- Issued by
-
United States Marine Corps
About this file
Attachment 12
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SOW/RFP | SPEC | Technical Criteria (SEC L) - RFP | Section M | CONTRACTOR PROPOSAL REFERENCE |
| L.1 TYPE OF CONTRACT (FAR 52.216-1) (APR 1984) | ||||
| N/A | N/A | The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation. | N/A | N/A |
| L.2 ANTICIPATED AWARD DATE (FEB 1995) | ||||
| N/A | N/A | The anticipated award date for this requirement is TBD. Offerors should use this date as a basis for schedules. | N/A | N/A |
| L.3 NUMBER OF AWARDS | ||||
| N/A | N/A | The Government intends to award a single contract under this RFP. | N/A | N/A |
| L.4 OFFER ACCEPTANCE PERIOD | ||||
| N/A | N/A | The minimum offer acceptance period is 180 calendar days from the date the Government specifies for receipt of proposals. | N/A | N/A |
| L.5 TIME, DATE AND PLACE FOR RECEIPT OF SUBMITTALS | ||||
| N/A | N/A | All Proposals that are submitted by U.S MAIL shall be addressed to the following address: | N/A | N/A |
| N/A | N/A | a. Submittals under this RFP will be received by the Contracting Officer no later than 4:00 p.m. (E.D.T.) on TBD at: PROGRAM MANAGER TRAINING SYSTEMS; Attn: John Lynch; 12350 Research Parkway; FL 32826-3275 | N/A | N/A |
| N/A | N/A | b. INSTRUCTIONS FOR HANDCARRIED OFFERS - If the proposal or final proposal revision (if and when a final proposal revision is requested) is hand carried, the offeror may bring a transmittal form to be completed by the receiving official, prior to the closing date specified in Block 9 of the Standard Form 33 for proposals or as specified in the amendment/letter request for final revised proposal. | N/A | N/A |
| N/A | N/A | All HAND CARRIED offers shall be delivered to the following address: UCF Partnership III – 5th Floor; 3100 Technology Parkway; Orlando, FL 32826; Attention: John Lynch, 407-380-4197; Contact Phone Numbers for Delivery: John E. Lynch 407-380-4197; Maria Beauford 407-380-8257 | N/A | N/A |
| N/A | N/A | c. Submission of email or facsimile offers are NOT authorized for this solicitation. | N/A | N/A |
| L.6 PROPOSAL INSTRUCTIONS AND PROPOSAL ARRANGEMENT | ||||
| N/A | N/A | a. General Instructions. Offerors are encouraged to review the requirements, seek to be innovative in their approach to providing the supplies, and maximize efficiencies and economies of scale. Capabilities may be established within either the offeror's corporate structure or through teaming arrangements. The Government is neither encouraging nor discouraging teaming arrangements and will focus on the offeror's proposed approach to perform work and satisfy the requirements. No alternate proposals shall be accepted. | N/A | N/A |
| N/A | N/A | b. The Procuring Contracting Officer (PCO) and Contract Specialist are the points of contact for this acquisition. Only the Procuring Contracting Officer is authorized to amend the Request for Proposals (RFP). Address any questions, concerns, or requests for clarification you may have, in writing, to: Program Manager Training Systems (PMTRASYS) – USMC; Attn: John Lynch, Contracting Officer;12350 Research Parkway; Orlando, FL 32826-3275; Fax Number: 407-380-4197 Email: john.e.lynch2@usmc.mil Note: All questions shall be received by Nov 02, 2012. No phone calls will be accepted. | N/A | N/A |
| L.7 ORGANIZATION AND CONTENT OF PROPOSALS | ||||
| General Instructions | ||||
| a. CONTENT | ||||
| N/A | N/A | An offeror’s proposal shall consist of four (4) separate volumes. Volume I shall address the Technical approach for all requirements. Volume II shall address Program Management and Logistics. Volume III shall address Price/Administrative approach for all requirements. Volume IV shall address Performance Risk for all requirements including the Past Performance worksheet. |
A. This evaluation will cover the following Factors:
Area I – Technical Area II – Management/Logistics Area III – Price Proposal/Administrative Area IV- Performance Risk
| N/A | ||||||
| b. OBJECTIVE | ||||||
| N/A | N/A | The objective of these proposal requirements is to ensure that the Government receives a complete approach for the U.S. Marine Corps Range Training Systems. Adherence to these proposal requirements will establish a uniform basis for evaluation. Failure to comply with any proposal content requirements or simply stating “compliant” to specific requirements will provide a basis to judge the proposals “unacceptable.” A proposal determined to be “unacceptable” may be removed from consideration. | N/A | N/A | ||
| N/A | N/A | Note: No Alternate Proposals shall be accepted. | N/A | N/A | ||
| c. PROPOSAL FORMAT | ||||||
| N/A | N/A | 1. The written portions of the proposal shall use no smaller than Microsoft Word 2007 Times New Roman font size 11. If both sides of sheets of paper are used, each sheet will be counted as two pages. Volumes shall be printed on 8 1/2 x 11 inch paper. Tables or figures may be printed on fold out sheets, which shall not exceed 11 x 17 inches. Figure text must be no smaller than Microsoft Word 2007 Times New Roman font size 11 should, to the maximum extent practicable, have the same major orientation as the text it accompanies. Electronic versions of the proposal shall be submitted in Microsoft Office 2003. | N/A | N/A | ||
| N/A | N/A | 2. All printed pages shall contain the phrase: “SOURCE SELECTION INFORMATION" (printed or stamped) in addition to the FAR proprietary data notice, if applicable. Each volume shall be submitted in standard size 3-ring binders that will facilitate the insertion of change pages and additional information provided during the source selection process. | N/A | N/A | ||
| N/A | N/A | 3. An offeror’s proposal shall include a transmittal letter that includes the following: solicitation number and closing date and time; Government issuing office identification; full official name and address of firm; individual designated as the responsible contact for the firm; reference to the enclosures or volume numbers and show quantities being provided of each; and the date of the enclosures or volumes if different from the date of an offeror’s proposal. The transmittal letter shall be signed by an authorized official of the offeror. | N/A | N/A | ||
| N/A | N/A | 4. Each volume should contain the following: | N/A | N/A | ||
