Med Corridor.jpeg

JPEG file 2 MB Posted

Attached to
Oregon State Correctional Institution Pharmacy Remodel
Solicitation number
S-29100-00017268
Issued by
Oregon

About this file

This file is an image related to a pharmacy remodel project at the Oregon State Correctional Institution in Salem, managed by the Oregon Department of Corrections. The image depicts a medical corridor layout and serves as a supporting exhibit for the Invitation to Bid issued for the facility remodel. The scope of work includes demolition and new construction of the Health Services facility medical unit, encompassing mechanical systems (HVAC equipment, ductwork, and piping), electrical systems (LED lighting, power distribution, branch circuits, exit signs, and fire alarm integration), plumbing, structural work, and finish work across exam rooms, offices, a dental area, vestibule, corridor, and stair areas. A mandatory pre-bid conference is scheduled for June 30, 2026 at 1:00 p.m. PST at the facility, with attendance required or bidders risk rejection. Bids are due July 21, 2026 at 2:00 p.m. PST. Project start is ten calendar days from the Notice to Proceed, with substantial completion required by September 25, 2026 and final completion by October 2, 2026.

The estimated contract value ranges from $150,000 to $250,000, with no federal funding used. Bidders must be registered with the Oregon Construction Contractors Board and comply with prevailing wage requirements for Marion County, Region 3, as established by the Bureau of Labor and Industries. An apprentice requirement mandates that contractors employ apprentices to perform 12 percent of work hours in apprenticeable occupations. Bid security of ten percent of the total bid amount is required, and the successful bidder must furnish performance and payment bonds each equal to 100 percent of the awarded contract amount within ten calendar days of award notification. Work must comply with the 2025 Oregon Structural, Mechanical, and Electrical Specialty Codes, the 2023 Oregon Plumbing Specialty Code, and the 2022 Oregon Fire Code. Liquidated damages are assessed at $310.00 per calendar day for missed completion dates, and a $10,000 contingency allowance applies for detention door, frame, and hardware changes. The facility owner maintains occupancy in adjacent areas throughout construction, requiring coordination with existing mechanical, electrical, fire alarm, security, and telecom systems.

Other files

File Type Posted
Med Basement enterance.jpeg JPEG file
Med Dental hall.jpeg JPEG file
Med Dental.jpeg JPEG file
Med Dental Door.jpeg JPEG file
Med Basement Panel.jpeg JPEG file
Med Basement Panel Wall.jpeg JPEG file
17268 ITB TCs.pdf PDF
Med Basement Door.jpeg JPEG file
Med Basement enterance1.jpeg JPEG file
Med North Office area.jpeg JPEG file
Med Basement Stair up.jpeg JPEG file
Med Corridor1.jpeg JPEG file
Med Basement Panel area 2.jpeg JPEG file
Med Office1.jpeg JPEG file
Med Basement Panel area.jpeg JPEG file
17268 Scope Specs.pdf PDF
Med Basement Panel area1.jpeg JPEG file
Med Enterance.jpeg JPEG file
Med Basement Panel Floor.jpeg JPEG file
Med Enterance1.jpeg JPEG file
17268 Plans.pdf PDF
Med Door.jpeg JPEG file
17268 Plan Holder List.pdf PDF
Med Office.jpeg JPEG file
Med Office2.jpeg JPEG file
Med Basement south of Panel.jpeg JPEG file
17268 ADDENDA 1.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .