This amendment modifies an invitation for bid for the AZ FLAP 62(1) King Canyon Trailhead project. The project consists of constructing a trailhead parking lot with approximately 30 parking stalls and two horse trailer stalls, as well as entrance improvements to Kinney Road including upgrading existing guardrail. The location is near Saguaro National Park at the King Canyon Trail in Pima County, Arizona.

The amendment replaces pages in the contract clauses and special contract requirements sections. It provides additional details on the anticipated construction duration from December 2020 to January 2021, the estimated cost range between $250,000 and $700,000, and requirements for the use of the government's web-based estimating and construction management system. Contractors must also attend training on the system and maintain active user accounts for staff. The document specifies notice to proceed and contract completion date requirements and modifies subcontracting documentation submittal procedures.

View the file

Other files

File Type Posted
Bid Tabs - AZ FLAP 62(1) King Canyon Trailhead .pdf PDF
Bid Opening Summary .pdf PDF
Amendment A002 10.7.2020.pdf PDF
Interested Vendor List 10 2 2020.pdf PDF
QnA 9 28 20.pdf PDF
QnA 9 24 20.pdf PDF
QnA - 9 15 2020 - King Canyon Trailhead.pdf PDF
FP-14_Eng.pdf PDF
Plans - AZ FLAP 62(1)_King Canyon Trailhead.pdf PDF
6982AF20B000041.pdf PDF
Hydraulics Tech Memo.pdf PDF
Utility Summary.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

I:

AGE OF PAGES

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REO. NO.

5. PROJECT NO. (If applicable)

A00l 9/24/2020 AZ FLAP 62(1)

6. ISSUED BY CODE 6905001 7. ADMINISTERED BY (]father than !rem 6) CODE I

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 WEST DAKOTA AVENUE, SUITE 360

LAKEWOOD, COLORADO 80228

ATTENTION: _Jorey Demi

8. NAME AND ADDRESS OF CONTRACTOR (No., srree1, coumy, Slate and ZIP Code) (✓) 9A. AMENDMENT OF SOLICITATION NO.

6982AF20B000041

9B. DATED (SEE ITEM ii) 9/8/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE I FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[Z] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers D is extended, IZ] is not ex1ended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 0* copies of the amendment; (b) By acknowledging receipl of this amendment on each copy of the offer submilled; or

(c) By separale letter or telegram which includes a reference to the solicilation and amendmenl numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire lo change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment. and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(✓) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specifyauihority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER - NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation dare, ere.)

SET FORTH IN ITEM ·14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify iype of modification and authority/

E. IMPORTANT

Contractor D isnot, [Z] is required to sign this document and return * See Item 14 Below copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organi:ed by UCF seclio11 /readings, including solicitarionkonm1ct subjecr matierwherefeasible.)

INVITATION FOR BID- Section C (Contract Clauses), Section E (SCRs)

Replace page C-3 with page C-3 dated September 24, 2020 attached to this amendment.

Replace page E-17 with page E-17 dated September 24, 2020 attached to this amendment.

*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE

SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signomre of person authorized ro sign)

PREVIOUS EDITION UNUSABLE

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY ___________________ _

(Signamre of Conrraciing Officer)

STANDARD FORM 30 (Rev. 10--83) Prescrilled liy GSA

FAR (48 CFR) 53.243

C-3

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015)

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (NOV 2015)

52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) Alternate I (APR 1984)

The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than {Refer to Subsection 108.01 of the SCRs}. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by November 9, 2020. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

(End of clause)

52.211-12 Liquidated Damages - Construction. (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of (see FP-14 section

108) for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.211-13 Time Extensions. (SEP 2000)

52.211-18 Variation in Estimated Quantity. (APR 1984)

52.215-5 Facsimile Proposals. (OCT 1997)

52.219-3, Notice of Hubzone Set-Aside or Sole Source Award (Nov 2011)

52.219-8 Utilization of Small Business Concerns. (OCT 2018)

52.219-28 Post-Award Small Business Program Rerepresentation. (JUL 2013)

(a) Definitions. As used in this clause--

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

A001 9/24/2020

E-17

AZ FLAP 62(1)

King Canyon Trailhead Parking Lot Pima County, Arizona

Schedule at least 2 non-work days out of every 14 calendar days. The selected non-work days do not need to be consecutive, but they must be scheduled. Provide at least 2 weeks notice before changing the scheduled days off.

Exemptions to scheduled days off may be granted by written approval from the CO for specific project operations and/or for periods of limited duration.

Add the following:

A Notice to Proceed must be issued before commencement of any work. The contract completion date is January 5 19, 2021.

Use the Government’s web-based system, Engineer’s Estimating, Bidding, Award, and Construction System (EEBACS), to prepare all “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes and field measurement documentation).

Attend a training session on the use of EEBACS. The training session will require up to 4 hours.

No more than 3 Contractor staff may attend the training unless approved by the CO. The Contractor shall be responsible for training additional staff.

Complete and electronically submit “EEBACS User Account Form” (Form EEBACS-001) for each individual requiring EEBACS access. Submit forms to the CO at the preconstruction conference or at least 10 days prior to the start of any contract work or EEBACS training. As needed, request additional system access using Form EEBACS-001 and allow 7 days for system access.

Maintain active EEBACS accounts for all contractor staff who use EEBACS and ensure that the CO is notified within 24 hours after an account holder is reassigned or no longer employed by the Contractor. Within 24 hours after an account holder is reassigned or no longer employed by the Contractor, submit an EEBACS-001 form requesting that the account be disabled.

The electronic version of EEBACS-001 is available at:

https://highways.dot.gov/federal-lands/estimates/forms

108.02 Subcontracting. Delete the third paragraph and substitute the following:

Within 14 days of subcontract award, submit a completed SF 1413 and 1413S. Complete Part I for each Subcontractor, and include Part II when the Subcontractor performs on-site work.

Complete other forms that may be required by the Government to show the work subcontracted and the total dollar amount of the subcontract. Submit the above required information for each Subcontractor at lower tiers.

A001 9/24/2020