| N/A | N/A | Cover and Title Page – The cover and title page indicate: | N/A | N/A | ||
| N/A | N/A | · Title of proposal | N/A | N/A | ||
| N/A | N/A | · RFP number | N/A | N/A | ||
| N/A | N/A | · Proposal volume | N/A | N/A | ||
| N/A | N/A | · Section numbers | N/A | N/A | ||
| N/A | N/A | · Serial number/copy number | N/A | N/A | ||
| N/A | N/A | · Offeror’s name | N/A | N/A | ||
| N/A | N/A | 5. Table of Contents – The table of contents must provide sufficient detail to enable easy location of important elements. | N/A | N/A | ||
| N/A | N/A | 6. No price information, (i.e., DOLLAR VALUES AND HOURLY RATES) shall be included in any volume other than the Price/Administrative Volume (Volume III). | N/A | N/A | ||
| N/A | N/A | 7. Provide a Standard Form 33, completed and signed. | N/A | N/A | ||
| d. COPY AND PAGE LIMITATIONS | ||||||
| N/A | N/A | The proposal shall be provided in the indicated number of paper and electronic copies for each volume. Each volume of the proposal shall be limited to the following page counts (fold out pages shall count as two pages, manufacturers product sheets do not count against the page count limitations). Pages supplemented with diagrams, drawings, and illustrations will be counted towards the maximum page count. | N/A | N/A | ||
| N/A | N/A | <Table Omitted> | N/A | N/A | ||
| e. PROPOSAL CONTENT | ||||||
| N/A | N/A | 1. Your proposal is to be based on the solicitation schedule, DD Forms 1423, Contract Data Requirements Lists (CDRL's), the Statement of Work and the System Specification. | N/A | N/A | ||
| N/A | N/A | 2. Each separate volume shall be identified on the first page with the Solicitation Number, the Offerors name, and the date. | N/A | N/A | ||
| N/A | N/A | 3. Proposal Page Limit: There is a 100 page limit for Volumes I and II. The Volumes shall NOT exceed either 50 double-sided pages or 100 single-sided pages in length (including diagrams). There is a 50 page limit for Volume IV. Volume IV shall NOT exceed 25 double-sided pages or 50 single sided pages in length (including diagrams). Any pages beyond this will be neither read nor considered in the evaluation. Tables of contents, cross-referencing indices, glossaries, pictures, acronym lists, and tabs that contain no information other than section identification are excluded from the page count. Proposals shall be presented on 8.5 x 11.0 inch white bond paper with one-inch margins and bound in a three-ring binder(s). Font size will be 11-point except text for illustrations and tables. Foldout pages may only be used for flow charts, graphs, tables, sample artist’s renditions, or other such data items. All text should be provided on standard 8.5 x 11.0 paper. A foldout page should be limited to 11.0 x 17.0 inches. | N/A | N/A | ||
| N/A | N/A | 4. Price Proposal Section B Spreadsheets: In addition to the hard copies, offerors’ price proposals (Section B) shall also be presented as spreadsheets on CD-ROM discs, indexed and labeled for content with the offeror’s name. Price proposals submitted on diskettes shall be compatible with Microsoft Excel 2007 for Windows. File names for electronically submitted files shall not exceed 8 characters. The first two letters of each file name shall be the initials or the first two letters of the offeror’s name, leaving the remaining six characters to indicate what is contained in the file. | N/A | N/A | ||
| VOLUME I – Technical | = | Believe it has been removed from the current L & M | ||||
| N/A | N/A | This section of the technical proposal shall demonstrate the offeror's ability to perform technical requirements. | Area I- Technical |
A. Technical Proposals will be evaluated to assess the offeror’s ability to successfully perform the prospective contract. The proposal will be evaluated against three Factors: Factor 1, Technical Understanding and Factor 2, Information Assurance, Factor 3, Safety, Safety Assessment. To be eligible for award, a proposal must be found acceptable for each Factor. All information provided will be considered in determining the offeror's ability to perform.
| = | Problem | |
| 3.2-3.2.1; |
3.3.1-3.3.3.2.2;
3.3.3.2.4-3.3.3.10.2;
3.3.3.11-3.3.3.18.1;
3.4.3.2-3.4.3.5;
4.1.2.2-4.6
3-3.5.1;
3.5.1.3-3.5.1.4;
3.5.2 – 3.5.2.1.1;
3.5.2.2 – 3.7.1.1.5;
3.8.1.1 - 5 1. Discuss your solution to provide contract line items that meet all the requirements of the Statement of Work (SOW) and System Specification (SPEC). a. Factor 1- Technical Understanding: The proposal will be evaluated to determine the offeror's technical knowledge and ability to perform technical requirements. The Government’s evaluation will include:
i. Evaluations of the approach, methodology, and ability to accomplish the CLIN items requirements identified in the SOW and SPEC.
N/A N/A 2. Provide a Requirements Traceability Matrix that identifies each technical solution mapped to the SPEC/SOW requirements a. Factor 1- ...
ii. Evaluation of the Requirements Traceability Matrix that identifies each technical solution mapped to the SPEC/SOW requirements N/A N/A 3. Discuss your solution to meeting the Information Assurance requirements outlined in the SOW and SPEC. b. Factor 2- Information Assurance
i. Evaluation of the approach, methodology, and ability to accomplish the requested Information Assurance requirements
4-4.1.2.1 3.5.1.1-3.5.1.2;
3.5.1.5;
3.7.2 – 3.7.2.1;
3.7.4-3.7.5; 4. Discuss your solution to comply and deliver Safety Assessment Reports. Provide a draft Safety Assessment of 2 systems. c. Factor 3- Safety
i. Evaluation of the draft Safety Assessment Report methodology robert.platt: robert.platt:
Does this include the evaluation of safety approach, or just SARs?
| VOLUME II – Program Management/Logistics | |||
| N/A | N/A | This section of the proposal shall demonstrate the offeror's ability to perform management/logistics requirements. | Area II- Program Management/Logistics |
Program Management/Logistics Proposal will be evaluated to assess the offerors ability to successfully perform the prospective contract. The proposal will be evaluated against four Factors: Factor 1, Integrated Master Schedule; Multiple Delivery Orders Concurrently, Factor 2, Life Cycle Support, Spare Parts, Subfactor 2, COTS/NDI, Factor 3, Technical Documentation, TD Format/Access, Factor 4, Quality Assurance Program.
3.1;
3.2.1 – 3.3;
3.4-3.4.3.1;
5.2.4.7-6 N/A 1. Discuss you planned Integrated Master Schedule for the RTS contract a. Factor 1- Integrated Master Schedule (MS)
i. Evaluation of the proposed IMS, indicated resources within the project team for concurrent projects robert.platt: robert.platt:
Typo, should be "IMS" instead of "MS" " " " " " " " " 2. Discuss your Program Management strategy that outlines an ability to manage and deliver multiple Delivery Orders (DOs) concurrently. ii. Provide a management plan outlining your ability to meet the technical requirements. The management plan should provide an overview of daily operations and procedures/policies to be implemented.
robert.platt: robert.platt:
Section L type language, but in Section M
iii. Identify all subcontractors to be utilized and describe their role under the contract.
robert.platt: robert.platt:
Does not trace to section L. Language does not fit section L.
3.3.3.2.3;
3.3.3.10.3;
5 - 5.2.4.6 3.7.3;
3.7.6 – 3.7.6.2.4
3. Discuss your life cycle support strategy for the systems under RTS
4. Discuss your strategy to meeting the requirements for spare parts with the CLS contractor.
5. Discuss your strategy for re-use of commercial products b. Factor 2- Life Cycle Support
i. Spare Parts
ii. COTS/NDI
All CDRLs N/A 6. Discuss your Technical Documentation strategy. c. Factor 3- Technical Documentation
i. TD Format/Access
3.4.4 N/A 7. Discuss your Quality Assurance Program/System, any certifications you may have received, and methods for continuous quality improvement. d. Factor 4, Quality Assurance Program
ii. Discuss your Quality Assurance Program and methods for continuous quality improvement. Describe your Quality Assurance (QA) program/plan that incorporates inspections as part of the overall QA plan.
| VOLUME III – Price Proposal/Administrative | |||
| N/A | N/A | The Price Proposal/Administrative Proposal Volume shall address the following: | The price proposal/administrative proposal will be evaluated for total price, reasonableness and materially unbalanced pricing of the basic and option quantities. |
| N/A | N/A | 1. Price Proposal. SF 33 - The offeror shall provide a completed and signed SF 33, Solicitation, Offer and Award. The price proposal shall consist of Sections A through K. For Section B, ensure prices are entered for all items for which space has been provided. The only items that don’t require a price to be entered or that can be Not Separately Priced (NSP) are those which have been so designated by the Government. The price proposal shall also contain Representations & Certifications (Section K). | " " " " |
| N/A | N/A | 2. Total Evaluated Price - The offeror shall provide a total evaluated price that consists of a unit price and a total of all Priced CLINs. | a. Total Price. The price of all items. |
| N/A | N/A | 3. The offeror shall provide information describing existing financial stability and company infrastructure via an independent analysis from an outside agency such as the Dun & Bradstreet report or other independent analysis of financial strength. |
robert.platt: robert.platt:
There is no section M factor for stability robert.platt: robert.platt:
Does this include the evaluation of safety approach, or just SARs?
robert.platt: robert.platt:
Typo, should be "IMS" instead of "MS" robert.platt: robert.platt:
Section L type language, but in Section M robert.platt: robert.platt:
Does not trace to section L. Language does not fit section L. N/A N/A 4. To facilitate contract administration, offerors are required to submit line item unit prices and total price will be proposed in whole dollars. b. Reasonableness. Normally, competition establishes price reasonableness. In limited situations, additional analysis will be required by the Government to determine reasonableness. If, after receipt of a proposal, the PCO determines that adequate price competition does not exist for the firm, fixed-price efforts and a determination is made that none of the exceptions in FAR 15.403-1(b) apply, the offeror will be required to provide certified cost and pricing data in accordance with FAR 15.403-4.
c. Unbalanced Pricing. Proposals will be analyzed to determine if the prices are materially unbalanced. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of price analysis techniques. An unbalanced offer may pose an unacceptable risk to the Government and may be rejected.
| N/A | N/A | 5. The offeror must adequately support all proposed prices. The proposal must include sufficient background to show derivation of all prices. If the Government cannot understand the price proposal, it may result in the Government finding the entire proposal to be unacceptable and thus eliminated from the competition. | " " " " |
| N/A | N/A | 6. Offerors are encouraged to submit any additional information which might assist in the proposal evaluation for reasonableness and realism. | b. Reasonableness. Normally, competition establishes price reasonableness. In limited situations, additional analysis will be required by the Government to determine reasonableness. If, after receipt of a proposal, the PCO determines that adequate price competition does not exist for the firm, fixed-price efforts and a determination is made that none of the exceptions in FAR 15.403-1(b) apply, the offeror will be required to provide certified cost and pricing data in accordance with FAR 15.403-4. |
| VOLUME IV –Performance Risk | |||
| N/A | N/A | The Performance RiskVolume shall provide the following information: | Area 4 –Performance Risk Assessment |
Performance Risk is associated with an offeror's ability to perform the solicitation's requirements as indicated by that offeror's record of past and current relevant performance. Each offeror will be evaluated on its past performance on contracts or subcontracts currently ongoing or completed within the last three years for similar products or services. A past performance risk will be associated with an offeror's ability to accomplish the requested effort based on the offeror’s relevant demonstrated past performance. The evaluation will assess such factors as relevancy (in complexity, size and scope) to the requirement; quality of product or service; schedule and cost control; and business and customer relationships.
Past performance information will be obtained through the past performance information requested in Section L, Contractor Performance Assessment Rating Systems (CPARS), similar systems of other government departments and agencies, Defense Contract Management Agency (DCMA) channels, interviews with program managers and contracting officers, and/or other sources known to the government, including commercial sources. Offerors are reminded that while the Government may elect to consider data obtained from other sources than requested in Section L, the burden of proving acceptability rests with the offerors.
| N/A | N/A | 1. The Government will conduct a performance risk assessment based upon the past performance of the offeror on prime contracts and major subcontracts. In conducting the performance risk assessment, offerors are cautioned that the Government may use data provided by the offeror and data obtained from other sources. The Government may consider past performance on contracts not submitted by the offeror irrespective of customer or completion date. | " " " " |
| N/A | N/A | 2. The performance risk volume shall identify and describe past performance information in fulfilling Government and commercial contracts still in progress that have at least one year of performance history or completed during the last three years. The offeror shall submit no more than four (4) contracts where the offeror performed as a prime and/or major subcontractor. The offeror shall also submit information regarding past efforts performed by its proposed major subcontractors. No more than two contracts for each major subcontractor shall be submitted. A major subcontractor is defined as one who furnishes a critical expertise or function under the scope of the contract, or is anticipated to perform or has performed 30% or more of the contract. Irrespective of limitations, all contracts active within the past five years that have been terminated for default, received show cause or cure notices, had a defective pricing or fraud action initiated by the Government, or have had products accepted on a non-conforming basis must be reported. | " " " " |
| N/A | N/A | 3. The offeror's past and present performance should demonstrate the ability to isolate past and present problems down to a root cause and to take systemic improvement management actions to resolve the root cause of the problems. The offeror should demonstrate application of systemic improvement management practices by presenting the root cause, corrective actions taken or being taken to resolve past and present performance problems. | The degree to which the Offeror can demonstrate that it has successfully adopted and applied the principles and techniques of continuous systemic improvement in resolving past performance problems will be assessed. The Government will consider trends in the number and severity of problems, the effectiveness of corrective actions taken, and the overall work record. |
| N/A | N/A | 4. Forward a copy of the Past Performance Questionnaire to the cognizant Program Manager, PCO, and ACO of the Government agency or commercial entity for each contract or subcontract. Any questionnaires submitted by other than the cognizant Government Agency or commercial entity will not be considered. Advise the reporting Government Agency or commercial entity that: | N/A |
| N/A | N/A | a. The completed questionnaire is to be considered source selection sensitive in accordance with FAR 3.104. | N/A |
| N/A | N/A | b. The completed questionnaires are to be returned to the following address: | N/A |
| N/A | N/A | E-Mail (internet): john.e.lynch2@usmc.mil | N/A |
| N/A | N/A | FAX: 407-381-8817 | N/A |
| N/A | N/A | or | N/A |
| N/A | N/A | U.S. Mail: PMTRASYS – USMC | N/A |
| N/A | N/A | Attn: John E. Lynch, Contacting Officer | N/A |
| N/A | N/A | 12350 Research Parkway | N/A |
| N/A | N/A | Orlando, FL 32828-3275 | N/A |
| N/A | N/A | 5. Past Performance Questionnaires are due NO later than the closing date for submission of proposals. The offeror shall advise the responding Government agency or commercial entity of the applicable date. | N/A |
| N/A | N/A | 6. In accordance with FAR 15.306, the offeror may be given the opportunity to discuss adverse past performance information obtained from this questionnaire if they have not previously responded through Contractor Performance Assessment Reporting System (CPARS) or similar system. However, the names of individuals providing the information shall not be disclosed. | N/A |
| L.8 NOTICE TO OFFERORS REGARDING SUBMISSION OF PROPOSAL PACKAGES | |||
| N/A | N/A | Offerors are advised that proposals shall be accepted only from those offerors proposing as potential prime contractors. Such offerors shall be responsible for submitting complete proposal packages containing all components of the proposal inclusive of subcontract proposals. Separate proposal envelopes or packages containing components of your offer, such as proposed subcontracts, shall be accepted. | N/A |
Squad Immersive Training Environment (SITE) Live Enhancements Cross Reference Matrix M67854-13-R-7802
RFP
mailto:john.e.lynch2@usmc.mil Reqts Document Section Evaluation Factor Requirements
| SOW | 3 | 3. REQUIREMENTS | |
| SOW | 3.1 | 3.1 General | |
| SOW | 3.1 | II-1 IMS | The contractor shall ensure compliance with the contract requirements and the timely delivery of products and services identified in Section B of the contract as it pertains to individual Delivery Orders (DOs). |
| SOW | 3.1 | II-1 IMS | Based on the scope of work for each DO, the contractor shall deliver supplies identified on the contract line items (CLINs) in Section B as part of a larger RTS II. |
| SOW | 3.1 | II-1 IMS | The contractor shall include delivery and installation costs into each CLIN item. |
| SOW | 3.1 | II-1 IMS | Installation and shipping requirements will be further defined in this SOW. |
| SOW | 3.2 | 3.2 Installation | |
| SOW | 3.2 | I-1 - Technical Understanding | The Government’s expectation of installation is one that, upon Government acceptance, is fully ready for commencement of Marine Corps training. |
| SOW | 3.2 | I-1 - Technical Understanding | The contractor shall install products identified in Section B on Military Construction (MILCON) ranges, legacy ranges, Military Operations in Urban Terrain (MOUTs), and other training venues as directed in the DOs. |
| SOW | 3.2 | I-1 - Technical Understanding | The contractor shall include pricing for associated RTS II design, shipping, installation, testing, labor, materials, and integrated program management in each CLIN. |
| SOW | 3.2 | I-1 - Technical Understanding | Technical Data shall be included in the CLIN pricing. |
| SOW | 3.2 | I-1 - Technical Understanding | MILCON ranges will be designed and constructed per CEHNC 1110-1-23 utilizing CAT5/CAT6 Ethernet cabling, Fiber Optic cabling, or a combination of both. |
| SOW | 3.2 | I-1 - Technical Understanding | Fiber optic cabling and Ethernet cabling will be terminated and labeled by others unless, specifically addressed in the DO. |
| SOW | 3.2 | I-1 - Technical Understanding | The contractor shall provide and install the required communication equipment to complete the network, to include but not limited to media converters/switches, data surge protection, power supply, etc., at the Range Tower and the Target Enclosures, as well as all CLIN items procured in the DO. |
| SOW | 3.2 | I-1 - Technical Understanding | At the completion of MILCON or other Naval Facilities Engineering Command (NAVFAC) managed construction and prior to mobilization, the contractor shall complete a Target Interface Inspection (TII) of the range. |
| SOW | 3.2 | I-1 - Technical Understanding | The purpose of this inspection is to verify power outputs and electrical outlets are compatible, data network connections are installed, terminated, and labeled correctly, and the data signals are verified. |
| SOW | 3.2 | I-1 - Technical Understanding | Additionally, a physical inspection of all target enclosures, range tower, cables and connectors shall be conducted to ensure the range is ready for installation of range targets and devices. |
| SOW | 3.2.1 | 3.2.1 Site Survey | |
| SOW | 3.2.1 | I-1 - Technical Understanding | The contractor shall conduct one site survey per project to consist of a two (2) day event which includes walking the range(s), meeting with the end user customer to refine the requirement(s) and meeting with facilities personnel required to obtain permitting. |
| SOW | 3.2.1 | I-1 - Technical Understanding | The site survey shall be to Marine Corps site(s). |
| SOW | 3.2.1 | II-1 IMS | The contractor shall be given two (2) full days within fifteen (15) days of the receipt of the DO in order to attend the Site Survey. |
| SOW | 3.2.1 | II-1 IMS | The contractor shall coordinate with the Government project team for the site visit dates. |
| SOW | 3.2.1 | II-1 IMS | The contractor is required to provide appropriate staff to ensure that all required data is gathered to fulfill the DO. |
| SOW | 3.2.1 | II-1 IMS | The Government estimates the appropriate staff for the contractor would include one (1) project manager and one (1) engineer for the Site Survey task. |
| SOW | 3.2.1 | II-1 IMS | Should the contractor require additional time or visits, it will be at the contractor’s expense. |
| SOW | 3.2.1 | II-3 Technical Documentation | A Site Survey Report shall be delivered in accordance with [CDRL A001, Site Survey Report, (DI-MISC-81381)]. |
| SOW | 3.2.2 | 3.2.2 Deliveries | |
| SOW | 3.2.2 | II-1 IMS | The contractor is solely responsible for delivering, receiving, accounting, and storing all Targetry, components, devices, and materials that comprise the complete DO to the point of final turnover at Government Final Inspection (GFI). |
| SOW | 3.2.2 | II-1 IMS | The Government will not sign for or store equipment on behalf of the contractor. |
| SOW | 3.2.2 | II-1 IMS | The contractor shall be present to accept deliveries for items that require installation. |
| SOW | 3.2.2 | II-1 IMS | The contractor shall contact the Government ten (10) working days prior to actual delivery of items or materials to conduct final coordination with the delivery location. |
| SOW | 3.3 | 3.3 Range Training Systems (RTS) Requirements | |
| SOW | 3.3 | II-1 IMS | The contractor shall deliver, install, and test training systems as part of a larger RTS, in accordance with (IAW) the SOW and specification, and the requirements of each DO. |
| SOW | 3.3.1 | 3.3.1 Live Fire Ground Based Training Systems | |
| SOW | 3.3.1 | I-1 - Technical Understanding | Live Fire Ground based training systems are comprised of a mix of Stationary Infantry Target (SIT), Stationary Armor Target (SAT), Moving Infantry Target (MIT), and Moving Armor Target (MAT) plus associated simulator equipment. |
| SOW | 3.3.1 | I-1 - Technical Understanding | All hardware shall be controlled by a Stationary and/or Portable Range Control Station utilizing integrated software. |
| SOW | 3.3.1 | I-1 - Technical Understanding | The following targets and effects systems shall be controlled from a single controller utilizing integrated software. |
| SOW | 3.3.1.1 | 3.3.1.1 Range Control Stations (RCS) | |
| SOW | 3.3.1.1 | I-1 - Technical Understanding | Each RCS shall provide a single, integrated control interface that controls all RCS-controlled devices. |
| SOW | 3.3.1.1 | I-1 - Technical Understanding | Each RCS shall use Microsoft Windows 7 Professional operating system. |
| SOW | 3.3.1.1 | I-1 - Technical Understanding | The contractor shall provide the following RCS variants according to the requirements below and the specification. |
| SOW | 3.3.1.1 | I-1 - Technical Understanding | All RCS systems delivered on this contract shall be integrated and capable of controlling target systems and effects devices installed as part of the complete RTS. |
| SOW | 3.3.1.1 | I-1 - Technical Understanding | The contractor shall provide the current version of integrated software and firmware to all RCS computers. |
| SOW | 3.3.1.1.1 | 3.3.1.1.1 RCS (Stationary) – Radio Frequency (RF) Communications with Integrated Software | |
| SOW | 3.3.1.1.1 | I-1 - Technical Understanding | The contractor shall provide RCS hardware suite, which includes a desktop PC, two (2) monitors, keyboard, mouse, printer, power cords, RF link box, antenna, cabling, and software to control all Targetry and range effects devices via two-way communications IAW the specification. |
| SOW | 3.3.1.1.1 | I-1 - Technical Understanding | The RCS shall include a CD and DVD burner, with all software necessary to record to CDs and DVDs. |
| SOW | 3.3.1.1.1 | I-1 - Technical Understanding | The contractor shall also provide an Uninterruptible Power Supply (UPS) for the Stationary RCS. |
| SOW | 3.3.1.1.2 | 3.3.1.1.2 RCS (Portable) - RF Communications with Integrated Software | |
| SOW | 3.3.1.1.2 | I-1 - Technical Understanding | The contractor shall provide a Portable RCS IAW the specification. |
| SOW | 3.3.1.1.2 | I-1 - Technical Understanding | The contractor shall provide a portable ruggedized laptop computer with RF capability to control all targets and effects devices. |
| SOW | 3.3.1.1.2 | I-1 - Technical Understanding | The contractor shall provide an additional lithium computer battery and radio battery, chargers, charger cables, and carrying backpack. |
| SOW | 3.3.1.1.3 | 3.3.1.1.3 RCS (Stationary) - Hard Wired (H/W) LAN Communications with Integrated Software | |
| SOW | 3.3.1.1.3 | I-1 - Technical Understanding | The contractor shall provide RCS hardware suite, which includes a desktop PC, two (2) monitors, keyboard, mouse, printer, power cords, LAN cabling, and software to control all targetry and range effects devices via H/W LAN communications, IAW the specification. |
| SOW | 3.3.1.1.3 | I-1 - Technical Understanding | The RCS shall include a CD and DVD burner, with all software necessary to record to CDs and DVDs. |
| SOW | 3.3.1.1.3 | I-1 - Technical Understanding | The contractor shall also provide an Uninterruptible Power Supply (UPS) for the Stationary RCS. |
| SOW | 3.3.1.1.4 | 3.3.1.1.4 RCS (Portable) – H/W LAN with Integrated Software | |
| SOW | 3.3.1.1.4 | I-1 - Technical Understanding | The contractor shall provide a Portable RCS IAW the specification. |
| SOW | 3.3.1.1.4 | I-1 - Technical Understanding | The contractor shall provide a portable ruggedized laptop computer with an H/W LAN connection and capability to perform as a back-up to the Stationary RCS to control all targets and effects devices when connected to the Range LAN network. |
| SOW | 3.3.1.1.4 | I-1 - Technical Understanding | The contractor shall provide an additional lithium computer battery, charger, charger cables, and carrying backpack. |
| SOW | 3.3.1.1.5 | 3.3.1.1.5 RCS (Stationary) - H/W LAN and RF (Dual Capable) COMM with Integrated Software | |
| SOW | 3.3.1.1.5 | I-1 - Technical Understanding | The contractor shall provide RCS hardware suite, which includes a desktop PC, two (2) monitors, keyboard, mouse, printer, power cords, LAN cabling, RF radio, RF converter box, software, and other components needed to achieve a dual control capability. |
| SOW | 3.3.1.1.5 | I-1 - Technical Understanding | The contractor shall provide two-way communications to control and receive information between the portable RF RCS and stationary RCS to control a combination of H/W LAN and RF targetry and range effects devices. |
| SOW | 3.3.1.1.5 | I-1 - Technical Understanding | Dual capability control shall be transparent to the RCS operator and not hinder his or her ability to display, control, and program all targets and effects devices installed on the range. |
| SOW | 3.3.1.1.5 | I-1 - Technical Understanding | The RCS shall include a CD and DVD burner, with all software necessary to record to CDs and DVDs. |
| SOW | 3.3.1.1.5 | I-1 - Technical Understanding | The contractor shall also provide an Uninterruptible Power Supply (UPS) for the Stationary RCS. |
| SOW | 3.3.1.2 | 3.3.1.2 SITs | |
| SOW | 3.3.1.2 | I-1 - Technical Understanding | SITs shall be modular and combine required components (Target Lifter and Silhouettes) and optional devices (LOMAH, Effects Simulators, and IR signatures) IAW the DO. |
| SOW | 3.3.1.2 | I-1 - Technical Understanding | All SITs shall operate using available power. SITs shall come complete with all necessary cables and interfacing devices to make it compatible with the power and signal interfaces. |
| SOW | 3.3.1.2 | I-1 - Technical Understanding | All power and communication wires/cables within the target position shall be installed in a neat and workmanlike manner per NEC Article 110. |
| SOW | 3.3.1.2 | I-1 - Technical Understanding | As required, the contractor shall provide SITs IAW the specification. |
| SOW | 3.3.1.2 | I-1 - Technical Understanding | SITs shall have the following configurations: |
| SOW | 3.3.1.2.1 | 3.3.1.2.1 RF, Battery Powered SIT (not installed) | |
| SOW | 3.3.1.2.1 | I-1 - Technical Understanding | The contractor shall provide, deliver, offload, and test battery-operated, RF controlled SITs with attached silhouette per the specification. |
| SOW | 3.3.1.2.1 | I-1 - Technical Understanding | This item is for portable range usage and will not require installation. |
| SOW | 3.3.1.2.2 | 3.3.1.2.2 RF, Battery Powered SIT | |
| SOW | 3.3.1.2.2 | I-1 - Technical Understanding | The contractor shall deliver, install, and test battery-operated, RF controlled SITs with attached silhouette per the specification. |
| SOW | 3.3.1.2.2 | I-1 - Technical Understanding | Target Enclosure Installation |
| SOW | 3.3.1.2.2 | I-1 - Technical Understanding | The contractor shall install battery-operated, RF controlled SITs in existing target enclosures, consisting of standard materials such as concrete, wood, SACON, and/or rubber as specified in the DO. |
| SOW | 3.3.1.2.2 | I-1 - Technical Understanding | The contractor shall: |
| SOW | 3.3.1.2.2 | I-1 - Technical Understanding | a. Mount SIT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface |
| SOW | 3.3.1.2.2 | I-1 - Technical Understanding | b. Connect target battery cable to 12V battery |
| SOW | 3.3.1.2.2 | I-1 - Technical Understanding | c. Attach radio antenna ensuring no portion of the antenna protrudes above the ballistic protection |
| SOW | 3.3.1.2.2 | I-1 - Technical Understanding | MOUT Installation |
| SOW | 3.3.1.2.2 | I-1 - Technical Understanding | a. Mount SIT to building wall adjacent to doorways, window, hallway, etc. as specified in the DO |
| SOW | 3.3.1.2.2 | I-1 - Technical Understanding | b. Connect target battery cable to 12V battery |
| SOW | 3.3.1.2.2 | I-1 - Technical Understanding | c. Attach radio antenna ensuring no portion of the antenna protrudes into the doorway, window, or hallway or beyond the ballistic protection provided |
| SOW | 3.3.1.2.3 | 3.3.1.2.3 RF, Battery Powered SIT with Solar Power System | |
| SOW | 3.3.1.2.3 | I-1 - Technical Understanding | The contractor shall deliver, install, and test battery-operated, RF controlled SITs with attached silhouette and solar power system for power regeneration per the specification. |
| SOW | 3.3.1.2.3 | Target Enclosure Installation | |
| SOW | 3.3.1.2.3 | I-1 - Technical Understanding | The contractor shall install battery-operated, RF controlled SITs in existing target enclosures, consisting of standard materials such as concrete, wood, SACON, and/or rubber as specified in the DO. |
| SOW | 3.3.1.2.3 | I-1 - Technical Understanding | The contractor shall: |
| SOW | 3.3.1.2.3 | I-1 - Technical Understanding | a. Mount SIT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface |
| SOW | 3.3.1.2.3 | I-1 - Technical Understanding | b. Connect target battery cable to 12V battery |
| SOW | 3.3.1.2.3 | I-1 - Technical Understanding | c. Connect the solar power system cable to 12V battery with charging controller and align solar power system for optimum sun exposure |
| SOW | 3.3.1.2.3 | I-1 - Technical Understanding | d. Attach radio antenna ensuring it doesn’t protrude beyond the ballistic protection |
| SOW | 3.3.1.2.4 | 3.3.1.2.4 RF, Shore Powered SIT | |
| SOW | 3.3.1.2.4 | I-1 - Technical Understanding | The contractor shall deliver, install, and test RF controlled, shore powered SITs with attached silhouette per the specification. |
| SOW | 3.3.1.2.4 | RF, Shore Powered SIT | |
| SOW | 3.3.1.2.4 | I-1 - Technical Understanding | The contractor shall install RF controlled shore powered SITs in existing target enclosures consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO. |
| SOW | 3.3.1.2.4 | I-1 - Technical Understanding | The contractor shall: |
| SOW | 3.3.1.2.4 | I-1 - Technical Understanding | a. Mount SIT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface |
| SOW | 3.3.1.2.4 | I-1 - Technical Understanding | b. Connect target power cable to the power outlet provided in the enclosure, per the DO and the specification |
| SOW | 3.3.1.2.4 | I-1 - Technical Understanding | c. Attach radio antenna ensuring no portion of the antenna protrudes above the ballistic protection |
| SOW | 3.3.1.2.4 | I-1 - Technical Understanding | MOUT Installation |
| SOW | 3.3.1.2.4 | I-1 - Technical Understanding | a. Mount SIT to building wall adjacent to doorways, window, hallway, etc. as specified in the DO |
| SOW | 3.3.1.2.4 | I-1 - Technical Understanding | b. Connect target power cable to the power outlet provided at the target location, per the DO and the specification. Power outlets will be provided within six (6) feet of the target location |
| SOW | 3.3.1.2.4 | I-1 - Technical Understanding | c. Attach radio antenna ensuring no portion of the antenna protrudes into the doorway, window, or hallway or beyond the ballistic protection provided |
| SOW | 3.3.1.2.5 | 3.3.1.2.5 H/W LAN, Shore Powered SIT | |
| SOW | 3.3.1.2.5 | I-1 - Technical Understanding | The contractor shall deliver, install, and test H/W LAN controlled, shore powered SITs with attached silhouette per the specification. |
| SOW | 3.3.1.2.5 | I-1 - Technical Understanding | Target Enclosure Installation |
| SOW | 3.3.1.2.5 | I-1 - Technical Understanding | The contractor shall install H/W LAN controlled; shore powered SITs in existing target enclosures consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO. |
| SOW | 3.3.1.2.5 | I-1 - Technical Understanding | The contractor shall: |
| SOW | 3.3.1.2.5 | I-1 - Technical Understanding | a. Mount SIT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface |
| SOW | 3.3.1.2.5 | I-1 - Technical Understanding | b. Connect target power cable to the power outlet provided in the enclosure, per the DO and the specification |
| SOW | 3.3.1.2.5 | I-1 - Technical Understanding | c. Mount the media switch inside the existing data panel |
| SOW | 3.3.1.2.5 | I-1 - Technical Understanding | d. Mount surge protection for the data lines, as required, in the data panels to ensure the target and all communications components are protected from line surges or lightning |
| SOW | 3.3.1.2.5 | I-1 - Technical Understanding | e. Connect the target data lines and media switch within the target data panel |
| SOW | 3.3.1.2.5 | I-1 - Technical Understanding | MOUT/Shoot house Installation |
| SOW | 3.3.1.2.5 | I-1 - Technical Understanding | a. Mount SIT to building wall adjacent to doorways, window, hallway, etc. as specified in the DO |
| SOW | 3.3.1.2.5 | I-1 - Technical Understanding | b. Connect target power cable to the power outlet provided at the target location, per the DO and the specification. Power outlets will be within six (6) feet of the target location |
| SOW | 3.3.1.2.5 | I-1 - Technical Understanding | c. Connect the target data line to the existing data receptacle or target data panel. Data outlets/panels will be within six (6) feet of the target location |
| SOW | 3.3.1.3 | 3.3.1.3 Double Arm -Stationary Infantry Targets (DSITs) | |
| SOW | 3.3.1.3 | I-1 - Technical Understanding | As required, the contractor shall provide DSITs IAW the specification. DSITs shall have following configurations: |
| SOW | 3.3.1.3.1 | 3.3.1.3.1 RF, Battery Powered DSITs (not installed) | |
| SOW | 3.3.1.3.1 | I-1 - Technical Understanding | The contractor shall provide, deliver, offload and test battery-operated, RF controlled DSITs with attached silhouette per the specification. |
| SOW | 3.3.1.3.1 | I-1 - Technical Understanding | This item is for portable range usage and will not require installation. |
| SOW | 3.3.1.3.2 | 3.3.1.3.2 RF, Battery Powered DSITs | |
| SOW | 3.3.1.3.2 | I-1 - Technical Understanding | The contractor shall deliver, install, and test battery-operated, RF controlled DSITs with attached silhouettes per the specification. |
| SOW | 3.3.1.3.2 | I-1 - Technical Understanding | Target Enclosure Installation |
| SOW | 3.3.1.3.2 | I-1 - Technical Understanding | The contractor shall install battery-operated, RF controlled DSITs in existing target enclosures, consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO. |
| SOW | 3.3.1.3.2 | I-1 - Technical Understanding | The contractor shall: |
| SOW | 3.3.1.3.2 | I-1 - Technical Understanding | a. Mount DSIT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface |
| SOW | 3.3.1.3.2 | I-1 - Technical Understanding | b. Connect target battery cable to 12V battery |
| SOW | 3.3.1.3.2 | I-1 - Technical Understanding | c. Attach radio antenna ensuring no portion of the antenna protrudes above the ballistic protection |
| SOW | 3.3.1.3.3 | 3.3.1.3.3 RF, Battery Powered DSITs, with Solar Power Systems | |
| SOW | 3.3.1.3.3 | I-1 - Technical Understanding | The contractor shall deliver, install, and test battery-operated, RF controlled DSITs with attached silhouettes and solar power system for power regeneration per the specification. |
| SOW | 3.3.1.3.3 | I-1 - Technical Understanding | Target Enclosure Installation |
| SOW | 3.3.1.3.3 | I-1 - Technical Understanding | The contractor shall install battery-operated, RF controlled DSITs with appropriate solar power systems in existing target enclosures, consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO. |
| SOW | 3.3.1.3.3 | The contractor shall: | |
| SOW | 3.3.1.3.3 | I-1 - Technical Understanding | a. Mount DSIT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface |
| SOW | 3.3.1.3.3 | I-1 - Technical Understanding | b. Connect target battery cable to 12V battery |
| SOW | 3.3.1.3.3 | I-1 - Technical Understanding | c. Connect the solar power system cable to 12V battery with charging controller and align solar power systems for optimum sun exposure |
| SOW | 3.3.1.3.3 | I-1 - Technical Understanding | d. Attach radio antenna ensuring it doesn’t protrude beyond the ballistic protection |
| SOW | 3.3.1.3.4 | 3.3.1.3.4 RF, Shore Power DSITs | |
| SOW | 3.3.1.3.4 | I-1 - Technical Understanding | The contractor shall deliver, install, and test RF controlled, shore powered DSITs with attached silhouettes per the specification. |
| SOW | 3.3.1.3.4 | I-1 - Technical Understanding | Target Enclosure Installation |
| SOW | 3.3.1.3.4 | I-1 - Technical Understanding | The contractor shall install RF controlled, shore powered DSITs in existing target enclosures consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO. |
| SOW | 3.3.1.3.4 | The contractor shall: | |
| SOW | 3.3.1.3.4 | I-1 - Technical Understanding | a. Mount DSIT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface |
| SOW | 3.3.1.3.4 | I-1 - Technical Understanding | b. Connect target power cable to the power outlet provided in the enclosure, per the DO and the specification |
| SOW | 3.3.1.3.4 | I-1 - Technical Understanding | c. Attach radio antenna ensuring no portion of the antenna protrudes above the ballistic protection |
| SOW | 3.3.1.3.5 | 3.3.1.3.5 H/W LAN, Shore Power DSITs | |
| SOW | 3.3.1.3.5 | I-1 - Technical Understanding | The contractor shall deliver, install, and test H/W LAN controlled, shore powered DSITs with attached silhouettes per the specification. |
| SOW | 3.3.1.3.5 | I-1 - Technical Understanding | Target Enclosure Installation |
| SOW | 3.3.1.3.5 | I-1 - Technical Understanding | The contractor shall install H/W LAN; controlled, shore powered DSITs in existing target enclosures consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO. |
| SOW | 3.3.1.3.5 | The contractor shall: | |
| SOW | 3.3.1.3.5 | I-1 - Technical Understanding | a. Mount DSIT within target enclosure utilizing bolts, or appropriate hardware for the mounting surface |
| SOW | 3.3.1.3.5 | I-1 - Technical Understanding | b. Connect target power cable to the power outlet provided in the enclosure, per the DO and the specification. |
| SOW | 3.3.1.3.5 | I-1 - Technical Understanding | c. Mount the media switch inside the existing data panel |
| SOW | 3.3.1.3.5 | I-1 - Technical Understanding | d. Mount surge protection for the data lines, as required, in the data panels to ensure the target and all communications components are protected from line surges |
| SOW | 3.3.1.3.5 | I-1 - Technical Understanding | e. Connect the target data lines and media switch within the target data panel |
| SOW | 3.3.1.4 | 3.3.1.4 Moving Infantry Targets (MITs) | |
| SOW | 3.3.1.4 | I-1 - Technical Understanding | MITs shall be modular and combine required components (Target Lifter and Silhouettes) and optional devices (LOMAH, Effects Simulators, and IR signatures) IAW the DO. |
| SOW | 3.3.1.4 | I-1 - Technical Understanding | The MIT shall incorporate a SIT target lifter. |
| SOW | 3.3.1.4 | I-1 - Technical Understanding | All moving targets shall come complete with all necessary cables and/or interfacing devices to be compatible with the commercial power and signal cables available as part of the target area configurations IAW CEHNC 1110-1-23, USACE Design Manual for Ranges. |
| SOW | 3.3.1.4 | I-1 - Technical Understanding | When using an alternate or additional power source, the moving target shall come with all necessary cables, hardware and/or interfacing devices to support the use of any such power source. |
| SOW | 3.3.1.4 | I-1 - Technical Understanding | Each MIT shall include a docking station. |
| SOW | 3.3.1.4 | I-1 - Technical Understanding | The docking station shall provide the required electrical power and connections to power the mover and recharge the mover’s batteries. |
| SOW | 3.3.1.4 | I-1 - Technical Understanding | The docking station shall provide a network connection to interface the mover to the RCS. |
| SOW | 3.3.1.4 | I-1 - Technical Understanding | As required, the contractor shall provide MITs IAW the specification. |
| SOW | 3.3.1.4 | I-1 - Technical Understanding | The contractor shall provide MITs with fifty (50) feet of track with each MIT with all mounting components and hardware required to install a fully functioning MIT track. |
| SOW | 3.3.1.4 | I-1 - Technical Understanding | MITs shall have the following configurations: |
| SOW | 3.3.1.4.1 | 3.3.1.4.1 RF, Battery Powered MITs (not installed) | |
| SOW | 3.3.1.4.1 | I-1 - Technical Understanding | The contractor shall deliver, offload, and test battery-operated, RF controlled MITs with attached silhouette per the specification. |
| SOW | 3.3.1.4.1 | I-1 - Technical Understanding | This item is for portable range usage and will not require installation. |
| SOW | 3.3.1.4.2 | 3.3.1.4.2 RF, Battery Powered MITs | |
| SOW | 3.3.1.4.2 | I-1 - Technical Understanding | The contractor shall deliver, install, and test battery-operated, RF controlled MITs with attached silhouette per the specification. |
| SOW | 3.3.1.4.2 | I-1 - Technical Understanding | Target Enclosure Installation |
| SOW | 3.3.1.4.2 | I-1 - Technical Understanding | The contractor shall install battery-operated, RF controlled MITs in existing target enclosures, consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO. |
| SOW | 3.3.1.4.2 | I-1 - Technical Understanding | The contractor shall: |
| SOW | 3.3.1.4.2 | I-1 - Technical Understanding | a. Mount MIT metal footers and track within target enclosure utilizing bolts, or appropriate hardware for the mounting surface |
| SOW | 3.3.1.4.2 | I-1 - Technical Understanding | b. Connect MIT battery cables to the systems 24V batteries |
| SOW | 3.3.1.4.2 | I-1 - Technical Understanding | c. Attach radio antenna ensuring no portion of the antenna protrudes above the ballistic protection or interferes with the operation of the MIT movement or target actuation |
| SOW | 3.3.1.4.3 | 3.3.1.4.3 RF, Shore Powered MITs | |
| SOW | 3.3.1.4.3 | I-1 - Technical Understanding | The contractor shall deliver, install, and test RF controlled, shore powered MITs with attached silhouette per the specification. |
| SOW | 3.3.1.4.3 | I-1 - Technical Understanding | Target Enclosure Installation |
| SOW | 3.3.1.4.3 | I-1 - Technical Understanding | The contractor shall install RF controlled, shore powered MITs in existing target enclosures consisting of standard materials such as concrete, wood, Ballistic Concrete, and/or rubber as specified in the DO. |
| SOW | 3.3.1.4.3 | I-1 - Technical Understanding | The contractor shall: |
This is the start of the file's text. The full file is on GovTribe.