L-1_Cost_Template_15_Nov_2016.xlsx
XLSX spreadsheet 602 KB Posted
- Attached to
- Common Aviation Command and Control System (CAC2S) Federal contract opportunity
- Solicitation number
- M67854-16-R-0217
- Issued by
- United States Marine Corps
About this file
L-1 Cost Template 15 Nov 2016
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| INSTRUCTIONS: |
| This template is being utilized as a means of documenting/summarizing each vendor's basis of estimate by CLIN for the CAC2S source selection on a consistent basis. |
The Government requests each vendor submit this template in addition to the full basis of estimate as outlined in the RFP/SOW. If use of the template is problematic, please explain why and offer an alternative means of documenting the basis of estimate associated with each CLIN. Use of the template to document the basis of estimate does not circumvent or replace vendor purchasing or estimating systems; rather, the template is a tool to summarize data from vendor purchasing and estimating systems on a consistent basis to support the source selection process.
Unit Cost Calculation SOW Requirement 3.2.1: Lot 1 CAC2S FDUs (CLINs 0001, 0002, 0003, 0004, 0010, 0011) SOW Requirement 3.2.2: Lot 2 CAC2S FDUs (CLINs 0101, 0102, 0109, 0110) SOW Requirement 3.2.3: Lot 3 CAC2S FDUs (CLINs 0201, 0202, 0207, 0208) SOW Requirement 3.2.4: Lot 4 CAC2S FDUs (CLINs 0301, 0306)
| Quantity: | 7 | Quantity: | 3 | Quantity: | 3 | Quantity: | 10 | Quantity: | 4 | Quantity: | 6 | Quantity: | 2 | Quantity: | 9 | Quantity: | 2 |
| AC2S (V)1 | Cost (GFY17$) | AC2S (V)2 | Cost (GFY17$) | AC2S (V)3 | Cost (GFY17$) | AC2S (V)1 | Cost (GFY17$) | AC2S (V)3 | Cost (GFY17$) | AC2S (V)1 | Cost (GFY17$) | AC2S (V)3 | Cost (GFY17$) | AC2S (V)1 | Cost (GFY17$) | AC2S (V)3 | Cost (GFY17$) |
| PMP | $ - 0 | PMP | $ - 0 | PMP | $ - 0 | PMP | $ - 0 | PMP | $ - 0 | PMP | $ - 0 | PMP | $ - 0 | PMP | $ - 0 | PMP | $ - 0 |
| Materials | Materials | Materials | Materials | Materials | Materials | Materials | Materials | Materials | |||||||||
| Manufacturing | $ - 0 | Manufacturing | $ - 0 | Manufacturing | $ - 0 | Manufacturing | $ - 0 | Manufacturing | $ - 0 | Manufacturing | $ - 0 | Manufacturing | $ - 0 | Manufacturing | $ - 0 | Manufacturing | $ - 0 |
| Variable Labor | Variable Labor | Variable Labor | Variable Labor | Variable Labor | Variable Labor | Variable Labor | Variable Labor | Variable Labor | |||||||||
| Fixed Labor | Fix Labor | Fix Labor | Fix Labor | Fix Labor | Fix Labor | Fix Labor | Fix Labor | Fix Labor | |||||||||
| Support Cost | $ - 0 | Support Cost | $ - 0 | Support Cost | $ - 0 | Support Cost | $ - 0 | Support Cost | $ - 0 | Support Cost | $ - 0 | Support Cost | $ - 0 | Support Cost | $ - 0 | Support Cost | $ - 0 |
| Storage/Freight | Storage/Freight | Storage/Freight | Storage/Freight | Storage/Freight | Storage/Freight | Storage/Freight | Storage/Freight | Storage/Freight | |||||||||
| Travel | Travel | Travel | Travel | Travel | Travel | Travel | Travel | Travel | |||||||||
| Software Licenses | Software Licenses | Software Licenses | Software Licenses | Software Licenses | Software Licenses | Software Licenses | Software Licenses | Software Licenses | |||||||||
| Platform IAT&C | Platform IAT&C | Platform IAT&C | Platform IAT&C | Platform IAT&C | Platform IAT&C | Platform IAT&C | Platform IAT&C | Platform IAT&C |
| SEPM | SEPM | SEPM | SEPM | SEPM | SEPM | SEPM | SEPM | SEPM |
| G&A | G&A | G&A | G&A | G&A | G&A | G&A | G&A | G&A |
| Profit | Profit | Profit | Profit | Profit | Profit | Profit | Profit | Profit |
Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0
| Cost | Cost | Cost | Cost | Cost | Cost | Cost | Cost | Cost | |||||||||
| PMP $ / System | $ - 0 | PMP $ / System | $ - 0 | PMP $ / System | $ - 0 | PMP $ / System | $ - 0 | PMP $ / System | $ - 0 | PMP $ / System | $ - 0 | PMP $ / System | $ - 0 | PMP $ / System | $ - 0 | PMP $ / System | $ - 0 |
| Total $ / System | $ - 0 | Total $ / System | $ - 0 | Total $ / System | $ - 0 | Total $ / System | $ - 0 | Total $ / System | $ - 0 | Total $ / System | $ - 0 | Total $ / System | $ - 0 | Total $ / System | $ - 0 | Total $ / System | $ - 0 |
Total Price by CLIN
| CLIN Summary | |||||
| CLIN | CLIN Summary | CLIN Type | Total Estimated Cost | Fixed Fee | Total Price |
| 0001 | First Article Test - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0002 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0003 | FDU - AN/TSQ-297(V)3 (TAOC Trainer) | FFP | |||
| 0004 | FDU - AN/TSQ-297(V)2 (TACC) | FFP | |||
| 0005 | CAC2S Data | NSP | |||
| 0006 | Reserved | ||||
| 0007 | CAC2S Engineering Studies | CPFF | |||
| 0008 | Government Furnished Property Repair | CPFF | |||
| 0009 | Software Sustainment | CPFF | |||
| 0010 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0011 | FDU - AN/TSQ-297(V)3 (TAOC Trainer) | FFP | |||
| 0101 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0102 | FDU - AN/TSQ-297(V)3 (TAOC Trainer) | FFP | |||
| 0103 | CAC2S Data | NSP | |||
| 0104 | Initial Issue Spares | FFP | |||
| 0105 | Wholesale Spares | FFP | |||
| 0106 | CAC2S Engineering Studies | CPFF | |||
| 0107 | Government Furnished Property Repair | CPFF | |||
| 0108 | Software Sustainment | CPFF | |||
| 0109 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0110 | FDU - AN/TSQ-297(V)3 (TAOC Trainer) | FFP | |||
| 0201 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0202 | FDU - AN/TSQ-297(V)3 (TAOC Trainer) | FFP | |||
| 0203 | Retrofit Spares | FFP | |||
| 0204 | CAC2S Engineering Studies | CPFF | |||
| 0205 | Government Furnished Property Repair | CPFF | |||
| 0206 | Software Sustainment | CPFF | |||
| 0207 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0208 | FDU - AN/TSQ-297(V)3 (TAOC Trainer) | FFP | |||
| 0209 | Software Transition | CPFF | |||
| 0210 | CAC2S Data | NSP | |||
| 0301 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0302 | CAC2S Data | NSP | |||
| 0303 | CAC2S Engineering Studies | CPFF | |||
| 0304 | Government Furnished Property Repair | CPFF | |||
| 0305 | Software Sustainment | CPFF | |||
| 0306 | FDU - AN/TSQ-297(V)3 (TAOC Trainer) | CPFF | |||
| 0307 | Reserved | FFP | |||
| 0308 | Reserved | FFP | |||
| 0309 | Reserved | FFP | |||
| 0310 | Software Transition | CPFF |
This sheet represents a roll up of all CLIN cost/price data from the detailed CLIN tabs. The grey cells indicate that they should not be populated with a cost, i.e., FFP CLINs do not have an associated Fixed Fee, therefore it is N/A. Cells highlighted in blue indicate a Reserved CLIN and are also N/A.
CLIN-CWBS Summary
| CLIN-CWBS Structure | ||||
| CLIN | CWBS | CWBS Description/Tile | Hours | Price |
| 0001 | 1.1.1.X | |||
| 1.1.1.Y | ||||
| 1.2.3.4.Z |
0002 1.1.1.4
This sheet represents CWBS for each CLIN in which work will be accomplished and associated cost/price accounting will take place.
CLIN0001
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0001 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0002
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0002 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0003
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0003 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0004
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0004 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0005
THIS CONTRACT LINE ITEM NUMBER IS NOT SEPARATELY PRICED. ANY COSTS ASSOCIATED WITH THIS CLIN SHOULD BE PRICED INTO ITS RESPECTIVE CLIN.
CLIN0006
THIS CONTRACT LINE ITEM NUMBER IS RESERVED FOR FUTURE USE.
CLIN0007
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0007 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
For the purpose of proposing the requirement only, Engineering Studies are estimated to be medium complexity, 320 hours.
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0008
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0008 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
For the purpose of proposing the requirement only, the estimated cost of GFE Repair is $50K per year.
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0009
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0009 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
For the purpose of proposing the requirement only, when TRs are included in a software build, the following assumptions should be made for each associated build:
a) There will be 50 TRs included in each build
b) Of the 50 TRs,
1. 10% will be maintain a complexity of 'hard', defined as requiring more than 80 hours to analyze, implement, integrate and verify;
2. 50% will be maintain a complexity of 'medium', defined as requiring less than 80 hours to analyze, implement, integrate and verify;
3. 40% will be maintain a complexity of 'easy', defined as requiring less than 16 hours to analyze, implement, integrate and verify.
For the purpose of proposing the requirement only, the Government anticipates (3) analyses per year of medium complexity not to exceed (300) hours per year.
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0010
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0010 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0011
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0011 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0101
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0101 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0102
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0102 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0103
THIS CONTRACT LINE ITEM NUMBER IS NOT SEPARATELY PRICED. ANY COSTS ASSOCIATED WITH THIS CLIN SHOULD BE PRICED INTO ITS RESPECTIVE CLIN.
CLIN0104
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0104 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0105
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0105 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0106
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0106 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
For the purpose of proposing the requirement only, Engineering Studies are estimated to be medium complexity, 320 hours.
CLIN0107
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0107 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
For the purpose of proposing the requirement only, the estimated cost of GFE Repair is $50K per year.
CLIN0108
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0108 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
For the purpose of proposing the requirement only, when TRs are included in a software build, the following assumptions should be made for each associated build:
a) There will be 50 TRs included in each build
b) Of the 50 TRs,
1. 10% will be maintain a complexity of 'hard', defined as requiring more than 80 hours to analyze, implement, integrate and verify;
2. 50% will be maintain a complexity of 'medium', defined as requiring less than 80 hours to analyze, implement, integrate and verify;
3. 40% will be maintain a complexity of 'easy', defined as requiring less than 16 hours to analyze, implement, integrate and verify.
For the purpose of proposing the requirement only, the Government anticipates (3) analyses per year of medium complexity not to exceed (300) hours per year.
CLIN0201
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0201 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0202
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0202 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0203
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0203 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel | |||||||||||||||||||||||||
| Overhead/Indirect | |||||||||||||||||||||||||
| Material handling | |||||||||||||||||||||||||
| Material OH | |||||||||||||||||||||||||
| G&A | |||||||||||||||||||||||||
| FCCM | |||||||||||||||||||||||||
| Profit/fee | |||||||||||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV |
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (GFY). Cost elements identified in Column A are provided as representative cost elements, but can be tailored as necessary at the sub-element level. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0204
| FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | ||||||||||||||||||||
| CLIN 0204 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (GFY$) | |||||||||||||||||||||||||
| Direct Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Indirect Labor | |||||||||||||||||||||||||
| Labor Category I | |||||||||||||||||||||||||
| Labor Category II | |||||||||||||||||||||||||
| Labor Category III | |||||||||||||||||||||||||
| Labor Category IV | |||||||||||||||||||||||||
| Material | |||||||||||||||||||||||||
| Subcontracts | |||||||||||||||||||||||||
| Vendor quotes/P.O.s | |||||||||||||||||||||||||
| Purchase order history | |||||||||||||||||||||||||
| Material estimates | |||||||||||||||||||||||||
| Other Direct Costs | |||||||||||||||||||||||||
| Travel |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .