ITB Exhibit A - Scope of Services .pdf
PDF 324 KB Posted
- Attached to
- Landscape Maintenance Services
- Solicitation number
- 142156
- Issued by
- Polk County, Florida
About this file
Landscape Maintenance Services Scope of Work Summary
This is an Invitation to Bid (ITB) Scope of Services document issued by the Central Florida Tourism Oversight District (CFTOD) for comprehensive landscape maintenance services across District roadways, rights-of-way, and designated properties. The scope encompasses full and complete care of approximately 1,452 acres, including turf areas, shrub beds, annual beds, trees, slopes, retention ponds, wood lines, and ditches. Services include removal, planting, fertilizing, weeding, mowing, trimming, edging, weed eating, irrigation inspection and maintenance, and pest control. The current contractor operates with approximately 65 employees. Work shall be performed between 3 a.m. and 5 p.m., Monday through Friday, with modified hours near resort areas (after 8 a.m.) and fire stations (after 7 a.m.), subject to seasonal adjustments and special events. The contract is awarded to one contractor for an initial term of three years with an optional two-year renewal period. The District intends to award the contract to the lowest responsive and responsible bidder, with the right to reject all bids or award to the next lowest responsive and responsible bidder if the selected bidder cannot execute the contract.
Bidders must demonstrate experience through three similar project references completed within the last five years as prime contractors, collectively demonstrating commercial landscape maintenance for properties with minimum 50-employee workforces, resort-quality standards, pond and canal maintenance, irrigation system management, plant installation and replacement, and pesticide/fertilizer application in compliance with regulations. Required certifications include Green Industries Best Management Practices (GI-BMP), Florida Department of Agriculture Pest Control Business License and Operator Certificate, FDOT Temporary Traffic Control Advanced and Intermediate certifications, and irrigation certifications (CIC for on-site manager and CIT for technicians). Contractors must submit a detailed Staffing Mobilization Plan, complete Subcontractor List, weekly facilities maintenance reports, weekly inspection reports, NPDES MS4 reporting documentation, and comply with Resolution 518 regarding water quality protection and Florida Administrative Code Rule 5E-1.003. Lump-sum monthly billing is prohibited; invoices must itemize charges separately by service area. Contractors are responsible for all damages caused by operations and must repair them within 24 hours or face back-charges at current hourly rates plus 20 percent on materials.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A - Scope of Services ITB No.: C007087
Project: Landscape Maintenance Services
SECTION 1. SCOPE OF SERVICES OVERVIEW
1.1 The Central Florida Tourism Oversight District (“District”) requests proposals from experienced and qualified firms for Landscape Maintenance services for District roadways, rights-of-way & other designated properties.
1.2 Full and complete care of all turf areas, shrub beds, annual beds, trees, slopes, retention ponds, wood lines, and ditches, which includes removal, planting, fertilizing, weeding, mowing, trimming, edging, weed eating, irrigation, and pest control. Owner is guaranteed that every planting mass, turf grass, trees, shrubs, ground cover annual/perennials, and flower containers shall maintain a healthy vigorous appearance and shall at all times be of the finest quality.
Note: The Contractor shall perform the basic services between the hours of 3 a.m. and 5 p.m., Monday through Friday or as deemed necessary and approved by Owner. Work within areas directly adjacent to Resort areas shall not begin until after 8 a.m. All work adjacent to the District Fire Stations will not commence until after 7 a.m. These hours are subject to change depending on the time of year and as a result of special events or holidays.
1.3 For informational purposes, the current contractor has approximately 65 employees working on this project. The total area included in the landscape maintenance services is approximately 1,452 acres.
1.4 For maps of the areas where the services will be performed, please refer to the link below.
https://experience.arcgis.com/experience/407594a18d3b4c0fab0d97de70bf68cd
SECTION 2. SCOPE OF SERVICES
2.1 General Requirements:
A. Contractor shall provide all labor, material, equipment, supervision, transportation, tools, incidentals, and all other requirements necessary to perform landscape maintenance including, but not limited to, the following:
1. Full and complete care of all turf areas, shrub beds, annual beds, trees, slopes, retention ponds, wood lines, and ditches, which includes removal, planting, fertilizing, weeding, mowing, trimming, edging, weed eating, irrigation, pest and litter control. Owner is guaranteed that every planting mass, turf grass, trees, shrubs, ground cover annual/perennials, and flower containers shall maintain a healthy vigorous appearance and shall at all times be of the finest quality.
B. Compliance with Resolution # 518: The Contractor shall perform all fertilization and related landscape maintenance services in strict accordance with Central Florida Tourism Oversight District Resolution No.
518, Protection of Water Quality, as amended or superseded by the Central Florida Tourism Oversight District (CFTOD), and Rule 5E-1.003, Florida Administrative Code (F.A.C.), as applicable. The Contractor shall comply with all applicable fertilizer content restrictions, application practices, fertilizer-https://experience.arcgis.com/experience/407594a18d3b4c0fab0d97de70bf68cd
RFP # C007087 Page 2 of 22 free zones, low maintenance zone requirements, and best management practices (BMPs). Grass clippings, fertilizer, vegetative matter, and other landscape debris shall not be blown, swept, discharged, or otherwise allowed to enter stormwater inlets, pipes, drainage systems, wetlands, waterways, or other water bodies. Any violation of these requirements shall be promptly corrected at the Contractor's expense.
C. Contract shall make weekly walk/ride -through reviews of the entire site related to visual observations and shall make necessary repairs and adjustments. Owner may attend the weekly walk/ride-through.
2.2 Work Activities and Frequencies
The following activities shall be performed at the frequencies specified below. The activities listed are not intended to be all-inclusive and are not limited to those specifically identified herein. Contractor shall perform all other related services necessary to ensure the satisfactory completion of the work.
Activity #1 and #2 – St Augustine Mow & Weed Eat Turf Frequency: Weekly – March-November; Twice Monthly December-February
1. St. Augustine grass shall be kept at a minimum height of 3-1/2 inches and a maximum height of 5 inches unless otherwise specified within the Agreement.
2. Trash/litter shall be picked up prior to all mowing. If litter is mowed over, it will be the responsibility of the contractor to remove all debris.
3. Grass clippings shall not be blown, swept, or otherwise discharged into ornamental beds, sidewalks, roadways, storm drains, inlets, drainage systems, waterways, or other areas where they may accumulate or cause obstruction. The Contractor shall properly manage and remove excess clippings generated during routine mowing, and no piles or accumulations of clippings shall be left in the mowing area. If excess turf clippings are found, the Contractor shall be notified and shall be responsible for removing them within twenty-four (24) hours of notification.
4. Contractor shall immediately disperse excess clippings or remove and dispose of at certified composting facility/landfill. This task shall be performed the same day as mowing. If an instance is reported, the contractor is required to correct this w/n 24 hours of notification.
5. During St. Augustine mowing, the Contractor shall neatly edge around all plant beds, sidewalks, curbs, trees, plants, all in-ground utility covers, etc., and maintain the shape and configuration of all planting areas in a clean manner free of imperfections at the same frequency as mowing and same day as mowing. Any damage caused during work will be the responsibility of the contractor to repair.
6. During St. Augustine mowing, all sidewalks, streets, and roadways shall be immediately swept, blown, or vacuumed to maintain a clean, well-groomed appearance.
7. During St. Augustine mowing, all areas inaccessible to mower, and/or otherwise un-mowable due to trees, light poles, signs, rocks, culverts, etc., shall be trimmed at the same height the same day and the same frequency as mowing.
8. The Owner reserves the right to adjust the calendar schedule as necessary to accommodate weather conditions that affect turf growth, including temperature extremes and excessive or insufficient precipitation.
RFP # C007087 Page 3 of 22
Activity #3 and #4 – Bahia Mow & Weed eat Turf Frequency: Weekly – March-November; Twice Monthly December-February
1. Bahia grass shall be kept at a minimum height of 3-1/2 inches and a maximum height of 5inches, to include seed heads, for maximum root development and for the best photosynthetic opportunity, unless otherwise specified within the Agreement.
2. Bahia grass for slopes shall be kept at a minimum height of 3.5 inches and a maximum height of 5 inches for maximum root development and for the best photosynthetic opportunity. Unless otherwise specified within the Agreement.
3. Trash/litter shall be picked up prior to all mowing. If litter is mowed over, it will be the responsibility of the contractor to remove all debris.
4. Grass clippings shall not be blown, swept, or otherwise discharged into ornamental beds, sidewalks, roadways, storm drains, inlets, drainage systems, waterways, or other areas where they may accumulate or cause obstruction. The Contractor shall properly manage and remove excess clippings generated during routine mowing, and no piles or accumulations of clippings shall be left in the mowing area. If excess turf clippings are found, the Contractor shall be notified and shall be responsible for removing them within twenty-four (24) hours of notification.
5. During Bahia mowing, the Contractor shall neatly edge around all plant beds, sidewalks, curbs, trees, plants, all in-ground utility covers, etc., and maintain the shape and configuration of all planting areas in a clean manner free of imperfections at the same frequency as mowing and same day as mowing. Any damage caused during work will be the responsibility of the contractor to repair.
6. During Bahia mowing, all sidewalks, streets, and roadways shall be immediately swept, blown, or vacuumed to maintain a clean, well-groomed appearance.
7. During Bahia mowing, all areas inaccessible to mower, and/or otherwise un-mowable due to trees, light poles, signs, rocks, culverts, etc., shall be trimmed at the same height the same day and the same frequency as mowing.
8. The Owner reserves the right to adjust the calendar schedule as necessary to accommodate weather conditions that affect turf growth, including temperature extremes and excessive or insufficient precipitation.
Activity #5 and #6 – Zoysia Mow & Weed eat Turf Frequency: Weekly – March-November; Twice Monthly December-February
1. Zoysia grass shall be kept at a minimum height of 2-1/2 inches and a maximum height of 3- 1/2inches for maximum root development and for the best photosynthetic opportunity. Unless otherwise specified within the Agreement.
2. Grass clippings shall not be blown, swept, or otherwise discharged into ornamental beds, sidewalks, roadways, storm drains, inlets, drainage systems, waterways, or other areas where they may accumulate or cause obstruction. The Contractor shall properly manage and remove excess clippings generated during routine mowing, and no piles or accumulations of clippings shall be left in the mowing area. If excess turf clippings are found, the Contractor shall be notified and shall be responsible for removing them within twenty-four (24) hours of notification.
RFP # C007087 Page 4 of 22
3. Contractor shall immediately disperse excess clippings or remove and dispose at certified composting facility/landfill. This task shall be performed the same day of mowing. If an instance is reported, the contractor is required to correct this w/n 24hours of notification.
4. During Zoysia mowing, the Contractor shall neatly edge around all plant beds, sidewalks, curbs, trees, plants, all in-ground utility covers, etc., and maintain the shape and configuration of all planting areas in a clean manner free of imperfections at the same frequency as mowing and same day as mowing. Any damage caused during work will be the responsibility of the contractor to repair.
5. During Zoysia mowing, all sidewalks, streets, and roadways shall be immediately swept, blown, or vacuumed to maintain a clean, well-groomed appearance.
6. During Zoysia mowing, all areas inaccessible to mower, and/or otherwise un-mowable due to trees, light poles, signs, rocks, culverts, etc., shall be trimmed at the same height the same day and the same frequency as mowing.
7. The Owner reserves the right to adjust the calendar schedule as necessary to accommodate weather conditions that affect turf growth, including temperature extremes and excessive or insufficient precipitation.
Activity #7 and #8 – Edge Zoysia (Curbs, Beds, Signs, and Tree rings) Frequency: Weekly – March-November; Twice Monthly December-February
1. The Contractor shall neatly edge around all plant beds, sidewalks, curbs, trees, plants, all in-ground utility covers, etc., and maintain the shape and configuration of all planting areas in a clean manner free of imperfections at the same frequency as mowing and same day as mowing.
2. All turf areas shall be edged according to specified frequency unless indicated within this document.
(Reference the Fee Breakdown Form)
3. Contractor shall edge around all drainage inlets, manholes and pipe end treatments to ensure free and clear drainage flow.
4. All sidewalks, streets, and roadways shall be immediately swept, blown, or vacuumed to maintain a clean, well-groomed appearance.
5. Chemical treatment or burning shall not be used for edging activities on any turf areas.
6. The Owner reserves the right to adjust the calendar schedule as necessary to accommodate weather conditions that affect turf growth, including temperature extremes and excessive or insufficient precipitation.
Activity #9 and #10 – Edge St. Augustine (Curbs, Beds, Signs, and Tree rings) Frequency: Weekly – March-November; Twice Monthly December-February
1. The Contractor shall neatly edge around all plant beds, sidewalks, curbs, trees, plants, all in-ground utility covers, etc., and maintain the shape and configuration of all planting areas in a clean manner free of imperfections at the same frequency as mowing and same day as mowing.
2. All turf areas shall be edged according to specified frequency unless indicated within this document.
(Reference the Fee Breakdown Form)
3. Contractor shall edge around all drainage inlets, manholes and pipe end treatments to ensure free
RFP # C007087 Page 5 of 22 and clear drainage flow.
4. All sidewalks, streets, and roadways shall be immediately swept, blown, or vacuumed to maintain a clean, well-groomed appearance.
5. Edging for all in bound St. Augustine beds on Hotel Plaza Blvd. shall be edged no later than 6am and outbound no later than 9am. Any alterations must be approved by District representative prior to changing.
6. Chemical treatment or burning shall not be used for edging activities on any turf areas.
7. The Owner reserves the right to adjust the calendar schedule as necessary to accommodate weather conditions that affect turf growth, including temperature extremes and excessive or insufficient precipitation.
Activity #11 and #12 – Edge Bahia (Curbs, Beds, Signs, and Tree rings) Frequency: Weekly – March-September and Twice Monthly, October-February
1. The Contractor shall neatly edge around all plant beds, sidewalks, curbs, trees, plants, all in-ground utility covers, etc., and maintain the shape and configuration of all planting areas in a clean manner free of imperfections at the same frequency as mowing and same day as mowing.
2. All turf areas shall be edged according to specified frequency unless indicated within this document.
(Reference the Fee Breakdown Form)
3. Contractor shall edge around all drainage inlets, manholes and pipe end treatments to ensure free and clear drainage flow.
4. All sidewalks, streets, and roadways shall be immediately swept, blown, or vacuumed to maintain a clean, well-groomed appearance.
5. All non-curb Bahia shall be edged at least quarterly (four times per year). During the active year of the contract, the Contractor shall monitor all non-curb roadways and perform additional edging as necessary or as requested by the Owner to prevent turf buildup from impeding pavement runoff.
This should include maintaining the edge of road markings (white or yellow) present on District roadways, ensuring all markings remain clear of vegetation, including turf and shrubs. All required edging and additional services shall be included in the Contractor’s pricing.
6. Chemical treatment or burning shall not be used for edging activities on any turf areas.
7. The Owner reserves the right to adjust the calendar schedule as necessary to accommodate weather conditions that affect turf growth, including temperature extremes and excessive or insufficient precipitation.
Activity #13 Turf (Litter, Trash, and Debris removal) Frequency: One time per week throughout the year
1. Contractor required at least once a week ensure turf areas are clear of litter, trash and debris during scheduled maintenance services. Contractor could be requested to address any issues found outside of the routine at an additional fee to the owner.
RFP # C007087 Page 6 of 22
Activity #14 – Hard Pruning on All Ornamental Grasses Frequency: January – February once a year
1. Contractor required to perform hard cutbacks to industry standards on all ornamental grasses w/n landscapes managed under agreement unless otherwise directed.
2. Contractor required to provide tools, labor & equipment to remove debris from site to a designated location. The District Material Recovery Facility is available to dispose of cuttings.
3. All cut debris must be removed at the end of each day of work. All beds should be cleared of all clippings.
4. Proper TTC must be followed while cutting back grasses adjacent to roadways.
Activity #15 – Spread Pine Straw/Mulch (Labor only) Frequency: October – March once a year
1. All beds shall be mulched once a year unless otherwise specified by the Owner.
2. Mulch and pine straw will be provided by the Owner. Contractor required to provide the quantities of material needed along with a schedule of application. Mulch may only be provided as bagged.
3. Additional requests may be made at an additional fee to the District.
4. Old mulch shall be cleared away and removed prior to new mulch application.
5. Mulch and pine straw shall be applied at no more than 2” deep and not less than 1 1/2” at any time and evenly across shrub beds.
6. At no time shall mulch be piled up around shrub crowns.
7. Mulching of signs, light poles, etc. shall be performed by Contractor once a year (winter) or as otherwise specified by the Owner.
8. Contractor required to provide proper transportation of material from staging area to the work site.
Activity #16 – Shrub Bed Maintenance (Weed Control, Litter, Trash, and Debris Removal, Pruning, Replacements, Etc.) Hard Pruning February – March Frequency: Weekly
1. No allowances will be made for rain days. All trimming shall be completed in a timely manner.
2. All clippings shall be removed from all sidewalks, roadways, and waterways.
3. Excess clippings shall be removed and disposed of at certified composting facility/landfill. This task shall be performed on the same day of pruning.
4. All shrubs shall be trimmed and maintained 6” off curbs, sidewalk, and turf edges always during the term of the Agreement. Owner reserves the right to adjust this specification. Owner may make recommendations as to the pruning style for selecting plant material w/n the landscape maintenance agreement.
5. All shrubs shall be trimmed to ensure sight lines for signs and intersections are always maintained.
Hard pruning will occur approximately February – March depending on the current weather conditions. Pruning could shift later to accommodate. Azaleas shall be pruned during June – July if material has completed it blooming cycle.
6. All shrubs’ beds shall be maintained at an acceptable show quality level and prior to any trimming
RFP # C007087 Page 7 of 22
Contractor must consult with Owner. Shrub beds shall be kept free of litter, trash, and all debris removed.
7. Dead plants shall be removed by Friday of calendar week that they are discovered (cut down or dug out and hole backfilled and/or resodded) and the plant shall be replaced within two weeks. This includes plants damaged due to maintenance practices such as round up.
8. All shrub beds shall be maintained, always weed free and shall be performed weekly as part of the
(52) weekly frequency.
9. At no time shall weeds be sheared when maintaining shrub beds.
10. All litter, trash, debris (including landscape debris) must be removed during weekly maintenance cycles.
11. Mulch shall be stirred throughout the year to prevent compaction.
Activity #17 – Annual Bed Maintenance:
Frequency : Weekly
1. All annual beds shall be maintained at an acceptable show quality level.
2. Dead plants shall be removed by Friday of calendar week as they are discovered.
3. Deadhead spent blooms from blooming annuals by correct methods. If method is reviewed as incorrect, contractor will be required to return to make correction w/n 24hrs of notification.
4. Ensure plant health during the growth cycle of the bedding plants.
5. Ensure proper watering cycle for the bedding plant installed at that time.
6. All litter, trash, debris (including landscape debris) must be removed during weekly maintenance cycles.
7. All annual beds shall be maintained always weed free using standard cultivating methods.
8. At no time shall weeds be sheared when maintaining shrub beds.
Activity #18 – Annual Bed Rotation Frequency: December, March, June, & September Weekly
1. Contractor required to install owner provided annuals at least (4) times a year as schedule dictates.
Each rotation size is dependent on the bed(s) due to be replaced. Largest total count for one cycle approximately 3,000 4-6” units.
2. Contractor required remove existing bed and dispose of
3. Contractor required to prep bed for replacement material.
4. Contractor required to properly transport material to the planting site.
5. Contractor required to provide approved TTC for any planting adjacent to roadways.
6. Contractor required to install new owner provided plant material to the specified heights and planting scheme as designated by the Owners representative.
7. Contractor required to coordinate required irrigation special scheduling for new installations accordingly.
RFP # C007087 Page 8 of 22
Activity #19 – Tree Care Frequency: Weekly checks
1. Removal of suckers, Spanish Moss, and Ball Moss from Oaks, Crapes, Ligustrums, and Wax myrtles shall be performed throughout the year as needed. This will be performed at a height that is accessible from the ground.
2. Visual inspection should be performed weekly to identify issues as part of the (52) weekly inspections.
3. Excess clippings shall be removed and disposed of at certified composting facility/landfill. This task shall be performed the same day of pruning.
Required minimal pruning of any low-hanging limbs or branches that directly impede pedestrian walkways, signs, active roadway travel lanes, curbs, or walls. Notification must be made to the Owner’s Representative prior to any trimming.
4. Mulch should be stirred around the tree rings throughout the year.
5. Weeds shall not be sheared at any time when maintaining around trees.
6. All tree rings and areas around trees shall be always weed free.
7. At no time shall mulch be piled up around shrub crowns.
Activity #20 – Palm Maintenance (all varieties) Frequency: Weekly checks
1. During weekly scheduled maintenance services, contractor will make visual inspection of palms w/n the maintenance area. Notification will be made to owner’s representative if any appear to be declining or are dead.
Activity #21 – Fertilize Shrubs/Groundcovers Frequency : October – November, January – February
1. Fertilization shall be completed within five (5) working days, unless discussed with owners rep.
2. Owner will provide all required fertilizer based on the count provided by the contractor. Contractor required to perform soil sampling to verify fertilizer formula request. Contractor must properly transport material to the work site and store any unused material.
3. The Contractor shall not apply any fertilizer or chemicals within fifteen (15) feet from the top of slope of any lake, canal, retention pond, or other body of water. Any fertilizer or chemical material deposited on sidewalks, roadways, or other impervious surfaces shall be immediately removed.
4. Contractor shall take special care as not to allow any fertilizers to go down into street drains. If this is documented, the contractor will be responsible for any necessary cleanup as required by state regulations.
5. Contractor shall take special care as not to allow any fertilizers to go down into street drains.
6. Fertilizer applications shall be evenly distributed across shrub beds and shall not be piled around shrub crowns. If this is found, contractor will be required to return to correct this w/n 48hours.
7. Fertilizer shall be applied when foliage is dry and not wet. If applied when wet, the Contractor shall be responsible for washing fertilizer off shrubs. Any damage caused due to improper application
RFP # C007087 Page 9 of 22 methods shall be the Contractor’s responsibility.
Activity #22 – Fertilize - Annuals (liquid as needed) Frequency : 5 times for each area after it is started
1. Fertilization shall be completed within five (5) working days, unless discussed with owners rep.
2. Owner will provide all required fertilizer based on the count provided by the contractor. Contractor required to perform soil sampling to verify fertilizer formula request.
3. Contractor must properly transport material to the work site and store any unused material.
4. The Contractor shall not apply any fertilizer or chemicals within fifteen (15) feet from the top of slope of any lake, canal, retention pond, or other body of water. Any fertilizer or chemical material deposited on sidewalks, roadways, or other impervious surfaces shall be immediately removed.
Contractor shall take special care as not to allow any fertilizers to go down into street drains. If this is documented, the contractor will be responsible for any necessary cleanup as required by state regulations.
5. Contractor shall take special care as not to allow any fertilizers to go down into street drains.
6. Fertilizer applications shall be evenly distributed across shrub beds and shall not be piled around shrub crowns. If this is found, contractor will be required to return to correct this w/n 48hours.
7. Fertilizer shall be applied when foliage is dry and not wet. If applied when wet, the Contractor shall be responsible for washing fertilizer off shrubs. Any damage caused due to improper application methods shall be the Contractor’s responsibility.
Activity #23 – Fertilize St Augustine Turf Frequency: 3 times a year
1. Fertilization shall be completed within five (5) working days, unless discussed with owners rep.
2. Owner will provide all required fertilizer based on the count provided by the contractor. Contractor required to perform soil sampling to verify fertilizer formula request.
3. Contractor must properly transport material to the work site and store any unused material.
4. The Contractor shall not apply any fertilizer or chemicals within fifteen (15) feet from the top of slope of any lake, canal, retention pond, or other body of water. Any fertilizer or chemical material deposited on sidewalks, roadways, or other impervious surfaces shall be immediately removed.
5. Contractor shall take special care as not to allow any fertilizers to go down into street drains. If this is documented, the contractor will be responsible for any necessary cleanup as required by state regulations.
6. Contractor shall take special care as not to allow any fertilizers to go down into street drains.
7. Fertilizer application shall be evenly distributed across shrub beds and shall not be piled around shrub crowns. If this is found, contractor will be required to return to correct this w/n 48hours.
8. Fertilizer shall be applied when foliage is dry and not wet. If applied when wet, the Contractor shall
RFP # C007087 Page 10 of 22
Activity #24 – Fertilize Zoysia Turf Frequency: 3 times per year
1. Fertilization shall be completed within five (5) working days, unless discussed with owners rep.
2. Owner will provide all required fertilizer based on the count provided by the contractor. Contractor required to perform soil sampling to verify fertilizer formula request.
3. Contractor must properly transport material to the work site and store any unused material.
4. The Contractor shall not apply any fertilizer or chemicals within fifteen (15) feet from the top of slope of any lake, canal, retention pond, or other body of water. Any fertilizer or chemical material deposited on sidewalks, roadways, or other impervious surfaces shall be immediately removed.
5. Contractor shall take special care as not to allow any fertilizers to go down into street drains. If this is documented, the contractor will be responsible for any necessary cleanup as required by state regulations.
6. Contractor shall take special care as not to allow any fertilizers to go down into street drains.
7. Fertilizer application shall be evenly distributed across shrub beds and shall not be piled around shrub crowns. If this is found, contractor will be required to return to correct this w/n 48hours.
8. Fertilizer shall be applied when foliage is dry and not wet. If applied when wet, the Contractor shall be responsible for washing fertilizer off shrubs. Any damage caused due to improper application methods shall be the Contractor’s responsibility.
Activity #25 – Fertilize Palms & Trees Frequency: 3 times per year
1. Fertilization shall be completed within five (5) working days, unless discussed with owners rep.
2. Owner will provide all required fertilizer based on the count provided by the contractor. Contractor required to perform soil sampling to verify fertilizer formula request.
3. Contractor must properly transport material to the work site and store any unused material.
4. The Contractor shall not apply any fertilizer or chemicals within fifteen (15) feet from the top of slope of any lake, canal, retention pond, or other body of water. Any fertilizer or chemical material deposited on sidewalks, roadways, or other impervious surfaces shall be immediately removed.
5. Contractor shall take special care as not to allow any fertilizers to go down into street drains. If this is documented, the contractor will be responsible for any necessary cleanup as required by state regulations.
6. Contractor shall take special care as not to allow any fertilizers to go down into street drains.
7. Fertilizer application shall be evenly distributed across shrub beds and shall not be piled around shrub crowns. If this is found, contractor will be required to return to correct this w/n 48hours.
8. Fertilizer shall be applied when foliage is dry and not wet. If applied when wet, the Contractor shall
RFP # C007087 Page 11 of 22
Activity #26 – Pest Control – as part of each activity Frequency : Weekly
1. Contractor shall submit to Owner all MSDS and chemical labels of pesticides and fertilizers used on properties. This shall be done prior to any application.
2. Contractor shall be responsible to provide all necessary labor/equipment/products to maintain a healthy vigorous, disease, insect, and weed free (turf, groundcover, shrubs, trees, annuals/perennials, and flower containers), by adhering to the Florida Green Industries Best Management Practices (B.M.P.) throughout the scope of Services.
3. Contractor is responsible for following all Florida Statute/Laws/Regulatory requirements as they relate to applying pesticides, fertilizers, or any other products.
4. Contractor shall be responsible to provide all necessary services (pre-emergent/post-emergent) to eliminate weeds within turf, shrub beds, tree rings, sign rings, light poles, and curb/pavement cracks.
5. Contractor shall be responsible to provide all necessary services to eliminate Imported Fire Ant mounds within the turf, shrub beds, tree rings, sign rings, light poles, curb/pavement, and sidewalk cracks. This shall also be done at Owners request at no additional cost.
6. Phosphates shall not be part of the fertilizers analysis unless soil tests determine otherwise.
Contractor shall perform soil and/or tissue samples prior to each fertilizing application.
7. Contractor shall dispose of all containers off property according to Florida Statute/Laws/Regulatory requirements.
8. Contractor shall also apply any supplemental fertilizer (nutrients) to maintain a healthy vigorous turf appearance throughout scope of Services. (Owner will supply fertilizer at Contractor’s specifications)
9. Contractor shall not apply any fertilizers closer than 15’ from lakes, canals, retention ponds, or any other body of water.
10. All pesticide and fertilizer products proposed for use shall be submitted to the District for formal review and written approval prior to application. The District reserves the right to reject or prohibit any product that, in the District’s determination, may pose a risk of environmental degradation or otherwise fail to meet applicable District, state, or federal requirements.
11. Contractor shall maintain and send a written log monthly to the Owner of all pesticides used on property. (Date, Name, Time, Product, Rate Used, Total Used, Location).
12. Contractor shall be responsible for strictly abiding to all FDOT Rules, Statutes, and Regulations applicable to the Temporary Traffic Control (TTC) and shall communicate all TTC work within the District prior to implementation.
Activity #27 – Wood Lines Frequency : Weekly checks
1. Contractor shall maintain all wood lines weekly identifying any vegetation impeding proper mowing of turf along wood lines.
2. Woodline shall be mowed within 18” of the water’s edge of the pond or canal weekly & bi-weekly as the frequency schedule dictates unless otherwise instructed.
RFP # C007087 Page 12 of 22
Activity #28 - Wood Lines - (1 Annual cutback)
1. Annual cutback for all wood lines adjacent to accessible turf along right of ways where mowing is performed.
2. Cutbacks will be performed to reduce encroaching vegetation by 3-5’.
3. Contractor required to remove any excess vegetation generated during the cut back.
4. Contractor required to provide a schedule of the annual wood line cutbacks.
5. Contractor responsible for any damage caused by equipment or methods during cutbacks.
Activity #29 – Ponds, Lakes and Canals Frequency : Weekly checks
1. Turf around ponds, lakes, and/or canals shall be maintained to the fluctuating water line, with a maximum eighteen-inch (18") horizontal natural zone at the water’s edge, where grass shall be maintained at a maximum height of twelve inches (12") to help trap litter; this area shall be maintained weekly as part of the fifty-two (52) weekly service frequencies, using appropriate equipment as necessary.
2. The Contractor shall remove all reachable floating litter prior to mowing and shall immediately report any heavy, inaccessible, or unreachable debris to the Owner’s Representative.
3. The Contractor shall maintain and edge around all storm pipes, overflow weirs, including concrete and Fabriform structures, skimmers, and outfall structures. Burning and chemical treatment to eliminate vegetation are strictly prohibited.
4. The Contractor shall ensure that all outfall swales downstream of pond structures remain routinely mowed, clear, and unobstructed to maintain proper drainage.
5. The Contractor shall maintain a fifteen-foot (15') no-fertilizer and no-herbicide zone measured from the top of bank of all lakes, canals, ponds, and other designated water bodies.
6. The Contractor shall prevent and remove tree and brush growth on levees, berms, and side slopes to maintain these areas clear and accessible.
7. The Contractor shall maintain a minimum fifteen-foot (15') vertical clearance along canal and pond maintenance levees to provide unobstructed access for District equipment.
8. The Contractor shall perform routine maintenance within gated primary water control structures and shall coordinate with the District regarding required access, gate operation, and lock procedures.
Activity #30 - Irrigation
1. Once a month, Contractor required to inspect irrigation sites including controller & zones for the entire District Irrigation System
2. Contractor required to provide a weekly report of irrigation operation to District Representatives.
3. Every month the contractor is required to complete but not limited to the tasks below:
a. Contractor will test and verify operation of all irrigation zones.
b. Contractor will inspect and adjust spray heads, rotors, and drip emitters for proper coverage.
c. Contractor required to clean clogged nozzles, filters, and emitters as needed.
RFP # C007087 Page 13 of 22
d. Contractor required to check for broken, damaged, missing, or sunken irrigation components.
e. Contractor required to inspect valves for proper operation and leaks.
f. Contractor required to verify proper pressure and flow throughout the system.
g. Contractor required to check for wet spots, dry spots, overspray, runoff and misting.
h. Contractor required to inspect lateral and mainline piping for visible leaks.
i. Contractor required to verify rain sensor and other weather-based devices are functioning properly.
j. Contractor required to raise and level heads as needed to maintain coverage.
k. Contractor required to document deficiencies and recommend repairs beyond routine maintenance.
l. Contractor required to clean controller enclosures and valve boxes of debris.
m. Contractor required to perform an inspection walk with the Owners Irrigation Representative monthly unless otherwise notified.
4. Contractor shall make repairs found during the inspection for the following:
a. Contractor shall repair/replace any damage to main lines 4” or less, ball valves, and control valves. Notification must be made to the owners representative prior to repairs.
b. Contractor shall repair/replace any damage to lateral lines, & sprinkler heads. All irrigation mainline repairs shall be inspected by Owner’s Representative.
c. Any irrigation mainline break 6” or larger, isolation/gate valves, or any mainlines deeper than 4’ (requiring shoring) caused by anyone other than the Contractor shall not be included in the base bid. However, the Owner may elect to have the Contractor perform the repairs upon receipt of a lump sum proposal to perform the work or may direct the Contractor to proceed on a time and material basis.
d. All irrigation repairs to be performed within 24 hours unless pre-approved by Owner.
e. The Contractor shall comply with the irrigation material specifications provided in Exhibit
F- Irrigation Specifications and Requirements .
f. Contractor shall be responsible for strictly abiding all FDOT Rules, Statutes, and
Regulations applicable to Temporary Traffic Control (TTC) and shall communicate all TTC work within the District prior to implementation.
5. Cabinet & Equipment Clearance: Prohibit irrigation heads from spraying directly onto above-ground electrical panels, signal cabinets, and infrastructure.
6. Emergency Infrastructure Leaks: Establish emergency protocols for irrigation line leaks that undermine roadways or levees (immediate shutoff, traffic control placement, and urgent owner notification).
Activity #31 - Water’s Edge Vegetation Extraction Frequency: One-time service, as ordered
1. Provide services necessary to maintain 60–75% canal view access.
RFP # C007087 Page 14 of 22
2. Remove (extract) trees approximately 3–5 inches in caliber, including pine trees, small oaks, and similar vegetation, completely to or below grade, with no above-grade portions remaining.
3. Remove low-growing vegetation, shrubs, vines, and other designated vegetation along the entire canal length to the water’s edge to provide the required canal view access.
4. Provide complete clearance around all control structures within the designated water-edge extraction areas.
5. Restore disturbed turf areas with matching sod where shrubs or other designated vegetation are removed.
6. Remove all extracted vegetation, debris, and other materials from the site and dispose of them at an approved landfill or disposal facility.
7. Immediately report any erosion, soil loss, washouts, slope instability, exposed roots, or other conditions affecting the canal bank or surrounding areas to the District, including the location and photographs when appropriate.
Activity #32 – Mow Ornamental Peanut Frequency: Eight times a year
1. Contractor shall mow all Ornamental Peanut to a height to allow for weed control w/ a chemical application if needed.
2. After one of these mowing sessions, contractor shall address any major weed infestation issues w/n the Ornamental Peanut bed.
Activity #33 – Edge Ornamental Peanut Frequency: Every two weeks (26 times per year)
1. Contractor shall neatly edge around all plant beds, sidewalks, curbs, trees, plants, all in-ground utility covers, etc., and maintain the shape and configuration of all planting areas in a clean manner free of imperfections at the same frequency as mowing turf and same day as mowing.
2. All sidewalks, streets, and roadways shall be immediately swept, blown, or vacuumed to maintain a clean, well-groomed appearance.
3. Peanut edging does not include chemical methods.
4. The owner reserves the right to adjust the calendar schedule as necessary to accommodate weather conditions that affect peanut growth, including temperature extremes and excessive or insufficient precipitation.
Activity #34 – Edge Ornamental Peanut Frequency: Frequency : Weekly
1. Contractor shall continuously maintain weeds w/n peanut
2. All litter, trash, debris (including landscape debris) must be removed during weekly maintenance cycles.
RFP # C007087 Page 15 of 22
2.3 LAY DOWN YARD
A. The Primary Landscape Contractor will utilize identified Lay Down Yards located on District Properties.
All other District Landscape Contractors will bring the necessary equipment on site at the time of service and stage as needed in approved locations by the Owner.
B. Contractor will be responsible for setting up any necessary storage units, etc. to provide all necessary services in accordance with the specified Epcot Building Codes.
C. Contractor is responsible for arranging a fuel truck to provide them with all necessary fuel to operate daily.
D. There shall be no fuel trailers or tankers located overnight within the lay down yard confines or any other Owner properties.
E. Contractor shall not perform any preventive maintenance within the lay down yard area except those specified such as changing of a tire for a mower or vehicle, changing of a belt, or changing blades. Work not permitted includes, without limitation, oil or fluid changes, engine rebuilds, etc.
F. Contractor is not permitted to operate any outside contracts from this lay down yard that are not deemed Central Florida Tourism Oversight District or CFTOD Utilities Division sanctioned work. Any other work not related to this contract located within this lay down yard would need to be approved by the Owner.
G. Contractor shall comply with all applicable CFTOD Land Development Regulations and obtain required permits and approvals through CFTOD Planning & Engineering.
H. Contractor shall provide secondary containment for on-site fueling to prevent soil contamination and runoff.
I. Contractor shall restrict all equipment, materials, and storage to designated Lay Down Yard boundaries and approved areas.
2.4 MISCELLANEOUS
A. Contractor shall at each visit, pickup and remove all debris such as paper and plastic products, branches from trees and shrubs, glass and metals, construction materials, etc. prior to mowing or leaving property.
B. Contractor shall be responsible at all times for maintaining sight lines for signs and intersections.
C. Contractor shall be responsible for maintaining all roadway bridge walls and keeping them free of all vegetation at all times.
D. Lump-sum monthly billing is prohibited. Invoices shall itemize charges separately by service area.
E. Emergency Response & Weather Preparedness: The Contractor shall maintain an emergency response plan and be prepared to provide post-storm ride-out services and immediate response for the removal and clearance of fallen trees, debris, and other obstructions blocking District roadways to restore safe and accessible conditions.
F. Contractor shall ensure all mowing and edging equipment is maintained with sharp blades to prevent turf tearing and disease and shall comply with all applicable noise and emissions standards, particularly when operating near resort hotels during early morning hours.
RFP # C007087 Page 16 of 22
G. Unit Pricing for Unforeseen Extra Work: The Contractor shall provide unit pricing for hourly labor rates and equipment usage rates, as identified in the Exhibit E – Schedule of Wages & Equipment Rates, for unforeseen extra work, including storm cleanup, emergency call-outs, additions to, or deletions from the Services, as required by the Owner. All unit pricing shall include the Contractor’s overhead, profit, employee burdens, benefits, insurance, and workers’ compensation costs.
H. From time to time, the Contractor will be required to perform additional services that are exclusive of the Scope of Services set forth in the Agreement. For example, the Owner might ask the Contractor to perform Temporary Traffic Control “set ups” to enable a separate roadway lighting contractor to perform maintenance on the Owner’s roadway lighting systems. For such additional services, the Contractor will be compensated in accordance with the schedule of billable hourly labor and equipment rates set forth in the Agreement.
2.5 QUALITY CONTROL
A. The Owner will have the right at any stage of the operation to reject any or all work and material that in the Owner's opinion does not meet the requirements of these specifications.
B. Throughout the entire landscape, the Contractor shall maintain the proper number of shrubs, groundcovers, trees; annuals/perennials, and flower containers in addition to the proper amount of turf grasses. The Contractor shall replace only those plant materials that are damaged or lost due to the Contractor's negligence at no additional cost to the Owner and Contractor shall follow the Central Florida Tourism Oversight District’s Landscape Specification. Unless otherwise specified in the scope of services, the Owner shall furnish or pay for, at the Owner's option, any plant materials or irrigation components damaged or lost for any reason other than the Contractor's negligence.
C. Contractor shall keep all bridge walls, barrier walls, concrete aprons, and drainage structures free of encroaching vegetation.
2.6 DAMAGE
A. Any damages caused by the Contractor, including but not limited to, mowing, edging, trimming, or fertilization, shall be repaired by the Contractor within 24 hours, or shall be repaired by the Owner and back-charged at the current rate per man hour plus material plus 20% on material only. Any plant materials required to correct damages caused by the Contractor shall be the responsibility of the Contractor.
B. Should the Owner elect to have the Contractor perform any work outside the scope of services, the Owner may request a lump sum proposal for the Work or may direct the Contractor to proceed on a time and material basis.
C. Contractor shall report all damages to the Owner immediately.
D. Contractor shall be financially responsible for any damage to District infrastructure caused by its operations, the District reserves the right to engage qualified third-party contractors to perform repairs when the Contractor lacks the required specialized certifications, with all associated costs charged to the Contractor.
RFP # C007087 Page 17 of 22
2.7 SAFETY
A. All Contractors’ employees shall wear brightly colored safety vests (FDOT specifications by road speed) when working within 15’ of any roadway. All safety apparel (including but not limited to vests) must be properly maintained.
B. All Contractors’ equipment shall be properly maintained with all safety equipment intact and operational. This includes warning lights and headlights.
C. Due to the close proximity to roadways and traffic patterns, work schedules shall be coordinated with the Owner to reduce traffic hazards.
D. Contractor shall be responsible for the safety of its employees and shall, at a minimum, meet the requirements of FDOT Statute/Laws/Regulations in accordance with the Temporary Traffic Control (T.T.C.) and shall communicate all T.T.C. work within the District.
E. Contractor shall acquire all necessary certifications and ensure all employees hold such certifications in order to generate TTC plans or implement TTC plans on District Roadways & Right-of-Ways.
F. All "Temporary Traffic Control" (T.T.C.) hardware used by the Contractor for the performance of its Services shall be new or like new condition at all times. Any hardware (i.e., barricades, signs, barrier walls, etc.) that is brought by the Contractor to the job site that is not new or like new shall be removed and replaced by the Contractor at no additional cost to the Owner and the respective work requiring maintenance of traffic that the hardware in contention is associated with may not be implemented until such time as the corrections are made. Contractor should confirm requirements for roadway safety vehicle equipment, eg. Attenuator Truck.
G. Utility Locates and Directional Drilling: The Contractor shall contact Sunshine State 811 and obtain all required utility locates prior to any excavation or digging; when directional drilling is required for irrigation installation, the Contractor shall demonstrate proven experience performing trenchless/directional boring, including under public roadways, and maintain a minimum clearance depth of five (5) feet below the roadway base and ten (10) feet below canal or pond beds.
H. Holiday Moratoriums & Environmental Compliance: The Contractor shall comply with all applicable RCES/District holiday work moratoriums, state water quality requirements, and erosion and sediment control requirements, including coordination with the District as necessary to ensure compliance before and during the performance of work.
2.8 DISTRICT ROADWAY VEHICLE RESTRICTIONS
A. The Contractor shall comply with all District requirements for the safe movement of slow-moving and mowing equipment on high-speed District roadways, including Osceola Parkway, Epcot Center Drive, and World Drive.
B. District equipment shall not be transported or driven off-site between District locations.
C. Movement of slow-moving or mowing equipment shall be prohibited during peak traffic hours, defined as 8:00 AM–10:00 AM and 4:00 PM–6:00 PM, and during special events, unless otherwise approved by the District.
D. When permitted, slow-moving and mowing equipment shall travel on the roadway shoulder and shall be staged outside designated clear recovery zones.
RFP # C007087 Page 18 of 22
E. For equipment movements exceeding two (2) miles on roadways with posted speed limits greater than 35 mph, the Contractor shall utilize a shadow vehicle and/or trailer transport, as applicable.
SECTION 3. DELIVERABLES AND MANDATORY REPORTING
3.1 The supplier of services must be able to provide Safety Data Sheet (“SDS”) and labels for chemicals purchased in accordance with the Federal “Right-to-Know” Regulations implemented by Occupational Safety and Health Administration for services provided.
3.2 A weekly facilities maintenance report shall be generated by the Contractor and submitted to the Owner outlining potential problem areas and the Contractor's proposed corrective action, upcoming work approval…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .