L-1_Cost_Template_21_November_2016.xlsx

XLSX spreadsheet 614 KB Posted

Attached to
Common Aviation Command and Control System (CAC2S) Federal contract opportunity
Solicitation number
M67854-16-R-0217
Issued by
United States Marine Corps

About this file

L-1 Cost Template_21 November 2016

View the file

Other files for this federal contract opportunity

Other files attached to Common Aviation Command and Control System (CAC2S), newest first.
File Type Posted
M67854-16-R-0217-0003_Conformed.pdf PDF
M67854-16-R-0217-0003.docx DOCX document
M67854-16-R-0217-Conformed_Though_Amendment_0002.docx DOCX document
CAC2S_RFP_QAs_Round_3_FBO.pdf PDF
L-1_Cost_Template_15_Nov_2016.xlsx XLSX spreadsheet
CDRL_A027_R1_20161104.docx DOCX document
M67854-16-R-0217-0002.docx DOCX document
M67854-16-R-0217-0001.docx DOCX document
M67854-16-R-0217_Exhibit_A_Amendment_0001_v3_CLEAN.docx DOCX document
M67854-16-R-0217_Exhibit_B_Amendment_0001_v3_CLEAN.docx DOCX document
M67854-16-R-0217-Conformed_through_Amendment_0001.docx DOCX document
CAC2S_RFP_QAs_Round_2_FBO_FINAL.pdf PDF
M67854-16-R-0217_Exhibit_E_Amendment_0001_v2_CLEAN.docx DOCX document
CAC2S_RFP_QAs_Round_1_FBO.pdf PDF
M67854-16-R-0217.docx DOCX document
Attachment_(12)_-_DD254 _Contract_Security_Classification_Specification _23_September_2016.pdf PDF
Attachment_L-2_Subcontractor_Consent_letters.docx DOCX document
Attachment_L-3_Client_authorization_letter.doc DOC document
M67854-16-R-0217_Exhibit_E.docx DOCX document
M67854-16-R-0217_Exhibit_B.docx DOCX document
M67854-16-R-0217_Exhibit_A.docx DOCX document
Attachment_L-1_Volume_III_Cost_Template.xlsx XLSX spreadsheet
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

INSTRUCTIONS:
This template is being utilized as a means of documenting/summarizing each vendor's basis of estimate by CLIN for the CAC2S source selection on a consistent basis.

The Government requests each vendor submit this template in addition to the full basis of estimate as outlined in the RFP/SOW. If use of the template is problematic, please explain why and offer an alternative means of documenting the basis of estimate associated with each CLIN. Use of the template to document the basis of estimate does not circumvent or replace vendor purchasing or estimating systems; rather, the template is a tool to summarize data from vendor purchasing and estimating systems on a consistent basis to support the source selection process.

Unit Cost Calculation SOW Requirement 3.2.1: Lot 1 CAC2S FDUs (CLINs 0001, 0002, 0003, 0004, 0010, 0011) SOW Requirement 3.2.2: Lot 2 CAC2S FDUs (CLINs 0101, 0102, 0109, 0110) SOW Requirement 3.2.3: Lot 3 CAC2S FDUs (CLINs 0201, 0202, 0207, 0208) SOW Requirement 3.2.4: Lot 4 CAC2S FDUs (CLINs 0301, 0306)

Quantity:7Quantity:3Quantity:3Quantity:10Quantity:4Quantity:6Quantity:2Quantity:9Quantity:2
AC2S (V)1Cost (GFY17$)AC2S (V)2Cost (GFY17$)AC2S (V)3Cost (GFY17$)AC2S (V)1Cost (GFY17$)AC2S (V)3Cost (GFY17$)AC2S (V)1Cost (GFY17$)AC2S (V)3Cost (GFY17$)AC2S (V)1Cost (GFY17$)AC2S (V)3Cost (GFY17$)
PMP$ - 0PMP$ - 0PMP$ - 0PMP$ - 0PMP$ - 0PMP$ - 0PMP$ - 0PMP$ - 0PMP$ - 0
MaterialsMaterialsMaterialsMaterialsMaterialsMaterialsMaterialsMaterialsMaterials
Manufacturing$ - 0Manufacturing$ - 0Manufacturing$ - 0Manufacturing$ - 0Manufacturing$ - 0Manufacturing$ - 0Manufacturing$ - 0Manufacturing$ - 0Manufacturing$ - 0
Variable LaborVariable LaborVariable LaborVariable LaborVariable LaborVariable LaborVariable LaborVariable LaborVariable Labor
Fixed LaborFix LaborFix LaborFix LaborFix LaborFix LaborFix LaborFix LaborFix Labor
Support Cost$ - 0Support Cost$ - 0Support Cost$ - 0Support Cost$ - 0Support Cost$ - 0Support Cost$ - 0Support Cost$ - 0Support Cost$ - 0Support Cost$ - 0
Storage/FreightStorage/FreightStorage/FreightStorage/FreightStorage/FreightStorage/FreightStorage/FreightStorage/FreightStorage/Freight
TravelTravelTravelTravelTravelTravelTravelTravelTravel
Software LicensesSoftware LicensesSoftware LicensesSoftware LicensesSoftware LicensesSoftware LicensesSoftware LicensesSoftware LicensesSoftware Licenses
Platform IAT&CPlatform IAT&CPlatform IAT&CPlatform IAT&CPlatform IAT&CPlatform IAT&CPlatform IAT&CPlatform IAT&CPlatform IAT&C
SEPMSEPMSEPMSEPMSEPMSEPMSEPMSEPMSEPM
G&AG&AG&AG&AG&AG&AG&AG&AG&A
ProfitProfitProfitProfitProfitProfitProfitProfitProfit

Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0

CostCostCostCostCostCostCostCostCost
PMP $ / System$ - 0PMP $ / System$ - 0PMP $ / System$ - 0PMP $ / System$ - 0PMP $ / System$ - 0PMP $ / System$ - 0PMP $ / System$ - 0PMP $ / System$ - 0PMP $ / System$ - 0
Total $ / System$ - 0Total $ / System$ - 0Total $ / System$ - 0Total $ / System$ - 0Total $ / System$ - 0Total $ / System$ - 0Total $ / System$ - 0Total $ / System$ - 0Total $ / System$ - 0

Total Price by CLIN

CLIN Summary
CLINCLIN SummaryCLIN TypeTotal Estimated CostFixed FeeTotal Price
0001First Article Test - AN/TSQ-297(V)1 (TAOC)FFP
0002FDU - AN/TSQ-297(V)1 (TAOC)FFP
0003FDU - AN/TSQ-297(V)3 (TAOC Trainer)FFP
0004FDU - AN/TSQ-297(V)2 (TACC)FFP
0005CAC2S DataNSP
0006Reserved
0007CAC2S Engineering StudiesCPFF
0008Government Furnished Property RepairCPFF
0009Software SustainmentCPFF
0010FDU - AN/TSQ-297(V)1 (TAOC)FFP
0011FDU - AN/TSQ-297(V)3 (TAOC Trainer)FFP
0101FDU - AN/TSQ-297(V)1 (TAOC)FFP
0102FDU - AN/TSQ-297(V)3 (TAOC Trainer)FFP
0103CAC2S DataNSP
0104Initial Issue SparesFFP
0105Wholesale SparesFFP
0106CAC2S Engineering StudiesCPFF
0107Government Furnished Property RepairCPFF
0108Software SustainmentCPFF
0109FDU - AN/TSQ-297(V)1 (TAOC)FFP
0110FDU - AN/TSQ-297(V)3 (TAOC Trainer)FFP
0201FDU - AN/TSQ-297(V)1 (TAOC)FFP
0202FDU - AN/TSQ-297(V)3 (TAOC Trainer)FFP
0203Retrofit SparesFFP
0204CAC2S Engineering StudiesCPFF
0205Government Furnished Property RepairCPFF
0206Software SustainmentCPFF
0207FDU - AN/TSQ-297(V)1 (TAOC)FFP
0208FDU - AN/TSQ-297(V)3 (TAOC Trainer)FFP
0209Software TransitionCPFF
0210CAC2S DataNSP
0301FDU - AN/TSQ-297(V)1 (TAOC)FFP
0302CAC2S DataNSP
0303CAC2S Engineering StudiesCPFF
0304Government Furnished Property RepairCPFF
0305Software SustainmentCPFF
0306FDU - AN/TSQ-297(V)3 (TAOC Trainer)FFP
0307ReservedFFP
0308ReservedFFP
0309ReservedFFP
0310Software TransitionCPFF

This sheet represents a roll up of all CLIN cost/price data from the detailed CLIN tabs. The grey cells indicate that they should not be populated with a cost, i.e., FFP CLINs do not have an associated Fixed Fee, therefore it is N/A. Cells highlighted in blue indicate a Reserved CLIN and are also N/A.

CLIN-CWBS Summary

CLIN-CWBS Structure
CLINCWBSCWBS Description/TileHoursPrice
00011.1.1.X
1.1.1.Y
1.2.3.4.Z

0002 1.1.1.4

This sheet represents CWBS for each CLIN in which work will be accomplished and associated cost/price accounting will take place.

CLIN0001

FY17FY18FY19FY20FY21FY22
CLIN 0001TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

CLIN0002

FY17FY18FY19FY20FY21FY22
CLIN 0002TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

CLIN0003

FY17FY18FY19FY20FY21FY22
CLIN 0003TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

CLIN0004

FY17FY18FY19FY20FY21FY22
CLIN 0004TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

CLIN0005

THIS CONTRACT LINE ITEM NUMBER IS NOT SEPARATELY PRICED. ANY COSTS ASSOCIATED WITH THIS CLIN SHOULD BE PRICED INTO ITS RESPECTIVE CLIN.

CLIN0006

THIS CONTRACT LINE ITEM NUMBER IS RESERVED FOR FUTURE USE.

CLIN0007

FY17FY18FY19FY20FY21FY22
CLIN 0007TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

For the purpose of proposing the requirement only, Engineering Studies are estimated to be medium complexity, 320 hours.

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

CLIN0008

FY17FY18FY19FY20FY21FY22
CLIN 0008TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

For the purpose of proposing the requirement only, the estimated cost of GFE Repair is $50K per year.

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

CLIN0009

FY17FY18FY19FY20FY21FY22
CLIN 0009TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

For the purpose of proposing the requirement only, when TRs are included in a software build, the following assumptions should be made for each associated build:

a) There will be 50 TRs included in each build

b) Of the 50 TRs,

1. 10% will be maintain a complexity of 'hard', defined as requiring more than 80 hours to analyze, implement, integrate and verify;

2. 50% will be maintain a complexity of 'medium', defined as requiring less than 80 hours to analyze, implement, integrate and verify;

3. 40% will be maintain a complexity of 'easy', defined as requiring less than 16 hours to analyze, implement, integrate and verify.

For the purpose of proposing the requirement only, the Government anticipates (3) analyses per year of medium complexity not to exceed (300) hours per year.

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

CLIN0010

FY17FY18FY19FY20FY21FY22
CLIN 0010TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

CLIN0011

FY17FY18FY19FY20FY21FY22
CLIN 0011TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

CLIN0101

FY17FY18FY19FY20FY21FY22
CLIN 0101TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

CLIN0102

FY17FY18FY19FY20FY21FY22
CLIN 0102TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

CLIN0103

THIS CONTRACT LINE ITEM NUMBER IS NOT SEPARATELY PRICED. ANY COSTS ASSOCIATED WITH THIS CLIN SHOULD BE PRICED INTO ITS RESPECTIVE CLIN.

CLIN0104

FY17FY18FY19FY20FY21FY22
CLIN 0104TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

CLIN0105

FY17FY18FY19FY20FY21FY22
CLIN 0105TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

CLIN0106

FY17FY18FY19FY20FY21FY22
CLIN 0106TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

For the purpose of proposing the requirement only, Engineering Studies are estimated to be medium complexity, 320 hours.

CLIN0107

FY17FY18FY19FY20FY21FY22
CLIN 0107TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

For the purpose of proposing the requirement only, the estimated cost of GFE Repair is $50K per year.

CLIN0108

FY17FY18FY19FY20FY21FY22
CLIN 0108TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

For the purpose of proposing the requirement only, when TRs are included in a software build, the following assumptions should be made for each associated build:

a) There will be 50 TRs included in each build

b) Of the 50 TRs,

1. 10% will be maintain a complexity of 'hard', defined as requiring more than 80 hours to analyze, implement, integrate and verify;

2. 50% will be maintain a complexity of 'medium', defined as requiring less than 80 hours to analyze, implement, integrate and verify;

3. 40% will be maintain a complexity of 'easy', defined as requiring less than 16 hours to analyze, implement, integrate and verify.

For the purpose of proposing the requirement only, the Government anticipates (3) analyses per year of medium complexity not to exceed (300) hours per year.

CLIN0109

FY17FY18FY19FY20FY21FY22
CLIN 0109TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

CLIN0110

FY17FY18FY19FY20FY21FY22
CLIN 0110TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

CLIN0201

FY17FY18FY19FY20FY21FY22
CLIN 0201TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel
Overhead/Indirect
Material handling
Material OH
G&A
FCCM
Profit/fee
FY17FY18FY19FY20FY21FY22
Direct Labor hrsTOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
BASIS OF ESTIMATE (BOE)
Tasks Performed

Methods of cost estimating

Calculations

Labor function

Description of each labor category

Cross-checks used to verify reasonableness

This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.

CLIN0202

FY17FY18FY19FY20FY21FY22
CLIN 0202TOTALQ1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4Q1Q2Q3Q4
Cost Summary (GFY$)
Direct Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Indirect Labor
Labor Category I
Labor Category II
Labor Category III
Labor Category IV
Material
Subcontracts
Vendor quotes/P.O.s
Purchase order history
Material estimates
Other Direct Costs
Travel

This is the start of the file's text. The full file is on GovTribe.