Hydrant_0321_parking_lot_magistrate_court_Ribaut_road.pdf

PDF 54 KB Posted

Attached to
Beaufort County Detention Center Gymnasium Conversion Project
Solicitation number
090126
Issued by
Barnwell County, South Carolina

About this file

This is a Hydrant Flow Test Results document for the Beaufort County Detention Center Gymnasium Conversion Project in South Carolina. The test was conducted on hydrant PR0321 located in the parking lot at the magistrate court on Ribaut Road on May 7, 2024, at 10:04 AM. The hydrant, manufactured by Mueller in 1988 (Model: Super Centurion), was tested to evaluate water pressure and flow capacity necessary for fire suppression systems supporting the detention center's renovation project. The test measured static pressure at 59 psi, residual pressure at 45 psi, and pitot pressure at 38 psi, with a total flow discharge of 1,034.7 gallons per minute and a total volume released of 6,208.2 gallons over the six-minute test period.

This hydrant flow test serves as critical infrastructure assessment documentation for the Beaufort County Detention Center Gymnasium Conversion Project, which involves renovating an existing multipurpose space into a secure dormitory-style inmate housing unit. The test results confirm adequate water supply and pressure availability from the municipal system to support fire safety requirements for the new detention housing facility, which is designed to address overcrowding conditions and provide medical isolation and quarantine capacity. The hydrant's performance metrics are essential for compliance with fire code requirements and ensuring the facility's operational readiness for secure detention operations.

View the file

Other files

File Type Posted
Beaufort_County_Detention_Center_Gymnasium_Conversion_Project.pdf PDF
2026.07.23_-_PROJECT_MANUAL.pdf PDF
2026.07.23_-_DRAWINGS.pdf PDF
Hydrant_0332_Marsh_Road.pdf PDF
Hydrant_0336_Duke_Street..pdf PDF
E2-1_-_FLOOR_PLAN_AND_DETAILS.dwg DWG drawing
M0-1_-_LEGENDS,_ABBREVIATIONS_AND_GENERAL_NOTES.dwg DWG drawing
P2-1_-_FLOOR_PLANS_-_PLUMBING.dwg DWG drawing
26-2574_-_Beaufort_County_-_106_Ribaut_Rd_Gymnasium_-_Lim_ACM.pdf PDF
P5-1_-_DETAILS.dwg DWG drawing
S1-1-1_-_SECOND_FLOOR_&_ROOF_FRAMING_PLAN_&_DETAILS.dwg DWG drawing
M2-1_-_MECHANICAL_CONSTRUCTION_PLANS.dwg DWG drawing
P0-1_-_LEGENDS,_ABBREVIATIONS_AND_GENERAL_NOTES.dwg DWG drawing
S0-0-1_-_GENERAL_NOTES_AND_LEGENDS.dwg DWG drawing
M0-2_-_SCHEDULES_AND_DETAILS.dwg DWG drawing
FP0-1_-_LEGENDS,_ABBREVIATIONS_AND_GENERAL_NOTES.dwg DWG drawing
M1-1_-_MECHANICAL_DEMOLITION_PLANS.dwg DWG drawing
FP1-0_-_FLOOR_PLAN.dwg DWG drawing
A1-3_-_MULTI-PURPOSE_TOILET_PLANS_&_DETAILS.dwg DWG drawing
A1-0_-_OVERALL_PLANS.dwg DWG drawing
COVER.dwg DWG drawing
A1-2_-_MULTI-PURPOSE_ELEVATIONS,_FRAME_TYPES_&_DETAILS.dwg DWG drawing
A1-1_-_MULTI-PURPOSE_PLANS.dwg DWG drawing
E0-1_-_LEGENDS,_ABBREVIATIONS_AND_GENERAL_NOTES.dwg DWG drawing
Detention_Center_Multi-Purpose_Renovation_Plans_Review.pdf PDF
A3-1_-_FINISH_SCHEDULE.dwg DWG drawing
Exhibit_4_-_Monthly_Compliance_Status_Report.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hydrant Flow Test Results

Hydrant ID: PR0321

Date of Flow Test: May 7, 2024 10:10 AM

Manufacture Year: 1988

Manufacturer: Mueller

Model: Super Centurion

Direction to Open: CCW (L)

Steamer Nozzle Height to Grade: 12

Time of Flow Test Start: 10:04

Time of Flow Test End: 10:10

Total Test Time: 6

Static Pressure (psi): 59

Residual Pressure (psi): 45

Pitot Pressure: 38

Flow at 20 psi: 1,799.2

Discharge (gpm): 1,034.7

Volume Released (gal): 6,208.2

File details come from the government source that posted it. Updated .