CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 0103, 0210, 0302
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
M67854-16-R-0217
F. CONTRACTOR
1. DATA ITEM NO.
B001
2. TITLE OF DATA ITEM
Contractor’s Progress, Status and Management Report
3. SUBTITLE
Monthly Status Report (MSR)17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80227
5. CONTRACT REFERENCE
SEE BLK 16
6. REQUIRING OFFICE
PEO LS, CAC2S
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION18. ESTIMATED TOTAL PRICE
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4 - In addition to the DID requirements, the MSR shall include Program Management, Government Furnished Property Management, Engineering, Manufacture, Assembly and Testing activities. Paragraphs 10.3.f, 10.3.g, 10.3.h, and 10.3.i of DI-MGMT-80227 are not required.
Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, Power Point, Visio, and Project).
BLK 5 - SOW paragraphs 3.3.1, 3.3.1.3, 3.3.1.4, 3.3.1.5, 3.3.1.6, 3.3.1.7, 3.3.1.12, 3.3.1.12.1, 3.3.1.13, 3.3.1.15, 3.4.4.1, 3.4.4.9, 3.4.4.16, 3.4.4.22.
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10 -13 - The reporting period will be from the first to last business day of each month, with the initial report submitted electronically, no later than 30 calendar days after Post Award Conference. Subsequent reports should be submitted electronically by the 10th of each month. The Government shall provide comments to the Contractor no later than 15 calendar days of receiving this data deliverable. If changes are required, those changes shall be incorporated in the following month’s MSR.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil DCMA: TBD at Contract Award
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| DCMA |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 2 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 0103, 0210, 0302
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B002
2. TITLE OF DATA ITEM
Conference Minutes
3. SUBTITLE
Meeting Minutes17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81250A
5. CONTRACT REFERENCE
SEE BLK 16
6. REQUIRING OFFICE
PEO LS, CAC2S
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION18. ESTIMATED TOTAL PRICE
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4 - Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, Power Point, Visio).
BLK 5 - SOW paragraphs: 3.3.1.2, 3.3.1.3, 3.3.1.4, 3.3.1.5, 3.3.1.6, 3.3.1.7, 3.4.4.1, 3.4.4.16, 3.4.4.22, 3.4.4.29.
BLK 9 –Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10 -13 - Submit electronically no later than 10 calendar days after each meeting, review, conference, or audit for Government review. The Government requires 7 calendar days to review this data deliverable. If changes are required, the Contractor shall resubmit the deliverable no later than 7 calendar days after receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 1 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 0103, 0210, 0302
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B003
2. TITLE OF DATA ITEM
Conference Agenda
3. SUBTITLE
Meeting Agenda
| 4. AUTHORITY (Data Acquisition Document No.) DI-ADMIN-81249A |
| 5. CONTRACT REFERENCE |
6. REQUIRING OFFICE 17. PRICE GROUP
PEO LS, CAC2S
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES18. ESTIMATED TOTAL PRICE |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4 - Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, Power Point, Visio).
BLK 5 - SOW paragraphs: 3.3.1.2, 3.3.1.4, 3.3.1.5, 3.3.1.6, 3.3.1.7, 3.4.4.1, 3.4.4.16, 3.4.4.22.
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10 -13 - Submit electronically no less than 14 calendar days prior to each meeting, review, conference, or audit for Government review. The Government requires 5 calendar days within receipt to review this data deliverable. If changes are required, the Contractor shall resubmit the deliverable no later than 2 calendar days after receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 1 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 0103, 0210, 0302
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B004
2. TITLE OF DATA ITEM
Briefing Material
3. SUBTITLE
| 4. AUTHORITY (Data Acquisition Document No.) DI-MGMT-81605 |
| 5. CONTRACT REFERENCE |
6. REQUIRING OFFICE 17. PRICE GROUP
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final18. ESTIMATED TOTAL PRICE |
| Reg |
| Repro |
16. REMARKS
BLK 4 - Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, Power Point, Visio).
BLK 5 - SOW paragraphs: 3.3.1.2, 3.3.1.4, 3.3.1.5, 3.3.1.6, 3.3.1.7, 3.4.4.1, 3.4.4.16, 3.4.4.22.
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10 -13 - Submit electronically no less than 14 calendar days prior to each meeting, review, conference, or audit for Government review. The Government requires 5 calendar days to review this data deliverable. If changes are required, the Contractor shall resubmit the deliverable no later than 2 calendar days after receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 1 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 0103, 0210, 0302
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B005
2. TITLE OF DATA ITEM
Integrated Program Management Report
3. SUBTITLE17. PRICE GROUP
Integrated Master Schedule
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81861A
5. CONTRACT REFERENCE
SOW 3.3.1.4, 3.3.1.9
6. REQUIRING OFFICE
PEO LSCAC2S18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4 - The Contractor shall provide monthly IPMRs per DID DI-MGMT-81861A except as modified per the following:
Formats 1 thru 4, and 7 instructions:
A.) ‘2.8.2. When EVM DFARS is Not Applicable’: Formats 1 through 4, and Format 7, are not applicable to this CDRL.
Formats 5 and 6 instructions:
B.) ‘2.4. Subcontractor Requirement’ and ‘3.7.1.1.2. Subcontractor Flowdown’: Separate Formats 5 and 6 for each subcontractor, with an IPMR DID Format 6 flow down requirement, shall be delivered with the Prime’s IPMR CDRL delivery. All tailoring instructions denoted in ‘Block 16’ of this CDRL also apply to the Prime’s subcontractor IPMR deliverables.
C.) ‘2.8.2. When EVM DFARS is Not Applicable’: The following sections of the IPMR DID are applicable (omitting references to Formats 1-4 and 7): 1.3, 1.4, 1.5, 2.1.1, 2.1.1.2, 2.2.5, 2.3, 2.4, 2.5.1, 2.6.1, 2.7, 3.6.7 thru 3.6.7.5, 3.6.11.2, 3.6.11.3, and 3.7 thru 3.7.3.
Format 5 instructions:
D.) ‘2.2.4. Native Variance Analysis Format’: Format 5 shall be submitted in any electronic file format (e.g., Excel, Word, or PDF) that facilitates human readability.
Format 6 instructions:
E.) ‘2.2.5. Native Schedule Format’: In addition to the XML electronic schema submission, Format 6(s) shall be provided in Microsoft Project 2010.
F.) ‘3.7.1.3.6. Schedule Risk Assessment (SRA)’: Unless otherwise directed by the Government, the following shall apply:
1) Individual, vice ‘Global’, estimates and rationale shall be developed and applied to all tasks on the following paths:
a. Primary critical path and near critical path to the final major program milestone
b. Primary driving path to the next major milestone
c. High-risk tasks/ activities in the contractor’s risk management plan
2) Remaining tasks’ three-point estimates and rationale shall be individually or globally applied.
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| IMS ANALYST |
| 0 |
| 0 |
| 1 |
| DCMA |
| 0 |
| 0 |
| 1 |
| DCARC |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 4 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 0103, 0210, 0302
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B005
2. TITLE OF DATA ITEM
Integrated Program Management Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81861A
5. CONTRACT REFERENCE
SOW 3.3.1.4, 3.3.1.9
6. REQUIRING OFFICE
PEO LSCAC2S
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4 (cont.):
Format 6 instructions (cont.):
G.) ‘3.7.1.3.6.4. SRA Reporting Frequency’: SRA shall be performed annually. The results of the first SRA shall be presented at the Post Award Conference. The contractor shall also submit the results of any other SRAs that are conducted to be in accordance with their company’s associated guidance.
H.) ‘3.7.3. Task/Activity Codes and Data Dictionary’: The first monthly analysis narrative submission for Format 6 shall include the ‘Schedule Assumptions’ and ‘Data Dictionary’. Any change, post-first submission, to the ‘Schedule Assumptions’ or ‘Data Dictionary’ requires re-submittal of the information with the affected IPMR deliverable.
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLK 12 -
A.) ‘2.5.1. Monthly Submission Requirement’ and ‘2.6.1’: The IMS submitted with the proposal shall be considered the first submission.
BLK 13 -
B.) ‘2.5.1. Monthly Submission Requirement’ and ‘2.6.1’: Subsequent submissions of Formats 5 and 6 are due within 12 working days after the close of the contractor’s monthly accounting period.
BLK 14 - Email addresses for Distribution list POCs:
All IPMR files must be electronically forwarded to the central repository at the DCARC Web site at https://ders.dcarc.pae.osd.mil/DCARCPortal/.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil IMS ANALYST: jason.grabowski@usmc.mil
DCMA: TBD
DCARC: HTTP://DCARC.PAE.OSD.MIL
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| IMS ANALYST |
| 0 |
| 0 |
| 1 |
| DCMA |
| 0 |
| 0 |
| 1 |
| DCARC |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 4 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _2_ of _2_ Pages |
18. ESTIMATED TOTAL PRICE
17. PRICE GROUP
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 0103, 0210, 0302
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B006
2. TITLE OF DATA ITEM
CONTRACT FUNDS STATUS REPORT (CFSR)
(DD Form 1586)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81468
5. CONTRACT REFERENCE
SOW 3.3.1.11.2.2
6. REQUIRING OFFICE
PEO LS, CAC2S
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
QRTLY
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION18. ESTIMATED TOTAL PRICE
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 4 - At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, Power Point, Visio).
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10-13: The initial report is due 30 calendar days after the end of the contractor's first full accounting quarter after contract award.
Subsequent quarterly reports are due to the Government not later than the 20th of the month after the close of the accounting quarter. The same 'as of date' shall be used for the CFSR and IPMR when they are submitted in the same month. The Government shall provide comments to the contractor within 7 calendar days of receiving this data deliverable. the contractor shall adjudicate all Government comments to draft or final submittals within 7 calendar days of receipt of Government comments.
The Contractor shall provide an electronic copy of the Government approved CFSR to the DCARC Central Repository. Location of the DCARC Central Repository Website HTTP://DCARC.PAE.OSD.MIL.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil
DCARC: HTTP://DCARC.PAE.OSD.MIL
DCMA: TBD
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| DCARC |
| 0 |
| 0 |
| 1 |
| DCMA |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 3 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 0103, 0210, 0302
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B007
2. TITLE OF DATA ITEM
Cost Data Summary Report (DD Form 1921)
3. SUBTITLE
Contractor Cost Data Reporting (CCDR)17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-81565C
5. CONTRACT REFERENCE
SOW 3.3.1.11.2.3
6. REQUIRING OFFICE
PEO LS, CAC2S
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION18. ESTIMATED TOTAL PRICE
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
Blocks 10 - 13: Prepare the Cost Data Summary Report (CDSR) in accordance with DI-FNCL-81565C (or the most recently approved version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-FNCL-81565C, is available from the Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil/csdr/FormsReporting.aspx#DIDs. The CSDR Plan is included as a contract attachment.
Contractors shall be required to submit the Contractor Cost Data Reports (CCDRs) at frequencies specified in the OSD DDCA-approved CSDR plan and in the contract. The contract CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a request for change in the event-driven date for reporting through the CSDR Submit-Review system for DCARC approval before the date reflected in the OSD DDCA-approved CSDR Plan.
All CCDRs shall be submitted electronically using the CSDR Submit-Review System. The required form and file type for each CCDR is specified in its Data Item Description (DID). Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. All DCARC Portal accounts need to be renewed at least annually.
Subcontractor Reporting: Prime contractors are responsible for flowing down CSDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds specified in the DoDI 5000.02, or as required by the CWIPT. This includes requiring subcontractors to electronically report directly to the DCARC using the CSDR Submit-Review System.
The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract CSDR plans for submission to the DCARC for DDCA approval.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil DCARC: http://dcarc.pae.osd.mil LCC MGR: jennifer.Kernich1@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| DCARC |
| 0 |
| 0 |
| 1 |
| LCC MGR |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 3 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 0103, 0210, 0302
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B008
2. TITLE OF DATA ITEM
Functional Cost-Hour Report (FCHR), DD Form 1921-1
3. SUBTITLE
Contractor Cost Data Reporting (CCDR)
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-81566C
5. CONTRACT REFERENCE
SOW 3.3.1.11.2.3
6. REQUIRING OFFICE 17. PRICE GROUP
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final18. ESTIMATED TOTAL PRICE |
| Reg |
| Repro |
16. REMARKS
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
Blocks 10 - 13: Prepare the Functional Cost Hour Report (FCHR) in accordance with DI-FNCL-81566C (or the most recently approved version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-FNCL-81566C, is available from the Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil/csdr/FormsReporting.aspx#DIDs. The CSDR Plan is included as a contract attachment.
Contractors shall be required to submit the Contractor Cost Data Reports (CCDRs) at frequencies specified in the OSD DDCA-approved CSDR plan and in the contract. The contract CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a request for change in the event-driven date for reporting through the CSDR Submit-Review system for DCARC approval before the date reflected in the OSD DDCA-approved CSDR Plan.
All CCDRs shall be submitted electronically using the CSDR Submit-Review System. The required form and file type for each CCDR is specified in its Data Item Description (DID). Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. All DCARC Portal accounts need to be renewed at least annually.
Subcontractor Reporting: Prime contractors are responsible for flowing down CSDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds specified in the DoDI 5000.02, or as required by the CWIPT. This includes requiring subcontractors to electronically report directly to the DCARC using the CSDR Submit-Review System.
The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract CSDR plans for submission to the DCARC for DDCA approval.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil DCARC: http://dcarc.pae.osd.mil LCC MGR: Jennifer.Kernich1@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| DCARC |
| 0 |
| 0 |
| 1 |
| LCC MGR |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 3 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 0103, 0210, 0302
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B009
2. TITLE OF DATA ITEM
Progress Curve Report (PCR), DD Form 1921-2
3. SUBTITLE
Contractor Cost Data Reporting (CCDR)
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-81567C
5. CONTRACT REFERENCE
SOW 3.3.1.11.2.3
6. REQUIRING OFFICE
PEO LS, CAC2S
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
Blocks 10 - 13: Prepare the Progress Curve Report (PCR) in accordance with DI-FNCL-81567C (or the most recently approved version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-FNCL-81567C, is available from the Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil/csdr/FormsReporting.aspx#DIDs. The CSDR Plan is included as a contract attachment.
Contractors shall be required to submit the Contractor Cost Data Reports (CCDRs) at frequencies specified in the OSD DDCA-approved CSDR plan and in the contract. The contract CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a request for change in the event-driven date for reporting through the CSDR Submit-Review system for DCARC approval before the date reflected in the OSD DDCA-approved CSDR Plan.
All CCDRs shall be submitted electronically using the CSDR Submit-Review System. The required form and file type for each CCDR is specified in its Data Item Description (DID). Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. All DCARC Portal accounts need to be renewed at least annually.
Subcontractor Reporting: Prime contractors are responsible for flowing down CSDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds specified in the DoDI 5000.02, or as required by the CWIPT. This includes requiring subcontractors to electronically report directly to the DCARC using the CSDR Submit-Review System.
The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract CSDR plans for submission to the DCARC for DDCA approval.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil DCMA: TBD at Contract Award DCARC: http://dcarc.pae.osd.mil LCC MGR: Jennifer.Kernich1@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| DCMA |
| 0 |
| 0 |
| 1 |
| DCARC |
| 0 |
| 0 |
| 1 |
| LCC MGR |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 4 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _1_ of _1_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 0103, 0210, 0302
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B010
2. TITLE OF DATA ITEM
Contractor Business Data Report, DD Form 1921-3
3. SUBTITLE
Contractor Cost Data Reporting (CCDR) 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-FNCL-81765B
5. CONTRACT REFERENCE
SOW3.3.1.11.2.3
6. REQUIRING OFFICE
PEO LS, CAC2S
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES18. ESTIMATED TOTAL PRICE |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
Blocks 10 - 13: Prepare the Contractor Business Data Report in accordance with DI-FNCL-81567C (or the most recently approved version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-FNCL-81567C, is available from the Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil/csdr/FormsReporting.aspx#DIDs. The CSDR Plan is included as a contract attachment.
Contractors shall be required to submit 1921-3 Contractor Business Data Report on an annual basis within 60 days subsequent to the end of the contractor's fiscal year for the life of the contract in accordance with DI-FNCL-81765B (or most recently approved version). Only one report is required to be completed and submitted by each FPR (Forward Pricing Rate) unit (e.g., plant, site, business unit) per year, independent of the number of contracts within the FPR unit which contain this CDRL item. The Contractor Business Data Report is to be prepared by and for the business entity (e.g., plant, site, or business unit) responsible for submitting the Forward Pricing Rate Proposal (FPRP) representing the basis for Forward Pricing Rate Agreement (FPRA) negotiations with the government. In the absence of a FPR requirement, the term “FPR unit” should be interpreted for reporting purposes as “business unit” as defined in the FAR.
The Defense Cost and Resource Center (DCARC) is responsible for administration of this requirement. The DCARC website is located at http://cade.osd.mil/csdr.
All 1921-3 reports shall be submitted electronically using the 1921-3 & FPR Submit-Review System. The required form and file type for each 1921-3 report is specified in its Data Item Description (DID). Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. All DCARC Portal accounts need to be renewed at least annually.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed/elmi@usmc.mil DCARC: http://dcarc.pae.osd.mil LCC MGR: Jennifer.Kernich1@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| DCARC |
| 0 |
| 0 |
| 1 |
| LCC MGR |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 3 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 0103, 0210, 0302
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B011
2. TITLE OF DATA ITEM
Software Maintenance Report (3026-2)
3. SUBTITLE
Software Resources Data Reporting (SRDR)17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-82035
5. CONTRACT REFERENCE
SOW 3.3.1.11.2.4
6. REQUIRING OFFICE
PEO LS, CAC2S
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES18. ESTIMATED TOTAL PRICE |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
Blocks 10 - 13: Prepare the Software Resources Data Report (SRDR) in accordance with DI-MGMT-82035 (or the most recently approved version) and the OSD Deputy Director, Cost Assessment (DDCA)-approved contract CSDR Plan. The DID, DI-MGMT-82035, is available from the Defense Cost and Resource Center (DCARC) website at http://cade.osd.mil/csdr/FormsReporting.aspx#DIDs. The CSDR Plan is included as a contract attachment.
Contractors shall be required to submit SRDRs at frequencies specified in the OSD DDCA-approved CSDR plan and in the contract. The contract CSDR plan uses the event field as the driver for the submission of the reports, not the "as of date." If the event slips, the contractor must notify the Government Program Office that a date change is needed. It is the responsibility of the Government Program Office to submit a request for change in the event-driven date for reporting through the CSDR Submit-Review system for DCARC approval before the date reflected in the OSD DDCA-approved CSDR Plan.
All SRDRs shall be submitted electronically using the CSDR Submit-Review System. The required file format for each SRDR is specified in its Data Item Description (DID). Data submitters must register through the DCARC website and possess a DoD-approved ECA digital certificate or DoD-issued CAC to obtain a DCARC Portal account and be authorized to upload CSDR content. Users can obtain access by submitting user information about themselves and their organizations to the DCARC Portal and requesting a CSDR submitter user role. After the registration information has been verified, the DCARC shall authorize the user account and requested roles. All DCARC Portal accounts need to be renewed at least annually.
Subcontractor Reporting: Prime contractors are responsible for flowing down CSDR requirements contained in their prime contracts to all subcontractors who meet the reporting thresholds specified in the DoDI 5000.02, or as required by the CWIPT. This includes requiring subcontractors to electronically report directly to the DCARC using the CSDR Submit-Review System.
The prime contractor shall be required to work with the CWIPT and all appropriate subcontractors to prepare separate subcontract CSDR plans for submission to the DCARC for DDCA approval.
The prime contractor and reporting subcontractors shall allocate resources for Integrated Baseline Reviews (IBR) and Verification and Validation (V&V) support of SRDRs as required by the government to ensure accurate and consistent software data reporting. The reviews will be conducted in accordance with each SRDR submission.
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| DCARC |
| 0 |
| 0 |
| 1 |
| DCMA |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 3 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _1_ of _2_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
0005, 0103, 0210, 0302
B. EXHIBIT
B
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
B011
2. TITLE OF DATA ITEM
Software Maintenance Report (3026-2)
3. SUBTITLE
Software Resources Data Reporting (SRDR)17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-82035
5. CONTRACT REFERENCE
SOW 3.3.1.11.2.4
6. REQUIRING OFFICE
PEO LS, CAC2S
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES18. ESTIMATED TOTAL PRICE |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
The prime contractor and reporting subcontractors shall utilize the Aerospace approved version of the University of Southern California (USC) Center for Systems and Software Engineering (CSSE) Unified Code Counter (UCC) to obtain a set of standardized code counts that reflect logical size, as opposed to physical, non-commented, etc. The government reserves the right to ask the prime contractor and reporting subcontractors to provide the UCC and Diff Tool output files for software by Source Lines of Code (SLOC) by Computer Software Configuration Item (CSCI) for the entire program. The link to the UCC is available at http://cade.osd.mil
SRDR data will be available to support contractors who work for the Office of the Secretary of Defense (OSD) or the services. Access to the data is only granted while the contractor is supporting a legitimate Department of Defense (DoD) contract, the contractor has a need-to-know, and a Non-Disclosure Agreement (NDA) has been signed with the Government organization that the contractor supports.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil
DCARC: HTTP://DCARC.PAE.OSD.MIL
DCMA: TBD
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| DCARC |
| 0 |
| 0 |
| 1 |
| DCMA |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 3 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page _2_ of _2_ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .