Bidders Questions

View the file

Other files

File Type Posted
Attachment_L-02_Addressing_a_new_EW_Capability_Sample_Problem27JUNE2018.docx DOCX document
Attachment_L-03_AOEW_Capability_Design__Implementation_Sample_Problem27JUNE2018.docx DOCX document
Questions_Round_3_Final.xlsx XLSX spreadsheet
18-R-5133_Amendment_3.pdf PDF
Attachment_L-08_-_Cost_and_Price_Proposal_Tables_Amended_18JUN2018.xls XLS spreadsheet
18-R-5113_Amendment_2.docx DOCX document
Attachment_L-08_-_Cost_and_Price_Proposal_Tables_Updated12JUN2018.xls XLS spreadsheet
18-R-5113_Amendment_1.pdf PDF
Attachment_L-11_-_Employee_Qualifications_Form_Updated12JUN2018.xlsx XLSX spreadsheet
Bidders_Questions_and_Answers_FBO_Round_1.xlsx XLSX spreadsheet
Attachment_J-08_Consolidated_GFP_Attachment.xls.xlsx XLSX spreadsheet
Attachment_L-02_Addressing_a_new_EW_Capability_Sample_Problem.docx DOCX document
Attachment_L-01_-_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Attachment_J-02_TRM-BFTT_Tailored_Source_Selection_Sensitive.docx DOCX document
Attachment_L-08_-_Cost_and_Price_Proposal_Tables.xls XLS spreadsheet
Attachment_J-04_BEWT_II_FAT_Procedure.docx DOCX document
Exhibit_A-1_EWTS_CDRLS_Information_Package.pdf PDF
Attachment_L-07_-_Past_Performance_Questionnaire.xlsx XLSX spreadsheet
Attachment_J-01-2_-_BEWT_II_ProductionTechnical_Data_Package.docx DOCX document
Attachment_L-03_AOEW_Capability_Design__Implementation_Sample_Problem(18May2018_r1).docx DOCX document
Attachment_L-04_-_Question_Submittal_Form.doc DOC document
Attachment_J-05_IWS_Common_WBS_Structure.pptx PPTX presentation
Attachment_J-06_-_ITS_Portal_2010_Quick_Ref_Guide.pdf PDF
Attachment_L-10_-_Facility_Checklist.xlsx XLSX spreadsheet
Exhibit_A_EWTS_CDRLs_14NOV2017.pdf PDF
N00024-18-R-5113_EWTS_RFP_5.30.18.pdf PDF
Attachment_J-01_-_GFI_List_18R5113.xls XLS spreadsheet
Attachment_J-01-4_-_NULKA_Technical_Information_Package.docx DOCX document
Attachment_L-05_-_Pre-Award_Accounting_System_Adequacy_Checklist.DOC DOC document
Attachment_J-03_IWS_1IT_ITS_SEP_1_Sept_2015.pdf PDF
Attachment_J-01-5_-_BEWT_ISEA_Support_Technical_Information_Package.docx DOCX document
Attachment_L-09_-_Contractor_Award_Information.docx DOCX document
Attachment_L-11_-_Employee_Qualifications_Form.xlsx XLSX spreadsheet
Attachment_L-06_-_Previous_Contract_Effort_Narratives.docx DOCX document
Attachment_J-01-1_-_SEWTT_Technical_Information_Package.docx DOCX document
Attachment_J-01-3_-_CIAT_Technical_Information_Package.docx DOCX document
Attachment_J-07_18-R-5113_DD254_Signed.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

GOVERNMENT RESPONSES TO EWTS SOLICITATION #N00024-18-R-5113

COMMENTS/QUESTIONS

- In the event of a conflict between the RFP and the Government responses to the Draft RFP questions, the RFP will govern.

- Answers to classified questions, if not addressed below, will be included with the release of the RFP

