M67854-16-R-0217_Exhibit_A.docx
DOCX document 741 KB Posted
- Attached to
- Common Aviation Command and Control System (CAC2S) Federal contract opportunity
- Solicitation number
- M67854-16-R-0217
- Issued by
- United States Marine Corps
About this file
M67854-16-R-0217 Exhibit A CDRLs
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
M67854-16-R-0217
F. CONTRACTOR
17. PRICE GROUP
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Systems Engineering Management Plan (SEMP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81785
5. CONTRACT REFERENCE
SOW para 3.4
6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICE
PEO LS, CAC2S
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK A – CLINs 0001, 0002, 0003, 0004, 0005, 0009, 0010, 0101, 0102, 0103, 0104, 0105, , 0108, , 0201, 0202, 0203, , 0206, 0207, 0208, 0209, 0210, 0301, 0302, , 0305, 0306, 0307, 0308, 0309, 0310
BLK 4 - Contractor format is acceptable, however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, Power Point, Visio).
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10-13 The contractor shall submit updated SEMP to reflect changes. The Government requires 14 calendar days to review. The Contractor shall resubmit the deliverable no later than 7 calendar days after receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil Lead Engineer: francis.bonner@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| Lead Engineer |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 2 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
M67854-16-R-0217
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Supplier’s Configuraton Management Plan (CMP)
3. SUBTITLE
CMP Change Pages
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80858C
5. CONTRACT REFERENCE
SOW para 3.4.1
6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK A - CLINs 0001, 0002, 0003, 0004, 0005, , 0009, 0010, 0011,0101, 0102, 0103, 0104, 0105, 0108, 0201, 0202, 0203,0206, 0207, 0208, 0209, 0210, 0301, 0302, 0305, 0306, 0307, 0308, 0309, 0310
BLK 4 - Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, PowerPoint, Visio).
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10 -13 - The Contractor shall submit change pages to the Configuration Management Plan that was submitted with the Contractor’s proposal. Allow 10 calendar days for Government review and comment. Provide final 10 calendar days after receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil Lead Engineer: francis.bonner@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| Lead Engineer |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 2 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
M67854-16-R-0217
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Technical Report-Studies/Services
3. SUBTITLE
Engineering Changes
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW para 3.4.1.1, 3.4.3, 3.4.4.2
6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK A – CLINs 0001, 0002, 0003, 0004, 0005, 0007, 0009, 0010, 0011, 0101, 0102, 0103, 0104, 0105, 0106, 0108, 0201, 0202, 0203, 0204, 0210, 0206, 0207, 0208, 0301, 0302, 0303, 0305, 0306, 0307, 0308, 0309
BLK 4 - Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, PowerPoint, Visio).
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10 - 13 – The contractor shall submit a report to document proposed changes to the Technical Data Package (TDP) within 5 calendar days of notification of component/part unavailability or identification of other identified discrepancies. Allow 15 calendar days for Government review and comment. Provide final 10 calendar days after receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil Lead Engineer: francis.bonner@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| Lead Engineer |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 2 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
M67854-16-R-0217
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Request For Variance (RFV)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80640D
5. CONTRACT REFERENCE
SOW para 3.4.1.1
6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK A – CLINs 0001, 0002, 0003, 0004, 0005, , 0007, 0009, 0010, 0011, 0101, 0102, 0103, 0104, 0105, 0106, 0108, 0201, 0202, 0203, 0204, 0206, 0207, 0208, 0301, 0302, 0303, 0305, 0306, 0307, 0308, 0309
BLK 4 - Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, PowerPoint, Visio).
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10 -13 - The Contractor shall submit a coordinated draft RFV for each proposed variance from current approved configuration documentation within 5 calendar of identification. The Government requires 30 calendar days for review. The Contractor shall incorporate the Government comments and submit the final no later than 7 calendar days after receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil Lead Engineer: francis.bonner@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| Lead Engineer |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 2 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
M67854-16-R-0217
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
As-Built Configuration List
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-CMAN-81516
5. CONTRACT REFERENCE
SOW para 3.4.1.2
6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION N/A
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK A – CLINs 0001, 0002, 0003, 0004, 0005, 0010, 0011, 0101, 0102, 0103, 0104, 0105, 0201, 0202, 0203, 0207, 0208, 02010, 0301, 0302, 0306, 0307, 0308, 0309
BLK 4 - Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, PowerPoint, Visio).
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10 -13 –- The Contractor shall submit an As-Built Configuration List with the delivery of each production item. The Government requires 20 calendar days for review. The Contractor shall incorporate the Government comments and submit the final no later than 7 calendar days after receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mill Lead Engineer: francis.bonner@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| Lead Engineer |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 2 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
M67854-16-R-0217
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Technical Report-Studies/Services
3. SUBTITLE17. PRICE GROUP
Engineering Studies
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
SOW para 3.4.1.3 and 3.4.4.5
6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK A – CLINs 0005, 0007, 0103, 0106, 0108, 0204, 0210, 0302, 0303 BLK 4 - Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, PowerPoint, Visio).
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10 - 13 – The contractor shall submit a report to document engineering study, analysis or engineering technical support conducted. All information supporting the technical study, analysis, techncail support (i.e redlined drawings, sketches, pictures, etc.) shall be provided in the technical report. Allow 10 business days for Government review. The contractor shall submit final within 10 business days afte receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| Lead Engineer |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 2 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
M67854-16-R-0217
F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Item Unique Identification (IUID) Marking Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81803
5. CONTRACT REFERENCE
SOW para 3.4.2 and 3.4.2.1
6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK A – CLINs 0001, 0002, 0003, 0004, 0005, , 0010, 0011, 0101, 0102, 0103, 0104, 0105, 0201, 0202, 0203, 0207, 0208, 0210, 0301, 0302, 0306, 0307, 0308, 0309
BLK 4 - Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, PowerPoint, Visio).
BLK 9: Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10 -13 – The contractor shall deliver the draft document 30 calendar days after contract award. The Government will require 30 calendar days to review and provide comments back to the contractor. The Contractor shall incorporate the Government comments and submit the final not later than 7 calendar days after receipt of Government comments.
Subsequent deliveries of the CDRL shall be within 30 calendar days after of an Engineering Change Proposal (ECP). The Government requires 15 calendar days for review. The Contractor shall incorporate the Government comments and submit the final not later than 7 calendar days after receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil Lead Engineer: francis.bonner@usmc.mil PSM: jack.olinick@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| Lead Engineer |
| 0 |
| 0 |
| 1 |
| PSM |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 3 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Item Unique Identification (IUID) Marking Activity, Validation and Verification Report
3. SUBTITLE17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81804A
5. CONTRACT REFERENCE
SOW para 3.4.2.2
6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK A – CLINs 0001, 0002, 0003, 0004, 0005, 0010, 0011, 0101, 0102, 0103, 0104, 0105, 0201, 0202, 0203, 0207, 0208, 0210, 0301, 0302, 0307, 0308, 0309
BLK 4 - Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, PowerPoint, Visio).
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10 -13 - The Contractor shall submit an IUID Marking Activity and Validation and Verification Report 20 calendar days after product marking. The Government requires 20 calendar days for review. The Contractor shall incorporate the Government comments and submit the final no later than 7 calendar days after receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil Lead Engineer: francis.bonner@usmc.mil
PSM: jack.olinik@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| Lead Engineer |
| 0 |
| 0 |
| 1 |
| PSM |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 3 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Quality Assurance (QA) Program Plan
3. SUBTITLE17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-81794
5. CONTRACT REFERENCE
SOW para 3.4.3.2
6. REQUIRING OFFICE
18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK A – CLINs 0001, 0002, 0003, 0004, 0005, , 0008, 0009, 0010, 0011, 0101, 0102, 0103, 0104, 0105, 0107, 0108, 0201, 0202, 0203, 0205, 0206, 0207, 0208, 0210, 0301, 0302, 0304, 0305, 0306, 0307, 0308, 0309)
BLK 4 - Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, PowerPoint, Visio).
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10 -13 – The Contractor shall deliver an update to the QA Program Plan, submitted with the Contractor’s proposal, 30 calendar days prior to the Production Readiness Review (PRR). The Government requires 15 calendar days for review. The Contractor shall incorporate the Government comments and submit the final no later than 7 calendar days after receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil Lead Engineer: francis.bonner@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| Lead Engineer |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 2 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
M67854-16-R-0217
F. CONTRACTOR
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Test Plan
3. SUBTITLE
Acceptance Test Plan
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80566A
5. CONTRACT REFERENCE
SOW para 3.4.3.3
6. REQUIRING OFFICE
PEO LS, CAC2S18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK A – CLINs 0001, 0002, 0003, 0004, 0005, 0009, 0010, 0011, 0101, 0102, 0103, 0104,0105, 0201, 0202, 0203, 0207, 0208, 0210, 0301, 0302, 0306, 0307, 0308, 0309
BLK 4 - Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, PowerPoint, Visio).
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLK s 10 -13 - The Test Plan shall be delivered 45 calendar days prior to the Production Readiness Review (PRR). The Government requires 20 calendar days for review. The Contractor shall incorporate the Government comments and submit the final document no later than 7 calendar days after receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil Lead Engineer: francis.bonner@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| Lead Engineer |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 2 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
M67854-16-R-0217
F. CONTRACTOR
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
Test Procedure
3. SUBTITLE
Acceptance Test Procedures
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80603A
5. CONTRACT REFERENCE
SOW para 3.4.3.3.1 and 3.4.3.3.2
6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK A – CLINs 0001, 0002, 0003, 0004, 0005, 0009, 010, 0011, 0101, 0102, 0103, 0108, 0201, 0202, , 0206, 0207, 0208, 0301, 0302, 0305, 0306, 0307, 0308, 0309
BLK 4 - Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, PowerPoint, Visio).
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10 -13 - Initial procedures shall be delivered 20 calendar days prior to the Production Readiness Review (PRR). The Government requires 10 calendar days for review. The Contractor shall incorporate the Government comments and submit the final document no later than 7 calendar days after receipt of Government comments.
Test procedures shall be modified to reflect updates to the procedures and/or changes to the configuration and delivered to the Government 15 calendar days after exercise of CLIN 0101 and 0201. The Government requires 20 calendar days for review. The contractor shall submit the final document 7 calendar days after receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil Lead Engineer: francis.bonner@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| Lead Engineer |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 2 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
M67854-16-R-0217
F. CONTRACTOR
1. DATA ITEM NO.
A012
2. TITLE OF DATA ITEM
Test/Inspection Report
3. SUBTITLE
Acceptance Test Report
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B
5. CONTRACT REFERENCE
SOW para 3.4.3.3.1 and 3.4.3.3.2
6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK A – CLINs 0001, 0002, 0003, 0004, 0005, 0009, 010, 0011, 0101, 0102, 0103, 0108, 0201, 0202, , 0206, 0207, 0208, 0301, 0302, 0305, 0306, 0307, 0308, 0309
BLK 4 - Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, PowerPoint, Visio).
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10 -13 - The Contractor shall submit a Test Report not later than 10 calendar days after the completion of each test event identified in the Contractor’s Integrated Master Schedule (IMS) and the Acceptance Test Plan. The Government requires 15 calendar days for review. The Contractor shall incorporate the Government comments and submit the final not later than 7 calendar days after receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil Lead Engineer: francis.bonner@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| Lead Engineer |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 2 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
M67854-16-R-0217
F. CONTRACTOR
1. DATA ITEM NO.
A013
2. TITLE OF DATA ITEM
Health Hazard Assessment (HHA) Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SAFT-80106C
5. CONTRACT REFERENCE
SOW para 3.4.3.4.2
6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK A – CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0011,0101, 0102, 0103, 0104, 0105, 0106,0107, 0108, 0201, 0202, 0203, 0204, 0205, 0206, 0207, 0208, 0301, 0302, 0303, 0304, 0305, 0306, 0307, 0308, 0309
BLK 4 - Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, PowerPoint, Visio).
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10 - 13 - The Contractor shall submit a HHA Report 45 calendar days prior to the Production Readiness Review (PRR). The Government requires 20 calendar days for review. The Contractor shall incorporate the Government comments and submit the final no later than 7 calendar days after receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| Lead Engineer |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 2 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
A
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
M67854-16-R-0217
F. CONTRACTOR
1. DATA ITEM NO.
A014
2. TITLE OF DATA ITEM
Hazardous Materials Management Program (HMMP) Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-81397C
5. CONTRACT REFERENCE
SOW para 3.4.3.5
6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK A – CLINs 0001, 0002, 0003, 0004, 0005, 0006, 0007, 0008, 0009, 0010, 0101, 0102, 0103, 0104, 0105, 0106,0107, 0108, 0201, 0202, 0203, 0204, 0205, 0206, 0207, 0208, 0301, 0302, 0303, 0304, 0305, 0306, 0307, 0308, 0309
BLK 4 - Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, PowerPoint, Visio).
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10 - 13 - The Contractor shall submit a HMMP Report 20 calendar days prior to the Production Readiness Review (PRR). The Government requires 10 calendar days for review. The Contractor shall incorporate the Government comments and submit the final no later than 7 calendar days after receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| Lead Engineer |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 2 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
M67854-16-R-0217
F. CONTRACTOR
1. DATA ITEM NO.
A015
2. TITLE OF DATA ITEM
Software Development Plan (SDP)
3. SUBTITLE
Software Sustainment Plan (SSP)
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81427A
5. CONTRACT REFERENCE
SOW para 3.4.4
6. REQUIRING OFFICE 18. ESTIMATED TOTAL PRICE
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
SEE BLK 16
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK A – CLINs 0009, 0108, 0206, 0305 BLK 4 - Contractor format is acceptable; however, to ensure information compatibility, the Contractor shall ensure all CDRLs, data, correspondence, etc. are provided in a format approved by the receiving Government representative.
At a minimum, the CDRL shall be provided electronically. Hard copies are only required if requested by the Government. All data shall be provided in an editable and non-protected format using MS Office 2010 products (Word, Excel, PowerPoint, Visio).
BLK 9 – Use the following: DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Oct 2016. Other requests shall be referred to Commander, Marine Corps Systems Command, Attn: PEO-LS/AC2SN, 2200 Lester Street, Quantico, VA 22134-6050.
BLKs 10 -13 – The Contractor shall deliver an update to the SSP, submitted with the Contractor’s proposal, 30 calendar days prior to the Production Readiness Review (PRR). The Government requires 15 calendar days for review. The Contractor shall incorporate the Government comments and submit the final no later than 7 calendar days after receipt of Government comments.
BLK 14 - Email addresses for Distribution list POCs:
COR: TBD
PCO: mohamed.elmi@usmc.mil Lead Engineer: francis.bonner@usmc.mil
| COR |
| 0 |
| 1 |
| 0 |
| PCO |
| 0 |
| 0 |
| 1 |
| Lead Engineer |
| 0 |
| 0 |
| 1 |
| 15. TOTAL --------- |
| 0 |
| 1 |
| 2 |
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE
| DD Form 1423-1, FEB 2001 |
| PREVIOUS EDITION MAY BE USED |
| Page __ of __ Pages |
CONTRACT DATA REQUIREMENTS LIST
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
SEE BLK 16
B. EXHIBIT
C. CATEGORY:
TDP _ _ TM _ _ OTHER __X__
D. SYSTEM/ITEM
CAC2S
E. CONTRACT/PR NO.
M67854-16-R-0217
F. CONTRACTOR
1. DATA ITEM NO.
A016
2. TITLE OF DATA ITEM
Software Product Specification (SPS)
3. SUBTITLE
Software Maintenance Release
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81441A
5. CONTRACT REFERENCE
SOW para 3.4.4.3
6. REQUIRING OFFICE
PEO LS, CAC2S
7. DD 250 REQ
LT
9. DIST
STATEMENT
SEE BLK 16
10. FREQUENCY
ASREQ
12. DATE OF 1ST SUBMISSION
14. DISTRIBUTION
| a. ADDRESSEE |
| b. COPIES |
8. APP CODE
11. AS OF DATE
13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16
| Draft |
| Final |
| Reg |
| Repro |
16. REMARKS
BLK A – CLINs 0009, 0108, 0206, 0305
BLK 4 - Contractor format is acceptable, however, to ensure information compatibility, the Contractor shall ensure…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .