Bid Opening Summary .pdf

PDF 183 KB Posted

Attached to
AZ FLAP 62(1), King Canyon Trailhead
Solicitation number
6982AF20B000041
Issued by

About this file

This document contains a bid opening summary for the King Canyon Trailhead Project number AZ FLAP 62(1). Standard Construction Co. of Avondale, AZ submitted the lowest bid at $507,415, followed by Monitor Construction Co. of Sonoita, AZ at $394,185, and Meridian Engineering Co. of Tucson, AZ at $388,285. The engineer's estimate was $440,000.

The related federal contract opportunity seeks bids for the King Canyon Trailhead project in Pima County, Arizona. The project scope involves constructing and paving a 30-stall trailhead parking lot with two horse trailer stalls, as well as entrance improvements to Kinney Road including upgraded guardrail. The anticipated construction period is December 2020 to February 2021. The estimated budget range is $250,000 to $700,000. The soliciting agency is the Department of Transportation Federal Highway Administration. This project is being advertised as a HUBZone set-aside.

View the file

Other files

File Type Posted
Bid Tabs - AZ FLAP 62(1) King Canyon Trailhead .pdf PDF
Amendment A002 10.7.2020.pdf PDF
Interested Vendor List 10 2 2020.pdf PDF
QnA 9 28 20.pdf PDF
QnA 9 24 20.pdf PDF
Amendment A001.pdf PDF
QnA - 9 15 2020 - King Canyon Trailhead.pdf PDF
FP-14_Eng.pdf PDF
Plans - AZ FLAP 62(1)_King Canyon Trailhead.pdf PDF
6982AF20B000041.pdf PDF
Hydraulics Tech Memo.pdf PDF
Utility Summary.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Opening Summary

Project Name: King Canyon Trailhead Project Number: AZ FLAP 62(1)

Bid Opening Date: 10/14/2020 Time: 2:00 p.m.

Bid Opening Location: Lakewood, CO Bid Opening Officer: Jorey Deml

Amendments: (1) 9/24/2020, (2) 10/7/2020, Bidder’s Name Bid Total

Standard Construction Co.

Avondale, AZ

A: $507,415.00 Total: $507,415.00

Monitor Construction Co.

Sonoita, AZ

A: $394,185.00 Total: $394,185.00

Meridian Engineering Co.

Tucson, AZ

A: $388,285.00 Total: $388,285.00

V. Pavkov Contracting Co.

Sumter, SC

A: $568,690.00 Total: $568,690.00

Stormwater Plans LLC dba SWP Contracting & Paving Glendale, AZ

A: $578,699.00 Total: $578,699.00

Engineer’s Estimate

A: $440,000.00 Total: $440,000.00

All bids subject to verification