A3-1_-_FINISH_SCHEDULE.dwg
DWG drawing 121 KB Posted
- Solicitation number
- 090126
- Issued by
- Barnwell County, South Carolina
About this file
A3-1 Finish Schedule
This is a construction schedule document (A3-1_-_FINISH_SCHEDULE.dwg) prepared for the Beaufort County Detention Center Gymnasium Conversion Project in South Carolina. The document is a detailed AutoCAD drawing file that outlines the finish schedule for the renovation project converting an existing gymnasium into a dormitory-style inmate housing unit. The schedule appears to coordinate the various finishing trades and materials required for the renovation work, including architectural finishes, mechanical systems, electrical installations, plumbing components, and security improvements necessary to transform the multipurpose space into a secure detention housing area with support facilities such as a new inmate shower room.
The finish schedule serves as a critical construction documentation tool that identifies material specifications, installation sequencing, and quality standards for all interior finishes and systems integration required throughout the project. This schedule document would be utilized by general contractors and subcontractors during the bidding process and subsequent construction phase to ensure compliance with project specifications and to coordinate the completion of various building systems and finishes in proper sequence to support the project's objective of providing additional inmate housing capacity and establishing a designated area capable of supporting medical isolation and quarantine operations.
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .