Bid Tabs - AZ FLAP 62(1) King Canyon Trailhead .pdf

PDF 9 MB Posted

Attached to
AZ FLAP 62(1), King Canyon Trailhead
Solicitation number
6982AF20B000041
Issued by

About this file

This federal contract opportunity solicitation requests bids for the AZ FLAP 62(1) King Canyon Trailhead project. The project consists of constructing and paving a 30-stall trailhead parking lot with two horse trailer stalls, as well as entrance improvements including guardrail upgrades to Kinney Road. The location is near the Saguaro National Park at the King Canyon Trail in Pima County, Arizona. The estimated cost range is between $250,000 and $700,000. The anticipated construction duration is from December 2020 to February 2021. The solicitation is being advertised as a HUBZone set-aside on behalf of the Department of Transportation Federal Highway Administration. The solicitation number is 6982AF20B000041.

View the file

Other files

File Type Posted
Bid Opening Summary .pdf PDF
Amendment A002 10.7.2020.pdf PDF
Interested Vendor List 10 2 2020.pdf PDF
QnA 9 28 20.pdf PDF
QnA 9 24 20.pdf PDF
Amendment A001.pdf PDF
QnA - 9 15 2020 - King Canyon Trailhead.pdf PDF
FP-14_Eng.pdf PDF
Plans - AZ FLAP 62(1)_King Canyon Trailhead.pdf PDF
6982AF20B000041.pdf PDF
Hydraulics Tech Memo.pdf PDF
Utility Summary.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2020-10-16T14:04:52-0600

JOREY M DEML

File details come from the government source that posted it. Updated .