Hydraulics Tech Memo.pdf
PDF 5 MB Posted
- Attached to
- AZ FLAP 62(1), King Canyon Trailhead
- Solicitation number
- 6982AF20B000041
About this file
This technical memorandum describes proposed drainage improvements for the King Canyon Trailhead federal lands access project in Pima County, Arizona. The project involves constructing a paved parking lot and entrance, along with drainage infrastructure to collect and convey off-site runoff. Recommendations include unlined open channels with 2:1 or 4:1 sideslopes to intercept flows from two off-site basins totaling 2.79 acres. An 18-inch CMP culvert is proposed to drain runoff under the parking lot, and additional 18-inch and 12-inch CMP culverts will outlet to an existing wash. Riprap aprons are designed at culvert outlets. Hydrologic analyses were performed using the Rational Method, and hydraulic structures were designed per FHWA and state guidelines. The memorandum provides design details, computations, and conclusions regarding the drainage system improvements.
This federal contract opportunity is for the construction of the King Canyon Trailhead project in Pima County, Arizona. Work includes paving a 30-stall parking lot with two horse trailer spaces, and entrance improvements such as guardrail upgrades to Kinney Road. The estimated contract value is between $250,000 and $700,000. The solicitation is set aside for certified HUBZone small businesses. The anticipated performance period is December 2020 through February 2021. The soliciting agency is the Federal Highway Administration under the Department of Transportation.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hydraulics Technical Memorandum Federal Lands Access Program
AZ FLAP 24(1)
King Canyon Trailhead
Federal Lands Access Program (FLAP)
Hydraulics Technical Memorandum with
Off-Site Hydrology
Pima County, Arizona
Prepared for:
U.S. Department of Transportation Federal Highway Administration
Central Federal Lands Highway Division IDIQ Contract No. DTFH68-14-D-00010
July 2020
Prepared by:
JACOBS ENGINEERING GROUP, INC.
707 17th Street, Suite 2300 Denver, Colorado 80202
Project No. WVXY4082
TABLE OF CONTENTS
Page No.
I. Project Description and Location A. Description B. Location
II. Drainage Basins A. Major Basins B. Minor Basins
III. Drainage Design Criteria A. General Criteria B. Hydrologic Criteria C. Hydraulic Criteria
IV. Hydrology A. Major Basins B. Minor Basins. ....................................................................................... …….. 7
V. Hydraulics A. Open Channel Design B. Pipe Culvert Design C. Outlet Protection Design
VI. Conclusion
VII. References
Figures
1 - Location Map 2 – Vicinity Map 3 – Minor Basins Off-Site 4 – Minor Basins On-Site 5 – Project Layout
Appendices
Appendix A Rainfall and Site Data Appendix B Rational Method Hydrology Appendix C Pipe Culvert Computations Appendix D Open Channel Computations i
I. PROJECT DESCRIPTION AND LOCATION
A. DESCRIPTION
The King Canyon Trailhead is located in Pima County, Arizona on Kinney Road North. The existing facility consists of an unpaved parking lot on the north side of the roadway adjacent to an unnamed wash.
The intent of this project is to provide a paved entrance and parking lot. The northern end of the lot will be adjacent to the existing trailhead. The entrance will match the existing Kinney Road pavement and conform with the roadway drainage features. Off-site runoff will be collected and conveyed to a discharge point without altering the natural drainage patterns.
B. LOCATION
The project is located on Kinney Road North in Pima County. It lies south of Saguaro National Park and west of Old Tucson theme park.
The project coordinates are 32° 14' 51" N, 111° 10' 01" W, see Figure
1. The project area is approximately
0.9 acres with a hilly topography and desert vegetation, see Figure 2.
Project Location
Figure 1 – Location Map
Project Site
Figure 2 – Vicinity Map
NORTH
N.T.S.
II. DRAINAGE BASINS
A. MAJOR BASINS
NO MAJOR BASINS WERE IDENTIFIED IN THE PROJECT
B. MINOR BASINS
Two minor basins, designated Off-Site Basin 1 and Off-Site Basin 2, drain to the project site.
These basins are located on the northeast side of the proposed parking lot. It has been delineated using aerial mapping and USGS topographical mapping (7.5 minute quadrant maps), Brown Mountain Quadrangle 2018. The points of concentration are located at the proposed open channels on the north and east sides of the site. These minor basins have an area of 1.25 acres and 1.54 acres. See Figure 3 – Minor Basins Off-Site.
Figure 3 – Minor Basins Off-Site
Off‐Site Basin 1
Trailhead
NORTH
N.T.S.
Off‐Site Basin 2
Four minor basins, designated On-Site Basin 1, On-Site Basin 2, On-Site Basin 3, and On-Ste Basin 4 drain from the project site to the existing drainageways. On-Site Basin 1 drains towards the ravine and concrete box culvert under Kinney Road. Basin 2 drains into Culvert 2. Basin 3 drains into Culvert 3, and Basin 4 discharges to the east as overland flows.
See Figure 4 – Minor Basins On-Site.
Figure 4 – Minor Basins On-Site
III. DRAINAGE DESIGN CRITERIA
A. GENERAL CRITERIA
Drainage criteria for the King Canyon Trailhead project was generally based on the guidelines outlined in FHWA Hydraulic Design Series No. 2 Second Edition, No. 4 Fourth Edition and No.
5 Third Edition. Site specific criteria were based on guidelines of Pima County and the Arizona Department of Transportation.
B. HYDROLOGIC CRITERIA
MAJOR BASINS
NO MAJOR BASINS WERE IDENTIFIED IN THE PROJECT
MINOR BASINS
Minor basins are those with drainage areas less than 100 acres. Runoff computations were based on the Hydraulic Design Series No. 2, Highway Hydrology, Rational Method. This method relies on basin parameters such as soil cover, hydrologic soils group, vegetation, area, length, slope, rainfall and time of concentration. In accordance with project criteria, the design storm is the 50-year event.
Rainfall intensities were obtained from NOAA Atlas 14. Soil characteristics were derived from the Natural Resources Conservation Service. Topography was obtained from aerial mapping and from USGS topographic map Brown Mountain Quadrangle 2018. A review of FEMA flood insurance maps indicated no regulated floodway lies in the project area. The FEMA firmette for the area has been provided. See Appendix A for these site conditions.
C. HYDRAULIC CRITERIA
Culvert design was based on current CFL criteria. Therefore, all drainage structures were designed to meet the following criteria.
Agency Criteria Storm Event CFL Flow Passes under Paved Areas 25-year
IV. HYDROLOGY
A. MAJOR BASINS
NO MAJOR BASINS WERE IDENTIFIED IN THIS PROJECT.
B. MINOR BASINS
For the Rational Method computations, the time of concentration was computed for each basin.
In accordance with design criteria, the minimum value was set at 10 minutes. Peak discharge rates were calculated using the following equation:
Q = C I A where
C = runoff coefficient based on soil type, one hour rainfall, vegetation cover
I = rainfall intensity (inches per hour)
A = basin area (acres)
RESULTS
The Rational Method computations are included in the Appendix B. The results are summarized in the following table.
RATIONAL METHOD BASIN RESULTS
Basin Area (acres) Q25 (cfs) Off-Site 1 1.25 3.4 Off-Site 2 1.54 4.2 On-Site 1 0.20 1.05 On-Site 2 0.15 0.79 On-Site 3 0.09 0.47 On-Site 4 0.14 0.73
V. HYDRAULICS
The proposed drainage improvements for the King Canyon Trailhead project are shown in Figure
5. Off-site runoff flowing from north to south will be intercepted by open channels. This runoff will then be conveyed westerly to a proposed pipe culvert lying under the parking lot and southerly to an existing wash. On-site runoff will be collected by a catch basin or sheet flow off to an open channel. The outlets of the culverts will be protected with riprap aprons. The proposed drainage design will accomplish the following objectives:
• Provide improved collection of off-site runoff flowing to the project area.
• Intercept flows with unlined open channels.
• Design channel to convey flows at a low velocity to avoid lining requirements.
• Provide a corrugated metal pipes to drain runoff under the parking lot.
• Include riprap aprons at the culvert outlet to mitigate erosion.
Figure 5 – Project Layout
A. OPEN CHANNEL DESIGN
The off-site runoff collector channel will be constructed as unlined ditches with side slopes and bottom widths as shown below. Riprap protection was required where the design velocity exceeds 4 feet per second. The computations were based on Manning’s Equation using a n value of 0.035 per ADOT standards. See Appendix C for detailed calculations.
Location Sideslopes Bottom Width (ft) Slope (ft/ft) Q25 (cfs) Depth (ft) Velocity (fps)
Channel 1 2:1 2:1 2.0 0.0800 3.4 0.30 4.55 Channel 2 2:1 2:1 2.0 0.0092 4.3 0.33 5.14 Channel 3 2:1 2:1 0.0 0.0050 5.4 1.18 1.96 Channel 4 4:1 2:1 0.0 0.0050 1.2 1.18 1.76
B. PIPE CULVERT DESIGN
The collector channel runoff will be drained by a corrugated metal pipe culverts (CMP) of the size indicated. A minimum of 12” of cover will be provided at the culvert. In addition end sections will be provided at the pipe inlet and outlet. The pipe was designed using HY8. Tailwater depths were set at 0.6 pipe diameter. The results including computed HW/D are summarized in the following table. Headwater depth will be at least 12” below pavement elevation at the entrance.
PIPE CULVERT RESULTS
Location Q25 (cfs) Diameter Length (ft) Slope (ft/ft) HW/D Culvert 1 3.4 1@18” 68 0.0294 0.65 Culvert 2 1.0 1@18” 128 0.0551 0.36 Culvert 3 0.5 1@18” 46 0.0250 0.36
C. OUTLET PROTECTION DESIGN
To protect against erosion and scour, it is proposed to construct a riprap apron at the outlet of pipe culverts. The aprons have been designed in accordance with HEC-14, Hydraulic Design of Energy Dissipators for Culverts and Channels and standard CFLHD plans. The 25-year peak discharges were considered the design flow. Following is a summary of the proposed riprap apron design. It is recommended the sizes and depths in the table below to be minimums. See Appendix D for detailed computations.
RIPRAP APRON RESULTS
Location D 50 (in) L A (ft) Apron Depth Width (3D) W A (ft) Vol (cu yd) Culvert 1 6 6 1.65 5 9 2.2
Culverts 2&3 6 6 1.65 10 9 4.4
VI. CONCLUSION
The proposed improvements to the King Canyon Trailhead require installation of a drainage system. The existing roadside ditches and wash crossings within the project limits will not be affected. The drainage recommendations detailed in this report will greatly improve drainage conditions at the trailhead. An all-weather parking facility will be provided and greatly improve the transportation considerations of the project. These proposed improvements are based on using current hydrologic and hydraulic methodologies.
VII. REFERENCES
1. Federal Lands Highway, Project Development and Design Manual (PDDM), Federal Highway Administration, January 2014
2. Scoping Summary, AZ FLAP 24 (1), King Canyon Trailhead Jacobs Engineering, July
3. Highway Drainage Design Manual, Arizona Department of Transportation, January 2007
4. NOAA Atlas 14, Volume 1, Version 5, National Oceanic and Atmospheric Administration
5. 7.5 min. series, Topographic Maps, US Geological Survey, Brown Mountain Quadrangle
6. Federal Highway Administration Hydraulic Design Series No. 2, Highway Hydrology, latest revision
7. Federal Highway Administration HY-8 ver 7.2, August 23, 2011
8. Drainage Design Manual for Maricopa County, Volume 2, January 28, 1996
9. Erosion and Sediment Control, Surface Mining in the Eastern US, US Environmental
Protection Agency, 1976
APPENDIX A
RAINFALL AND SITE DATA
APPENDIX B
RATIONAL METHOD HYDROLOGY
0.49
2.16
APPENDIX C
PIPE CULVERT COMPUTATIONS
HY-8 Culvert Analysis Report
Crossing Discharge Data
Discharge Selection Method: Specify Minimum, Design, and Maximum Flow
Minimum Flow: 3.4 cfs
Design Flow: 3.4 cfs
Maximum Flow: 3.4 cfs
Table 1 - Summary of Culvert Flows at Crossing: Culvert 1
Headwater Elevation
(ft) Total Discharge (cfs)
Culvert 1 Discharge (cfs)
Roadway Discharge (cfs) Iterations
2700.98 3.40 3.40 0.00 1
2700.98 3.40 3.40 0.00 1
2700.98 3.40 3.40 0.00 1
2700.98 3.40 3.40 0.00 1
2700.98 3.40 3.40 0.00 1
2700.98 3.40 3.40 0.00 1
2700.98 3.40 3.40 0.00 1
2700.98 3.40 3.40 0.00 1
2700.98 3.40 3.40 0.00 1
2702.40 10.67 10.67 0.00 Overtopping
Table 2 - Culvert Summary Table: Culvert 1
* Full Flow Headwater elevation is below inlet invert.
Straight Culvert
Inlet Elevation (invert): 2700.00 ft, Outlet Elevation (invert): 2698.00 ft
Culvert Length: 68.03 ft, Culvert Slope: 0.0294
Site Data - Culvert 1
Site Data Option: Culvert Invert Data
Inlet Station: 0.00 ft
Inlet Elevation: 2700.00 ft
Outlet Station: 68.00 ft
Outlet Elevation: 2698.00 ft
Number of Barrels: 1
Culvert Data Summary - Culvert 1
Barrel Shape: Circular
Barrel Diameter: 1.50 ft
Barrel Material: Corrugated Steel
Embedment: 0.00 in
Barrel Manning's n: 0.0240
Culvert Type: Straight
Inlet Configuration: Square Edge with Headwall
Inlet Depression: None
Total Discharge
(cfs) Culvert
Discharge (cfs)
Headwater Elevation
(ft) Inlet
Control Depth (ft)
Outlet Control
Depth (ft)
Flow Type
Normal Depth (ft)
Critical Depth (ft)
Outlet Depth (ft)
Tailwater Depth (ft)
Outlet Velocity
(ft/s) Tailwater Velocity
(ft/s)
3.40 3.40 2700.98 0.984 0.0* 1-S2n 0.610 0.703 0.610 0.900 5.035 0.000
3.40 3.40 2700.98 0.984 0.0* 1-S2n 0.610 0.703 0.610 0.900 5.035 0.000
3.40 3.40 2700.98 0.984 0.0* 1-S2n 0.610 0.703 0.610 0.900 5.035 0.000
3.40 3.40 2700.98 0.984 0.0* 1-S2n 0.610 0.703 0.610 0.900 5.035 0.000
3.40 3.40 2700.98 0.984 0.0* 1-S2n 0.610 0.703 0.610 0.900 5.035 0.000
3.40 3.40 2700.98 0.984 0.0* 1-S2n 0.610 0.703 0.610 0.900 5.035 0.000
3.40 3.40 2700.98 0.984 0.0* 1-S2n 0.610 0.703 0.610 0.900 5.035 0.000
3.40 3.40 2700.98 0.984 0.0* 1-S2n 0.610 0.703 0.610 0.900 5.035 0.000
Table 3 - Downstream Channel Rating Curve (Crossing: Culvert 1)
Tailwater Channel Data - Culvert 1
Tailwater Channel Option: Enter Constant Tailwater Elevation
Constant Tailwater Elevation: 2698.90 ft
Roadway Data for Crossing: Culvert 1
Roadway Profile Shape: Constant Roadway Elevation
Crest Length: 20.00 ft
Crest Elevation: 2702.40 ft
Roadway Surface: Paved
Roadway Top Width: 24.00 ft
Flow (cfs) Water Surface Elev (ft) Depth (ft)
3.40 2698.90 0.90
3.40 2698.90 0.90
3.40 2698.90 0.90
3.40 2698.90 0.90
3.40 2698.90 0.90
3.40 2698.90 0.90
3.40 2698.90 0.90
3.40 2698.90 0.90
Crossing Discharge Data
Discharge Selection Method: Specify Minimum, Design, and Maximum Flow
Minimum Flow: 1 cfs
Design Flow: 1 cfs
Maximum Flow: 1 cfs
Table 4 - Summary of Culvert Flows at Crossing: Culvert 2
Headwater Elevation
(ft) Total Discharge (cfs) Culvert 2 Discharge
(cfs) Roadway Discharge
(cfs) Iterations
2691.84 1.00 1.00 0.00 1
2691.84 1.00 1.00 0.00 1
2691.84 1.00 1.00 0.00 1
2691.84 1.00 1.00 0.00 1
2691.84 1.00 1.00 0.00 1
2691.84 1.00 1.00 0.00 1
2691.84 1.00 1.00 0.00 1
2691.84 1.00 1.00 0.00 1
2691.84 1.00 1.00 0.00 1
2695.32 12.77 12.77 0.00 Overtopping
Table 5 - Culvert Summary Table: Culvert 2
* Full Flow Headwater elevation is below inlet invert.
Straight Culvert
Inlet Elevation (invert): 2691.30 ft, Outlet Elevation (invert): 2689.50 ft
Culvert Length: 57.03 ft, Culvert Slope: 0.0316
Site Data - Culvert 2
Site Data Option: Culvert Invert Data
Inlet Station: 0.00 ft
Inlet Elevation: 2691.30 ft
Outlet Station: 57.00 ft
Outlet Elevation: 2689.50 ft
Number of Barrels: 1
Total Discharge
(cfs) Culvert
Discharge (cfs)
Headwater Elevation
(ft) Inlet
Control Depth (ft)
Outlet Control
Depth (ft)
Flow Type
Normal Depth (ft)
Critical Depth (ft)
Outlet Depth (ft)
Tailwater Depth (ft)
Outlet Velocity
(ft/s) Tailwater Velocity
(ft/s)
1.00 1.00 2691.84 0.536 0.0* 1-S2n 0.318 0.373 0.318 0.900 3.656 0.000
1.00 1.00 2691.84 0.536 0.0* 1-S2n 0.318 0.373 0.318 0.900 3.656 0.000
1.00 1.00 2691.84 0.536 0.0* 1-S2n 0.318 0.373 0.318 0.900 3.656 0.000
1.00 1.00 2691.84 0.536 0.0* 1-S2n 0.318 0.373 0.318 0.900 3.656 0.000
1.00 1.00 2691.84 0.536 0.0* 1-S2n 0.318 0.373 0.318 0.900 3.656 0.000
1.00 1.00 2691.84 0.536 0.0* 1-S2n 0.318 0.373 0.318 0.900 3.656 0.000
1.00 1.00 2691.84 0.536 0.0* 1-S2n 0.318 0.373 0.318 0.900 3.656 0.000
1.00 1.00 2691.84 0.536 0.0* 1-S2n 0.318 0.373 0.318 0.900 3.656 0.000
Culvert Data Summary - Culvert 2
Barrel Shape: Circular
Barrel Diameter: 1.50 ft
Barrel Material: Corrugated Steel
Embedment: 0.00 in
Barrel Manning's n: 0.0240
Culvert Type: Straight
Inlet Configuration: Thin Edge Projecting
Inlet Depression: None
Table 6 - Downstream Channel Rating Curve (Crossing: Culvert 2)
Tailwater Channel Data - Culvert 2
Tailwater Channel Option: Enter Constant Tailwater Elevation
Constant Tailwater Elevation: 2690.40 ft
Roadway Data for Crossing: Culvert 2
Roadway Profile Shape: Constant Roadway Elevation
Crest Length: 20.00 ft
Crest Elevation: 2695.32 ft
Roadway Surface: Paved
Roadway Top Width: 33.00 ft
Flow (cfs) Water Surface Elev (ft) Depth (ft)
1.00 2690.40 0.90
1.00 2690.40 0.90
1.00 2690.40 0.90
1.00 2690.40 0.90
1.00 2690.40 0.90
1.00 2690.40 0.90
1.00 2690.40 0.90
1.00 2690.40 0.90
APPENDIX D
OPEN CHANNEL COMPUTATIONS