Attachment_L-08_-_Cost_and_Price_Proposal_Tables.xls

XLS spreadsheet 127 KB Posted

Attached to
Electronic Warfare Training Systems (EWTS)
Solicitation number
N00024-18-R-5113
Issued by

About this file

L-08 Cost and Price Proposal Tables

View the file

Other files

File Type Posted
Attachment_L-02_Addressing_a_new_EW_Capability_Sample_Problem27JUNE2018.docx DOCX document
Attachment_L-03_AOEW_Capability_Design__Implementation_Sample_Problem27JUNE2018.docx DOCX document
Questions_Round_3_Final.xlsx XLSX spreadsheet
18-R-5133_Amendment_3.pdf PDF
N00024-18-R-5113_Bidders_Questions_Final.xlsx XLSX spreadsheet
Attachment_L-08_-_Cost_and_Price_Proposal_Tables_Amended_18JUN2018.xls XLS spreadsheet
18-R-5113_Amendment_2.docx DOCX document
Attachment_L-08_-_Cost_and_Price_Proposal_Tables_Updated12JUN2018.xls XLS spreadsheet
18-R-5113_Amendment_1.pdf PDF
Attachment_L-11_-_Employee_Qualifications_Form_Updated12JUN2018.xlsx XLSX spreadsheet
Bidders_Questions_and_Answers_FBO_Round_1.xlsx XLSX spreadsheet
Attachment_J-08_Consolidated_GFP_Attachment.xls.xlsx XLSX spreadsheet
Attachment_L-02_Addressing_a_new_EW_Capability_Sample_Problem.docx DOCX document
Attachment_L-01_-_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Attachment_J-02_TRM-BFTT_Tailored_Source_Selection_Sensitive.docx DOCX document
Attachment_J-04_BEWT_II_FAT_Procedure.docx DOCX document
Exhibit_A-1_EWTS_CDRLS_Information_Package.pdf PDF
Attachment_L-07_-_Past_Performance_Questionnaire.xlsx XLSX spreadsheet
Attachment_J-01-2_-_BEWT_II_ProductionTechnical_Data_Package.docx DOCX document
Attachment_L-03_AOEW_Capability_Design__Implementation_Sample_Problem(18May2018_r1).docx DOCX document
Attachment_L-04_-_Question_Submittal_Form.doc DOC document
Attachment_J-05_IWS_Common_WBS_Structure.pptx PPTX presentation
Attachment_J-06_-_ITS_Portal_2010_Quick_Ref_Guide.pdf PDF
Attachment_L-10_-_Facility_Checklist.xlsx XLSX spreadsheet
Exhibit_A_EWTS_CDRLs_14NOV2017.pdf PDF
N00024-18-R-5113_EWTS_RFP_5.30.18.pdf PDF
Attachment_J-01_-_GFI_List_18R5113.xls XLS spreadsheet
Attachment_J-01-4_-_NULKA_Technical_Information_Package.docx DOCX document
Attachment_L-05_-_Pre-Award_Accounting_System_Adequacy_Checklist.DOC DOC document
Attachment_J-03_IWS_1IT_ITS_SEP_1_Sept_2015.pdf PDF
Attachment_J-01-5_-_BEWT_ISEA_Support_Technical_Information_Package.docx DOCX document
Attachment_L-09_-_Contractor_Award_Information.docx DOCX document
Attachment_L-11_-_Employee_Qualifications_Form.xlsx XLSX spreadsheet
Attachment_L-06_-_Previous_Contract_Effort_Narratives.docx DOCX document
Attachment_J-01-1_-_SEWTT_Technical_Information_Package.docx DOCX document
Attachment_J-01-3_-_CIAT_Technical_Information_Package.docx DOCX document
Attachment_J-07_18-R-5113_DD254_Signed.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Solicitation N00024-18-R-5113 Attachment L-08
CLINDescriptionForm L-08-AForm L-08BForm L-08-CForm L-08-DForm L-08-E
0001Training Syst. Eng. and Tech SupportXXXX
1001Training Syst. Eng. and Tech SupportXXXX
2001Training Syst. Eng. and Tech SupportXXXX
3001Training Syst. Eng. and Tech SupportXXXX
4001Training Syst. Eng. and Tech SupportXXXX
0005BEWT II ProductionX
1005BEWT II ProductionX
2005BEWT II ProductionX
3005BEWT II ProductionX
4005BEWT II ProductionX
0007Depot Repair and ISEA SupportXXXX
1007Depot Repair and ISEA SupportXXXX
2007Depot Repair and ISEA SupportXXXX
3007Depot Repair and ISEA SupportXXXX
4007Depot Repair and ISEA SupportXXXX
0009FAU/BEWT IIX

L-08-A

Solicitation #: N00024-18-R-5113Offeror:
Offeror Proposal #:Offeror POC:
CLINs 0001, 0007, 1001, 1007, 2001, 2007, 3001, 3007, 4001, 4007TotalBase YearOption Year 1Option Year 2Option Year 3Option Year 4
Proposed HoursProposed RateTotal Proposed DollarsProposed HoursProposed RateTotal Proposed DollarsProposed HoursProposed RateTotal Proposed DollarsProposed HoursProposed RateTotal Proposed DollarsProposed HoursProposed RateTotal Proposed DollarsProposed HoursProposed RateTotal Proposed Dollars
Prime Contractor Direct Labor Cost
Labor Category 1
Labor Category 2
Labor Category 3
Labor Category 4
Labor Category 5
etc.
Total Direct Labor
Prime Contractor Indirect Labor Cost
Overhead
Fringe Benefits
Etc.
Total Indirect Labor Cost
Total Prime Contractor Labor Cost
Subcontractor Labor Cost
Subcontractor 1 Labor Category
Subcontractor 2 Labor Category
Etc.
Total Direct Labor
Subcontractor Indirect Labor Cost
Handling
G&A
Other (if any)
Total Indirect Labor Cost
Total Subcontractor Labor Cost
TOTAL COSTS ($)
COM
Fee ($)
Fee (%)
Total ESTIMATED COSTS ($) Plus Fixed Fee
Composite Rate (Total Dollars Proposed/Total Hours)
Add or delete rows as necessary

&CAttachment 5 Cost and Price Workbook and Supporting Labor Data

L-08-B

Solicitation #: N00024-18-R-5113Offeror:
Offeror Proposal #:Offeror POC:
CLINs 0001, 1001, 2001, 3001, 4001TotalBase YearOption Year 1Option Year 2Option Year 3Option Year 4
Government Labor CategoriesCurrent ClearanceOfferor/Subcontractor Labor CategoriesNotional Labor Hours All YearsNotional % Labor Mix Per YearFully Loaded Cost TotalBase Yr% Labor MixLoaded Hourly RateFully Loaded Base YrOpt 1% Labor MixLoaded Hourly RateFully Loaded Opt 1 YrOpt 2% Labor MixLoaded Hourly RateFully Loaded Opt 2 YrOpt 3% Labor MixLoaded Hourly RateFully Loaded Opt 3 YrOpt 4% Labor MixLoaded Hourly RateFully Loaded Opt 4 Yr
Program Manager - EE/ME (Key Personnel)9,6004.4%$ - 01,9204.4%$ - 0$ - 01,9204.4%$ - 0$ - 01,9204.3%$ - 0$ - 01,9204.4%$ - 0$ - 01,9204.5%$ - 0$ - 0
Assistant PM/Senior Engineer - EE/ME(Key Personnel)9,6004.4%$ - 01,9204.4%$ - 0$ - 01,9204.4%$ - 0$ - 01,9204.3%$ - 0$ - 01,9204.4%$ - 0$ - 01,9204.5%$ - 0$ - 0
Senior Engineer - EE/ME19,2008.8%$ - 03,8408.9%$ - 0$ - 03,8408.7%$ - 0$ - 03,8408.6%$ - 0$ - 03,8408.8%$ - 0$ - 03,8409.0%$ - 0$ - 0
Mid-Level Engineer - EE/ME19,2008.8%$ - 03,8408.9%$ - 0$ - 03,8408.7%$ - 0$ - 03,8408.6%$ - 0$ - 03,8408.8%$ - 0$ - 03,8409.0%$ - 0$ - 0
Project Engineer - EE/ME19,2008.8%$ - 03,8408.9%$ - 0$ - 03,8408.7%$ - 0$ - 03,8408.6%$ - 0$ - 03,8408.8%$ - 0$ - 03,8409.0%$ - 0$ - 0
Hardware Designer/Technician19,2008.8%$ - 03,8408.9%$ - 0$ - 03,8408.7%$ - 0$ - 03,8408.6%$ - 0$ - 03,8408.8%$ - 0$ - 03,8409.0%$ - 0$ - 0
Senior Software Engineer (Key Personnel)19,2008.8%$ - 03,8408.9%$ - 0$ - 03,8408.7%$ - 0$ - 03,8408.6%$ - 0$ - 03,8408.8%$ - 0$ - 03,8409.0%$ - 0$ - 0
Software Designer48,00022.0%$ - 09,60022.2%$ - 0$ - 09,60021.8%$ - 0$ - 09,60021.5%$ - 0$ - 09,60022.1%$ - 0$ - 09,60022.5%$ - 0$ - 0
Senior Project Analyst22,48910.3%$ - 03,8939.0%$ - 0$ - 04,64910.6%$ - 0$ - 04,64910.4%$ - 0$ - 04,64910.7%$ - 0$ - 04,64910.9%$ - 0$ - 0
Project Analyst13,2846.1%$ - 02,8806.7%$ - 0$ - 02,9346.7%$ - 0$ - 03,6018.1%$ - 0$ - 02,2685.2%$ - 0$ - 01,6013.7%$ - 0$ - 0
Test & Certification/QA Specialist9,6004.4%$ - 01,9204.4%$ - 0$ - 01,9204.4%$ - 0$ - 01,9204.3%$ - 0$ - 01,9204.4%$ - 0$ - 01,9204.5%$ - 0$ - 0
Technical Writer9,6004.4%$ - 01,9204.4%$ - 0$ - 01,9204.4%$ - 0$ - 01,9204.3%$ - 0$ - 01,9204.4%$ - 0$ - 01,9204.5%$ - 0$ - 0
Total218,173100.0%$ - 043,253100.0%44,063100.0%44,730100.0%43,397100.0%42,730100.0%
*Loaded Hourly Rate is exclusive of FCCOM and fee
TotalBase YearOption Year 1Option Year 2Option Year 3Option Year 4
Composite Rate$ - 0Composite Rate$ - 0Composite Rate$ - 0Composite Rate$ - 0Composite Rate$ - 0Composite Rate$ - 0
Total Cost$ - 0Total Cost$ - 0Total Cost$ - 0Total Cost$ - 0Total Cost$ - 0Total Cost$ - 0
FCCOM$ - 0FCCOM$ - 0FCCOM$ - 0FCCOM$ - 0FCCOM$ - 0FCCOM$ - 0
Fixed Fee$ - 0Fixed Fee0%$ - 0Fixed Fee0%$ - 0Fixed Fee0%$ - 0Fixed Fee0%$ - 0Fixed Fee0%$ - 0
Total CPFF$ - 0Total CPFF$ - 0Total CPFF$ - 0Total CPFF$ - 0Total CPFF$ - 0Total CPFF$ - 0
Fully Burdened Composite Rate$ - 0Fully Burdened Composite Rate$ - 0Fully Burdened Composite Rate$ - 0Fully Burdened Composite Rate$ - 0Fully Burdened Composite Rate$ - 0Fully Burdened Composite Rate$ - 0
CLINs 0007, 1007, 2007, 3007, 4007
Government Labor CategoriesCurrent ClearanceOfferor/Subcontractor Labor CategoriesNotional Labor Hours All YearsNotional % Labor Mix Per YearFully Loaded Cost TotalBase Yr% Labor MixLoaded Hourly RateFully Loaded Base YrOpt 1% Labor MixLoaded Hourly RateFully Loaded Opt 1 YrOpt 2% Labor MixLoaded Hourly RateFully Loaded Opt 2 YrOpt 3% Labor MixLoaded Hourly RateFully Loaded Opt 3 YrOpt 4% Labor MixLoaded Hourly RateFully Loaded Opt 4 Yr
Project Analyst14,400100.0%$ - 02,880100.0%$ - 0$ - 02,880100.0%$ - 0$ - 02,880100.0%$ - 0$ - 02,880100.0%$ - 0$ - 02,880100.0%$ - 0$ - 0
TotalBase YearBase YearBase YearBase YearBase Year
Composite Rate$ - 0Composite Rate$ - 0Composite Rate$ - 0Composite Rate$ - 0Composite Rate$ - 0Composite Rate$ - 0
Total Cost$ - 0Total Cost$ - 0Total Cost$ - 0Total Cost$ - 0Total Cost$ - 0Total Cost$ - 0
FCCOM$ - 0FCCOM$ - 0FCCOM$ - 0FCCOM$ - 0FCCOM$ - 0FCCOM$ - 0
Fixed Fee$ - 0Fixed Fee0%$ - 0Fixed Fee0%$ - 0Fixed Fee0%$ - 0Fixed Fee0%$ - 0Fixed Fee0%$ - 0
Total CPFF$ - 0Total CPFF$ - 0Total CPFF$ - 0Total CPFF$ - 0Total CPFF$ - 0Total CPFF$ - 0
Fully Burdened Composite Rate$ - 0Fully Burdened Composite Rate$ - 0Fully Burdened Composite Rate$ - 0Fully Burdened Composite Rate$ - 0Fully Burdened Composite Rate$ - 0Fully Burdened Composite Rate$ - 0
*Loaded Hourly Rate is exclusive of FCCOM and fee
Percent of Time on This Contract
Key PersonnelBase YearOption Year 1Option Year 2Option Year 3Option Year 4
Program Managerr - EE/ME
Assistant PM/Senior Engineer - EE/ME
Senior Software Engineer - EE/ME

L-08-C

Solicitation #: N00024-18-R-5113Offeror:
Offeror Proposal #:Offeror POC:
Rates TableSupporting Data
Proposed RatesCurrentReason for difference between CY17 actual current rates and CY18 proposed ratesHistorical Actuals
Rates CategoryCY18CY19CY20CY21CY22Rates CategoryCY17CY16CY15CY14
EscalationEscalation
Escalation %Escalation %
Direct Labor RateDirect Labor Rate
Category 1Category 1
Category 2Category 2
Category nCategory n
Indirect RateIndirect Rate
Category 1Category 1
Category 2Category 2
Category nCategory n
General & Adminstrative RateGeneral & Adminstrative Rate
Category 1Category 1
Category 2Category 2
Category nCategory n
Other RateOther Rate
Category 1Category 1
Category 2Category 2
Category nCategory n
Facility Capital Cost of Money RateFacility Capital Cost of Money Rate
Category 1Category 1
Category 2Category 2
Category nCategory n
Prepare one of these forms as needed for each CY and each labor category as applicable
Round direct labor rates to 2 decimals, indirect rates to 2 decimals, and G&A and FCCOM to 3 decimals

L-08-D

Solicitation #: N00024-18-R-5113Offeror:
Offeror Proposal #:Offeror POC:
BEWT II Production Stepladder Pricing
ItemFrom QuantityTo QuantityUnit Price
000515$ - 0
610$ - 0
1115$ - 0
1620$ - 0
100515$ - 0
610$ - 0
1115$ - 0
1620$ - 0
200515$ - 0
610$ - 0
1115$ - 0
1620$ - 0
300515$ - 0
610$ - 0
1115$ - 0
1620$ - 0
400515$ - 0
610$ - 0
1115$ - 0
1620$ - 0

L-08-E

Solicitation #: N00024-18-R-5113Offeror:
Offeror Proposal #:Offeror POC:
Section B Pricing
CLINDescriptionTypeFirm/OptionQTYUnitUnit PriceTotalEst. CostFixed Fee $
0001Training Syst. Eng. And Tech SupportCPFFFirm43,253Hrs$ - 0$ - 0$ - 0$ - 0
0002DataNSPFirm
0003ODC MaterialCostFirm1Lot$ 264,500.00$ 264,500.00
0004TravelCostFirm1Lot$ 49,500.00$ 49,500.00
0005BEWT II ProductionFFPOption20Ea
0006Storage - Non ProductionCostOption1,000Sq Ft
0007Depot Repair/ISEA SupportCPFFOption2,880Hrs$ - 0$ - 0$ - 0$ - 0
0009FAU/BEWT IIFFPFirm1Ea$ - 0
Total Base$ 314,000.00
1001Training Syst. Eng. And Tech SupportCPFFOption44,063Hrs$ - 0$ - 0$ - 0$ - 0
1003ODC MaterialCostOption1Lot$ 356,827.00$ 356,827.00
1004TravelCostOption1Lot$ 65,793.00$ 65,793.00
1005BEWT II ProductionFFPOption20Ea
1006Storage - Non ProductionFFPOption1,000Sq Ft
1007Depot Repair/ISEA SupportCPFFOption2,880Hrs$ - 0$ - 0$ - 0$ - 0
Total OY 1$ 422,620.00
2001Training Syst. Eng. And Tech SupportCPFFOption44,730Hrs$ - 0$ - 0$ - 0$ - 0
2003ODC MaterialCostOption1Lot$ 356,827.00$ 356,827.00
2004TravelCostOption1Lot$ 65,793.00$ 65,793.00
2005BEWT II ProductionFFPOption20Ea
2006Storage - Non ProductionFFPOption1,000Sq Ft
2007Depot Repair/ISEA SupportCPFFOption2,880Hrs$ - 0$ - 0$ - 0$ - 0
Total OY 2$ 422,620.00
3001Training Syst. Eng. And Tech SupportCPFFOption43,397Hrs$ - 0$ - 0$ - 0$ - 0
3003ODC MaterialCostOption1Lot$ 272,677.00$ 272,677.00
3004TravelCostOption1Lot$ 50,943.00$ 50,943.00
3005BEWT II ProductionFFPOption20Ea
3006Storage - Non ProductionFFPOption1,000Sq Ft
3007Depot Repair/ISEA SupportCPFFOption2,880Hrs$ - 0$ - 0$ - 0$ - 0
Total OY 3$ 323,620.00
4001Training Syst. Eng. And Tech SupportCPFFOption42,730Hrs$ - 0$ - 0$ - 0$ - 0
4003ODC MaterialCostOption1Lot$ 182,900.00$ 182,900.00
4004TravelCostOption1Lot$ 35,100.00$ 35,100.00
4005BEWT II ProductionFFPOption20Ea
4006Storage - Non ProductionFFPOption1,000Sq Ft
4007Depot Repair/ISEA SupportCPFFOption2,880Hrs$ - 0$ - 0$ - 0$ - 0
Total OY 4$ 218,000.00
Total$ 1,700,860.00
Gray cells shall not be filled in