modification; accomplishNoHB0023-Sep-20
644-11-001Crew Shower; preserveNoHB0023-Sep-20
644-11-002Crew Shower; preserveNoHB0023-Sep-20
651-80-001ShipAlt DDG51-85629D Combination Ovens replace; accomplishNoHB0023-Sep-20
655-80-001ShipAlt DDG51-00429D, Self Service Laundry Installation; accomplsihNoHB0023-Sep-20
110-21-001Structural Pipe Stanchion; repairYes3.1.1WC0002-Oct-20
110-21-002Structural Pipe Stanchion; repairYes3.1.1WC0002-Oct-20
123-22-001Chain Locker, Starboard; preserveNoWC0002-Oct-20
123-22-002Chain Locker, Port; preserveNoWC0002-Oct-20
123-22-003Chain Locker Sump; preserveNoWC0002-Oct-20
123-22-004Chain Locker, Starboard; repairYes3.2.1.1WC0002-Oct-20
123-22-005Chain Locker, Port; repairYes3.2.1.1WC0002-Oct-20
123-22-006Chain Locker Sump; repairYes3.2.1.1WC0002-Oct-20
130-11-001Aircraft Securing Fitting; replaceNoWC0002-Oct-20
150-11-00101 Level Bulkhead; repairYes3.1.1WC0002-Oct-20
150-11-00201Level Weld; repairYes3.1.1WC0002-Oct-20
150-11-00401 Level Deck; repairYes3.2.1WC0002-Oct-20
150-11-00701 Level Deck; repairYes3.2.1WC0002-Oct-20
150-80-001ShipAlt DDG-51-AER86007D (Partial), Increase Deck Plate Thickness Modification; accomplishYes3.1.1WC0002-Oct-20
167-11-001Bolted Equipment Removal Plate (BERP) Repair; accomplishYes3.2.1WC0002-Oct-20
251-00-001Number One Gas Turbine Module (GTM) Clean Air Intake; repairNoWC0002-Oct-20
251-00-002Number One Ship Service Gas Turbine Generator Clean Air Intake; Touch upNoWC0002-Oct-20
251-31-002Air Intake and Exhaust Louver; clean and preserveNoWC0002-Oct-20
251-32-001Gas Turbine Intake Number One; repairNoWC0002-Oct-20
251-32-002Gas Turbine Intake Number 2; repairNoWC0002-Oct-20
256-80-001ShipAlt DDG-51-64250D, Ship Gas Turbine Generator (SSGTG) Emergency Seawater Cooling System Modification; accomplishNoWC0002-Oct-20
259-10-001Number 2 Gas Turbine Mixing Room, Uptakes, and 05 Lvl Stack Top; repairNoWC0002-Oct-20
259-10-002Number One Gas Turbine Mixing Room, Uptakes, and 05 Lvl Stack Top; repairNoWC0002-Oct-20
259-11-001Gas Turbine (GTRB) Exhaust Duct Collector; repairNoWC0002-Oct-20
320-80-001ShipAlt DDG51-64231D, Automatic Bus Transfer (ABT) Relocation; accomplishNoWC0002-Oct-20
512-11-003Hanger Number One Vent Duct Cleaning; accomplishNoWC0002-Oct-20
523-11-001Countermeasure Washdown (CMWD) Nozzle, Piping and Associated Fitting; cleanNoWC0002-Oct-20
528-11-001ShipAlt DDG51-64240D, Uptake Drain Piping Overboard Routing Correction; accomplishNoWC0002-Oct-20
551-11-001Anti-icing Expansion Joint; replaceNoWC0002-Oct-20
571-31-001Sliding Padeye, Tilting; overhaul and preserveNoWC0002-Oct-20
571-31-002Sliding Padeye, Tilting; overhaul and preserveNoWC0002-Oct-20
582-11-001Retractable Chock and Retractable Chock Cover; repalce and preserveNoWC0002-Oct-20
582-11-002Retractable Towing Pad; repair and preserveNoWC0002-Oct-20
583-11-001Boat handling System; overhaulYes3.5.3.1WC0002-Oct-20
588-21-001Recovery Assist, Securing and Transversing (RAST) System Track and Plate; clean and preserveNoWC0002-Oct-20
593-21-002Number 2 Gas Turbine Waste Drain Pump; overhaulNoWC0002-Oct-20
611-80-001ShipAlt DDG51-64185D, Anchor Chain Chaffing Plate Installation; accomplishNoWC0002-Oct-20
623-80-001DDG51 Class AER 66048, Accomadation Ladder Feathering Bar Securing Pin; accomplishNoWC0002-Oct-20
624-11-001Balanced Joiner Door; remove, store and installYes3.1.2WC0002-Oct-20
631-13-001Collective Protection System (CPS) Zone One Fan Room; repair and preserveNoWC0002-Oct-20
631-13-002Collective Protection System (CPS) Zone 2 Fan Room; repair and preserveNoWC0002-Oct-20
631-13-003Collective Protection System (CPS) Zone 2 Fan Room; repair and preserveNoWC0002-Oct-20
631-13-004Collective Protection System (CPS) Zone 3 Fan Room; repair and preserveNoWC0002-Oct-20
631-13-005Collective Protection System (CPS) Zone 2 Fan Room; repair and preserveNoWC0002-Oct-20
631-21-004Intake/Uptake Deck Preservation; accomplishNoWC0002-Oct-20
634-11-001Chemical - Resistant Floor Covering; resurface and repairNoWC0002-Oct-20
634-11-002Chemical - Resistant Floor Covering; resurfaceNoWC0002-Oct-20
634-11-003Chemical - Resistant Floor Covering; installNoWC0002-Oct-20
634-11-004Chemical - Resistant Floor Covering; replaceNoWC0002-Oct-20
634-11-00503 Level peel and Stick Nonskid; replaceNoWC0002-Oct-20
634-21-001Nonskid; replaceNoWC0002-Oct-20
634-21-002Nonskid; replaceNoWC0002-Oct-20
634-21-00302 Level Refueling Station Nonskid; replaceNoWC0002-Oct-20
643-11-001Berthing Space Temporary Deck Studs; replaceNoWC0002-Oct-20
992-31-003Temporary Air Conditioning; provideNoWC0002-Oct-20
993-31-003Temporary Deck Covering; provideNoWC0002-Oct-20
472-90-001ShipAlt DDG-80156K An/SLQ (V)6 Hardware. ShipAlt DDG51-81382 AN/SLQ-32 (V)6 Data Adaptation Processor (DAP); accomplishNoAL0113-Oct-20
522-80-001ShipALt DDG51-82474D, Relocation of CIWS, Torpedo, and DLS Magazine Gauge; accomplsihNoAL0113-Oct-20
721-31-001Vertical Launch System (VLS), MK 41 Launcher Top and Uptake Hatch; preserveNoAL0113-Oct-20
844-31-001Combat System Discrepancy Correction; accomplishNoAL0113-Oct-20
980-00-001Ordalt 83135, Close-in Weapon System (CIWS) Cable Reliability Improvements, Alteration Installation Team (AIT) Support Service; provideNoAL0113-Oct-20
980-11-003ShipAlt DDG51-81961K/85114K, Tatical Tomahawk Weapons Control System (TTWCS)V5.4.0.2 Upgrade Alteration Installation Team (AIT) Support; provideNoAL0113-Oct-20
980-11-006ShipAlt 86304K, 86222K, 86644K, AN/SQQ89A(V)15 (TI-16/15), AN-UQN Next Gen Fathometer USW: DSS, Alteration Installation Team (AIT) Support Services; provideNoAL0113-Oct-20
980-90-001ShipALt DDG51-93762K, Optical Dazzling Interdictor Navy (ODIN), Alteration Installation Team (AIT) Support Services; provideNoAL0113-Oct-20
980-90-002OrdAlts DDG51-70111 Empty Case Tray, 70227 Cradle Operating Cylinder, 70751 Gun Port Shield, 70920 Fuze Setter, 70921 Breech Partially, 77862 Snubbers (Electrical Safety Change), and 83489 Servo I/O Obsolesence, Alteration Installation Team (AIT) Support Service; provideNoAL0113-Oct-20
992-11-007Pressurized Waveguide and Transmission Line Dry Air Lay-Up; accomplishNoAL0113-Oct-20
993-31-002AN/SPY-1D Antenna Protective Cover; installNoAL0113-Oct-20
042-11-001Accountability of Manhour and Material Reservation; accomplishNoCA0020-Nov-20
077-01-001Hazardous Waste Produced on Naval Vessels; controlNoCA0020-Nov-20
980-11-001Light-Off Discrepancy Correction Assistance; provideNoCA0020-Nov-20
980-11-002ShipAlt Number, ShipAlt Title, Alteration Installation Team (AIT) Support Services; provideNoCA0020-Nov-20
980-11-004Maintanance Team Office Space; provide and maintainNoCA0020-Nov-20
980-11-005Ship's Force Office Space for Work Authorization Form (WAF) Processing and tag Out Services; provideNoCA0020-Nov-20
992-11-001Temporary Dry Provision Stowage; provideNoCA0020-Nov-20
992-11-004Temporary Services; provideNoCA0020-Nov-20
992-11-005Temporary Refrigerated Storage Facility, 2560 Cubic Feet; provideNoCA0020-Nov-20
992-11-006Temporary Flammable Liquid Hazardous Waste and Hazardous Material Storage for Ship's Force Use; provideNoCA0020-Nov-20
992-31-001Pumping; accomplishNoCA0020-Nov-20
992-31-002Bilge Cleaning and Pumping; accomplishNoCA0020-Nov-20
993-11-001Rigging, Crane and Transportation Services; provideNoCA0020-Nov-20

A+ Dates Rev9

DDG-57 EDSRA 2013 A + DATES
REV917-Apr-13
SUNMONTUEWEDTHUFRISATSUNMONTUEWEDTHUFRISAT
3-Feb-134-Feb-135-Feb-136-Feb-137-Feb-138-Feb-139-Feb-1310-Feb-1311-Feb-1312-Feb-1313-Feb-1314-Feb-1315-Feb-1316-Feb-13
XST to BAE
17-Feb-1318-Feb-1319-Feb-1320-Feb-1321-Feb-1322-Feb-1323-Feb-1324-Feb-1325-Feb-1326-Feb-1327-Feb-1328-Feb-131-Mar-132-Mar-13
123456789101112
3-Mar-134-Mar-135-Mar-136-Mar-137-Mar-138-Mar-139-Mar-1310-Mar-1311-Mar-1312-Mar-1313-Mar-1314-Mar-1315-Mar-1316-Mar-13
Dock
1314151617181920212223242526
17-Mar-1318-Mar-1319-Mar-1320-Mar-1321-Mar-1322-Mar-1323-Mar-1324-Mar-1325-Mar-1326-Mar-1327-Mar-1328-Mar-1329-Mar-1330-Mar-13
2728293031323334353637383940
31-Mar-131-Apr-132-Apr-133-Apr-134-Apr-135-Apr-136-Apr-137-Apr-138-Apr-139-Apr-1310-Apr-1311-Apr-1312-Apr-1313-Apr-13
25% Conf
4142434445464748495051525354
14-Apr-1315-Apr-1316-Apr-1317-Apr-1318-Apr-1319-Apr-1320-Apr-1321-Apr-1322-Apr-1323-Apr-1324-Apr-1325-Apr-1326-Apr-1327-Apr-13
Turnover 1Turnover 2
5556575859606162636465666768
28-Apr-1329-Apr-1330-Apr-131-May-132-May-133-May-134-May-135-May-136-May-137-May-138-May-139-May-1310-May-1311-May-13
Turnover 3#1 SWBD#3 SWBD#2 SWBD
6970717273747576777879808182
12-May-1313-May-1314-May-1315-May-1316-May-1317-May-1318-May-1319-May-1320-May-1321-May-1322-May-1323-May-1324-May-1325-May-13
Turnover 4Turnover 5
8384858687888990919293949596
26-May-1327-May-1328-May-1329-May-1330-May-1331-May-131-Jun-132-Jun-133-Jun-134-Jun-135-Jun-136-Jun-137-Jun-138-Jun-13
2 FO BanksTurnover 6
979899100101102103104105106107108109110
9-Jun-1310-Jun-1311-Jun-1312-Jun-1313-Jun-1314-Jun-1315-Jun-1316-Jun-1317-Jun-1318-Jun-1319-Jun-1320-Jun-1321-Jun-1322-Jun-13
Turnover 750% Conf2 FO BanksUndockVCHT
111112113114115116117118119120121122123124
23-Jun-1324-Jun-1325-Jun-1326-Jun-1327-Jun-1328-Jun-1329-Jun-1330-Jun-131-Jul-132-Jul-133-Jul-134-Jul-135-Jul-136-Jul-13
SW/CCS DKPWFM/AFFF/Halon/LP/HP/ENG Vent/MRG LOLOFSP2 FO BanksPH Dk BA/CHW/AC/Steer
125126127128129130131132133134135136137138
7-Jul-138-Jul-139-Jul-1310-Jul-1311-Jul-1312-Jul-1313-Jul-1314-Jul-1315-Jul-1316-Jul-1317-Jul-1318-Jul-1319-Jul-1320-Jul-13
CRP400HZDIU CalAHSS/JP5FUELING
139140141142143144145146147148149150151152
21-Jul-1322-Jul-1323-Jul-1324-Jul-1325-Jul-1326-Jul-1327-Jul-1328-Jul-1329-Jul-1330-Jul-1331-Jul-131-Aug-132-Aug-133-Aug-13
Hab VentFO Test CompCOMX HPTNAVSSI/67/73AHSS Vent Test
153154155156157158159160161162163164165166
4-Aug-135-Aug-136-Aug-137-Aug-138-Aug-139-Aug-1310-Aug-1311-Aug-1312-Aug-1313-Aug-1314-Aug-1315-Aug-1316-Aug-1317-Aug-13
75% ConfAHSS CalALO
167168169170171172173174175176177178179180
18-Aug-1319-Aug-1320-Aug-1321-Aug-1322-Aug-1323-Aug-1324-Aug-1325-Aug-1326-Aug-1327-Aug-1328-Aug-1329-Aug-1330-Aug-1331-Aug-13
AHSS CertHab T/O
181182183184185186187188189190191192193194
1-Sep-132-Sep-133-Sep-134-Sep-135-Sep-136-Sep-137-Sep-138-Sep-139-Sep-1310-Sep-1311-Sep-1312-Sep-1313-Sep-1314-Sep-13
HPT COMPPCDMove NOBLOA Prep
195196197198199200201202203204205206207208
15-Sep-1316-Sep-1317-Sep-1318-Sep-1319-Sep-1320-Sep-1321-Sep-1322-Sep-1323-Sep-1324-Sep-1325-Sep-1326-Sep-1327-Sep-1328-Sep-13
Fueling/JP5
209210211212213214215216217218219220221222
29-Sep-1330-Sep-131-Oct-132-Oct-133-Oct-134-Oct-135-Oct-136-Oct-137-Oct-138-Oct-139-Oct-1310-Oct-1311-Oct-1312-Oct-13
LOALOALOALOALOA/DTFCSea TrialsSea TrialsSea TrialsEOA

&D

EquipCable Turnover R9

USS MITSCHER DDG-57

DDGM BF Critical Path Equipment/Cable Turnover, Power-up & Test Requirement Schedule

REV9, 17APR13

EquipmentA +DateComments
Turnover 1
SPS-73 ISEA Disconnect SAOP for relocation26-Feb-13
All Power Sources and Terminal Boxes for Equipment in A+45, A+55 & A+64 to also include new and upgraded sources.*4417-Apr-13*To include but not limited to: LC11, 12, 13, 21, 23, 24, 25, 31, 32, 33, 34, 35, 41; PP 3-210-2, 2-299-1, 2-299-2, 01-129-2, 1-268-1, 1-288-1, 2-199-2, 3-219-2, 3-173-3, 4-131-1, 2-199-4, 2-219-1, 1-113-1, 3-116-1, 01-130-0, 1-157-2 as per SIDs.

paul.r.jackson: Tim Gudge:

This is a list of all new or fully upgraded power panels that power 1st-3rd T/O equipment. Some will be removed and put in 4th T/O as they are secondary sources.

GEDMS Mesh B (BSE B1-B10)4417-Apr-13
GEDMS Mesh A BSEs and power cables affecting 1st Turnover IOUs*4417-Apr-13*Mount BSE enclosure and provide J2 connector and cable for IOU power. Fiber not required until MESH A light-off. (BSE A03: J2: 3-210-2-1L-C) (BSE A10: J2: 3-210-2-1L-G) (BSE A04: J2 : LC25-1L-A8)

robert.gudge: robert.gudge:

have to check power source.

IOUs: 31, 32, 34, 42, 72, 824417-Apr-13
USEs 31A, 31B, 32A, 32B, 34A, 34B, 42A, 72A, 82A & All Associated UPS, Relay Enclosures, Junction Boxes, and C/O Switches4417-Apr-13
C-DR Boxes 12, 13, 14, 14A, 15, 15A, 16, 24, 374417-Apr-13Install FDS ITB Modification Kit for the following ITB's; 12, 12A, 13, 13A, 14, 15, 16, 16A, 17, 17A, 25 & 25A.
Turnover 2
UCCs 1 & 25124-Apr-13
RSC DCC, C/O SW & Speaker5124-Apr-13Hold Keyboard, 40" Monitor & Printer for later installation per SMR direction.
RSC Repair 5, C/O SW, Speaker & Access Cut5124-Apr-13Hold Keyboard for later installation per SMR direction.
TIWS (CCS)5124-Apr-13LAN Drop & Power Outlet
IOUs: 73, 74, 83, 84, 945124-Apr-13
GEDMS Mesh A BSEs and power cables affecting 2nd Turnover IOUs*5124-Apr-13*Mount BSE enclosure and provide J2 connector and cable for IOU power. Fiber not required until MESH A light-off. (BSE A09: J2: LC33-1L-H1) (BSE A06: J2: LC25-1L-A12)

robert.gudge: robert.gudge:

have to check power source.

C-DR Boxes 7, 8, 8A, 11, 25, 26, 315124-Apr-13Install FDS ITB Modification Kit for the following ITB's; 7, 7A, 11, 11A, 26, & 26A.
USEs 73A, 74A, 74C, 83A, 83B, 84A, 94A & All Associated UPS, Relay Enclosures, Junction Boxes, and C/O Switches5124-Apr-13
Turnover 3
Electric Plant DIU 1 (Power/Network/Shipside Cabling)6003-May-13
Propulsion DIU 4 (Power/Network/Shipside Cabling)6003-May-13
UCC 36003-May-13
ECs 1A, 1B (Power/Network/Shipside Cabling)6003-May-13
FADC 16003-May-13
RSC Repair 2, C/O SW, Speaker6003-May-13Hold Keyboard for later installation per SMR direction.
TIWS (MER 1)6003-May-13LAN Drop & Power Outlet
RSC CSMC, C/O SW, Speaker6003-May-13Hold Keyboard for later installation per SMR direction.
Fire Detection System ITB Upgrade Electrical Mods & Cabling for IOUs in T/Os 1, 2, and 3.6003-May-13
IOUs: 22, 33, 61, 626003-May-13
GEDMS Mesh A BSEs and power cables affecting 3rd Turnover IOUs*6003-May-13*Mount BSE enclosure and provide J2 connector and cable for IOU power. Fiber not required until MESH A light-off. (BSE A02: J2: (3-210-2-1L-D)

robert.gudge: robert.gudge:

Have to check power source.

robert.gudge: robert.gudge:

have to check power source.

paul.r.jackson: Tim Gudge:

This is a list of all new or fully upgraded power panels that power 1st-3rd T/O equipment. Some will be removed and put in 4th T/O as they are secondary sources.C-DR Boxes 19, 21, 22, 23, 23A6003-May-13Install FDS ITB Modification Kit for the following ITB's; 20, 20A, 22, 23, 23A, 24 & 24A.
USEs 22A, 33A, 61A, 62A & All Associated UPS, Relay Enclosures, Junction Boxes, and C/O Switches6003-May-13
F/O, L/O & CRP valves associated with SCD 71604K, Including electrical hook-up, in MER16003-May-131A/1B F/O Filt/Sep Outlet, #1MRG Pur Suct/Fill, #1CRP Pur Suct/Fill
#1 SWBD and related Load Centers and 1SF Special Frequency SWBD (2-Days)6306-May-13Conduct all tie-ins and install Thermal Monitoring System
#3 SWBD and related Load Centers and 2SF Special Frequency SWBD (2-Days)6508-May-13Conduct all tie-ins and install Thermal Monitoring System
#2 SWBD/1SA and any outstanding work/Final Ringout (2-Days, Ships's 60HZ PWR Secured)6710-May-13Conduct all tie-ins and install Thermal Monitoring System
Turnover 4
All Power Sources & Terminal Boxes for Equipment in A+73, A+83 and A+92*7215-May-13*To include but not limited to: PP 02-167-1, 01-178-2, 2-116-1, 3-173-3, 2-48-1, 2-299-1, 3-258-1, 2-405-2, 1-143-2, 2-282-1, 3-256-2, 3-284-3, 04-154-2, 3-442-2, 3-442-1, 1-157-2, 03-142-2, 03-141-1, 03-154-2, 03-133-1, 03-129-1, 03-132-1, 03-130-1, 3-213-2, 3-255-1 as per SIDs.

paul.r.jackson: Tim Gudge:

This is a list of all new or fully upgraded power panels that feed 4th-6th T/O equipment. Some will be added from the list in 1st T/O.

Electric Plant DIUs 2 & 3 (Power/Network/Shipside Cabling)7215-May-13
Propulsion DIU 5 (Power/Network/Shipside Cabling)7215-May-13
UCC 47215-May-13
RSC Repair 3, C/O SW, Speaker7215-May-13Hold Keyboard for later installation per SMR direction.
ECs 2A, 2B (Power/Network/Shipside Cabling)7215-May-13
FADCs 2 & 37215-May-13
TIWS (MER 2)7215-May-13LAN Drop & Power Outlet
Aft Steering Unit (ASU)7215-May-13
Local Control Steering Units (LCUs 1 - 4)7215-May-13
IOUs: 11, 13, 14, 41, 51, 817215-May-13
C-DR Boxes 1, 10, 17, 27, 28, 28A, 30, 33, 34, 35, 367215-May-13Install FDS ITB Modification Kit for the following ITB's; 1, 10, 18, 27, 27A, 28, & 30.
USE 11A, 13A, 14A, 41A, 51A, 81A & All Associated UPS, Relay Enclosures, Junction Boxes, and C/O Switches7215-May-13
F/O, L/O & CRP valves associated with SCD 71604K, Including electrical hook-up, in MER27215-May-132A/2B F/O Filt/Sep Outlet, #2MRG Pur Suct/Fill, #2CRP Pur Suct/Fill
Turnover 5
Ship Control Console (SCC)8124-May-13
BCCS8124-May-13
HFS8124-May-13
IBNS Racks 1, 2, including HS Firewall, UPS & C/O Switches8124-May-13
IBNS Radar Rack8124-May-13
Trigger/Video Amp/Nulka Processor8124-May-13
IBNS NAV 1 computer (Pilot House)8124-May-13
IBNS NAV 2 computer (Chart Room)8124-May-13
IBNS NAV 3 computer (CIC)8124-May-13
IBNS NAV 4 computer (CO's Laptop)8124-May-13
SPS-73 SAOP, Ethernet SW, C/O SW & UPS8124-May-13
NAVSSI Inputs to IBNS/SAOP8124-May-13
ELS & LAN Drops/Receptacles8124-May-13
RSC CIC & C/O Switch8124-May-13Hold Keyboard for later installation per SMR direction.
Pilot House IBNS Trainer / RSC8124-May-13Hold Keyboard, Training Monitors, Joystick & Cables for later installation per SMR direction.
IOUs: 21, 23, 53, 71, 91, 938124-May-13
GEDMS Mesh A BSEs and power cables affecting 5th Turnover IOUs*8124-May-13*Mount BSE enclosure and provide J2 connector and cable for IOU power. Fiber not required until MESH A light-off. (BSE A01: J2: (3-210-2-1L-A) (BSE A08: J2: LC33-1L-F) (BSE A07: J2; LC25-1L-A10) (BSE A05: J2: LC25-1L-A11)

robert.gudge: robert.gudge:

Have to check power source.

robert.gudge: robert.gudge:

have to check power source.

paul.r.jackson: Tim Gudge:

This is a list of all new or fully upgraded power panels that feed 4th-6th T/O equipment. Some will be added from the list in 1st T/O.C-DR Boxes 4, 6, 5, 5A, 9, 18, 20, 328124-May-13Install FDS ITB Modification Kit for the following ITB's; 2, 4, 5, 6, 8, 8A, 9, 19, 19A, 21, & 21A.
Oil Lab PC (SCD 70403K)8124-May-13Includes all cabling, connections, Oil Lab PC, C-DR 40-43, SCD 70403K,
2 Fuel banks closed & ready to test (any two from groups 1 through 6)8901-Jun-13Includes requirements of SCD 70403K and 77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, C-DR 40-43, TDRs, cabling, connections)
Turnover 6
Continuous Thermal Monitoring System9204-Jun-13ADACS unit in MER2, including power and all hook-ups
GEDMS Maintenance Group9204-Jun-13
GEDMS Mesh A BSE A1-A10 Light Off9204-Jun-13
Turnover 7
SPS-73 ISEA Connectorize SAOP9810-Jun-13
DVSS - ALL VIROEs, CJBs, Cables (*)9810-Jun-13
IOU: 92 & Associated UPS, Relay Enclosure, Junction Boxes, and C/O Switches9810-Jun-13
C-DR Box 2 & 2A9810-Jun-13
2 Fuel banks closed & ready to test (any two from groups 1 through 6)10618-Jun-13Includes requirements of SCD 70403K and 77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, C-DR 40-43, TDRs, cabling, connections)
CCS Deck COMPLETE11325-Jun-13
Potable Water System, incl Tanks, TBs, MOVs, TLIs & Modified Pump Controllers11426-Jun-13
Ventilation - Engineering, CPS Zone 4, Exhaust & Supply11628-Jun-13E=SS01-150-1, SS01-150-3, ES01-146-1, ES01-146-3, SS2-203-1, ES01-191-1, SS3-251-2, ES01-258-2, SS2-262-2, SS2-270-1, ES01-243-1, ES01-255-2

CPS=SS01-301-2, SS01-305-2, ES01-308-2, ES01-309-2, ES01-308-4

LO Filter Separator Purifier (SCD 76253K)11901-Jul-13
Remaining fuel tank groups closed & ready to test - SCD 70403K COMPLETE12002-Jul-13Includes requirements of SCD 70403K and 77829K for those tanks (MOVs, XDCRs, Press SWs, Flow Meters, C-DR 40-43, TDRs, cabling, connections)
All TLI's not previously turned over, Including Redundant, Radar/TDR and associated TBs, JP-5, all electrical work COMPLETE, SCDs 77829K/77269K COMPLETE12002-Jul-13SCD 77829K, Includes all cabling, C-DR boxes, TBs, etc. from sensor/component to DIU (INCL OW, CRP & MRG due to DIU tie-ins)
Pilot House Deck COMPLETE12305-Jul-13
AHSS Install Complete, Including Vent Mod13113-Jul-13
Digital Indicators SCD 77427 COMPLETE13820-Jul-13Placeholder
(*) Install all DVSS Cameras as directed by PMR
70403Digital Fuel Fill Control System
71604Machinery Control Station/Damage Control Station Upgrade
71605Advanced Galley Mod
71615Digital Video Surveillance System
71726Full IBNS Upgrade
71734Joint Biological Point Detect System
77269Redundant TLI in GEN HD TK
73088Gigabit Ethernet Data Multiplex System
73622H2S Detector System in VCHT Rooms
76034Emer JP5 Fill to #3 GEN HD TK
76253Lube Oil Filter Separator Purifier
76974Moriah WS HW For DDG Mod Plan
77259EM Log Rpl AN/WSN-9(V)1 Digital Hybrid Speed Log (DHYSL)
77427Digital Indicators
77829Radar and TDR TLI's for DFM/JP5/PotWtr

&P

Shipbd Test Major Milestone R9

DDG 57 GEDMS/MCS/IBNS/DVSS/DFC INTEGRATED TEST SCHEDULE
INTERNAL MAJOR MILESTONES - REV9, 19APR13
SystemScheduledRevised (4/17/13)Actual EndA+ Dates
Ship Move to BAEThursday, February 07, 20132/7/13
DOCK SHIP (Tentative)Tuesday, March 05, 20133/5/131
1TURNOVER 1Wednesday, April 17, 20133/15/1344
2TURNOVER 2Wednesday, April 24, 201351
3GEDMS MESH B POWER UP/INITIAL SW LOAD (ISEA)Monday, April 29, 201356
4DFC (LM2500) TRAINING (ISEA)Wednesday, May 01, 201358
7TURNOVER 3Friday, May 03, 201360
6#1/3/2 SWBD/LC/1SF/2SF TIE-IN/CTM INSTALL - 6-11 MAYMonday, May 06, 201363
GEDMS TEMPORARY 3GMG (COMMS AVAILABLE)(ISEA)Wednesday, May 08, 201365
8START FDS HARNESS CHECKS (T/O 1,2,3) (ISEA)Wednesday, May 08, 201365
9TURNOVER 4Wednesday, May 15, 201372
10START FDS INITIAL POWER UP (ISEA)Thursday, May 16, 201373
11MCS PWR UP/EC/MCS SW LOAD (INCL TIWS) (ISEA)Thursday, May 16, 201373
13MCS/EC GRND ISO/SIG VERIFICATION/COLD TESTING(MER1)Saturday, May 18, 201375
14TURNOVER 5Friday, May 24, 201381
16MCS/EC GRND ISO/SIG VERIFICATION/COLD TESTING(MER2)Saturday, May 25, 201382
18START DC SENSOR TESTING (ISEA)Monday, May 27, 201384
19IBNS POWER UP (ISEA)Monday, May 27, 201384
212 FO TANK GROUPS TURNED OVER START TLI/FCS TESTINGSaturday, June 01, 201389
22TURNOVER 6Monday, June 03, 201391
24IBNS SIGNAL VERIFICATION/SW LOAD (ISEA)Wednesday, June 05, 201393
GEDMS MESH A POWER UP (ISEA)Wednesday, June 05, 201393
23TURNOVER 7Monday, June 10, 201398
242 FO TANK GROUPS TURNED OVER CONT' TLI/FCS TESTINGTuesday, June 18, 2013106
UNDOCKMonday, June 03, 2013Thursday, June 20, 2013108
20VCHT (TANKS/PIPING/PUMPS)Friday, June 14, 2013Friday, June 21, 2013109
26SWS SYSTEM (PIPING/PUMPS/MOVs)Tuesday, June 18, 2013Tuesday, June 25, 2013113
DECK IN CCS COMPLETETuesday, June 25, 2013113
POTWTR SYSTEM (PIPING/TANKS/PUMPS/MOVs)Wednesday, June 19, 2013Wednesday, June 26, 2013114
27FM/AFFF/HALON (PIPING/PUMPS/MOVs)Friday, June 14, 2013Friday, June 28, 2013116
28VENT SYSTEM (FUELING/HPT, ENG/CPS-Z4)Wednesday, June 19, 2013Friday, June 28, 2013116
29LP/HP AIR (PIPING/VALVES/COMPRESSORS)Friday, June 21, 2013Friday, June 28, 2013116
30MRG LO SYSTEM (PIPING/MRGs/PUMPS/FILTERS/COOLERS)Saturday, June 22, 2013Saturday, June 29, 2013117
31LO FILTER SEPARATOR PURIFIERSaturday, June 22, 2013Monday, July 01, 2013119
REMAINING FO TANKS TURNED OVER TO TESTTuesday, June 25, 2013Tuesday, July 02, 2013120
32DECK IN PILOT HOUSE COMPLETEFriday, July 05, 2013123
BLEED AIR (PIPING/VALVES)Thursday, June 27, 2013Saturday, July 06, 2013124
33STEERING (RUDDERS/RAMS/HPUs)Thursday, June 27, 2013Saturday, July 06, 2013124
34AC PLANTS / CHILL WATER SYSTEMFriday, June 28, 2013Saturday, July 06, 2013124
EOSS VALIDATION (ISEA)Wednesday, July 03, 2013Sunday, July 07, 2013125
35CPP/CRP (PIPING/SHAFTS/PUMPS/HOPM/OD BOX)Monday, June 24, 2013Sunday, July 07, 2013125
FCS TRAINING FOR SHIPS FORCE (ISEA/NAG)Wednesday, June 26, 2013Monday, July 08, 2013126
DVSS OPERATOR TRAINING (ISEA)Friday, July 05, 2013Monday, July 08, 2013126
36LUBE OIL FILTER SEPARATOR TRAINING (ISEA)Wednesday, June 26, 2013Monday, July 08, 2013126
400HZ AVAILABLETuesday, July 02, 2013Tuesday, July 09, 2013127
DIU CALIBRATIONS COMPLETEFriday, July 05, 2013Friday, July 12, 2013130
AHSS SYSTEM COMPLETE (INCL VENT MOD)Saturday, July 06, 2013Saturday, July 13, 2013131
JP5 (TANKS/TLIs/PIPING/PUMPS/FILTERS)Saturday, July 06, 2013Saturday, July 13, 2013131
37RSC TRAINING (ISEA)Monday, July 01, 2013Monday, July 15, 2013133
38FUEL SHIPWednesday, July 03, 2013Wednesday, July 17, 2013135
TIWS TRAINING (ISEA)Tuesday, July 09, 2013Monday, July 22, 2013140
VENT SYSTEM (HAB, CPS-Z1-3)Thursday, July 18, 2013Thursday, July 25, 2013143
39F/O TESTING COMPLETESaturday, July 13, 2013Saturday, July 27, 2013145
40HOT PLANT TESTING COMMENCEMonday, July 15, 2013Monday, July 29, 2013147
41NAVSSI/IFF/67/73 RADAR AVAILABLE FOR IBNS TESTINGTuesday, July 23, 2013Tuesday, July 30, 2013148
AHSS VENT VELOCITY TESTING (MSR/BIW)Monday, July 15, 2013Wednesday, July 31, 2013149
42AHSS CAL/TESTING/TRAINING (ISEA/OEM)Thursday, August 01, 2013Thursday, August 15, 2013164
AEGIS LIGHT OFFSaturday, August 03, 2013Saturday, August 17, 2013166
43AHSS CERTIFICATION (NHRC)Monday, August 05, 2013Monday, August 19, 2013168
44HAB TURNOVER / MOVE ABOARD COMMENCEThursday, August 08, 2013Thursday, August 22, 2013171
HOT PLANT TESTING COMPLETEWednesday, August 21, 2013Wednesday, September 04, 2013184
46PCDThursday, August 22, 2013Thursday, September 05, 2013185
47SHIP MOVES TO NAVSTAFriday, August 23, 2013Friday, September 06, 2013186
48SHIP LOA PREPMonday, August 26, 2013Monday, September 09, 2013189
MCS OVER THE SHOULDER TRAINING (ISEA ~5 days)Monday, August 26, 2013Monday, September 09, 2013189
IBNS OPERATOR TRAININGTuesday, September 03, 2013Monday, September 16, 2013196
49FUELING / RECEIVE JP5Thursday, September 05, 2013Thursday, September 19, 2013199
IBNS IOS/IBNS OPERATOR TRAINING BUFFERMonday, September 09, 2013Monday, September 23, 2013203
LOAMonday, September 16, 2013Monday, September 30, 2013210
51DOCK TRIALSFriday, September 20, 2013Friday, October 04, 2013214
52FAST CRUISESaturday, September 21, 2013Saturday, October 05, 2013215
53SEA TRIALSTuesday, September 24, 2013Tuesday, October 08, 2013218
IBNS TRAINING UNDERWAYTuesday, September 24, 2013Tuesday, October 08, 2013218
54END OF AVAILFriday, September 27, 2013Friday, October 11, 2013221
55FINAL SOFTWARE LOADPost Sea Trials
56TLI TESTING (FUELING AT SEA)Post Sea Trials
FOLLOW-ON IBNS MAINTENANCE TRAINING (TBD)Post Sea Trials

GEDMS Checklist

DDG61 GEDMS CHECKLIST
BSEBSEIOUC-DRNEWUSE-AUSE-B
A1Weight RmB1Supply Strm 41130ET Shop11A
A2DC LockerB2Crew 5132828ALoad Center 113A
A3PW 1-254-6-LB3Supply Support1427CO PW 02-154-1-L14A
A4PW 1-174-01-LB4Pwr Convers Rm2118Supply Strm 3
A5CSMCB5Crew 22221EM Shop22A
A6PW 1-78-01-LB6Fwd IC2320PW 2-338-1-L
A7SonarB7AUX 13112 & 13MER 231A31B
A8Crew 1B8Supply Strm 13216CCS32A32B
A9MER 1B9Crew 4332323ADC Locker33A
A10Crew 3B10Crew 63437MER 234A34B
4117Aft IC41A
4224CSER 342A
511Fwd IC51A
5355ATR 2-116-1-T
5431MER 154A
6122Rep 361A
6219Aft Steering62A
719Radio
7215Rep 572A
7326CSMC73A
7411MER 174A74C
8110CSER 281A
821414AOPS Office82A
8388AAux 183A
8425Admin84A
916GSE Shop/Gage Cal
9222ASonar 3
934CSER 1
947Sec Force Locker94A
DELETED:IOU 12 / C-DR29 IOU 52 / C-DR3

Tota # of USE = 26