Tracker #DocumentPage #Section/
ParagraphQuestion/CommentProposed Action/ChangeAnswer
20RFP39C.3.2.9GFM Storage is required per the RFP Para C.3.2.9, but GFM that would be stored is not.Specify what currently required or anticipated Government Furnished Property (GFP) (GFE or GFM) is required to be stored per RFP Para C.3.2.9 in support of BEWT II production.The offeror should use Attachment J-08 Consolidated GFP Attachment as their guide for GFM storage.
21Attachment J-01-2 BEWT II Production TDP / BEWT II-TECH MANUALBEWT II TM pgs. 294, 295, 296Lower left corner of drawings0015-021-28-0020 (CABLE ASSEMBLY, IMU J6 TO AN/SLQ-32B LAN, IMU) and BEWT II-TECH MANUAL drawings, 0015-021-28-0019 (CABLE ASSEMBLY, J1 POWER, IMU), 0015-021-28-0020 (CABLE ASSEMBLY, IMU J6 TO AN/SLQ-32B LAN, IMU) and 0015-021-28-0021 (CABLE ASSEMBLY, IMU J7 TO BFTT LAN, IMU) all indicate “SUPPLIED BY OTHERS”.Clarify whether the three items “SUPPLIED BY OTHERS” are GFM that would be required to the stored per RFP Para C.3.2.9.The Government has considered the recommendation and determined no change to the solicitation is necessary. The called out cabling are all cables connecting the BEWT II system to the existing shipboard systems. These specific cables are provided by the Navy's installation contractor at the time of installation and are not supplied by, or the responsibility of, the BEWT II production contractor.
22Attachment J-04, BEWT II FAT Procedure7Figure 3.1.4-1Drawing included in this figure (0015-02-57-0001) is not in the TDP. In addition, that drawing in not on the Drawing List (0015-02-00-0002). There is a drawing with the same title but different drawing number in the TDP-- 0015-02-57-0010.Please confirm this drawing is the current system level interconnection drawing.The Government has considered the recommendation and determined no change to the solicitation is necessary. The drawings are current. Drawing labeled 0015-02-57-0001 is a typo and should be labled 0015-02-57-0010.
23Attachment J-04, BEWT II FAT ProcedureCover PageNAThe statement on the cover page indicates software required for FAT will be provided on award.Please provide technical specifications for any non-GFE computers required (other than the BEWT laptop) to run the FAT test software.The Government has considered the recommendation and determined no change to the solicitation is necessary. The hardware required for the FAT of the FAU is included in the Consolidated GFP Attachment J-08.
24RFP Section M1344.3 / Technical Plans and Engineering ApproachFirst sentence states: “The Government will evaluate the software development process it [emphasis added] will use to complete each [SEWTT, CIAT and NULKA development process the Offeror will use…”? “Offeror” is not referenced in that sentence; so “it” refers to the government--evaluating its own process? Was it intended to say “…will evaluate the software Capability TIP].Please confirm if the sentence should read: “The Government will evaluate the software development process the Offeror will use to complete each [SEWTT, CIAT and NULKA Capability TIP]”.The solicitation has been updated to clarify the meaning of the paragraph.
25Solicitation1153.1.2 Labor Mix TableRequires Offors to “…categorize proposed personnel using the years of experience specified in the Labor Mix Table…” and to “.. provide the rationale used in selecting the proposed labor mix or allocation.” if different.Provide guidance / instruction on where to report this information.The Government has considered the recommendation and determined no change to the solicitation is necessary. Provide your rational in Attachment L-08, tab L-08-B.
26Attachment L-08n/aInstructions / Tab ESpreadsheet refers to CLIN 0009 for the FAU; there is no CLIN 0008Modify to state CLIN 0008 is the FAUThe Government has considered the recommendation and determined a change to the solicitation is necessary. Tab L-08-E of Attachmanet L-08 CLIN 0009 has been changed to CLIN 0008.
27Attachment L-08 / Cost and Price Proposal TablesN/AAttachment L-08Can sheets be linked to one another so information entered on one sheet can auto-populate to a different sheet where the same information is to be entered?Allow linking of information to ensure information is presented correcting on related worksheets. Provide additional detailed instructions on how the Cost Template is to be completed.Per Section L, 3.2.1, "All MS Excel files must have formulas clearly evident, editable, and functioning. MS Excel spreadsheets must be linked to other cells within the same workbook or worksheet (e.g., direct labor = hours x direct labor rate). Cells may not be linked to cells in other workbooks (i.e., separate files)."
28Attachment L-08 / Cost and Price Proposal TablesN/AAttachment L-08 /Sheet L-08A/Total Proposed Rate ColumnPlease explain what information should be entered in the “Proposed Rate Column” under the “Total” Section.Please provide additional instructions.The Government has considered the recommendation and determined no change to the solicitation is necessary. Column B is the Total hours across all years for each Labor Category. Column C is the Total Proposed Rate (composite) across all years for each Labor Category. Column D is the Total Proposed Dollars (less fee). Column B times Column C equals Column D.
29Attachment L-08 / Cost and Price Proposal TablesN/AAttachment L-08 / Sheet L-08B / Current Clearance ColumnHow should we enter the clearance information if we have more than one individual under the same labor category?Please provide additional instructions.The Government has considered the recommendation and determined no change to the solicitation is necessary. Since all personnel tasked on this contract must have a minimum clearance of Secret, Solictation page 114, enter the lowest currently held clearance for personnel sharing a labor category.
30Solicitation113/114 & 1203.1.2.3 Factor 3: Technical Approach / 2. Key Personnel

3.2.1. Factor 6: Cost and Price

Section 2.1.1 Direct and Indirect Costs / Paragraph a.iii This section states that salary information shall not be included in the letters of intent. However, Section 2.2.1 on Page 120 states that letters of intent must include “agreed to salary”. We are assuming that two (2) versions of the Letter of Intent are required. One without salary for the Technical Volume and one with salary for the Cost Volume. Please confirm and/or provide clarification regarding this requirement. The Government has considered the recommendation and determined no change to the solicitation is necessary. The assumption is correct. No Cost/Price information shall be inclued in any volume other than Volume V. Letters of Intent are only required for Key Personnel, whether current employees or future employees to be included in Volume IV with no Cost/Price information. A second set of Letters of Intent for non-current future employees, key and non-key, shall be included in Volume V to include agreed to salary information.