Hydrant_0336_Duke_Street..pdf

PDF 54 KB Posted

Attached to
Beaufort County Detention Center Gymnasium Conversion Project
Solicitation number
090126
Issued by
Barnwell County, South Carolina

About this file

This is a Hydrant Flow Test Results report for a municipal water system asset located in what appears to be a South Carolina jurisdiction. The document details the performance specifications of Hydrant ID PR0336, a 1989 Mueller Super Centurion model installed on Duke Street. The hydrant underwent a comprehensive flow test on May 7, 2024, beginning at 10:46 AM and concluding at 10:50 AM, with a total test duration of 4 minutes. The test measured critical hydraulic parameters including a static pressure of 58 psi, residual pressure of 44 psi, and pitot pressure of 30 psi, with the hydrant capable of discharging 919.35 gallons per minute at a flow rate of 1,576.36 gpm at 20 psi. The test released a total volume of 3,677.4 gallons during the evaluation period.

The hydrant opens in a counterclockwise direction and maintains a steamer nozzle height of 10 inches to grade. This flow test data serves as a baseline assessment of the hydrant's operational capacity and would typically be utilized for fire protection system planning and maintenance records. The test results indicate the hydrant's current performance characteristics, which may inform infrastructure planning decisions, maintenance schedules, or capital improvement initiatives related to the county's water distribution and fire protection systems. The document does not contain pricing information, bid requirements, or contract terms.

View the file

Other files

File Type Posted
Beaufort_County_Detention_Center_Gymnasium_Conversion_Project.pdf PDF
2026.07.23_-_PROJECT_MANUAL.pdf PDF
2026.07.23_-_DRAWINGS.pdf PDF
Hydrant_0321_parking_lot_magistrate_court_Ribaut_road.pdf PDF
Hydrant_0332_Marsh_Road.pdf PDF
E2-1_-_FLOOR_PLAN_AND_DETAILS.dwg DWG drawing
M0-1_-_LEGENDS,_ABBREVIATIONS_AND_GENERAL_NOTES.dwg DWG drawing
P2-1_-_FLOOR_PLANS_-_PLUMBING.dwg DWG drawing
26-2574_-_Beaufort_County_-_106_Ribaut_Rd_Gymnasium_-_Lim_ACM.pdf PDF
P5-1_-_DETAILS.dwg DWG drawing
S1-1-1_-_SECOND_FLOOR_&_ROOF_FRAMING_PLAN_&_DETAILS.dwg DWG drawing
M2-1_-_MECHANICAL_CONSTRUCTION_PLANS.dwg DWG drawing
P0-1_-_LEGENDS,_ABBREVIATIONS_AND_GENERAL_NOTES.dwg DWG drawing
S0-0-1_-_GENERAL_NOTES_AND_LEGENDS.dwg DWG drawing
M0-2_-_SCHEDULES_AND_DETAILS.dwg DWG drawing
FP0-1_-_LEGENDS,_ABBREVIATIONS_AND_GENERAL_NOTES.dwg DWG drawing
M1-1_-_MECHANICAL_DEMOLITION_PLANS.dwg DWG drawing
FP1-0_-_FLOOR_PLAN.dwg DWG drawing
A1-3_-_MULTI-PURPOSE_TOILET_PLANS_&_DETAILS.dwg DWG drawing
A1-0_-_OVERALL_PLANS.dwg DWG drawing
COVER.dwg DWG drawing
A1-2_-_MULTI-PURPOSE_ELEVATIONS,_FRAME_TYPES_&_DETAILS.dwg DWG drawing
A1-1_-_MULTI-PURPOSE_PLANS.dwg DWG drawing
E0-1_-_LEGENDS,_ABBREVIATIONS_AND_GENERAL_NOTES.dwg DWG drawing
Detention_Center_Multi-Purpose_Renovation_Plans_Review.pdf PDF
A3-1_-_FINISH_SCHEDULE.dwg DWG drawing
Exhibit_4_-_Monthly_Compliance_Status_Report.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hydrant Flow Test Results

Hydrant ID: PR0336

Date of Flow Test: May 7, 2024 10:51 AM

Manufacture Year: 1989

Manufacturer: Mueller

Model: Super Centurion

Direction to Open: CCW (L)

Steamer Nozzle Height to Grade: 10

Time of Flow Test Start: 10:46

Time of Flow Test End: 10:50

Total Test Time: 4

Static Pressure (psi): 58

Residual Pressure (psi): 44

Pitot Pressure: 30

Flow at 20 psi: 1,576.36

Discharge (gpm): 919.35

Volume Released (gal): 3,677.4

File details come from the government source that posted it. Updated .