Med Corridor1.jpeg
JPEG file 3 MB Posted
- Solicitation number
- S-29100-00017268
- Issued by
- Oregon
About this file
This file is a photograph related to the Oregon Department of Corrections' pharmacy remodel project at Oregon State Correctional Institution in Salem. The image appears to show a corridor or medical facility layout diagram labeled "Med Corridor1," which likely depicts the architectural planning or design elements relevant to the Health Services facility medical unit renovation project.
The pharmacy remodel project encompasses demolition and new construction work including mechanical systems (HVAC equipment, ductwork, and piping), electrical systems (LED lighting, power distribution, branch circuits, exit signs, and fire alarm integration), plumbing, structural work, and finish work across multiple areas including exam rooms, offices, a dental area, vestibule, corridor, and stair areas. A mandatory pre-bid conference is scheduled for June 30, 2026 at 1:00 p.m. PST at the facility, with attendance required or bids will be rejected. Bids are due July 21, 2026 at 2:00 p.m. PST. Project start is ten calendar days from the Notice to Proceed, with substantial completion required by September 25, 2026 and final completion by October 2, 2026. The estimated contract value ranges from $150,000 to $250,000, with bid security of ten percent of the total bid amount required. The successful bidder must provide performance and payment bonds each equal to 100 percent of the awarded contract amount and proof of insurance within ten calendar days of award notification. Work must comply with the 2025 Oregon Structural, Mechanical, and Electrical Specialty Codes; the 2023 Oregon Plumbing Specialty Code; and the 2022 Oregon Fire Code. Bidders must be registered with the Oregon Construction Contractors Board and comply with prevailing wage requirements for Marion County, Region 3, with an apprentice requirement mandating that contractors employ apprentices to perform 12 percent of work hours in apprenticeable occupations. Liquidated damages are assessed at $310.00 per calendar day for missed completion dates. No federal funding is used for this project.
Other files
| File | Type | Posted |
|---|---|---|
| Med Basement enterance.jpeg | JPEG file | |
| Med Dental hall.jpeg | JPEG file | |
| Med Dental.jpeg | JPEG file | |
| Med Corridor.jpeg | JPEG file | |
| Med Dental Door.jpeg | JPEG file | |
| Med Basement Panel.jpeg | JPEG file | |
| Med Basement Panel Wall.jpeg | JPEG file | |
| 17268 ITB TCs.pdf | ||
| Med Basement Door.jpeg | JPEG file | |
| Med Basement enterance1.jpeg | JPEG file | |
| Med North Office area.jpeg | JPEG file | |
| Med Basement Stair up.jpeg | JPEG file | |
| Med Basement Panel area 2.jpeg | JPEG file | |
| Med Office1.jpeg | JPEG file | |
| Med Basement Panel area.jpeg | JPEG file | |
| 17268 Scope Specs.pdf | ||
| Med Basement Panel area1.jpeg | JPEG file | |
| Med Enterance.jpeg | JPEG file | |
| Med Basement Panel Floor.jpeg | JPEG file | |
| Med Enterance1.jpeg | JPEG file | |
| 17268 Plans.pdf | ||
| Med Door.jpeg | JPEG file | |
| 17268 Plan Holder List.pdf | ||
| Med Office.jpeg | JPEG file | |
| Med Office2.jpeg | JPEG file | |
| Med Basement south of Panel.jpeg | JPEG file | |
| 17268 ADDENDA 1.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .