About this file
M67854-16-R-0217 Section L Attachment L-1
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| INSTRUCTIONS: |
| This template is being utilized as a means of documenting/summarizing each vendor's basis of estimate by CLIN for the CAC2S source selection on a consistent basis. |
The Government requests each vendor submit this template in addition to the full basis of estimate as outlined in the RFP/SOW. If use of the template is problematic, please explain why and offer an alternative means of documenting the basis of estimate associated with each CLIN. Use of the template to document the basis of estimate does not circumvent or replace vendor purchasing or estimating systems; rather, the template is a tool to summarize data from vendor purchasing and estimating systems on a consistent basis to support the source selection process.
Unit Cost Calculation SOW Requirement 3.2.1: Lot 1 CAC2S FDUs (CLINs 0001, 0002, 0003, 0004, 0010, 0011) SOW Requirement 3.2.2: Lot 2 CAC2S FDUs (CLINs 0101, 0102, 0109, 0110) SOW Requirement 3.2.3: Lot 1 CAC2S FDUs (CLINs 0201, 0202, 0207, 0208) SOW Requirement 3.2.4: Lot 1 CAC2S FDUs (CLINs 0301, 0306)
| Quantity: | 7 | Quantity: | 3 | Quantity: | 2 | Quantity: | 10 | Quantity: | 4 | Quantity: | 6 | Quantity: | 2 | Quantity: | 9 | Quantity: | 2 |
| AC2S (V)1 | Cost | AC2S (V)2 | Cost | AC2S (V)3 | Cost | AC2S (V)1 | Cost | AC2S (V)3 | Cost | AC2S (V)1 | Cost | AC2S (V)3 | Cost | AC2S (V)1 | Cost | AC2S (V)3 | Cost |
| PMP | $ - 0 | PMP | $ - 0 | PMP | $ - 0 | PMP | $ - 0 | PMP | $ - 0 | PMP | $ - 0 | PMP | $ - 0 | PMP | $ - 0 | PMP | $ - 0 |
| Materials | Materials | Materials | Materials | Materials | Materials | Materials | Materials | Materials | |||||||||
| Manufacturing | Manufacturing | Manufacturing | Manufacturing | Manufacturing | Manufacturing | Manufacturing | Manufacturing | Manufacturing | |||||||||
| Variable Labor | Variable Labor | Variable Labor | Variable Labor | Variable Labor | Variable Labor | Variable Labor | Variable Labor | Variable Labor | |||||||||
| Fixed Labor | Fix Labor | Fix Labor | Fix Labor | Fix Labor | Fix Labor | Fix Labor | Fix Labor | Fix Labor | |||||||||
| Support Cost | Support Cost | Support Cost | Support Cost | Support Cost | Support Cost | Support Cost | Support Cost | Support Cost | |||||||||
| Storage/Freight | Storage/Freight | Storage/Freight | Storage/Freight | Storage/Freight | Storage/Freight | Storage/Freight | Storage/Freight | Storage/Freight | |||||||||
| Travel | Travel | Travel | Travel | Travel | Travel | Travel | Travel | Travel | |||||||||
| Software Licenses | Software Licenses | Software Licenses | Software Licenses | Software Licenses | Software Licenses | Software Licenses | Software Licenses | Software Licenses | |||||||||
| IAT&C | IAT&C | IAT&C | IAT&C | IAT&C | IAT&C | IAT&C | IAT&C | IAT&C |
| SEPM | SEPM | SEPM | SEPM | SEPM | SEPM | SEPM | SEPM | SEPM |
| G&A | G&A | G&A | G&A | G&A | G&A | G&A | G&A | G&A |
| Profit | Profit | Profit | Profit | Profit | Profit | Profit | Profit | Profit |
Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0 Grand Total $ - 0
| Cost | Cost | Cost | Cost | Cost | Cost | Cost | Cost | Cost | |||||||||
| PMP $ / System | $ - 0 | PMP $ / System | $ - 0 | PMP $ / System | $ - 0 | PMP $ / System | $ - 0 | PMP $ / System | $ - 0 | PMP $ / System | $ - 0 | PMP $ / System | $ - 0 | PMP $ / System | $ - 0 | PMP $ / System | $ - 0 |
| Total $ / System | $ - 0 | Total $ / System | $ - 0 | Total $ / System | $ - 0 | Total $ / System | $ - 0 | Total $ / System | $ - 0 | Total $ / System | $ - 0 | Total $ / System | $ - 0 | Total $ / System | $ - 0 | Total $ / System | $ - 0 |
CLIN Yearly Summary
| CLIN Yearly Summary | |||||
| CLIN | CLIN Summary | CLIN Type | Total Estimated Cost | Fixed Fee | Total Price |
| 0001 | FAT & FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0002 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0003 | FDU - AN/TSQ-297(V)3 (TAOC Trainer) | FFP | |||
| 0004 | FDU - AN/TSQ-297(V)2 (TACC) | FFP | |||
| 0005 | Data | NSP | |||
| 0006 | Reserved | ||||
| 0007 | Engineering Studies | CPFF | |||
| 0008 | GFP Repair | CPFF | |||
| 0009 | SW Sustainment | CPFF | |||
| 0010 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0011 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0101 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0102 | FDU - AN/TSQ-297(V)3 (TAOC Trainer) | FFP | |||
| 0103 | Data | NSP | |||
| 0104 | Initial Issue Spares | FFP | |||
| 0105 | Retgrofit Spares | FFP | |||
| 0106 | Engineering Studies | CPFF | |||
| 0107 | GFP Repair | CPFF | |||
| 0108 | SW Sustainment | CPFF | |||
| 0201 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0202 | FDU - AN/TSQ-297(V)3 (TAOC Trainer) | FFP | |||
| 0203 | Wholesale Spares | FFP | |||
| 0204 | Engineering Studies | CPFF | |||
| 0205 | GFP Repair | CPFF | |||
| 0206 | SW Sustainment | CPFF | |||
| 0207 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0208 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0209 | Software Transition | CPFF | |||
| 0210 | Data | NSP | |||
| 0301 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0302 | Data | NSP | |||
| 0303 | Engineering Studies | CPFF | |||
| 0304 | GFP Repair | CPFF | |||
| 0305 | SW Sustainment | CPFF | |||
| 0306 | Software Transition | CPFF | |||
| 0307 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0308 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0309 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| 0310 | FDU - AN/TSQ-297(V)1 (TAOC) | FFP | |||
| TOTALS: |
This sheet represents roll up of all CLIN cost/price data.
CLIN-CWBS Summary
| CLIN-CWBS Structure | ||||
| CLIN | CWBS | CWBS Description/Tile | Hours | Price |
| 0001 | 1.1.1.X | |||
| 1.1.1.Y | ||||
| 1.2.3.4.Z |
0002 1.1.1.4
This sheet represents CWBS for each CLIN in which work will be accomplished and associated cost/price accounting will take place.
CLIN0001
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0001 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0002
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0002 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0003
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0003 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0004
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0004 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0005
THIS CONTRACT LINE ITEM NUMBER IS NOT SEPARATELY PRICED. ANY COSTS ASSOCIATED WITH THIS CLIN SHOULD BE PRICED INTO ITS RESPECTIVE CLIN.
CLIN0006
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0006 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0007
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0007 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0008
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0008 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0009
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0009 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0010
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0010 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0011
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0011 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0101
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0101 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0102
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0102 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0103
THIS CONTRACT LINE ITEM NUMBER IS NOT SEPARATELY PRICED. ANY COSTS ASSOCIATED WITH THIS CLIN SHOULD BE PRICED INTO ITS RESPECTIVE CLIN.
CLIN0104
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0104 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0105
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0105 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0106
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0106 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0107
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0107 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0108
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0108 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0201
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0201 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0202
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0202 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0203
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0203 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0204
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0204 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0205
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0205 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY). These categories are examples and can be tailored as necessary. The costs/formulas on this sheet should be supported by the Materials, Rates, ODCs, and Travel tabs in this Workbook as well as the Basis of Estimate per Section L.
CLIN0206
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| CLIN 0206 | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Cost Summary (TY$) | $ - 0 | ||||||||||||||||
| Direct Labor | $ - 0 | ||||||||||||||||
| Labor Category I | |||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| Indirect Labor | |||||||||||||||||
| Labor Category I | $ - 0 | ||||||||||||||||
| Labor Category II | $ - 0 | ||||||||||||||||
| Labor Category III | $ - 0 | ||||||||||||||||
| Labor Category IV | $ - 0 | ||||||||||||||||
| TOOLING | |||||||||||||||||
| QUALITY CONTROL | |||||||||||||||||
| MANUFACTURING OPS | |||||||||||||||||
| Material | $ - 0 | ||||||||||||||||
| Subcontracts | $ - 0 | ||||||||||||||||
| Vendor quotes/P.O.s | $ - 0 | ||||||||||||||||
| Purchase order history | $ - 0 | ||||||||||||||||
| Material estimates | $ - 0 | ||||||||||||||||
| Other Direct Costs | $ - 0 | ||||||||||||||||
| Travel | $ - 0 | ||||||||||||||||
| Overhead/Indirect | $ - 0 | ||||||||||||||||
| Material handling | $ - 0 | ||||||||||||||||
| Material OH | $ - 0 | ||||||||||||||||
| G&A | $ - 0 | ||||||||||||||||
| FCCM | $ - 0 | ||||||||||||||||
| Profit/fee | $ - 0 | ||||||||||||||||
| FY17 | FY18 | FY19 | FY20 | ||||||||||||||
| Direct Labor hrs | TOTAL | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | - 0 | ||||||||||||||||
| Labor Category III | - 0 | ||||||||||||||||
| Labor Category IV | - 0 | ||||||||||||||||
| Indirect Labor | - 0 | ||||||||||||||||
| Labor Category I | - 0 | ||||||||||||||||
| Labor Category II | |||||||||||||||||
| Labor Category III | |||||||||||||||||
| Labor Category IV |
- 0
| BASIS OF ESTIMATE (BOE) |
| Tasks Performed |
Methods of cost estimating
Calculations
Labor function
Description of each labor category
Cross-checks used to verify reasonableness
This sheet represents detailed CLIN cost/price data by Government Fiscal Year (FY).
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .